1 la yXud % , Annexure-A fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF FRESH VENDOR REGISTRATION AS ON 17-08-2017 dz e- la- S. No. vkbZ Ve dk uke Name of items vkosnd dk uke Name of applicant vkosnu fnukad Date of application orZ eku fLFkfr Current status pkyu 'kfDr& vkbZ Ve Motive Power BK items 1. Liner (LP) M/s Cooper, Satara. 21.11.2009 Firm has sent 04 nos. for fitment at AMV/DSL shed for field trials. Trial period is two year and has been started in Aug.11. AMV/DSL shed has been advised on 02.08.13 to submit performance. Further as per current vendor guide line ver-12, Firm has been advised to submit details of legal documents and WCR/Jabalpur has been requested to place developmental order 10 nos. on 23.09.14. Reminder issued. Reply received on 12.05.15 on which shortcoming advised to firm on 07.07.15. Firm’s reply awaited. 2. CCB (with advance feature) M/s FTRTIL, Hosur. 12.01.2011 DLW has been advised to place development order on 09.06.14. DLW has placed developmental order for 11 no. in June 14. Prototype inspection carried out at Italy and Hosur. Dispatch and fitment clearance for supply of ILS brake system of M/s FTRTIL was given on 10/3/2017 subject to compliance of certain condition. 3. High friction brake block M/s HCL, Mumbai 27.06.2013 Capacity & capability assessment has done. Inspection of brake blocks against development order done. Fitment/performance details sought from DLS/UBL & DLS/SGUJ Several reminders were issued to DLS/SGUJ No feedback has been received from DLS/SGUJ. The performance reports received from DLS/UBL is under scrutiny. 4. High friction brake block M/s ILPL, Mumbai 15.07.2009 Firm has been advised to submit improved sample for testing at BDL/RDSO along with testing charges. Firm to deposit testing charges. 5. Air Compressor (Water cooled) M/s KPCL, Pune 07.11.2012 Manufacturing 3 nos. of prototype air compressor has been cleared vide letter no. SD.Dev.GM.Compressor dt. 21.01.13. Offer for prototype inspection from firm awaited. 6. Brake Interface Unit (BIU) M/s Lotus, Visakhapatnam 09.04.2015 Development order for 10 Nos. BIU has been recommended to DMW/Patiala on 03.11.15. Functional testing is carried out from 18/11/15 to 21/11/15 & limitations observed in BIU Design are communicated to firm on 16/12/15. Type test results have also been sought from the firm. Firm reply received on 16.12.15 regarding type test. Some clarification is asked from firm on 15.01.16. Firm reply regarding type test was received on 25.01.16 & firm was advised on 27.01.16 to submit type test result accordingly. Firm has submitted the type test results. Clearance for BIU against WCR PO has been provided vide note, addressed to EC group, dt. 08/05/2016. 7. Brake Interface Unit (BIU) M/s Medha, Hyderabad 09.04.2015 Functional Testing & Type Testing is completed in Aug 2015. Development order for 10 Nos. BIU has been recommended to DMW/Patiala on 11.09.15. 8. Auto Drain Valve M/s Midland & Co., Kolkata 12.10.2010 M/s Midland & Co., Kolkata has been approved as development source for auto drain valve in RDSO Vendor Directory vide this office letter no. SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco M/s Midland Co., Kolkata 12.07.2011 Capability assessment done. QAP approved. Modified Prototype inspection has done on 11.02.15. Fitment & functional test on loco has done on 18.03.15. DLW has been advised to place Dev. Order on 30.04.15. On 08.02.16 WR also was advised to place dev P.O. 04

Transcript of fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated...

Page 1: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

1

layXud % ,

Annexure-A

fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr

CURRENT STATUS OF FRESH VENDOR REGISTRATION AS ON 17-08-2017 dze- la-

S. No. vkbZVe dk uke

Name of items vkosnd dk uke

Name of applicant

vkosnu fnukad Date of

application

orZeku fLFkfr Current status

pkyu 'kfDr& vkbZVe

Motive Power –BK items

1. Liner (LP) M/s Cooper, Satara.

21.11.2009

Firm has sent 04 nos. for fitment at AMV/DSL shed for field trials. Trial period is two year and has been started in Aug.11. AMV/DSL shed has been advised on 02.08.13 to submit performance. Further as per current vendor guide line ver-12, Firm has been advised to submit details of legal documents and WCR/Jabalpur has been requested to place developmental order 10 nos. on 23.09.14. Reminder issued. Reply received on 12.05.15 on which shortcoming advised to firm on 07.07.15. Firm’s reply awaited.

2. CCB (with advance feature)

M/s FTRTIL, Hosur.

12.01.2011 DLW has been advised to place development order on 09.06.14. DLW has placed developmental order for 11 no. in June 14. Prototype inspection carried out at Italy and Hosur. Dispatch and fitment clearance for supply of ILS brake system of M/s FTRTIL was given on 10/3/2017 subject to compliance of certain condition.

3. High friction brake block

M/s HCL, Mumbai 27.06.2013 Capacity & capability assessment has done. Inspection of brake blocks against development order done. Fitment/performance details sought from DLS/UBL & DLS/SGUJ Several reminders were issued to DLS/SGUJ No feedback has been received from DLS/SGUJ. The performance reports received from DLS/UBL is under scrutiny.

4. High friction brake block

M/s ILPL, Mumbai 15.07.2009 Firm has been advised to submit improved sample for testing at BDL/RDSO along with testing charges. Firm to deposit testing charges.

5. Air Compressor (Water cooled)

M/s KPCL, Pune 07.11.2012 Manufacturing 3 nos. of prototype air compressor has been cleared vide letter no. SD.Dev.GM.Compressor dt. 21.01.13. Offer for prototype inspection from firm awaited.

6. Brake Interface Unit (BIU)

M/s Lotus, Visakhapatnam

09.04.2015 Development order for 10 Nos. BIU has been recommended to DMW/Patiala on 03.11.15. Functional testing is carried out from 18/11/15 to 21/11/15 & limitations observed in BIU Design are communicated to firm on 16/12/15. Type test results have also been sought from the firm. Firm reply received on 16.12.15 regarding type test. Some clarification is asked from firm on 15.01.16. Firm reply regarding type test was received on 25.01.16 & firm was advised on 27.01.16 to submit type test result accordingly. Firm has submitted the type test results. Clearance for BIU against WCR PO has been provided vide note, addressed to EC group, dt. 08/05/2016.

7. Brake Interface Unit (BIU)

M/s Medha, Hyderabad

09.04.2015 Functional Testing & Type Testing is completed in Aug 2015. Development order for 10 Nos. BIU has been recommended to DMW/Patiala on 11.09.15.

8. Auto Drain Valve M/s Midland & Co., Kolkata

12.10.2010 M/s Midland & Co., Kolkata has been approved as development source for auto drain valve in RDSO Vendor Directory vide this office letter no. SD.Dev.28LAV-1 dated 21.07.2017.

9. Gauge complex with AFI, HHP Loco

M/s Midland Co., Kolkata

12.07.2011 Capability assessment done. QAP approved. Modified Prototype inspection has done on 11.02.15. Fitment & functional test on loco has done on 18.03.15. DLW has been advised to place Dev. Order on 30.04.15. On 08.02.16 WR also was advised to place dev P.O. 04

Page 2: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

2

unit supplied to DLW through control console manufacturer is fitted on loco. Control console supplier advised (dt. 17.04. 2017) to place P.O. of firm for 06 units.

10. Air Flow Indicator for CCB on ALCO Loco

M/s Midland Co., Kolkata

10.02.2015 Scrutiny done and shortcomings advised to firm on 18.02.15. C&CA done. Firm has been advised to submit revised QAP dated 7/29.10.15. Reminder issued on 08.02.16 & 03.05.16. Reminder also issued on 08.02.16 to Z. Rlys to submit field performance of items already supplied by firm to them. Revised QAP received on 04.10.16. QAP shortcoming advised dt. 22.12.16. reply awaited.

11. Connecting Rod Big End Bearings Upper Half Lower Half

M/s Patel Brass Works Pvt. Ltd., Gujarat

23.09.2011 Firm has been advised to manufacture 15 sets connecting rod big end bearing dated 28.01.13 for prototype inspection. Reminder issued on 23.09.14 for prototype inspection along with details of legal documents on 23.09.14. Reminder issued with confirmation of material on 12.02.15. Reply received on 08.04.15 & under scrutiny.

12. Auto Drain Valve M/s Prag Ploymers, Lucknow

11.02.2015 Capacity assessment has been done on 31.12.15. Firm cleared for dev. order. DLW/DMW has been advised to place dev. Order on 05.04.16.

13. Feed Valve M/s Prag Ploymers, Lucknow

09.04.2015 Capacity assessment has been done on 31.12.15. Firm cleared for dev. order. DLW/DMW has been advised to place dev. Order on 05.04.16. DMW placed P.O. Test scheme for bench marking issued to brake lab on 27.03.17. Testing in brake lab under process.

14. Valve- Emergency Brake for HHP Loco

M/s Recon, Howrah

09.04.2015 Scrutiny done & shortcoming advised to firm on 03.06.2015. Firm reply received on 03.07.17. Factory License has been received on 10.09.15. Capacity assessment has been done on 07.01.16. Remarks of capacity assessment have been advised to firm on 12.02.16. Firm cleared for Development Order. DLW has been advised to place development order on 10/12.02.2016. Proto type inspection has been done as per DLW P.O.

15. Modified Hand Brake Assembly

M/s ACME, Howrah

11.05.2015 Capacity assessment has been done on 08.01.16. Remarks of capacity assessment have been advised to firm on 10/12.02.16. Firm cleared for Development Order. DLW/DMW has been advised to place development order on 10.02.2016 and 14.09.2016. Since, DLW yet to place development order on firm, to expedite the case, the inspection against SE Rly. P.O. for HHP loco has been done and cleared for field trial. Inspection against DMW P.O. for ALCO loco has also been done and cleared for field trial. In this regard, it was requested to S.E. Rly. & DMW/PTA to furnish the field performance on 27.04.2017.

16. Modified Hand Brake Assembly

M/s J. P. Seat, Howrah

20.05.2015 . Capability assessment has been done on 16 & 17.11.2016. Firm has already supplied modified hand brake assembly (169 nos.) to DLW, hence, instead of placement of development order, the quantity already supplied by the firm, firm has cleared for considered for performance monitoring. For performance monitoring, it was advised to Z.Rlys. to furnished field performance on 05.05.2017.

17. Modified Hand Brake Assembly

M/s Target, Patiala 27.05.2015 Scrutiny done & shortcoming advised to firm on 04.06.15.Firm reply received on 07.08.15. Shortcoming advised to firm on 04.09.15. Firm reply received. Shortcoming advised to firm on 16.12.15.

18. Valve- Emergency Brake for HHP Loco

M/s Topgrip Instruments, Kolkata

07.05.2015 Capacity assessment has been done on 16.07.2015. Firm cleared for Development Order. DLW has been advised to place development order on 03.09.15. Based on satisfactory prototype test, firm cleared for field trial. DLW has been advised to fit 10 nos. subject item on HPP loco dated 01.04.16. Reminder has been issued to DLW for fitment details on 22.06.2017.

Page 3: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

3

19. Modified Hand Brake Assembly

M/s Topgrip Instruments, Kolkata

14.05.2015 Capacity assessment has been done on 16.07.2015. Remarks of capacity assessment have been advised to firm on 12.08.2015.Firm reply received on 20.08.15 and found in order. Case is put up for approval of prototype inspection. Firm cleared for Development Order. DLW has been advised to place development order on 03.09.15. Vide DLW letter no. dlw.m.65.36 dated 14.12.2015, DLW informed that as per DLW production program, ALCo loco will not be manufactured by DLW. Hence, DMW has been requested to place development order on 29.12.2016. 01 no. proto type modified hand brake assembly for HHP loco has been cleared for field trial on 03.04.2017. Against DMW P.O., proto type inspection has been done on 18 to 20.07.2017 and some deviations were observed in dimensions during proto type inspection and advised to firm to submit compliance on 31.07.2017.

20. J-1 Safety valve M/s Topgrip Instruments, Kolkata

17.05.2015 Capacity assessment has been done on 16.07.2015. Remarks of capacity assessment have been advised to firm on 12.08.2015.Firm reply received on 20.08.15 and found in order. Case is put up for approval of prototype inspection. Firm cleared for Development Order. Based on DLW letter no. dlw.m.65.24.1.1 dated 12.02.2016, E. Rly. has been advised to place development order on 19.02.16.

21. Brake System,Computer / Microprocessor Controlled ALCO and EMD Locomotives

M/s Wabtec Railway Electronics, USA

01.06.2015 The Capacity & Capability assessment(C&CA) is to be under taken at firm premises i.e M/s Wabtec Railway Electronics, 21200, Dorsey Mill Road, Germantown, MD 20876, USA.

22. Valve- Emergency Brake for HHP Locomotives

M/s Knorr Bremse India (P) Ltd

28.07.2015 Capability assessment done and report under finalization.

23. Lube Oil Pump (gear driven gear type)

M/s Santra & Co 28.07.2015 Comments on application form issued to firm on 08/10.09.15. Firm’s reply received dt. 17.03.16. Shortcomings advised to firm dt. 23.05.16. Reply awaited.

24. Air Flow Measuring Valve and Air Flow Indicator

M/s Radish Technologies

29.07.2015 Capability assessment done. DMW advised to place dev P.O. on 21.06.17.

25. Air Flow Indicator for CCB on ALCO Locomotives

M/s Topgrip Indus Instruments Pvt. Ltd, Kolkata

02.09.2015 Shortcoming has been advised on 30.09.15. Reply received on 11.01.16. Shortcomings advised on 08.02.16. Reminder issued on 03.05.16. Reply received on 11.11.16 is under scrutiny. On 18.05.17 letter issued for ISO & NSIC copy.

26. N-1 Reducing valve M/s Topgrip Instruments Company, Kolkata

04.09.2015 Shortcoming has been advised to firm on 28/29.10.2015. Firm reply received on 12.12.15. Capacity assessment has been done on 04.02.15. Remarks of capacity assessment have been advised to firm on 31.03.16. Firm reply received on 13.06.16 and under scrutiny.

27. Valve feed, ALCo, EMD & Electric locomotives

M/s Topgrip Instruments Company, Kolkata

04.09.2015 Shortcoming has been advised to firm on 28/29.10.2015. Firm reply received on 12.12.15 and firm cleared for dev. order. DLW/DMW has been advised to place dev. Order on 05.04.16. DMW placed P.O. Test scheme for bench marking issued to brake lab on 27.03.17. Testing in brake lab under process.

28. D-1 Emergency brake valve

M/s Topgrip Instruments Company, Kolkata

07.10.2015 Shortcoming has been advised to firm on 28/29.10.2015. Firm reply received on 12.12.15. Capacity assessment has been done on 04.02.15. Remarks of capacity assessment have been advised to firm on 31.03.16. Firm reply received on 13.06.16 and under scrutiny.

29. Auto Drain Valve M/s Associated Tools, Howrah

26.11.2015 Shortcoming has been advised to firm on 16/29.12.2015. Firm reply received on 23.05.16 & 08.11.16 Shortcoming has been advised to firm on

Page 4: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

4

27.12.16.

30. Valve- Emergency Brake for HHP Locomotives

M/s Kaysons Electricals Pvt. Ltd., Varanasi

05.03.2016 Shortcoming has been advised to firm on 20/24.05.16. Firm reply received on 13.06.16 and under scrutiny.

31. Brake Interface Unit (BIU)

M/s HBL Power Systems Limited

27.06.2016 Capacity & Capability assessment of M/s HBL Power Systems Limited, Hyderabad, for their registration in RDSO vendor directory for mfg. & supply of Brake Interface Unit (BIU) for Train Collision Avoiding System and Distributed Power Control System for diesel locomotive fitted with IRAB class of Brake system (RDSO specification no. MP.0.01.00.31, Rev. 00, Dec-2014) was carried out on 6/7/2017 by DIR/MP/KJM, Bangalore and submitted report, which is under study.

32. Indigenous CCB with versatile Software

M/s Escorts Limited ( Railway Equipment Division)

30.06.2016 Capability and capacity assessment of the M/s Escorts for manufacture and supply of Computer Controlled Brake System for Diesel Locomotives as per Specification no. MP.0.01.00.23 (Rev 00) of November 2009 has been carried out. Development order for 2 nos. Computer Control Brake System as per RDSO Specification no. MP.0.01.00.23 (Rev 00) of November 2009 for fitment on WDS6 locomotive has been recommended to DMW/Patiala on 22/05/2017.

33. Modified Hand Brake Assembly

M/s Radish Technologies Aligarh

16.06.2016 Capability assessment has been done on 11.05.2017. Remarks on capability assessment have been advised to firm on 19.06.2017. Firm cleared for development Order. DLW & DMW has been advised to place development order on 19.06.17.

34. Modified Hand Brake Assembly

M/s A.D Electro Steel Co. Pvt. Ltd

26.08.2016 Shortcoming has been advised to firm on 22.11.16. Firm reply received on 23.03.2017 and shortcoming has been advised to firm on 23.05.2017.

35. Gauge Complex with AFI, HHP Loco

M/s Pricol Engineering Industries Limited

11.08.2016 Shortcoming advised dt. 22.12.16. Case may be closed as firm has withdraw registration form dt. 10.07.17

36. L’ Type Composition Brake Block, ALCO & Electric Locomotives

M/s Wabtec Texmaco Rail Private Limited, Kolkata

24.05.2017 Capacity assessment has been done on 29 & 30.06.17. It was requested to SER/ Kolkata to place dev. order for conducting field trial on diesel & electric locomotives. It was advised to firm to submit the samples for dynamometer testing at BDL/RDSO along with internal dynamometer test & physical/chemical properties test results vide letter dt 03.08.2017.

37. High Friction Composition Brake Block, HHP locomotives

M/s Wabtec Texmaco Rail Private Limited, Kolkata

29.05.2017 Capacity assessment has been done on 29 & 30.06.17. It was requested to SER/ Kolkata & NWR/Jaipur to place dev. order for conducting field trial on HHP locomotives. It was advised to firm to submit the internal dynamometer test & physical/chemical properties test results vide letter dt 03.08.2017.

dze- la-

S. No.

vkbZVe dk uke

Name of items

vkosnd dk uke

Name of applicant

vkosnu fnukad

Date of application

orZeku fLFkfr

Current status

pkyu 'kfDr& bZlh vkbZVe

Motive Power – EC items

1. Sensor, Fuel Level M/s BAYHAM INDIA PVT LTD

14.02.2013 Application received on 14.02.13 and Letter issued to firm on 15.03.13 Reply received from M/s Bayham through Mail on 01-04-13. Letter issued on 21-06-13 for submitting documents as per vendor guideline ver.7. Reply received on 08-08-13 and send for Legal cell /RDSO scrutiny on 27-08-13. File received from legal cell on 08.01.2014 and under further process. Letter sent to firm on 07.03.14 for submit the declaration for undertaking. Reply received on 24.03.14. Deficiencies advised to firm on 01.05.14. Reply received on17/18.06.14 and Letter issued to firm

Page 5: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

5

for deficiencies on 03-07-2014. Reminder letter issued to firm on 29/09/2014, reply awaited.

2. 8V, 500 Ah LM Lead Acid Battery

M/s Beacon battery enterprises/ hoppecke battery systems Beacon :172 Sector 23 Gurgaon

14.07.2011 Application scrutinised. Documents not found as per RDSO Spec. Joint meeting held with firm on 19.07.11 and advised to comply the same. Firm agreed to modify the design and document. Reply received on 18.10.2011. Letter issued for manufacture of Ni-Cd Battery Sample on 03.11.2011. Visit to firm on 23.11.11. Testing facility and samples not available. Firm has given the assurance by Feb 2012. Reply received and letter issued to firm on 06.07.12 for deficiencies. Reminder letter issued on 06.03.2013. Letter issued on 02-07-13 for submitting documents as per vendor guideline. Documents received on July 19, 2013 against reminder. Document paper not completed by Notary attested till date. Document papers submitted by firm and file sent to Legal cell on date 22.11.13. File return from Legal cell on 09.01.2014. One set of 8V, 500Ah lead acid battery for developmental P.O. meet to firm from DLW Varanasi and checked by RDSO at firm premises not found suitable samples and letter send to firm and DLW Varanasi dated 03.03.2014. Revised letter sent to firm on 08.04.14. Firm has submit the compliance doc. to RDSO on 07.08.14 and discussed with JD/DEMU for development of testing Lab and ready the modified sample. Firm has agreed to submit the internal test results on Sept. 2014.

3. 6V, 150Ah Ni-Cd Battery Storage Unit

M/s Beacon battery enterprises/ hoppecke battery systems Beacon :172 Sector 23 Gurgaon

13.05.2011 Application scrutinised. Documents not found as per RDSO Spec. Joint meeting held with firm on 19.07.11 and advised to comply the same. Firm agreed to modify the design and document. Reply received on 18.10.11. Letter issued for manufacture of Ni-Cd Battery Sample on 03.11.2011. Visit to firm on 23.11.11.Testing facility and samples not available. Firm has given the assurance by Feb 2012. Reply received and letter issued to firm on 06.07.12 for deficiencies. Reminder letter issued on 06.03.2013. Letter issued on 02-07-13 for submitting documents as per vendor guideline. Documents received on July 19, 2013 against reminder. Case file sent to legal cell on 17.09.2013 for scrutiny. File return from Legal cell on 09.01.2014. DLW developmental order given to firm for one loco set of 6v, 150Ah Ni-Cd battery and proto type test done at firm’s premises. Test results are not found satisfactory and letter sent to DLW Varanasi and firm on 03.03.2014. Revised letter sent to firm on 08.04.14. Firm has submit the compliance doc. to RDSO on 07.08.14 and discussed with JD/DEMU for development of testing Lab and ready the modified sample. Firm has agreed to submit the internal test results on Sept. 2014.

4. Sensor, Fuel Level M/s Elixir Engineering, #6, SFHS Shopping Area, Nandini Lay out, Bangalore – 560 096

13.06.2013 Letter issued on 21-06-13 for submitting documents as per vendor guideline ver.7, Reply received on 13-08-13 and under process. Letter issued to firm on 20-08-13 for compliance of Legal Cell Observation. Reply received and sent to legal Cell on 19-09-13 for Scrutiny. File received from legal cell on 08.01.2014 and under further process. Letter sent to firm on 07.03.14 for submit the declaration for undertaking. Reply received on 24.03.14. Deficiencies advised to firm on 01.05.14. Reply received on 27.05.14 and letter issued for clarification on 20-06-14. Reply received from firm through e-mail on 27.06.14. Letter for clarification issued on 01.08.2014. Reply received on 04/09/14 and capacity and capability assessment to be carried out.

5. Master Controller of M/s Inspros 30.04.2011 Load Life test is completed. The firm has submitted

Page 6: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

6

EMD locomotive (Dynamic Control Assembly)

Engineers Pvt Ltd,126, Sector-A, Industrial Area, Mandeep, Bhopal- 462046

vibration test report issued from ERTL New Delhi on 09/02/12. Letter issued to DLW vide our letter SD. EMD. Master Controller (Inspros) on 02/03/12 for extension of P.O. issued to M/s Inspros. IC issued on 23.03.12. Prototype clearance for field trial has been issued to M/s lnspros Engineers Pvt. Ltd, Bhopal on 19-04-12. Letter to SBI and GY Shed sent for Performance feedback of the EMD Master Controller under field trial. Technical Audit with DLW conducted on 23

rd and 24

th May’13. Audit report prepared and

issued to DLW and Firm for complying the issue raised in the report. Audit verification is still pending, however this office has reminded by letter on 08.11.2013. Letter issued to firm for providing the date of verification for audit on 05/03/2014. Reply received from firm. Date of verification finalised and letter issued to firm on 19/03/2014. Letter also issued to DLW for providing the fitment details on the locomotive on 19/03/14. Letter issued to DLW and M/s Inspros for re- scheduled the verification for audit as requested by the Firm on 03/04/14. M/s Inspros intimated to RDSO again and re- scheduled the date of verification for audit. Case is under process. Letter issued to M/s Inspros and DLW for verification for audit on 23/05/2014. Letter issued to firm on 18/07/2014 for clarification on failure of trial equipment. Letter issued to firm for QAP clarification on 21.10.2014. QAP clarification received and is under scrutiny. Firm is advised to submit the compliance the documents and failures of equipment under field trial as discussed in the MOM dated 03.07.2015. Reminder issued on 06.11.15 and reply awaited. Letter issued to firm on 11.01.2016 to compliance the issues and submit the report with joint note with shed. Letter issued to firm on 16.03.2016 for submit the compliance the documents. Reminder letter issued to Firm regarding compliance the issues and submit the report with joint note with shed on 14.07.2016. Reminder letter issued to All CMPEs for collecting the performance of Inspros make HHP controller. Letter issued to firm on 19.08.16 for furnish the compliance. Letter issued to firm for submission of modification done by the firm on 03.10.16. Letter issued for approval on dated 02.06.2017. Case Closed.

6. Conventional stick type Master controller BHEL model MC03802B

M/s Inspros Engineers Pvt Ltd,126, Sector-A, Industrial Area, Mandeep, Bhopal- 462046

03.01.2012 After scrutiny, letter sent to firm vide our letter no. SD.ALCO MASTER CONTROLLER on 19/01/12 for submitting the QAP. The firm has submitted QAP on 09/02/12 and scrutinised. Intimated on Phone and e-mail also to M/s Inspros for offer the type test. Reply received on 21.06.12. BHEL type test programme sent to firm by e-mail on 18.07.12 and asked to submit the internal test result as per the BHEL test programme. The firm again advised by e-mail to offer for type test on 01/08/2012. Reminder issued to firm on 11/09/12.The capability assessment waived off. Prototype Type Test started. In-house test done at 6th and 7th feb` 2013 at the firm premises. Vibration test completed. Test report scrutinised. Letter issued to DMW/Patiala with a copy to firm for field trial on 14/08/2013 vide this office letter no. SD.DFM.ALCo MASTER CONTROLLER (Inspros) dt. 14.08.13. Reminder letter issued to DMW on 19/03/2014. Reply received from DMW/PTA of Status of field trial on loco. Letter issued to DMW/PTA on 29.01.15 for fitment details.

7. Micro-Controller based governor for ALCO / DLW /

M/s Laxven Systems,Plot No 188/a, Sector-

18.04.2012 Application received on 19.04.2012. Letter written to the firm date 02.05.2012 for details. Letter received from the firm vide letter no. LAX/RDSO/MCBG-048/12-

Page 7: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

7

DMW 16 & 6 Cylinder 251 Series Diesel / Electric Locomotives

III,Lane-1, IDA, Phase-II, Cherlapally Hyderabad

13 date 15.05.12. Deficiencies advised to firm on 19.06.12 by email. Reply received on 04.07.12 by email and case is under process. Latest Digital Signature submitted and uploaded on RDSO website by firm on 31st July12.Further credentials have been sought from the vendor as per the vendor guideline on 7/8th Aug2012. Letter sent to firm on 8th Oct'2012 for compliance of infrastructure. Firm sent mail on 06.02.13 regarding the compliance of infrastructure. Check sheet has been prepared. Further, on 18th Feb'13, firm has been asked to submit Plant & Machinery list in non-judicial stamp of Rs. 100. And self-declaration form of allied sister concern. Firm has submitted self-declaration form of allied sister concern. Firm has submitted Plant & Machinery list in non-judicial stamp. MCBG test schedule under Scrutiny as per Rev 03. Testing at the firms premises planned in April 2013. Firm has been asked to send the OGA drg for MCBG. Capacity Assessment and functional testing of prototype conducted on 9

th and 10

th May 2013. Firm

has to carry out further testing at the Govt. recognized lab. Letter issued on 13/08/2013. Firm has submitted ETDC test report and the same is under study. MCBG unit is planned to be tested on engine test bed at DMW. Letter issued on 08.10.13 to DMW for testing. Letter issued to CMM/PTA on 23.05.14 for developmental order for two no. MCBG and a letter issued to M/s Laxven System on 23.05.14 for conducting remaining test as per Rev. 03. Remaining test has been carried out at firm premises from 17.07.14 to 22.07.14 and letter sent to DMW/Patiala on 07.08.14 for conducting performance test. Performance test has been carried out at DMW on 13.10.14 to 16.10.14 and case is under process. Equipment has been fitted on loco no. 16716 at DMW, Patiala and performance is under monitoring. Second unit fitted on loco no. 16714 and letter issued to diesel shed MLY on 20.05.2015 for performance feedback. Letter issued to diesel shed MLY on 22.03.2016 for performance feedback. Letter received from M/s Laxven dated: 21.05.2016 for enlistment in vendor directory for supply of MCBG. M/s Laxven submitted the documents as per vendor guideline on dated: 21.06.2016. M/s Laxven submitted the QAP as per vendor guideline on dated: 05.07.2016 Check sheet has been prepared. Letter issued to DLS MLY on 16.08.2016 for performance feedback. Fresh registration of firm in the List of RDSO Vendors for Developmental Orders for MCBG for Alco locomotives vide letter no. SD.Dev.MCBG (ALCo) (Laxven) dated: 21.06.17.

8. Micro Controller Based speed recorder-indicator

M/s Stesalit Ltd, Park Plaza (N) 71, Park Street, K O L K A T A

12.09.2007 Prototype approval is issued for field trials on 15.05.09 vide letter no.SD. DFM. M.1.3 (Stesalit). Letter issued to firm vide our letter even no. SD. DFM. M.1.3 (Stesalit) on 21/07/11 regarding status of field trial. Firm response received. Letter issued to DLW regarding to know the dispatch details of trial equipment. Reply from DLW received. As per the DLW letter, trial equipment is lying at the central dispatch at DLW and it is ready to dispatch. A request letter issued to DLW in this regard on 03/02/12. Firm has requested to include in Part-II Category. Reply issued to firm on 28.03.12 for completing the field trial in response to up gradation to part-II. A letter issued to DMW vides our letter of even no. SD. DFM. M.1.3 (Stesalit) on 18/07/2013 for providing the fitment details. Reminder letter issued to DMW on 31.01.2014. Reply from DMW/PTA is received on 20/03/2014. Letter issued to

Page 8: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

8

concerned diesel sheds for performance feedback on 21/03/2014. Letter issued to concerned diesel sheds for performance feedback on 21/03/2014. Trial equipment failed. Letter issued to M/s Stesalit for repair/ Replacement of the failed equipment on 06.08.2014. Reminder issued to firm on 29.01.15. Letter issued to firm on 26.08.16 for submit the relevant documents regarding change in shareholding leading to change in management.

9. Battery-8V, 500Ah lead acid

M/s United Lead oxide Products Pvt. Ltd.

12.06.2013

Application received on 18.06.13 and as per revised Vendor guideline fresh documents sought Vide letter dt. 21.06.13. Documents received as on 19 July 2013. Documents with Original Case file Sent to legal Cell for Scrutiny. Observation raised by legal Cell communicated to the firm vide letter dt 17.09.13 and firm has submitted the documents on 05.12.13. File sent to Legal cell for scrutiny on 05.12.20. File return from Legal cell on 09.01.14. Firm has informed for firm visit and Capacity/capability assessment done on 06.04.14, and development order letter send to DMW/DLW and inform to firm. Letter sent to firm again for prepare the sample for Prototype testing on 11.09.14. Prototype testing is under process. Developmental order issued from DLW 31.07.2015 for 70 no. quantity. Letter sent to DMW on 09.08.16 regarding correction in developmental PO. Modified P.O. and received. Case is under process. Letter issued to DLW for fitment details on 28.07.2017

10. Master Controller for EMD locomotive

M/s Saitronik Electric equipments Plot No. 2-10-168, EC Nagar, Post-Cherlapally, Hyderabad

14.03.2014 Application received on 14.03.2014. As per vendor guideline documents scrutinised and letter issued for complying the deficiencies vide letter dt. 18.03.2014. Letter issued to firm on 03/04/2014 for complying the deficiencies mentioned vide our letter no. SD.EMD. MASTER CONTROLLER (Saitronik). Reply received, case is under process. Letter issued to firm on 02/05/2014 again for submission of list of M/c vide our letter no. SD.EMD. MASTER CONTROLLER (Saitronik). Documents received on 23/07/2014 and are under scrutiny. Deficiency advised to firm on 05.08.2014 SD.EMD. MASTER CONTROLLER (Saitronik). Case is under process in reference to firm`s Reply dated 06/08/2014. Letter issued to firm on 22.10.2014. Reminder issued to firm on 12.02.2016 for willingness to develop the HHP Master controller as per EOI. Letter issued to firm for clarification in change in address on 14/15.03.2016. Letter issued to on 28.03.2016 for fresh vendor registration. Letter sent to DLW on 09.05.2016 for placing developmental order on the firm. Letter issued to DLW for developmental proposal for alternate design on 08.08.2017.

11. Control System, AC- AC Traction for 4500HP EMD Locomotives & its sub-assemblies

ABB India Ltd Survey No 88/3 & 4 Kasaba Hobli , Nelamangala Taluk , Bangalore

06.03.2014 Vendor registration form has been received & it is under scrutiny. Shortcomings were advised to the firm vide RDSO letter dated- 07.05.14. Reminder letter issued to the firm dt 11-07-14. Reply from M/s ABB has been received on 04-11-2014. Emailed has been sent to M/s ABB on 03-02-2015 regarding “Make in India” policy on foreign firms against DG note no-DG/Misc./2014, dated-20-10-2014. M/s ABB has submitted the Bill of material via email dated-05-02-2015. M/s ABB has submitted the list of indigenous components for AC-AC propulsion system for diesel locomotives on 27-02-2015. Shortcomings were advised to M/s ABB on 16-03-2015. Firm replied vide letter dated 26.05.2015 and is under scrutiny. Letter issued to firm on 11.03.2016 for further clarification regarding vendor registration.

12. Control System, AC- AC Traction for

Crompton Greaves Limited

06.02.2014 Vendor registration form has been received & it is under scrutiny. Shortcomings were advised to the firm

Page 9: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

9

4500HP EMD Locomotives & its sub-assemblies

Plot No: 9, New Industrial Area Phase-2, Mandideep (Madhya Pradesh)

vide RDSO letter dated- 07.05.14. Reminder letter issued to the firm dt 11-07-14. M/s CGL’s reply against RDSO letter dated-07.05.14 has been received on 26.12.14 and is under scrutiny. Furthermore, shortcomings based on firm’s reply, has been advised to the firm vide letter dated-28.10.15.

13. Sensor, Fuel Level M/s Pricol Engineering Industries Limited

10.06.2014 Online application received on 10.06.2014 and letter issued to firm on15.07.2014 for submitting documents/clarifications. Reply received on 28.01.15. Shortcomings advised to firm on 13.02.15 by email. Reply received on 21/07/15. Letter sent to firm on 25.08.2015 for submitting shortcomings.

14. Control system locomotives Microprocessor based for ALCO locomotives

Lotus Wireless Technologies India Pvt. Ltd.

27.06.2014 Online application received on 27.06.2014 and case is under process. Deficiencies advised to firm vide letter no. SD.Dev.MCS, dt: 08.08.14. Reply received on 11.09.14. Email sent to firm for obtaining balanced documents on 01.10.14, firm has submitted the same on 08.10.14. Email sent to firm for obtaining balanced documents on 14.10.14 and reply received on 22.10.14. Letter issued to firm on 02.12.14 for need few clarifications and reply awaited. Reminder letter given to the firm on dated: 15.03.17. Firm vide letter no. 16-17/QAM2014/4679 dated: 22.03.17 requested RDSO to discontinue the registration. Case is closed on 21.04.17.

15. Micro-Controller based governor for ALCO / DLW / DMW 16 & 6 Cylinder 251 Series Diesel / Electric Locomotives

Lotus Wireless Technologies India Pvt. Ltd.

17.07.2014 Online application received on 17.07.2014. Deficiencies advised to firm vide letter no. SD.Dev.MCBG (Alco), dt: 08.08.14. Reply received on 11.09.14. Email sent to firm for obtaining balanced documents on 01.10.14, firm has submitted the same on 08.10.14 and case is under process. Email sent to firm for obtaining balanced documents on 14.10.14 and reply received on 22.10.14. Letter issued to firm on 02.12.14 for need few clarifications and reply awaited. Capability cum capacity assessment done on 11.05.15 & 12.05.15. Reminder letter given to the firm for submitting the documents on dated 20.04.17. No reply till date.

16. Sensor, Fuel Level M/s Saitronik Electric Equipments

11.08.2014 Online application form received and case after scrutiny letter issued to firm on 24/10/2014 for submitting deficiencies/clarifications. Reply received from firm on 10/11/2014. After scrutiny of documents letter issued to firm on 20/11/2014 for submitting clarifications. Documents received from firm on 01/12/2014 and scrutiny is under process. Letter issued to firm on 27.01.15 for asking some clarification regarding compliance of specification. Reply received through e-Mail on 24-02-15 and under process.

17. Control System, AC- AC Traction for 4500HP EMD Locomotives & its sub-assemblies

M/s Yongji Xinshisu Electric Equipment Co. Ltd., P.R. China

04.09.2014 Online application form dated-04.09.2014 was received and is under scrutiny. Shortcomings advised to firm on 29.12.14. Vide their letter dated-08-01-2015, Firm has submitted the intimation regarding joint venture between M/s Poineer Filmed Pvt Ltd. and Yongji Xinshisu Electric Comp ltd. Vide their letter dated-14-02-2015, Firm has asked some queries from RDSO regarding specification of AC-AC IGBT control traction system and same is under preparation by RDSO. However shortcomings against RDSO letter dated-29-12-2014 are still awaited from the firm. Reminder letter issued to firm on 15.09.2015 in connection with compliance of specification and shortcomings. Reply received on 25/10/2015 and case is under process. Further some calcifications sought from the firm vided this office letter dated-10.02.16. Reply received by the firm vide letter dated-13.04.17. Case is under process.

18. Distributed Power Control System for

Lotus Wireless Technologies

22.01.2015 Online application received on 22.01.15. Letter issued to Firm on 6/9.02.15. Capability cum capacity

Page 10: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

10

HHP Locomotives India Pvt. Ltd. assessment done on 11.05.15&12.05.15.Letter sent to DLW for placing developmental order on the firm on 18.06.15. Inspection call received on 19.01.2016. Letter sent to firm on 21.01.2016 for submit documents. Documents received on 03.02.2016. Proto type testing carried out from 16.05.16 to 19.05.16 at firm’s premises. Letter issued to firm for provisional clearance of proto type DPCS on 17.06.16. Provisional clearance issued on 22.05.17 with EMD AC-AC TCS subject to successful validation. Validation of DPCS with Siemens AC-AC TCS is planned in 16th August 2017 onwards.

19. Distributed Power Control System for Alco Locomotives

Lotus Wireless Technologies India Pvt. Ltd.

22.01.2015 Online application received on 22.01.15. Letter issued to Firm on 6/9.02.15. Letter e-mailed to firm on 27-03-2015. Capability cum capacity assessment done on 11.05.15&12.05.15. Proto type testing carried out from 12.04.16 to 15.04.16 at firm’s premises. Prototype clearance issued on 01.08.17.

20. Control system locomotive, Microprocessor based for ALCO locomotives

M/s Laxven Systems, Hyderabad

06.02.2015 Online application received on 06.02.15 and case is under process. Letter issued to firm on 13-08-15 for submitting shortcomings. Reminder letter given to the firm for submitting the documents on dated 15.03.17. No reply till date.

21. Sensor, Fuel Level M/s Top Grip Industries , Hyderabad

23.02.2015 Online application received on 23.02.15 and letter issued to firm on 18/03/2015 for submitting Shortcomings. Documents have been scrutinized and letter issued to firm on 19/06/2014 for submitting shortcomings. Reply received on 28/08/2015 and case is under process.

22. Loco Cab Video and Voice Recording System RDSO Spec. No. MP.0.0400.14, Rev-0

Matrix Security and Surveillance Pvt Ltd, 8-2-293/82/J/119-A, Journalist Colony, Phase II, Jubileehills, Hyderabad

16.04.2015 Online application received on 16.04.15. Shortcoming of vendor registration form has been advised to firm on 06-07-2015. Reminder letter has been issued to firm on 07.10.2015. Reply received on 10/11/2015. Vide RDSO letter no SD-DEV.LCVR-DTDR, dated-11-12-2015, for Placement of developmental order for M/s Matrix has been given to DMW/Patiala for Alco locomotives. Letter has been sent to CME/DLW on 22-01-2016 regarding placement of development order to M/s Matrix for HHP locomotives.

23. Distributed Power Control System for HHP Locomotives

MEDHA Servo Drives Pvt. Ltd., Hyderabad

15.04.2015 Online application received on 15.04.15. Capability cum capacity assessment done on 08.05.15.Letter sent to DLW for placing developmental order on the firm on dated 18.06.15. Inspection call received on 05.02.2016. Inspection carried out from 16.02.2016 to 27.02.2016. Letter issued to firm for provisional clearance of proto type DPCS on 09.06.16. Validation at Kazipet shed with CCB 2.0 has been carried out in July 2017.Validation with CCB 1.5 carried out in Raipur shed in Jan’2017.

24. Auxiliary Power Unit (APU) for HHP Locomotives

Daulat Ram Engineering Services (P) Ltd, 10/2, NH-12 Simrai, Post: Obedullahganj,

29.04.2015 Online application received on 29.04.15 and shortcomings advised to firm on 19.05.15 and reply awaited. RDSO official visited the firm for capability assessment on 15/07/15 but couldn’t be carried out on account of the firm.

25. Auxiliary Power Unit (APU) for HHP Locomotives

IC Electricals Company (P) Limited, 156, 2nd Floor, DSIDC, Okhla Industrial Area, Phase-I, New Delhi

07.05.2015

Online application received on 29.05.15 vide Vendor Reference ID: QAM2015/5789. Letter issued to firm on 01/07/2015 for submitting shortcomings. Reminder letter issued on 16.07.2015.Capabiity cum capacity assessment carried out 21/07/15. Letter sent to DLW on 25/08/2015 for placing developmental order on the firm. Inspection call received on 04.02.2016. E-mail sent to firm on 11.02.206 for submitting details of sub components of APU. Reply received and case is under process. Clarification regarding alternator & Compressor are sought from the firm through e-mail on 29.04.16. Response of e-mail dated 29.03.16 regarding engine clarification are also awaited.

Page 11: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

11

26. Control system locomotives Microprocessor based for ALCO locomotives

IC Electricals Company (P) Limited, 156, 2nd Floor, DSIDC, Okhla Industrial Area, Phase-I, New Delhi

07.05.2015

Online application received on 29.05.15 vide Vendor Reference ID: QAM2015/5789. Letter issued to firm on 01/07/2015 for submitting shortcomings. Letter given to the firm for submitting the documents on dated 20.04.17. No reply till date.

27. Auxiliary Power Unit (APU) for Alco Locomotives

Daulat Ram Engineering Services (P) Ltd, 10/2, NH-12 Simrai, Post: Obedullahganj, Dist : Raisen (M.P.)

01.06.2015 Online application received on 01.06.15. Telephonically advised to firm for submitting the relevant documents. Documents received on 12/01/2016. Letter issued to firm on dated 22.03.2016 for submission of clarifications and short comings.

28. Converter, Traction control, IGBT-based for 4000HP EMD locomotives & its sub-assemblies

Daulat Ram Engineering Services (P) Ltd, 10/2, NH-12 Simrai, Post: Obedullahganj, Dist : Raisen

01.06.2015 Online application received on 01.06.15 and case is under process

39. Control system locomotives Microprocessor based for ALCO locomotives

Daulat Ram Engineering Services (P) Ltd, 10/2, NH-12 Simrai, Post: Obedullahganj, Dist : Raisen

01.06.2015 Online application received on 01.06.15. Letter issued to firm on 27/10/2015 for submitting documents. Case is closed and firm has been advised vide letter no. SD.Dev.MCS (Daulat Ram) dated:28.04.17

30. Remote Monitoring and Management of Locomotive and Trains

M/s Laxven Systems, Hyderabad

12.06.2015 Online application received on 12.06.15 and case is under process. Letter issued to firm on 30/06/2015 for submitting shortcomings. Firm submitted documents vide letter no. LAX/RDSO/REMMLOT-104/15-16 date:25-07-15. Letter issued to firm on 13-08-15 for submitting the remaining documents. Reminder letter given to the firm for submitting the documents on dated 15.03.17. No reply till date.

31. Loco Cab Video and Voice Recording System

M/s Laxven Systems, Hyderabad

12.06.2015 Online application received on 12.06.15. Shortcomings of vendor registration form have been advised to firm on 16-07-2015. Reply is awaited. Reminder has been given to the firm on 16.10.2015. Vide RDSO letter no SD-DEV.LCVR-DTDR, dated-11-12-2015, for Placement of developmental order for M/s Laxven has been given to DMW/Patiala for Alco locomotives. Letter has been sent to CME/DLW on 22-01-2016 regarding placement of development order to M/s Laxven for HHP locomotives.

32. Master Controller Improved stick type for ALCo locomotives

Inspros Engineers Pvt. Ltd., 126, Sector-A, Industrial Area, Mandeep, Bhopal

08.07.2015 Online application received on 08.07.15 and case is under process. Letter issued to firm on 07.08.2015 for submission of documents. Reply received on 17.11.15 and case is under scrutiny. Letter issued to firm on 15.02.2016 for compliance of issues. Letter issued to DMW on 29.04.16 for development order given to firm. Firm requested for prototype test from 21

st Aug,

2017 as per DMW P O. Case is under process.

33. Auxiliary Power Unit (APU) for HHP Locomotives

Medha Servo Drives Pvt Ltd.

16.07.2015 Online application received on 16.07.15 and case is under process. Letter sent to DLW on 25/08/2015 for placing developmental order on the firm. Prototype test carried out from 23.05.16 to 29.05.16.Provisional clearance is accorded vide RDSO letter no.SD.Dev.APU.HHP(Medha) dated 27.09.16. Validation on loco no.40409 has been carried out at SPJ shed in March 2017.

34. Auxiliary Power Unit (APU) for HHP Locomotives

EMD Locomotive Technologies noida Phase II, Extn, 201305, UP

03.08.2015 Online application received on 03.08.15 and case is under process. Letter sent to DLW on 25/08/2015 for placement of developmental order on the firm.

35. Auxiliary Power IC Electricals 30.07.2015 Online application received 30.07.15 and firm letter

Page 12: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

12

Unit (APU) for Alco Locomotives

Company (P) Limited, 156, 2nd Floor, DSIDC, Okhla Industrial Area, Phase-I, New Delhi

dated 17/08/2015, received on 25/08/2015. E-mail sent to firm on 09/10/2015 for submit the shortcoming. Letter sent to DMW on 08.01.16 for recommending developmental order on firm.

36. Governor/LCC Engine for DEMU

Sirveen Control Systems Pvt. Ltd., Plot No.A-7/1, Electronic Complex, Kushaiguda, HYDERABAD

30.07.2015 Online application received 30.07.15 and case is under process. Letter issued to firm on dated: 02.11.2015 for submitting documents. Firm submitted documents on dated: 01.12.2015. Firm has submitted revised QAP on dt.26.02.2016. Check sheet has been prepared. Case is under process. Type test completed. Prototype clearance given on 10

th Feb 2017.This item has

been transferred to ICF Chennai vide letter no. SD.Vendor.1 dated 03.04.2017

37. Distributed Power Control System for HHP Locos.

GE India Industrial Pvt Ltd, Transportaion System Division AIFACS Building,1, Rafi Marg,NewDelhi

12.08.2015 Clarification for work address sought from the firm on 13.08.2015 through e-mail and reminded through letter on 31.08.2015. Clarification received on 08/09/2015. Letter issued to firm on 15/09/2015 for submission of required fee. Clarification received by firm on 17/09/2015. Mail sent to firm on 30.01.15 for submit the revised fee.

38. Auxiliary Power Unit (APU) for Alco Locomotives

Hind Rectifiers Limited, Plot No. 110, E-16 Road, MIDC Satpur Nashik

05.08.2015 Online application received on 05.08.2015. Letter issued to firm on 26/11/2015 for submitting shortcomings/clarifications.

39. Auxiliary Power Unit (APU) for HHP Locomotives

Cooper Corporation Private Limited, Nariman House. M-60/1 Additional Midc Post Kodoli Satara Maharashtra

04.09.2015 Online application received on 04.09.2015. Letter issued to firm on 26/11/2015 for submitting relevant documents. Documents received on 10.02.2016 and case is under process. QAP submitted by the firm on 08.03.2016 and case is under process. Recommendation for developmental order given to DLW, Varanasi on 13.07.2016. Prototype testing has been carried out in Nov’2016.Validation of APU on loco no.40447 at Pune shed with M/s Siemens make AC AC TCS carried out in May 2017. However validation of APU on loco no.40473 with EMD AC AC TCS at Pune shed could not be completed successfully .M/s EMD has requested for revalidation and integration testing vide letter dated 03.07.17.letter issued on 18.07.17 to Pune shed for confirming availability of loco for the same. M/s Cooper has requested extension of approval till 30

th Sept’2017 vide their letter dated

28.07.17 for compressor testing as per RDSO spec Rev.2 as per ISO 1217 and IS 10431.

40. Auxiliary Power Unit (APU) for HHP Locomotives

Kirloskar Oil Engine Ltd., Laxmanrao Kirloskar Road, Khadki, Pune

04.09.2015 Online application received on 04.09.2015. Letter issued to firm on 26/11/2015 for submitting relevant documents. Document received on 16.012.15. Documents scrutinized and shortcomings were informed through e-mail dated 26.02.2016. E-mail received and case is under process. Letter issued to firm on dated 22.03.2016 for submission of clarifications and short comings. Recommendation for developmental order given to DLW, Varanasi on 13.07.2016. Provisional Clearance given to firm on 17.04.17.Validation test is to be carried out with Siemens AC AC TCS in BNDM shed.

41. Auxiliary Power Unit (APU) for Alco Locomotives

Stone India Limited, 16, Taratalla Road, Kolkata

04.09.2015 Online application received on 04.09. Letter issued to firm on 26/11/2015 for submitting relevant documents.

42. Control System, AC-AC Traction for 4500HP for EMD locomotives & its sub-assemblies

Bharat Heavy Electricals Limited, BHEL, Electronics Division,

23.09.2015 Online application received on 23.09.2015. Capability assessment of the firm conducted on 19.08.15 to 20.08.15. Letter No. SD. HHP. LCCS (BHEL) sent to DLW on 09/09/2015 for placement of developmental order on the firm. Shortcomings advised to firm on

Page 13: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

13

Mysore Road Bangalore

16.11.2015.

43. Auxiliary Power Unit (APU) for ALCo Locomotives

M/s Prag Polymers, Lucknow

15.09.2015 Online application received on 15.09.2015. Letter issued to firm on 13.11.2015 to furnish the shortcomings/clarifications. Reply received on 14.12.2015. Letter sent to DMW on 06.01.2016 for placing developmental order on the firm. Prototype testing carried out in April 2017.Provisional clearance issues subject to successful validation on 01.06.17.

44. Auxiliary Power Unit (APU) for ALCo Locomotives

Cooper Corporation Private Limited, Satara Maharashtra

08.09.2015 Online application received on 08.09.2015. Letter issued to firm on 26/11/2015 for submitting relevant documents. Document received on 21.12.15 and case is under process. Letter issued to firm on 08.02.2016 for submitting shortcomings. Documents received on 19.02.2016. Scrutiny of documents is under process. Letter issued to firm on dated 29.04.2016 for submission of compliance of shortcomings. Firm is asked to provide suitable date for capability assessment on 01.06.16. Capability assessment has been carried out in June 2016. Recommendation for developmental order given to DMW, Patiala on 06.07.2016.

45. Loco Cab Video and Voice Recording System

Medha Servo Drives Pvt Ltd., P-4/5B,IDA Nacharam, Hydrabad

03.12.2015 Online application received on 03.12.2015 and case is under scrutiny. Vide RDSO letter no SD-DEV.LCVR-DTDR, dated-11-12-2015, for Placement of developmental order for M/s Medha has been given to DMW/Patiala for Alco locomotives. Letter has been sent to CME/DLW on 22-01-2016 regarding placement of development order to M/s Medha for HHP locomotives.

46. Distributed Power Control System for Alco Locos

BHARAT FORGE LTD, Mundhwa, Pune

17.12.2015 Online application received on 17.12.2015 and case is under process.

47. Distributed Power Control System for HHP Locos

BHARAT FORGE LTD, Mundhwa, Pune

17.12.2015 Online application received on 17.12.2015 and case is under process.

48. Auxiliary Power Unit for HHP Locomotives

BHARAT FORGE LTD, Mundhwa, Pune

17.12.2015 Online application received on 17.12.2015 and case is under process.

49. Control System, AC- AC Traction for 4500HP EMD Locomotives & its sub-assemblies

BHARAT FORGE LTD, Mundhwa, Pune

15.01.2016 Online application received on 15.01.2016 and case is under process. Short comings were advised to firm on 10-02-2016. Reply received on 18-02-2016 and documents are under scrutiny by RDSO. Letter issued to firm on 09.06.16 for submitting clarifications.

50. Auxiliary Power Unit for HHP Locomotives

K K Iron Industries, SH 15/79-A Shivpur Varanasi UP

07.02.2016 Online application received on 07.02.2016. Documents received on 09/02/2016 and case is under process.

51. Auxiliary Power Unit (APU) for Alco Locomotives

Kirloskar Oil Engines Ltd, A-11/1, MIDC, Ambad, Nasik - Maharashtra – India

08.03.2016 Online application received on 08.03.2016. Firm is asked to provide suitable date for capability assessment on 01.06.16. Capability assessment has been carried out in June 2016. Recommendation for developmental order given to DMW, Patiala on 06.07.2016. Provisional Clearance issued vide letter dated 26.05.17subject to successful validation.

52. Low Maintenance lead acid Batteries for Diesel Electric loco engine starting application (8 V, 500 Ah lead acid)

LEAD ACID BATTERY CO. (P) LTD, KOLKATA

28.03.2016 Online application received on 28.03.2016 and case is under process. Letter issued to firm on 13.05.2016 to furnish the shortcomings/clarifications. Reply received on 23.05.16. Letter issued to firm on 10.08.16 for capability assessment. Capacity assessment has been done on 09.09.16 and case is under process.

53. Master Controller Improved stick type for ALCo locomotives

Lifting Machineries India Pvt. ltd., Gurgaon

28.03.2016 Online application received on 28.03.2016 and case is under process. Letter issued to firm on 13.05.2016 to furnish the shortcomings/clarifications. Letter issued to firm on 13.07.2017 for closing the case.

54. Master Controller of Lifting 28.03.2016 Online application received on 28.03.2016 and case is

Page 14: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

14

EMD locomotive Machineries India Pvt. ltd., Gurgaon

under process. Letter issued to firm on 13.05.2016 to furnish the shortcomings/clarifications. Letter issued to firm on 13.07.2017 for closing the case.

55. Auxiliary Power Unit (APU) for Alco Locomotives

Laxven Systems, Hyderabad

01.04.2016 Online application received on 01.04.2016 and case is under process.

56. Auxiliary Power Unit for HHP Locomotives

Laxven Systems, Hyderabad

01.04.2016 Online application received on 01.04.2016 and case is under process. Letter of shortcomings sent to the firm on 12.08.2016.

57. Fuel Level Sensor for Diesel Electric Locomotives

i-LAB Informatics Pvt. Ltd., GUJARAT

01.04.2016 Online application received on 01.04.2016 and case is under process.

58. Remote Monitoring and Management of Locomotive and Trains

Bharat Forge Ltd., Pune

04.04.2016 Online application received on 04.04.2016. Short comings were advised to firm on 06-05-2016. Firm submitted the documents vide their letter no. BFL/MII/RDSO/REMMLOT/001 dated: 07.06.2016. Letter issued to firm on 12.07.2016 for submitting the mandatory documents. Letter given to the firm for submitting the documents on dated 15.03.17. No reply till date.

59. Loco Cab Video and Voice Recording System

Kaysons Electricals Pvt. Ltd., Varanasi

07.04.2016 Online application received on 07.04.2016. Documents received from firm on 12.04.2016. Letter issued to firm on 12.05.2016 for submitting shortcoming/clarifications. Reply received from the firm vide letter dated-01.02.17. Further few more clarifications were asked vide this office letter dated-17.05.17 to which firm replied vide letter dated-13.06.17 and 12.07.17. Case is under process.

60. Remote Monitoring and Management of Locomotive and Trains

Lotus Wireless Technologies India Pvt. Ltd, B7, EEIE Industrial Park ,B-Block, Autonagar, Vishakapatnam-

02.05.2016 Online application received on 02.05.2016 and case is under process. Letter issued to firm on 13.05.2016 for submitting the documents. Firm have submitted the documents. Mail sent to firm on 15.07.2016 for clarification in QAP. Firm has resubmitted the QAP on 16.08.2016. Case is under process. Provisional clearance for supply of LRMS and Antenna of REMMLOT system has been given vide letter no. SD.Dev.REMMLOT (Lotus) dated: 26.07.17

61. Master Controller of EMD locomotive

Craftsman Automation Private Limited, Unit 3, 123/4 Sangothipalayam Road , Arasur Post, Coimbatore

12.05.2016 Online application received on 12.05.2016. Letter of shortcomings sent to the firm on 16.06.2016. Reply received on 17.07.16 and case is under process. Letter issued to Dir/MP/SBC on 01.08.2017 for capacity and capability assessment.

62. Auxiliary Power Unit for HHP Locomotives

Siemens Ltd, Plot 6A, Sector 18, Maruti Industrial Area, HUDA Gurgaon

25.05.2016 Online application received on 25.05.2016. Letter issued on 09.06.15 to firm for fitment trial of APU on free of cost basis at BGKT shed.

63. Remote Monitoring and Management of Locomotive and Trains

Siemens Ltd, Plot 6A, Sector 18, Maruti Industrial Area, HUDA Gurgaon

25.05.2016 Online application received on 25.05.2016 and case is under process. Firm submitted the documents vide their letter no. MO MLT LM dated: 14.06.2016. Letter issued to firm on 04.07.2016 for submitting the documents. Reminder letter issued to firm on 16.08.2016 for submitting the documents. Firm is supplying REMMLOT hardware of M/s Lotus for which provisional clearance has been given further documents submitted by M/s Siemens is under process.

64. Auxiliary Power Unit for HHP Locomotives

Tractors India Private Limited, Plot Number H-1 ADDA Industrial area , NH2 By pass road Asansol, Burdwan

30.09.2016 Online application received on 30.09.2016. Original documents received on 04.10.2016 and case is under process.

Page 15: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

15

West Bengal

65. Automatic Control of Engine Stop with Auxiliary Power Unit-ACES with APU for Alco locomotives

Sirveen Control Systems Pvt. Ltd., Plot No.A-7/1 Ground & First Floor,Electronic Complex, Kusaiguda, Hyderabad

25.11.2016 Online application received on 25.11.16 and case is under process.

dze- la-

S. No.

vkbZVe dk uke

Name of items

os.Mj dk uke

Name of Vendor

vkosnu fnukad

Date of application

orZeku fLFkfr

Current status

pkyu 'kfDr& bZe vkbZVe Motive Power – EM items

A. Traction Motors Items ---

1. Carbon Blocks M/s Mersen India Pvt. Ltd., Bangalore

21.04.14 Type test of new carbon block grade LFC554 (I) carried out at firm’s premises from 14-7-14 to 16-7-14. On 08.05.15, cleared for placement of dev. order from DMW and zonal railways.

2. Carbon Blocks M/s Schunk Metal & Carbon (I) Pvt. Ltd., Bangalore

18.01.16 Shortcoming advised to the firm on 28-4-16. Reminder-1 sent to the firm on 22.06.17.

3. Conductor copper Heat sealed kapton covered

M/s Cosmos Conductors Pvt. Ltd., Tumkur

02.01.13 On 06.05.13, assessment done by RDSO officer. Type test witnessed from 25.01.14 to 27.01.14. On 20.03.14, advised to offer for type test as a fresh due to non-compliance of cl. 5.1.2 of spec.

4. Conductor copper Heat sealed kapton covered

M/s Mahendra Industries, Bangalore

16.07.12 On 08.0513, assessment done by RDSO officer. Type test witnessed from 22.01.14 to 24.01.14. Cleared for dev. order on 23.05.14 to DMW/PTA.

5. Conductor copper Heat sealed kapton covered

M/s Malwa Strips Pvt. Ltd., Dewas

05.10.10 On 07.07.11, firm cleared for placement of dev. order by DMW. On 07.02.14, reminder-I issued to CME/DMW for placement of dev. order.

6. Kapton covered copper conductor for traction machines

M/s Slimlite Electricals Pvt. Ltd. (Unit-II), Daman

23.11.16 Vendor form under scrutiny.

7. Glass tape, Silicon elastomer

M/s MICAPLY, Bhopal

28.04.14 On 07.05.16, capacity assessment carried out.

8. Glass tape, Silicon elastomer

M/s Sneham International Belgaum

04.02.15 Vendor form under scrutiny.

9. Motor Armature, DC Traction for ALCo

M/s Daulat Ram Engg. Services (P) Ltd. Raisen

14.08.12 On 13.09.12, clearance given for fitment trial at DMW. On 16.04.13, cleared to supply balance quantity to DMW.

10. Motor Armature, DC Traction for ALCo

M/s Star Electric

Company, Ludhiana

27.01.14 On 04.03.14, advised shortcoming.

11. Motor Armature, DC Traction for ALCo

M/s IC Electricals Company (P) Limited, Haridwar, Uttarkhand

15.12.16 Vendor form under scrutiny.

12. Motor Commutating field coils assembly, DC Traction for ALCo

M/s Cosmic General Industries, Mumbai

13.06.13 On 22.02.14 & 19.03.15, RDSO officer visited for capability assessment. On 09.04.15, recommended for placement of dev. order from DMW. Type test carried out against DMW P.O. and on 01.03.16, cleared for field trial after heat run test at DMW.

13. Motor Commutating Field Coils assembly, DC Traction for ALCo

M/s IC Electricals Company (P) Limited, Haridwar, Uttarkhand

15.12.16 Vendor form under scrutiny.

14. Motor Complete, DC Traction for ALCo locomotives with following sub-assembly:A. Armature, B.Commutator, C. Commutating field

M/s Daulat Ram Engg. Service (P) Ltd., Raisen.

13.04.12 On 29.04.13, type test completed and 02 nos. cleared for fitment & field trial at DLW.

Page 16: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

16

coils assembly, D. Main field coils assembly, E. Magnet frame (machined)

15. Motor Complete, DC Traction for ALCo locomotives with following sub-assembly:A. Armature, B.Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame (machined)

M/s Saini Electrical & Engineering Works, Navi Mumbai

08.05.12 Type test completed. On 20.07.12, advised for fitment at DMW for field trial. On 04.12.12, 04 TMs cleared for trial at DMW.

16. Motor Complete, DC Traction for ALCo locomotives with following sub-assembly:A. Armature, B.Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame (machined)

M/s Rotomac Electricals Pvt. Ltd., Kolkata

06.06.13 On 05.09.13, assessment of Kolkata premises done by RDSO officer. On 23.09.13, assessment of Sahibabad premises done by RDSO officer. On 16.02.15, recommended for developmental order to DMW.

17. Motor Complete, DC Traction for ALCo with following sub-assembly: A Armature B. Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame (machined) (TM 4907)

M/s Integrated Electric Co. Pvt. Ltd., Bengaluru.

19.12.11 On 27.03.13 & 22.11.13 (again), advised shortcomings. On 04.05.13, assessment done by RDSO officer. Reminder sent on 15.04.2014 to respond to letter, dated 22.11.2013.

18. Motor Complete, DC Traction for ALCo with following sub-assembly:A Armature B. Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame(machined)- (TM 5002)

M/s Integrated Electric Co. Pvt. Ltd., Bangalore

27.04.10 On 02.03.12, recommended for developmental order to DMW. Letter sent to DMW/PTA on 22.11.13 for status of P.O.

19. Motor Complete, DC traction for ALCo locomotives with following sub-assemblies: A) Armature, B) Commutator, C) Commutating field coils assembly, D) Main field coils assembly, E) Magnet frame (machined)

M/s IC Electricals Company (P) Limited, Haridwar, Uttarkhand

15.12.16 Vendor form under scrutiny.

20. Motor Main Field Coils assembly, DC Traction for ALCo

M/s Cosmic General Industries, Mumbai

19.07.13 On 22.02.14 & 19.03.15, RDSO officer visited for capability assessment. On 09.04.15, recommended for placement of dev. order from DMW.

21. Motor Main field coils assembly, DC Traction for ALCo

M/s Stesalit Ltd., Solan (H.P.)

27.04.12 On 22.02.13, provisional approval of drg. of main field coils given.

22. Motor Main Field Coils assembly, DC traction for ALCo

M/s IC Electricals Company (P) Limited, Haridwar, Uttarkhand

15.12.16 Vendor form under scrutiny.

23. Motor Main Field Coils assembly, DC traction for ALCo

M/s ROTOMAC ELECTRICALS PVT. LTD.

09.01.17 Vendor form under scrutiny.

24. Motors Traction AC, for EMD locomotives

M/s Daulat Ram Engg. Service (P) Ltd., Raisen.

21.12.10 On 18.01.11, recommended for developmental order. On 10.09.15, again recommended for developmental order to be placed by DLW.

25. Motors Traction AC, for M/s Saini Electrical 04.01.11 On 18.01.11, recommended for developmental

Page 17: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

17

EMD locomotives & Engg. Works, Navi Mumbai

order. Also advised shortcomings on 04.02.11. On 10.09.15, again recommended for developmental order to be placed by DLW.

26. Motors Traction AC, for EMD locomotives

M/s CSR ZHUZHOU Electric CO., LTD

04.07.13 On 17.12.13, design detail received. On 15.05.14, received revised QAP. On 16.06.2014, asked RA/Berlin for carrying out capacity & capability assessment of the firm. On 13-14 January 2015, assessment was done by RA Berlin. On 08.06.15, recommended for developmental order.

27. Motors Traction AC, for EMD locomotives

M/s Crompton Greaves Ltd., Mandideep, Bhopal

12.02.14 Approval letter for ‘Developmental orders’ issued on 11.08.17.

28. Motors Traction AC, for EMD locomotives

M/s Saini Electrical and Engg. Works, Ambernath (East), Dist. Thane.

28.07.14 Vendor form under scrutiny.

29. 3-phase induction motors for 4500 hp, AC- AC WDG4 & WDP4B diesel electric locomotives

M/s S. E. P. Electrotyazmash Ukraine

05.05.15 On 06.11.15, advised shortcomings of documents received on 27.08.15. Firm requested to close the application on 20.02.17.

30. 3-phase induction motors for 4500 hp, AC- AC WDG4 & WDP4B diesel electric locomotives

M/s Force Motion Technology LLP, Navi Mumbai

19.05.16 On 30.03.17, shortcomings advised.

31. 3-phase induction motors for 4500 hp,AC- AC WDG4 & WDP4B diesel electric locomotives

M/s Rotomac Electricals Pvt. Ltd., Kolkata

07.06.16 On 11.07.16, advised shortcomings. On 28.07.16, reply from firm received. On 27.07.17 Shortcoming advised.

32. 3-phase induction motors for 4500 hp,AC- AC WDG4 & WDP4B diesel electric locomotives

M/s ABB India Ltd., Vadodara

13.06.16 On 30.03.17, shortcomings advised.

33. 3 Phase Squirrel Cage Induction Motor for 5500HP AC-AC WDG5 Locomotives

M/s Saini Electrical and Engineering Works, Ambernath [East], Dist. Thane

21.09.15 Vendor form under scrutiny.

34. 3 Phase Squirrel Cage Induction Motor for 5500HP AC-AC WDG5 Locomotives

M/s Siemens Ltd., New Delhi

16.11.15 On 06.09.16, prototype cleared.

35. 3-phase induction motors for 4500 hp,AC- AC WDG4 & WDP4B diesel electric locomotives

M/s CNR Pioneer Electric Private Ltd., Bawal Rewari

02.08.16 Approved for an additional unit. As change name CRRC Pioneer electric india private limited.

36. 3-phase induction motors for 4500 hp,AC- AC WDG4 & WDP4B diesel electric locomotives

M/s Escorts Limited (Railway Equipment Division), Faridabad

30.09.16 On 27.09.16, advised shortcomings. On 27.02.17, reply from firm received.

37. Tape, Kapton adhesive M/s MICAPLY, Bhopal

30.09.13 On 22.10.13, assessment done by officer. From 26.12.13 to 28.12.13, type test conducted at firm’s premises. Cleared for dev. order on 07.05.14 to DMW/PTA. Type test carried out against DMW P.O. and on 05.06.17, advised for six month field trial.

38. Tape, Kapton adhesive M/s Sneham International, Belgaum

09.02.15 Vendor form under scrutiny.

39. Tape, Kapton adhesive M/s 3A Associates Incorporated, silvasa

15.11.16 Vendor form under scrutiny.

40. Tape, Resi-glass banding M/s Rotomac Electricals Pvt Ltd., Kolkata

03.12.12 On 02.05.13, assessment done by RDSO officer. On 19.08.13, advised DMW for placement of developmental order.

41. Tape, Resi-glass banding M/s Nashik Insulations Pvt. Ltd., Nashik

13.05.13 On 01/05.05.15, recommended for placement of dev. order from DMW. Type test carried out against DMW P.O. and on 13.06.17, cleared for fitment trial at DMW.

Page 18: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

18

42. Class 200 resin-preimpregnated semi-cured unidirectional Polyglass banding tapes Used on traction machines (TG/TM/AG) of diesel electric Locomotives and DEMUs

M/s MICAPLY, Bhopal

07.10.15 On 07.05.16, capacity assessment carried out. On 06 & 07.02.17, type test carried out against DMW P.O. and balance testing continued at NABL lab.

B. Gears & Pinions Items ----EMD Locomotives

1. Gears & pinion (Case hardened) Traction for EMD locomotives

M/s Elecon Engineering Company Ltd., Anand Sojitra Road

14.08.12 On 14-15.12.12, capacity assessment carried out. On 22.01.13, recommended for dev. order to DLW for both items. Again on 03.07.13, 04.10.13 & 20.3.14, advised DLW for placement of dev. order. On 29/10/14 firm informed that DLW has placed 17 teeth pinions of EMD locos. 1. PO No. 061412060.14137565 dt. 23.09.2014 for 66 Nos. of Pinion 17 T G4. 2. PO No. 061412080.14137568, dt. 23.09.2014 for 25 Nos. of Pinion 17 T P4. On 14.7.2017, RDSO has sent a letter to Dy. CDE/DLW for fitment details of firm supplied traction gears and pinions of HHP locos.

2. Gears & pinion (Case hardened) Traction for EMD locomotives

M/s G. G. Automotive Gears Ltd., Dewas

19.02.11 On 26-27.03.12, capacity-cum-capability assessment done and on 02.05.12, cleared for dev. order for both items. IC issued on 21.7.2014 for 90 teeth bull gear of WDG4 locos. On 67/28-07-2017, capacity cum capability assessment done. On 11.08.2017, approved as developmental order for supply of axle gears of HHP locos. On 14.7.17, asked from DLW for fitment details for pinions of HHP locos.

3. Gears & pinion (Case hardened) Traction for EMD locomotives

M/s Kalyani Engineering Works, Ghazizbad

18.11.11 On 22.08.13 & 17.09.13, capacity-cum-capability assessment carried out. On 18.10.13, recommended for developmental order to DLW for both items. DLW placed P.O. for 30 nos. of 90 teeth bull gears.

4. Gears & pinion (Case hardened) Traction for EMD locomotives

M/s Research Dev & Mfg Corporation, Bangalore

13.09.11 On 15.03.12, advised DLW for dev. order for both items. Firm got 6 Nos. 17 teeth pinions order from DLW. On 20.3.14, again advised DLW for placement of dev. order for pinions. On 29.12.2015 firm upgraded as Part-I vendor for supply of traction gears of HHP (EMD) locos. On 14.7.17, asked from DLW for fitment details of pinions of HHP locos.

5. Traction Gears, (Case hardened) for EMD

M/s Vulcan Industrial Engg Ct Ltd., Dist - Anand, Gujarat

07.02.14 Capacity cum capability assessment by an officer is pending. On 18/24-03-2015, firm requested to grant status of approved firm.

6. Traction Gears, (Case hardened) for EMD

M/s Shanthi Gears Ltd., Coimbatore.

07.03.11 On 17.06.11, cleared for dev. order for item. After scrutiny of the documents, all documents are found satisfactory. Prototype inspection of 77 teeth and 90 teeth bull gears will be carried out from 20.12.2016 and onwards. On 24.5.2017 & 2.8.2017, firm submitted internal inspection report and requested to RDSO for prototype inspection of the same.

7. Traction Gears, (Case hardened) for EMD

M/s Hilton Metal Forging Ltd., Tal- Wada, Dist- Palghar

14.12.15 Firm’s capacity cum capability assessment of the firm has been carried out from 19.1.2016 to 20.1.2016. Firm is not capable to manufacture finished gears. This firm is basically a forging manufacturer.

8. Traction Gears, (Case hardened) for EMD

M/s Craftsman Automation Private Limited, Arasur Post.

13.06.16 On 26.8.2016, shortcomings informed to the firm. Till date firm could not submit any documents related to indicated in shortcomings. On 27.07.2017, reminder-I issued to the firm to submit the same.

Page 19: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

19

9. Traction Pinions, (Case hardened) for EMD

M/s Vulcan Industrial Engg Ct Ltd., Dist - Anand, Gujarat

07.02.14 Capacity cum capability assessment by an officer is pending. On 18/24-03-2015 firm requested to grant status of approved firm.

10. Traction Pinions, (Case hardened) for EMD

M/s Trina Quebec Gears Ltd., New Delhi

26.09.09 From 12-3-2015 to 14-3-2015 Prototype inspection of 17 teeth pinions of WDG4 locos has been carried out by RDSO. On 17.3.2015, IC on 17 teeth pinions issued. On 24.6.2016 firm has submitted all relevant documents. On 28-7-2016 firm’s name changed. On 24.10.16 approved QAP for manufacturing of traction gears of HHP locos handed over to the firm representative. On letter sent to concern rlys for performance feedback. On 25.7.2017, reminder-I, issued to concern Railways for performance of pinions.. Till date, pinions performance received from Hubli shed (3nos) and VSKP shed (14nos). Waiting for performance from other sheds.

11. Traction Pinions, (Case hardened) for EMD

M/s Craftsman Automation Private Limited, Arasur Post

13.06.16 On 26.8.2016, shortcomings informed to the firm. Till date firm could not submit any documents related to indicated shortcoming. On 27.07.2017, reminder-I issued to the firm to submit the same.

12. Pinion Gear Steel (43 B 17)

M/s Timken India Limited, District-Durg, State - Chhattishgarh

15.12.16 On 17.07.17, advised shortcomings.

B. Gears & Pinions Items ----ALCo Locomotives

1. 1 Gears & pinions, Traction, Case hardened, for ALCo

M/s Elecon Engineering Company Ltd., Anand Sojitra Road.

28.01.13 On 02.05.13 and 04.10.13, recommended DMW/PTA for dev. order for both items. Prototype inspection of 65 T carried out. From 22.12.16 to 24.01.17, prototype inspection of 74T carried out. On 16.11.16, fitment details received from DMW.

2. Gears & pinions, Traction, Case hardened, for ALCo

M/s Kalyani Engineering Works, Ghazizbad

18.11.11 On 22.08.13 & 17.9.13, capacity-cum-capability assessment carried out. On 18.10.13, recommended for dev. order to DMW for both items. On 13.11.13, DMW/PTA placed 18 teeth pinions dev. Order.

3. Gears & pinions, Traction, Case hardened, for ALCo

M/s Trina Quebec Gears Ltd., New Delhi

04.03.13 Prototype inspection of 65 teeth & 74 teeth gears carried out from 18.02.14 to 21.02.14 against DMW P.O. On 05.03.14, IC issued. On 30.09.15, cleared for placement of developmental order for pinion from DMW. Only Fitment details of 65 teeth and 74 teeth bull gears received from DMW on 22/11/16. On 13.07.17, letter sent to DMW for fitment details of 42 Nos. 65T & 24 Nos. 74T.

4. Traction Pinions, (Case hardened) for ALCo locomotives

Premium Transmission ltd., Pune

30.09.16 On 28-10-16, shortcomings advised. On 05.01.17, reply from firm received. On 10.07.17, again advised shortcomings

C. Bearings & Susp. Tube Items ---

1. Bearings, Traction Motor- TM Drive end & TM Non-drive end for EMD locomotives

M/s FARO-S.p.A, Calendasco (PC) Italy

19.06.14 Compliance of the shortcomings received on 30.01.15. On 07.04.15, advised to submit credentials. Compliance of the credentials received on 14.05.15. On 19.05.15 & 08.06.15, cleared for developmental order. Prototype inspections offered by the firm against DMW POs vide their letter no. NTI/RDSO/1807A/2015-16 dated 18.07.16. Prototype inspection under process at FARO/Italy.

2. Bearings, Traction alternator (EMD Part No. 9549071) for EMD locomotives

M/s FAG Bearings India Limited, Vadodara

19.05.16 Shortcomings advised on 20.07.2016. Compliance of the shortcomings received on 06.09.2016. Case under process.

3. Bearings for Traction motor, ALCo locomotives - (NU328 & NH 318

M/s FAG Bearings India Ltd., Vadodara

31.07.12 On 06.02.13, assessment carried out. On 06.08.14, advised DMW for placement of developmental order.

Page 20: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

20

rivetless)

4. Bearings for Traction motor, ALCo locomotives - (NU328 & NH 318 rivetless)

M/s SKF Technologies (India) Pvt. Ltd., Ahmedabad.

30.09.13 Cleared for developmental order on 02.08.12. Inspection carried out against NR’s P.O. and IC issued on 07.04.17.

5. Bearings for Traction motor, ALCo locomotives - (NU328 & NH 318 rivetless)

M/s Austin Engineering Company Ltd., Junagadh (Gujarat)

07.10.14 On 12.05.15, advised shortcomings of compliance received on 17.04.15. Again, on 31.07.15, shortcomings advised. Compliance of the shortcomings received on 12.10.2015. On 22.02.16 advised to submit details of compliance as per RDSO Doc. No. QO-F-7.1-8 Ver. 1.0. Details of compliance received on 04.04.16 & case under process. Firm’s assessment is due.

6. Bearings, roller type of Traction motor for ALCo locomotives, (NH320

rivetless - Commutator end; NU330 rivetless - Pinion end & Alternator / Generator bearings)

M/s Austin Engineering Company Ltd., Junagadh (Gujarat)

07.10.14 On 12.05.15, advised shortcomings of compliance received on 17.04.15. Again, on 31.07.15, shortcomings advised. Compliance of the shortcomings received on 12.10.2015. On 22.02.16 advised to submit details of compliance as per RDSO Doc. No. QO-F-7.1-8 Ver. 1.0. Details of compliance received on 04.04.16 & case under process. Firm’s assessment is due.

7. Tube Suspension: Housing bearing kit (consisting 11 items)

M/s P.D. Steels, Mohali.

17.12.12 On 18.10.13, assessment carried out. On 16.01.14, cleared for placement of developmental order by DLW. Prototype inspection of 1 set carried out against DLW P.O. and on 03.03.17, IC issued after successful fitment at DLW.

8. 9. Tube Suspension: Housing bearing kit (consisting 11 items)

M/s Sonak Engineering Pvt. Ltd. Navi Mumbai

23.09.11 On 18.09.12 & 02.02.13, assessment carried out. On 12.03.13 cleared for developmental order. Prototype inspection carried out at firms premises from 11.01.16 to 13.01.16 against DLW P.O. On 16.02.16, dispatch clearance given to DLW for fitment trial.

9. 4. Tube Suspension: Housing bearing kit (consisting 11 items) for EMD locomotives

M/s Saurabh Metal Pvt. Ltd., Bhopal

03.06.09 From 02-05-14 to 03-05-14, prototype inspection carried out against DLW P.O. On 17.10.14 IC issued. 1 set of suspension tube has been successfully fitted at DLW on 19.09.2014.

10. Tube Suspension: Housing bearing kit (consisting 11 items) for EMD locomotives

M/s Anup Malleables Ltd., Dhanbad

08.01.15 On 20.01.15, advised shortcomings. Reminder -1 issued on 17/20.04.15. Reminder -II issued on 24.07.15. Reminder -III issued on 18.01.16. Firm informed & ensured that compliance of shortcomings will be submitted up to 1

st week of

june’16 vide firm’s letter dated 25.04.2016.

11. Tube Suspension: Housing bearing kit (consisting 11 items) for EMD locomotives

M/s Special Engineering Services Ltd., Kolkata

24.04.15 On 12/13.05.15, advised shortcomings. Compliance of shortcomings received on 05.06.15 & scrutinized. Case is under process. On 02.03.16, informed to carry out capability assessment from 09.3.16 to 10.3.16. Capability assessment was done. On 22.04.2016, cleared for placement of developmental order.

12. Tube Suspension: Housing bearing kit (consisting 4 items) for EMD locomotives

M/s P.D. Steels, Mohali

07.10.14 On 07.11.14, advised shortcomings of vendor form. Clarification of shortcomings received on 08.01.15. Cleared for developmental order vide letter no. SD. Aux. TMB.3.1 (P.D. Steels), dtd: 03/09.03.2015.

13. Tube Suspension: Housing bearing kit (consisting 4 items) for EMD locomotives

M/s Sonak Engineering Pvt. Ltd., Navi Mumbai

14.10.14 On 18.04.15, assessment carried out. On 01.05.15, firm cleared for placement of developmental order.

14. Tube Suspension: Housing bearing kit (consisting 4 items) for EMD locomotives

M/s Indore Nitriders, Indore

12.02.15 On 16.02.15, advised shortcomings of vendor form. Reminder-1 issued on 22.05.15. Reminder -II issued on 24.07.15. Compliance of the shortcomings received on 02.12.15. Again, advised shortcomings on 18.01.16. On 15.07.16 capability assessment was carried out & case is under process.

Page 21: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

21

15. 10.

Tubes & accessories, Suspension bearing (10 components) of ALCo

M/s Alert Engineering Enterprises, Bhopal

21.12.11 On 20.03.13 assessment again carried out. On 04.07.13, firm cleared for placement of developmental order by DMW.

16. Tubes & accessories, Suspension bearing (10 components) of ALCo

M/s P.D. Steels, Mohali.

17.12.12 On 18.10.13, assessment carried out. On 16.01.14, cleared for placement of developmental order by DLW. Prototype inspection carried out at firms premises from 24.03.15 to 26.03.15 against DMW P.O. Clearance letter issued on 08.06.15 to firm for material dispatched to DMW. Inspection Certificate issued on 13.10.2015 after successful fitment trial at DMW/PTA.

17. 1. Tubes & accessories, Suspension bearing (10 components) of ALCo

M/s Simplex Engg. & Foundry works (P) Ltd., Bhilai,

12.03.07 Cleared for developmental order on 06.07.09.

18. 7. Tubes & accessories, Suspension bearing (10 components) of ALCo

M/s Sonak Engineering Pvt. Ltd. Navi Mumbai

13.09.11 On 18.09.12 & 02.02.13, assessment carried out. On 12.03.13, cleared for developmental order. Fitment details received from DMW & requested to send performance feedbacks from Rlys on 13.08.15. Case under process.

19. Tubes & accessories, Suspension bearing (10 components) For TM 4907 & TM 5002 of ALCo locomotives

M/s Excelsior Industries, Habibganj, Bhopal

09.02.15 On 16.02.15, advised shortcomings of vendor form. Reminder-1 issued on 22.05.15. Compliance of shortcomings received on 05.06.15. On 05.05.16 & 06.05.16, assessment carried out & under process. On 06.12.16, cleared for dev. order.

D. Cables & Cleaning Solvent Items

1. Locomotive Insulated Wire – Sizes AWG # 3 and Smaller

M/s Apar Industries Ltd. (Unit: Uniflex Cables), Mumbai

27.06.13 Type test completed on 21.07.16. On 28.10.16, cleared for developmental order.

2. Flame Retardant 200C Fluoroelastomer Insulated Main Lead & Brush Gear Cables used in Traction Motors of Diesel Electric Locomotives

M/s Siechem Technologies Pvt. Ltd., Pondicherry

21.01.13 On 03.06.13, capability cum capacity assessment and type testing completed. On 19.08.13, advised for fitment trial at DMW on 2 TMs.

3. 2. Flame Retardant 200C Fluoroelastomer Insulated Main Lead & Brush Gear Cables used in Traction Motors of Diesel Electric Locomotives

M/s United cables Industries, Noida.

13.07.10 On 11.08.11, advised DMW for placement of developmental order & to conduct fitment trial. On 20.08.13, asked for legal documents. On 21.10.13, advised for fitment trial at DMW on 2 TMs.

4. Locomotive Power Cable – Sizes AWG # 1 and Larger

M/s Apar Industries Ltd. (Unit: Uniflex Cables), Mumbai

27.06.13 On 19.06.14, Internal test results received. From 17.03.15 to 18.03.15, capacity assessment by an officer carried out. On 23.10.15, revised internal test results received. Type test completed on 21.07.16. On 28.10.16, cleared for developmental order.

5. Resins & Varnishes For Traction Machines Used Ondiesel Electric Locomotives

M/s Fine Finish Organics Pvt Ltd., Navi Mumbai

22.05.14 On 13.01.15, advised for properties of INSUFINE-5002. On 20.07.15, clarification on shortcomings received. On 16.10.15, received QAP & mandatory declarations and waiting for factory license.

6. Cleaning Solvent For Electrical Rotating Machines Of Diesel Electric Locomotives

M/s Unijules Life Sciences Ltd., Nagpur

23.11.16 Vendor form under scrutiny.

E. TM Blower & Duct Items ---

1. 1. Bellows- (Moulded rubber without fabric), TM for ALCo

M/s Waidhan Engg. & Industries Pvt. Ltd., Singrauli (MP)

07.12.09 On 09.12.11, advised to DMW & DLW for dev. order. On 30.04.12, advised DMW & all CMPEs for dev. order. On 27/04/15, DMW has been asked about fitment of type of bellows 'leather or rubber'. On 05/02/15, firm stated that no dev. order placed by DMW. DMW stated on 20/05/15 that only leather bellows are used. On 28.03.17, firm was requested to submit supply details. On 07.07.17, asked from CMPE/Rlys. for using whether leather bellow or

Page 22: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

22

rubber bellow.

2. 2. Bellows- (Moulded rubber without fabric), TM for ALCo

M/s Abelasto Products Pvt. Ltd., Kolkata.

19.10.09 On 24.08.11, advised to DMW & DLW for dev. order. On 27.12.11, advised to all CMPEs for dev. order. On 30.04.12 & 16.05.13, advised DMW for dev. order. On 28.03.17, firm was requested to submit supply details. On 07.07.17, asked from CMPE/Rlys. for using whether leather bellow or rubber bellow. On 17.06.17, firm replied for not getting order.

F. Alternator & DB Items ----

1. Alternator, Traction with Auxiliary Machines & their sub-assemblies for Broad Gauge Diesel Electric ALCo locomotives

M/s Saini Electrical and Engineering Works, Navi Mumbai

22.10.13 Capability assessment of the firm done on 16.07.14. On 18.09.14, recommended for dev. order. Unit under field trial observation at MLDT. Performance awaited since 29-07-16.

2. Alternator-Rectifier Traction, for EMD locomotives (for alternator)

M/s TD Power Systems Limited, Bangalore

27.06.13 Capability assessment of the firm done on 28.07.14. On 16.09.14, recommended for dev. order. DLW placed dev. PO no. 091310180.15117980 dte. 27.03.15 for 10 units. As per firm’s letter, dtd: 06.06.17, no progress made in TA development after not allowing the firm for any design change vide RDSO letter, dtd: 18.02.16.

3. Alternator-Rectifier Traction, for EMD locomotives (for alternator)

M/s Saini Electrical and Engineering Works, Navi Mumbai

03.09.13 Capability Assessment of the firm done on 16.07.14 & 16.04.15. On 05.05.15, recommended for placement of dev. order from DLW. DLW placed developmental PO no. 091510190.15118284 dated 21-1-15 for 10 units. Stage inspection carried out from 07.05.16 to 10.05.16. On 22.01.17, prototype inspection done. Unit under field trial at SR/GOC since 24.05.17 for six months.

4. Alternator-Rectifier Traction, for EMD locomotives (for alternator)

M/s Medha Traction Equipment Pvt. Ltd., Ghatkesar

14.11.13 Capability assessment of the firm done on 29.07.14. On 16.09.14, recommended for dev. order. On 10-03-15, advised to take the necessary

action in connection with RDSO’s new vendor approval policy on Manufacturing in INDIA.

5. Alternator-Rectifier Traction, for EMD locomotives for alternator (for Alternator & Rectifier)

M/s Daulat Ram Engineering Services (P) Ltd., Raisen

20.08.13 Capability assessment of the firm done on 17-06-14. On 16.09.14, recommended for dev. order. On 19.09.16, during meeting at RDSO, firm has been advised to improve insulation of equipment. After post improvement done and verified by RDSO dispatch clearance given on 16-11-16.

6. Alternator-Rectifier Traction, for EMD locomotives for alternator

M/s Crompton Greaves Ltd., Bhopal

24.04.15 On 05.05.15, advised shortcomings. On 15-06-15, firm has submitted QAP and other details fallen short. Performance of TAs supplied/repaired is under field trial observation.

7. Alternator-Rectifier Traction, for EMD locomotives for alternator

M/s CNR Pioneer Electric Private Ltd., Bawal Rewari

02.08.16 Capability assessment of the firm has been done by RDSO. Approved for an additional unit.

8. Alternator Mounted Rectifier Assembly For AC/DC Diesel Electric Locomotives

M/s Ruttonsha International Rectifier Ltd., Panchmahals, Gujarat

02.08.16 Capability assessment of the firm has been done by RDSO on 21-10-16. On 28.10.16, recommended for developmental order.

9. Rectifier Bank Assembly for HHP Locomotives (EMD Part No 40027895, DLW Part No 18021554 or equivalent

M/s Hind Rectifiers Limited, Mumbai

17.12.15 Shortcomings advised to firm on 29-01-16. Firm submitted documents fallen short on 15-02-16. Firm has been advised to carry out pending tests from outside agency.

10. Rectifier Bank Assembly for HHP Locomotives (EMD Part No 40027895, DLW Part No 18021554 or equivalent

Ruttonsha International Rectifier Ltd. Dist. Panchmahals, Gujarat

31.03.16 Capability assessment of the firm has been done by RDSO on 21-10-16. On 28.10.16, recommended for developmental order.

G. DEMU items ---

1. Three Phase AC-AC Transmission System & Associated Control Equipment for 1600 H`P Diesel Electric Multiple Unit

M/s Crompton Greaves Ltd.,

01.06.15 Vendor form under scrutiny.

Page 23: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

23

2. Three Phase AC-AC Transmission System & Associated Control Equipment for 1600 HP Diesel Electric Multiple Unit

M/s Bharat Force Ltd., Pune`

17.12.15 Vendor form under scrutiny.

3. Three Phase AC-AC Transmission System & Associated Control Equipment for 1600 HP Diesel Electric Multiple Unit

M/s Medha Servo Drives Pvt Ltd., Hydrabad

01.03.16 Vendor form under scrutiny.

4. Three Phase AC-AC Transmission System & Associated Control Equipment for 1600 HP Diesel Electric Multiple Unit

M/s Bharat Force Ltd., Pune`

13.06.16 Vendor form under scrutiny.

H. Starter Motor Items ---

1. E-Locker/ Dustbin Motor Blower Assly for EMD (WDG5)

M/s Saini Electrical and Engineering Works, Ambernath [East], Dist.

21.09.15

On 24.11.15, advised shortcomings of vendor form. Reply on shortcomings received on 30.12.15. On 28.07.17, advised shortcomings.

2. E-Locker/ Dustbin Motor Blower Assly for EMD (WDG5) Locomotives

M/s Thyron Engineering Pvt. Ltd., Sativali Road, Vasai

07.10.15 On 24.11.15, advised shortcomings of vendor form. Reminder issued to the firm on 22.04.16. Reminder issued to the firm on 31.07.17

dze- la-

S. No. vkbZVe dk uke

Name of items os.Mj dk uke

Name of Vendor vkosnu fnukad

Date of application

orZeku fLFkfr

Current status

pkyu 'kfDr&batu vkbZVe

Motive Power – Engine items

EMD Items

1. Main Bearings

M/s Zollern BHW Gleitlager GmbH & Co., Germany

05.09.13 Letter sent to firm on 31.07.15. Reply received from firm on 15.09.15, 27.10.15, 06.01.2016 & 20.01.2016. Case has been forward to Railway Board.

2. Main Bearings

M/s Hi-Bond Bearings Pvt. Ltd., Rajkot

19.12.14 Firm has not submitted some documents required for processing the case. Reply received on 28.08.2015 & 18.11.2015, 27.11.2015, 08.02.2016 & 15.06.2016. Deficiencies advised on 14.08.2015, 10.12.2015 & 08.03.16 & 14.10.2016. Reply awaited.

3. Main Bearings

M/s KSPG, Pune 06.04.15 Firm has not submitted some documents required for processing the case. Balance deficiencies advised on 27.11.2015. Reminder sent to firm on 11.03.2016 06.06.2016 & 10.10.2016. Reply awaited.

4. Bearing - Con Rod

M/s PBW Pvt. Ltd., Rajkot

21.09.11 i) Part – I status given for con rod bearing lower only on 05.07.2016. ii) Firm is yet to offer prototype upper con rod bearings.

Alco Items

5. Connecting Rod Bearings

M/s Hi-Bond Bearings Pvt. Ltd., Rajkot

19.12.14 Firm has not submitted some documents required for processing the case. Reply received on 18.11.2015 & 27.11.2015. Balance deficiency advised to firm on 14.08.2015 & 10.12.2015. Reminder sent to firm on 11.03.2016. Reply received on 15.06.2016. Balance deficiency advised to firm on 14.10.2016. Reply awaited.

6. Main Bearing Shell (Inter & Centre)

M/s Benara Automotives Pvt. Ltd., Agra-282007

10.06.14 Firm has not submitted some documents required for processing the case. Deficiencies are being advised.

7. Main Bearing Shell (Inter & Centre)

M/s Hi-Bond Bearings Pvt. Ltd., Rajkot

19.12.14 Firm has not submitted some documents required for processing the case. Reply received on 18.11.2015 & 27.11.2015. Balance deficiency advised to firm on 14.08.2015 & 10.12.2015. Reminder sent to firm on 11.03.2016. Reply received on 15.06.2016. Balance deficiency advised to firm on 14.10.2016. Reply received on 07.12.2016. Under scrutiny.

8. Main Bearing Shell (Inter & Centre)

M/s Esteedee Autocom Engineers Pvt. Ltd., Thane

16.04.15 Firm has not submitted some documents required for processing the case. Reply received on 05.11.2015 & 24.02.2016. Balance deficiencies advised on 06.10.2015, 16.12.2015 & 13.10.2016. Reply awaited.

9. Main Bearing, M/s Hi-Bond 19.12.14 Firm has not submitted some documents required for

Page 24: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

24

Thrust

Bearings Pvt. Ltd., Rajkot

processing the case. Reply received on 18.11.2015 & 27.11.2015. Balance deficiency advised to firm on 14.08.2015 & 10-12-2015. Reminder sent to firm on 11.03.2016. Reply received on 15.06.2016. Balance deficiency advised to firm on 14.10.2016. Reply received on 07.12.2016. Under scrutiny.

10. Main Bearing, Thrust )

M/s EsteedeeAutocom Engineers Pvt. Ltd., Thane

17.04.15 Firm has not submitted some documents required for processing the case. Reply received on 05.11.2015 & 24.02.2016. Balance deficiencies advised on 06.10.2015, 16.12.2015 & 13.10.2016. Reply awaited.

11. Connecting Rod Bearings

M/s BenaraAutomotives Pvt. Ltd., Agra-282007

30.05.13 DLW & DMW have been advised on 20.06.2014 to place developmental order on the firm.

dze- la-

S. No. vkbZVe dk uke

Name of items os.Mj dk uke

Name Of Vendor

vkosnu fnukad

Date of application

orZeku fLFkfr

Current status

pkyu 'kfDr & batu flLVe vkbZVe

Motive Power – Engine System items

1. Filter Housing, Secondary Engine Air Filters, for ALCo & EMD Locomotives.

M/s G.B. Equipments System Ltd., Dehradun (India)

13.05.13. Deficiencies advised to firm on 07/06/13. Firm Reply received on 26-06-2013. Deficiencies advised to firm on 09.07.13. Reply received on 22.7.2013. File has been sent to legal cell for legal clearance on 02.8.13. File returned from legal cell on 21.10.2013 with remarks. Deficiencies advised to firm on 07/11/13. Firm advised vide letter-dated 14.03.14. Deficiencies advised to firm on 26.03.2014. Reply received on 02.06.14. Deficiencies advised to firm on 24/06/14. Reply awaited. Reply recd from firm on dated 12.08.14. Deficiencies still exists. Firm replied on 12.08.2014. Firm’s reply received on 10.09.2014. Visit of the firm planned in the 2

nd week of Oct,2014.

Capability assessment done from 09.10.14 to 10.10.14. The case is being processed for next stage. Advice letter for placement of developmental order issued to CDE/DLW & CME/DMW on 26.11.2014. Inspection call against DMW developmental order received on 15.12.2016. Inspection against DMW developmental order was carried out at firm’s premises from 23.12.2016 to 24.12.2016. DM & IC issued. Vide letter no. SD.Vendor.1 dt.03.04.2017 item has been transferred to DLW. Vide letter No. SD.FIL.G.B.Equipment dt.04.08.2017, document related to vendor registration for the subject item has been handed over in the office of CDE/ DLW/ Varanasi.

2. Spin-on Fuel Filter for EMD Locomotives.

M/s Pioneer Fil Med(P) Ltd., Gurgaon

05.06.13 Deficiencies advised to firm on 03-07-2013. Reminder sent to firm on 31.01.2014. Firm has sent the related documents, on 11.02.14. Deficiencies advised to firm on 07.03.2014.Reply received from firm on dt.10.03.2014. Deficiencies advised to firm on 03-04-2014. Reply received on 08.05.2014. RDSO officer visited the firm on 09&10.05.14 for capacity assessment. Vide MOM dated 10.05.2014, the firm will submit copy of modified QAP. Copy of modified QAP has been recd. Type test has been planned to be conducted at firm’s premises from 11.08.14. RDSO team is at firm’s premises to conduct type test. Type testing has been completed on 13.08.14. Field trial is being planned. Letter for developmental order vide this office letter No.SD.Fil.Pioneer dt.01.09.14 has been issued to CMPE/D/NR. Reminder letter sent to CMPE/D/NR on 07.09.2015

Page 25: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

25

for developmental order. Developmental order received from NR, firm requested for proto type inspection vide letter dated 03.06.16 received on 14.06.16. Inspection has been done on 01.07.16. DM & IC issued. Letter dt. 17.05.17 sent to Sr.DME/AMV for field trial performance report. Performance report received on 06.07.17.

3. Filter Element, Fibre Glass, ECC for EMD Locomotives.

M/s Pioneer Fil Med(P) Ltd., Gurgaon

06.06.13 Deficiencies advised to firm on 03-07-2013. Reminder sent to firm on 31.01.2014. Reply received from firm on dt.10.03.2014. Deficiencies advised to firm on 03-04-2014. Reply received on 08.05.2014. Deficiencies advised to firm on 23.05.2014. Letter dated 29.08.2014 sent to firm. Letter sent to firm on 29.04.15.Reminder regarding submission of documents sent to firm on 29.07.2015. Firm vide letter dated 17.08.15 has informed that they are in process of developing the filter and needs 06 months more time. Show cause notice issued to firm on 22.06.2016 to reply within 30 days & reminder on 03.08.16 to reply within 20 days. Vide letter No. SD.FIL.Pioneer dated 27.07.2017 online vendor registration of the firm has been closed.

4. Filter, Compressor oil spin on, for EMD locomotives.

M/s Pioneer Fil Med(P) Ltd., Gurgaon

06.06.13 Deficiencies advised to firm on 03-07-2013. Reminder sent to firm on 31.01.2014. Reply received from firm on dt.10.03.2014. Deficiencies advised to firm on 03.04.2014. Reply received on 08.05.2014. Deficiencies advised to firm on 23.05.2014. Reply received on 03.06.14. Reply dated 25.6.14 received from the firm. Letter dated 29.08.2014 sent to firm. Letter sent to firm on 30.04.15. Reminder regarding submission of documents sent to firm on 30.07.2015. Firm vide letter dated 17.08.15 has informed that they are in process of developing the filter and needs 06 months more time. Show cause notice issued to firm on 24.06.2016 to reply within 30 days & reminder on 03.08.16 to reply within 20 days. Firm vide letter dated 07.11.16 has requested to extend their online vendor registration for next 06 months as they are still under developmental process. Vide letter No. SD.FIL.Pioneer dated 27.07.2017 online vendor registration of the firm has been closed.

5. Low Mean Pore size Primary & Secondary Fuel Oil Filter Elements for Diesel Electric Locomotives.

M/s Pioneer Fil Med(P) Ltd., Gurgaon

24.10.13 Deficiencies advised to firm on 07.11.13. Reply received on 13.01.14. Reply received from firm on dt.10.03.2014. Deficiencies advised to firm on 03-04-2014. Staff visiting the firm from 11.04.2014 for testing of fuel filters. Type test conducted from 11.04.2014 to 13.04.2014. Reply received on 08.05.2014. RDSO officer visited the firm on 09&10.05.14 for capacity assessment. Vide MOM dated 10.05.2014; the firm will submit copy of modified QAP. Copy of modified QAP has been recd. Deficiencies advised to firm on 23.05.2014. Reply received on 03.06.14. Deficiencies advised to firm on 06-06-2014. Reply received from the firm. The case is under examination from the view point of testing charges, field trials etc. Letter for field trial has been issued on 10.07.14. Firm has got developmental P.O. from SCR. RDSO representative deputed on 18.09.2014 – 19.09.2014 for inspection of fuel filter elements against developmental P.O. at firm’s premises. Inspection of fuel filter elements against developmental P.O. of SCR has been completed at firm’s premises & I.C. dated 26.09.2014 has been issued. Letter sent to Sr.DME (Dsl), Guntakal & Kazipet on 26.12.2014 requesting them to advise fitment details of filters put on field trial. Fitment details of filters on 6 nos. locomotives of GTL shed received on 02.02.2015. Performance asked from

Page 26: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

26

Sr.DME (Dsl), Guntakal & Kazipet on 07.05.2015. Performance received from Kazipet & Guntakal shed on 22.06.15 & 07.07.15 respectively. Deficiencies advised to firm on 23.07.15. Reply received on 29.07.15. Performance report asked from DSL/Guntakal on 14.08.15 and reminder 23.09.15 & 16.11.15. Letter sent to Sr. DME (Dsl)/ Kazipet to send signed copy of performance report. Deficiency advised to firm on 14.08.2015. Reply received on 23.11. 2015. Letter dt 05.02.16 sent to CMPEs(Dsl)/NR, SWR & firm for retrial. Inspection call received from firm on 26.07.16 for retrial. Inspection was carried out at firm’s premises from 22.11.2016 to 24.11.2016. DM & IC issued. Field performance reported as poor and filters withdrawn from service. Report received from KJM/SWR by e-mail on 23.02.17.

6. Filter housing, Secondary Engine Air Filter for ALCo and EMD locomotives.

M/s Prag Polymers, B-1, Talkatora, Industrial Estate, Lucknow-226011

27.06.14 Deficiencies advised to firm on 15.07.2014. Letter sent to firm on 07.01.2015. Firm’s reply received on 10.02.2015. Deficiencies advised to firm on 20.02.2015. Reminder for deficiencies advised to firm on 11.09.2015. Reply received on 12.02.2016. Capability assessment carried out on 03.06.2016. Letter for developmental order issued to CDE/DLW and CME/DMW on 23.08.2016. Vide letter no. SD.Vendor.1 dt.03.04.2017 item has been transferred to DLW. Vide letter No. SD.FIL.Prag dt.04.08.2017, document related to vendor registration for the subject item has been handed over in the office of CDE/ DLW/ Varanasi.

7. Long Life Lubricating Oil Filter Element for Locomotive Diesel Engines.

M/s Parker Hannifin India Pvt. Ltd. Bangalore.

14.07.14 Deficiencies advised to firm on 30.07.2014. Reply received on 11.11.2014. Deficiencies advised to firm on 25.11.2014. Reply received on 02.03.2015. Deficiencies advised to firm on 27.03.2015. Firm’s reply received on 08.05.2015 & 22.06.2015. Deficiencies advised to firm on 17.08.2015. Reply received on 08.10.2015. Deficiencies advised to firm on 01.12.2015. Reply received on 22.02.16. Firm’s letter received on 15.12.16 to conduct inspection at their premises.

8. Soak Back Lube oil Filter for EMD Locomotives.

M/s Parker Hannifin India Pvt. Ltd. Bangalore.

14.07.14 Deficiencies advised to firm on 30.07.2014. Reply received on 11.11.2014. Deficiencies advised to firm on 25.11.2014. Reply received on 02.03.2015. Deficiencies advised to firm on 27.03.2015. Reply received on 03.12.2015. Deficiencies advised to firm on 31.12.2015. Reply received on 29.02.16. Capability assessment carried out on 25.05.16 to 27.05.16. Type testing is to be done at the firm’s premises.

9. Low Mean Pore size Primary & Secondary Fuel Oil Filter Elements for Diesel Electric Locomotives .

M/s Parker Hannifin India Pvt. Ltd. Bangalore.

14.07.14 Deficiencies advised to firm on 28.07.2014. Reply received on 11.11.2014. Deficiencies advised to firm on 25.11.2014 Reply received on 02.03.2015. Deficiencies advised to firm on 27.03.2015. Again deficiencies advised to firm on 25.08.2016. Reply awaited.

10. Filter Elements, Suction strainer, for EMD locomotives.

M/s Parker Hannifin India Pvt. Ltd. Bangalore.

17.07.14 Deficiencies advised to firm on 28.07.2014. Reply received on 11.11.2014. Deficiencies advised to firm on 25.11.2014. Reply received on 02.03.2015. Deficiencies advised to firm on 27.03.2015. Reply received on 14.07.2016. Deficiencies advised to firm on 03.08.16. Reminder notice issued to firm on 07.07.17 to reply within 30 days. Reply awaited.

11. Spin –on Fuel Filter for EMD locomotives.

M/s Parker Hannifin India Pvt. Ltd. Bangalore.

17.07.14 Deficiencies advised to firm on 31.07.2014. Reply received on 11.11.2014. Deficiencies advised to firm on 25.11.2014. Reply received on 02.03.2015. Deficiencies advised to firm on 27.03.2015. Reply received on 04.04.2016. Deficiencies advised to firm on 03.05.2016. Reminder notice issued to firm on

Page 27: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

27

12.07.17 to reply within 30 days. Reply awaited.

12. Spin-on turbocharger Lube Oil Filter for EMD Locomotives.

M/s Parker Hannifin India Pvt. Ltd. Bangalore.

17.07.14 Deficiencies advised to firm on 31.07.2014. Reply received on 11.11.2014. Deficiencies advised to firm on 25.11.2014. Reply received on 02.03.2015. Deficiencies advised to firm on 27.03.2015. Again deficiencies advised to firm on 25.08.2016. Reminder notice issued to firm on 21.07.17 to reply within 30 days. Reply awaited.

13. Low Mean Pore size Primary & Secondary Fuel Oil Filter Elements for Diesel Electric Locomotives.

M/s G S Products, Dehradun

07.10.14 Deficiencies advised to firm on 29.10.2014. Original receipt of NEFT/RTGS payment and documents regarding category of vendors asked from firm vide letter dt. 05.01.2015. Reply received on 13.01.2015. Deficiencies advised to firm on 23.01.2015. Reply received on 25.03.2015. Capability assessment carried out on 02.09.15. Deficiencies advised to firm on 19.10.2015. Reply received on 02.11.15. Deficiencies advised on 15.06.16. Reply received on 25.07.2016. Case was discussed with EDSMP. As per instruction, study on use of indigenous media is in progress and permission from RB is to be taken. Vide letter dt 07.04.17, Railway Board was requested for approval of indigenous filter paper media. Vide RB letter dt 12.04.17, a committee was nominated for specification of lube oil and fuel oil filters/media.

14. Disposable car body filters with built – in louvers and casing.

M/s G S Products, Dehradun

04.02.15 Deficiencies advised to firm on 18.02.2015. Reply received on 17.03.2015. Capability assessment carried out on 02.09.15. Advised to firm for type testing on 22.03.16 and reminder on 31.05.16 & 20.09.16. Vide letter received on 28.04.17, Firm has requested for testing at their premises.

15. Low Mean Pore size Primary & Secondary Fuel Oil Filter Elements for Diesel Electric Locomotives.

M/s G.B. Equipments System Ltd., Dehradun (India)

24.02.15 Deficiencies advised to firm on 17.03.2015. Reply received on 15.05.15. Deficiencies advised to firm on 29.06.2015. Reply received on 20.07.15. Capability assessment carried out on 01.09.15. Deficiencies advised to firm on 16.10.15 & 20.10.15. Reply received on 26.11.2015 & 09.02.2016. Deficiencies advised to firm on 11.04.2016. Reply received on 02.05.2016.Deficiencies advised to firm on 08.06.2016.Reply received on 05.07.16. Deficiencies advised to firm on 23.08.2016. Reply awaited.

16. Long Life Lubricating Oil Filter Element for Locomotive Diesel Engines

M/s Pioneer Fil Med(P) Ltd., Gurgaon

16.04.15

Deficiencies advised to firm on 07.05.2015. Reminder letter for deficiencies sent to firm on 27.11.2015. Reply received on 14.07.2016. Clause-4 of compliance RDSO spec. No. MP.0.2600-15, Rev.04 is still pending.

17. Disposable car body filters with built – in louvers and casing.

M/s Parker Hannifin India Pvt. Ltd. Bangalore.

16.04.15 Deficiencies advised to firm on 14.05.2015. Reply received on 07.07.15. Deficiencies advised to firm on 17.09.2015. Reminder for deficiencies sent to firm on 29.01.2016. Reply received on 06.04.2016. Deficiencies advised to firm on 19.05.2016. Capability assessment carried out on 25.05.16 to 27.05.16. Deficiencies advised to firm on 31.05.16. Reply received on 26.07.2016. Deficiencies advised/ Clarification asked vide letter dated 04.11.16 from firm. Reply awaited.

18. Disposable car body filters with built – in louvers and casing.

M/s Spectrum Filtration Pvt. Ltd., Howrah

11.05.15 Deficiencies advised to firm on 26.06.2015. Reply received on 07.09.15. Deficiencies advised to firm on 18.09.2015. Reply received on 06.11.2015. Deficiencies advised to firm on 01.12.2015. Reply received on 15.12.2015. Deficiencies advised to firm on 25.02.16. Capability assessment carried out on 09.&10.03.16 and report is being prepared. Deficiencies advised to firm on 20.06.2016. Reply received on 14.07.2016, vide this letter firm has informed that they will do the re-testing in 3-4 weeks.

Page 28: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

28

Further communication from the firm is awaited. Internal test report received on 15.11.16. Vide letter received on 06.03.17, Firm has requested for visit of their premises.

19. Filter elements pre-cleaner for WDG5 locomotives.

M/s Pioneer Fil Med (P) Ltd., Gurgaon

06.08.15 Deficiencies advised to firm on 18.09.2015. Reply received on 16.10.15. Deficiencies advised to firm on 06.11.2015. Reply received on 29.12.2015. Deficiencies advised on 01.03.16 & reminder on 04.11.2016. Reply received on 15.12.16. Under scrutiny.

20. Disposable car body filters with built – in louvers and casing.

M/s Pioneer Fil Med (P) Ltd., Gurgaon

08.10.15 Deficiencies advised to firm on 04.11.2015. Reply received on 29.12.2015. Field trial performance asked from Sr. DME /DSL/ TKD on 08.01.2016. Performance received vide email dt 17.11.16. reported as satisfactory.

21. Filter Elements, Suction strainer, for EMD locomotives.

M/s Flair Strainers & Filters ,Vatva, Ahmedabad

12.07.16 Deficiencies advised to firm on 28.07.2016. Reply awaited.

22. Filter elements, Secondary Engine Air Filters, for ALCo & EMD Locomotives.

United Filters, Fursungi Gaon Road, Fursungi, Pune

30.09.16 Deficiencies advised to firm on 07.10.2016. Reply awaited.

23. Filter Paper Media for Long Life Lubricating Oil Filter Element for Locomotive Diesel Engines (RDSO Spec. No. MP.0.2600-15, Rev.04, Jan.07)

M/s Parker Hannifin India Pvt. Ltd. Bangalore

28.10.16 Firm has not submitted any documents.

dze- la-

S. No. vkbZVe dk uke

Name of items os.Mj dk uke

Name Of Vendor

vkosnu fnukad

Date of application

orZeku fLFkfr

Current status

pkyu 'kfDr& ,y-Mh] vkbZVe

Motive Power – LD items

1. Coupler Assembly, H type Tight lock for ALCo / Electric HHP locomotives.

M/s Escorts Limited/ New Delhi

19.09.2011 Documents scrutinized and Shortcomings communicated several times vide letters No. SD.TTH.COUPLER dated 18.10.2011 and 02.01.2012. Firm’s replies received vide letter nos. EL/RDSO/MP/RR/11-12/186dated 16.12.2011and 20.03.2012. Received documents again scrutinized and complied. Capacity assessment completed on dated 19.08.2012. Firm communicated for prototype inspection vide letter no. SD.TTH.COUPLER dated 08.02.2013. Prototype clearance, DM and IC issued on dated 03.07.2013. Fitment of Prototype completed at DLW and fitment details of two couplers received from DLW vide letter No.DLW.M.65.153 dated 22.10.13 Firms advised vide letter No. SD .TTH COUPLER dated 17.12.13 for submission of legal documents. Prototype inspection for 28 nos. Quantity has been completed on date 06.11.15.

2. Coupler E-type for EMD locomotives

M/s Raneka Industries Ltd/ Pithampur

29.09. 2012 Documents scrutinized and Shortcomings and advice communicated several times to Firm vide letter No.SD.DEV.PAC/MAC-CBC (Pt) dated 27.11.2012, 25.02.2013, & 08.04.2013. Firm’s reply received vides letter nos. RIL/KJ/MK/12-13 dated 07.01.2013, 12.01.2013, 26.02.2013, 15.03.2013, 15.10.2013. Firm complied after overcoming shortcomings and commissioning of ‘No bake’ moulding system as advised. Capacity assessment has been completed and Prototype inspection has been done and

Page 29: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

29

Development order recommended vide this office letter no SD.PAC/MAC-CBC dated 07.08.2014.

3. Coupler Assembly, H type Tight lock for ALCo / Electric HHP locomotives.

M/s Sanrok Enterprises/Faridabad

14.06. 2011 Documents scrutinized and Shortcomings communicated to Firm on dated 20.07.2011. Received documents again scrutinized and complied. Capacity assessment completed on dated 10.04.2012. Developmental order placed vide letter No.SD.TTH.COUPLER dated 19.07.2012. Prototype clearance and DM and IC issued on dated 11.10.13

4. Draft Gear Soft with Yoke Assembly.

M/s Sanrok Enterprises/Faridabad

07.06. 2011 Document scrutinized and shortcomings communicated to firm. After overcoming shortcomings Capacity assessment completed on dated 14.11.2011. Advised for prototype testing on dated 16.11.2011. Prototype clearance, DM and IC issued on dated 31.12.2012. Fitment of Prototype completed at DMW/PTA. Firm advised vide letter no. SD.TTH.COUPLER dated 17.12.13 for submission of legal documents. Approved as Pre developmental source.

5. Draft gear with Yoke assembly for EMD locomotives ( part no. 8420236 & 8439090)

M/s Prag Industries Lucknow

15.12. 2012 Documents scrutinized and complied. Capacity assessment completed on dated 09.01.2013. Firm advised for prototype inspection vide letter no. SD.DEV.PAC/MAC-CBC dated 10.01.2013. Static, fatigue, compression set, tensile, ash content, ozone tests of rubber completed. Samples for tup hammer test have been shield. Firm advised vide letter No. SD.DEV.PAC/MAC-CBC dated 17.12.13 for submission of legal documents. Prototype inspection has been completed on 01.03.2016.10 nos. quantity under field trial.

6. Spring Pads Assembly, Side Buffer, Long life

M/s Aryan Exporters Pvt Ltd

05.09.2013 Legal documents scrutinized and shortcomings communicated to firm. Firm’s reply received vide letter no. AE/2013-14/RDSO/1/BS ASSY/987 dated 28.10.2013 and found complied. Capacity assessment has been completed on 22.08.2014. Developmental order has been recommended vide this office letter no. SD.DFM.A.10.1 dated 22.09.14. Prototype inspection has been completed on 01.09.2015. Approved as Pre developmental source.

7. Draft Gear Soft with Yoke Assembly.

M/s Prag Industries Lucknow

17.10. 2013 Documentsscrutinized and complied. Capacity and capability assessment completed on dated 01.11.2013 and advised to prepare prototype sample vide letter no. SD.TTH.COUPLER dated 20.11.2013. Firm has been recommended for developmental order for DMW/PTA. Prototype inspection

8. Coupler E-type for EMD locomotives

M/s Hindustan Engineering & Industries Ltd.

29.08.2014 Application under scrutiny. Deficiency has been advised vide this office letter no. SD.DEV.PAC/MAC-CBC, dated 13.11.2014 to Firm. Firm has advised for deficiencies noted under Prototype inspection.

9. High capacity ,long life side buffer assembly

M/S Hemco Engineering,MP

23.08.2016 Under scrutiny.

10. High capacity ,long life side buffer assembly

N.K. Iron Industires, Agra.

01.01.2015 Deficiency has been advised vide this office letter no. SD.DFM.A.10.1, dated 10.04.2015. Capacity & capability assessment has been completed 12.08.2016 and approved as pre developmental sources.

11. Coupler E-type for EMD locomotives

Atul Engineering Udyog

15.01.2015 Capacity & capability assessment has been completed on 29.05.2015 and recommended for developmental order vide letter no. SD.PAC/MAC-CBC dated 11.06.2015. Prototype inspection has been completed on 22.04.2017.

Page 30: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

30

12. Coupler E-type for EMD locomotives

Ombesco rail products Ltd., Dhanbad

27.12.2016 Application scrutiny has been done, firm was informed regarding deficiencies in legal documents vide letter no. SD.TTH.Coupler(Pt) dated 10.07.2017.

13. Draft Gear Soft with Yoke Assembly

Atul Engineering Udyog

28.10.2015 Application scrutiny has been completed, legal documents, dynamic test report of durel DC-75 has been obtained . Firm has submitted MOU for getting Elastomer pads durel ‘DC-75’ vide letter no. E/AEU/K/RDSO/2017-18/ dated 03.08.2017.

14.

Coupler Assembly, H type Tight lock for ALCo / Electric HHP locomotives

M/s Prag Industries Lucknow

16.06.2015 Meantime application processing was held up as per railway board guidelines i.e. no proliferation of H-type coupler until design is frozen. However, now application is under scrutiny.

15. m Coupler Assembly, H type Tight lock for ALCo / Electric HHP locomotives

Atul Engineering Udyog

14.10.2015 Meantime application processing was held up as per railway board guidelines i.e. no proliferation of H-type coupler until design is frozen. However, now application is under scrutiny.

16.

Coupler Assembly, H type Tight lock for ALCo / Electric HHP locomotives

M/s Raneka Industries Ltd/ Pithampur

12.04.2016 Meantime application processing was held up as per railway board guidelines i.e. no proliferation of H-type coupler until design is frozen. However, now application is under scrutiny.

17. Coupler Assembly, H type Tight lock for ALCo / Electric HHP locomotives

M/s Vasco Railway Enterprises, Faridabad.

24.02.2016 Meantime application processing was held up as per railway board guidelines i.e. no proliferation of H-type coupler until design is frozen. However, now application is under scrutiny.

18. Coupler Assembly, H type Tight lock for ALCo / Electric HHP locomotives

M/s Bhilai Engg.co.LTD., Bhilai

19.12.2016 Meantime application processing was held up as per railway board guidelines i.e. no proliferation of H-type coupler until design is frozen. However, now application is under scrutiny.

dze- la-

S. No.

vkbZVe dk uke

Name of items

vkosnd dk uke

Name of applicant

vkosnu fnukad

Date of application

orZeku fLFkfr

Current status

pkyu 'kfDr& Ogh-Mh-th] vkbZVe

Motive Power – VDG items

1. Centre Pivot Liners for locomotives

M/s Engineered Polymers(I) Pvt. Ltd., Banglore

15.10.10 Capacity assessment done on 25.03.2015. Cleared for developmental order on 17.04.2015. Letter sent to DMW / PTA on 07.12.16 regarding status of dev order.

2. Vertical and Lateral hydraulic dampers

M/s Gabriel India Ltd., Distt.- Pune

29.10.10 Firm has been cleared for developmental order on 26.04.2012. Firm has completed supply of 05 loco sets of vertical damper in July 2014. Performance received on 18.05.2016. As the firm has not got dev. order of secondary lateral dampers, on firm’s request, a letter sent to CMPE (D)/NCR on 14.07.2016, recommending dev order of 05 loco sets of the same.

3. Vertical and Lateral hydraulic dampers

M/s GB Equipment Systems Ltd., Dehradun

23.01.15 Application scrutinised, shortcomings communicated to firm on 05.02.2015. Reminder sent on 24.06.2015. Reply received on 15.7.15, shortcoming communicated on 12.10.15. Reply received through e-mail on 27.10.15. A letter send to firm on 03.11.15 for non-compliance of shortcoming. Reply received on 21.12.2015. Shortcomings communicated to firm on 13.01.2016 with closure notice. Reply received on 08.02.2016, through which firm has intimated that they will submit MoU with reputed manufacturer soon. Shortcomings communicated on 07.06.2016. Reply received on 20.06.2016. Shortcomings communicated on 14.07.2016. Reply received on 11.08.2016, under review.

Page 31: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

31

4. TPU spring pad (Happy Pad) for locomotives

M/s Micro Engineers, Plot No.104, Udyog Kendra Extn. 1, Near Habibpur Village, Greater Noida

26.12.12 Cleared for developmental order for 10 loco sets on 28.07.2014. DMW/PTA has placed P.O. for 261 Nos. Firm has submitted inspection call vide letter dated 29.06.2015. Inspection done on 24.08.15. A letter sends to DMW on 05.11.15 to send fitment details of 216 nos. of TPU Spring pads. Fitment detail received from DMW on 08.12.2015

5. TPU spring pad (Happy Pad) for locomotives

M/s Drip Elastotek, 58, Netaji Subhas Road, Pijrapole Society,Goushala, Liluah, Howrah

13.10.15 Application scrutinised, shortcomings communicated to firm on 26.11.15. Reply received on 16.03.2016. Shortcomings communicated to firm on 03.06.2016. Reply received on 27.07.2016. Shortcomings communicated on 08.09.16. As no reply recd., a reminder sent on 08.12.16.

6. Motor Nose Link Bushing for EMD Locomotives

M/s Prag Industries (I) Pvt. Ltd., E-7 Talkatora Industrial Estate, Lucknow

05.06.13 Prototype inspection carried out on dated 19.08.2014. I.C. issued on 21.08.14. As per DLW letter, fitment of 05 loco set completed in Jan 15, under field trial of one year. Performance feedback asked vide letter dated 09.02.16. A reminder was sent to railways for performance on 27.05.2016 cut off date 26.06.2016. During review of the case, shortcomings observed, communicated to firm on 21.07.2016. Reminder sent on 16.11.16. After compliances of shortcoming, capability assessment was done 27.12.2016. Qualifying Qty as a ‘Developmental vendor’ is under review.

7. Motor Nose Link Bushing for EMD Locomotives

B.D. Bansal Steel Industries, Chembur, Mumbai

29.04. 15 Application scrutinised, shortcomings communicated to firm on 22.05.2015. Reply received on 22.06.15 & 10.07.15, shortcoming communicated to firm on 07.10.2015. Reply received on 12.10.15. Shortcoming again observed communicated to firm vide letter dated 05.02.16. Reply received on 15.10.16. Shortcoming again observed communicated to firm vide letter dated 31.10.16. Reply received on 25.11.16. After compliances of shortcoming, capability assessment was done 06.06.2017. Noticed shortcomings were communicated on 15.06.2017. Reply received on 01.08.2017. Case under scrutiny.

8. Motor Nose Link Bushing for EMD Locomotives

M/s Frontier Alloy Steels Ltd., Jamni Wala Road, Jamboo Khala, Tehsil Paonta Sahib,Distt. Sirmaur

13.10.15 Application scrutinised, shortcomings communicated to firm on 02.12.15. Reply received on 11.02.2016. Shortcomings again observed, communicated to firm on 10.03.2016. Reply received on 23.05.2016. DD/VDG nominated for Capability & capacity assessment. A letter was issued for confirmation to the firm on 06.07.2016. Reminder sent on 16.11.16. After compliances of shortcoming, capability assessment was done 31.08.2017. Case under review.

9. Motor Nose Link Bushing for EMD Locomotives

INNOVA RUBBERS PVT. LTD., Plot No. H - 107, MIDC Industrial Area, MIDC Ambad, Nashik

15.12.16 After compliances of shortcoming, DD/VDG is nominated for capability assessment on 02.06.2017, planned on 30.08.2017.

10. Bushing Traction Rod for EMD Locomotives.

M/s Manisha Rubeer Enterprises. Mumbai

26.11.10 Inspection completed on 18.11.15. Despatch memo issued. Material under fitment at DLW for field trial of one year. Qualifying Qty as a ‘Developmental vendor’ is under review.

11. Bushing Traction Rod for EMD Locomotives.

M/s Mandeep Industries, Amausi Industrial Area, Nadarganj, Lucknow

19.08.14 Capability assessment done on 05.12.2014. Firm has offered prototype on 15.04.15. DD (VDG) & ARO/M & C dte have carried out prototype inspection. Material failed during testing, intimated to firm vide letter dated 14.10.15. Letter sent to firm on 05.02.2016 to re-offer prototype sample within 30 days failing which your application may be closed. Firm has requested for some more time (60 days) vide letter dated 11.03.2016. Firm was advised to offer prototype sample of Bushing Traction Rod for HHP locomotives

Page 32: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

32

by 04.07.2016 vide letter dated: 02.06.2016. Firm reply received on 27.06.2016, shortcomings observed, communicated to firm on 28.07.2016. Reminder sent on 07.12.16. Vide letter dated: 24.05.2017, firm wanted more 30 days for offering of sample testing.

12. Bushing Traction Rod for EMD Locomotives.

B.D. Bansal Steel Industries, Chembur, Mumbai

29.04. 15 Application scrutinised, shortcomings communicated to firm on 22.05.2015. Reply received on 22.06.15 & 10.07.15, shortcoming communicated to firm on 07.10.2015. Reply received on 12.10.15. Shortcoming again observed communicated to firm vide letter dated 05.02.16. Reply received on 15.10.16. Shortcoming again observed communicated to firm vide letter dated 31.10.16. Reply received on 25.11.16. After compliances of shortcoming, capability assessment was done 06.06.2017. Noticed shortcomings were communicated on 15.06.2017. Reply received on 01.08.2017. Case under scrutiny.

13. Bushing Traction Rod for EMD Locomotives.

M/s Frontier Alloy Steels Ltd., Jamni Wala Road, Jamboo Khala, Tehsil Paonta Sahib, Distt.- Sirmaur

13.10.15 Application scrutinised, shortcomings communicated to firm on 02.12.15. Reply received on 11.02.2016, Shortcomings again observed, communicated to firm on 10.03.2016. Reply received on 23.05.2016. DD/VDG nominated for Capability & capacity assessment. A letter was issued for confirmation to the firm on 06.07.2016. Reminder sent on 16.11.16. After compliances of shortcoming, capability assessment done 31.08.2017. Case under review.

14. Bushing Traction Rod for EMD Locomotives.

INNOVA RUBBERS PVT. LTD., Ambad, Nashik

15.12.16 After compliances of shortcoming, DD/VDG is nominated for capability assessment on 02.06.2017, planned on 30.08.2017.

15. Spring Single coil for EMD locomotives

M/s B. P. Springs, Howrah

13.05.11 Prototype inspection completed on 03.05.2014, against DLW P.O. (05 loco sets of WDP4 & WDG4 springs). Fitment details was asked from DLW vide letter dated 31.07.2014. Partial fitment detail received from DLW on 21.07.15. Letter again sent to DLW on 23.09.15 for sending complete fitment detail. Fitment detail for the rest Qty. asked from DLW & performance asked from Zonal railway vide letter dated 01.03.2016.

16. Spring – Single Coil for EMD locomotives

M/s Shandong Zhiheng Vibration Damping Tech. Co. Ltd., P.R. China

14.03.14 Firm has been cleared for developmental order in Mar 15. A letter was sent to DLW & DMW on 05.11.2015 regarding status of developmental order. Prototype inspection to be carried out by RDSO officer.

17. Rubber Spring Assembly for WDG4 locomotive

M/s Aryan Exporter Pvt. Ltd., Lucknow

18.05.12 Application shortcomings communicated to firm on 15.06.2012, 27.09.12 & 21.11.12. Capacity assessment done on 16.12.2016. Firm has been recommended for developmental order on 28.12.2016. 16 nos. of rubber spring has been inspected and under field trial. Firm has further given a inspection call for 44 Nos., received on 11.08.2017 but DP expired on 14.08.2017. DP extension required.

18. Rubber Spring Assembly for WDG4 locomotive

M/s Frontier Alloy Steels Ltd., Jamni Wala Road, Jamboo Khala, Tehsil Paonta Sahib,Distt. Sirmaur

13.10.15 Application & QAP has been scrutinised, shortcomings communicated to firm on 08.02.2016. Reply received on10.03.2016, shortcomings communicated to firm on 01.04.16. Reminder sent on 08.12.16. After compliances of shortcoming, capability assessment was done 31.08.2017. Case under review.

19. Rubber Spring Assembly for WDG4 locomotive

MGM Rubber Company, 277 Jessore Road, Kolkata-700048

01.11.16 Application & QAP has been scrutinised, shortcomings communicated to firm on 05.04.2017. After compliances of shortcoming, capability assessment was done 06.07.2017. Firm was recommended for developmental order on 10.07.2017.

20. Rubber Spring M/s Climax 25.07.17 Application scrutinised, shortcomings

Page 33: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

33

Assembly for WDG4 locomotive

Overseas Pvt. Ltd., IMT, Manesar, Gurgaon, Haryan

communicated to firm on 08.08.2017. Reply is awaited.

21. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Simplex Castings Limited, Bhilai

28.10.09 Cleared for prototype on 10.09.12. Verification of manufacturing facilities available with the firm has been done on 19.10.12. Prototype inspection of 02 bogies completed. IC issued on 27.06.2016. Material under field trial of one year. Firm has to comply the revised STR.

22. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Beekay Engineering Corporation, Bhilai

24.02.11 Cleared for developmental order on 29.12.11. Bogies have been fitted in loco no. WDP4D-336 (Road No.-40243) and despatched to ED/SR on 10.08.2015, under field trial of one year. Firm has to comply the revised STR.

23. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Simplex Engg & Foundry Works Pvt. Ltd. Additional unit: 11, Industrial estate, Bhilai

07.11.12 Application scrutinized, Shortcomings communicated to firm on 07.12.2012, 09.05.2013, 06.08.2013. Firm’s reply received on 20.02.2013, 14.05.2013, 17.08.2013. Clarification on few points of the reply asked from firm vide letter dated 08.10.2013. Reply received on 04.12.2013. Firm’s premises have been verified for their infrastructural facilities on 10.12.2013.

24. Fabricated Bogie Frame & Bolster Assembly for locomotive

Texmaco UGL Rail Pvt. Ltd., Belgharia, Kolkata-700 056, West Bengal, India

03.11.13 Application scrutinized, shortcomings communicated to the firm on 26.12.2013. Reminder sent on 22.09.2014. Reply received on 07.10.14, shortcomings communicated to firm on 31.10.2014. Reply received on 12.01.15, shortcomings communicated to firm on 23.02.2015. Reply received on 17.04.2015. Vide letter dated 04.01.2016, it has been advised to firm to submit STR compliance along with QAP. Only STR compliance received through e-mail on 09.01.16. Firm wants to utilise some facilities of his other unit, so clarification asked vide letter dated 16.03.2016. Reply received on 20.09.2016, shortcoming communicated on 08.05.2017.

25. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Hindustan Engg. & Industries Ltd. Kolkata

13.03.14 Application scrutinised. Shortcomings communicated to firm on 21.04.2014. Firm’s legal documents received on 24.04.2014, Shortcomings communicated to firm on 14.05.2014. Firm’s reply received on 26.08.2015. STR compliance asked vide letter dated 11.01.2016. Reply received on 26.07.16, shortcoming communicated on 02.05.2017.

26. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Jupiter Wagons LTD., Kolkata

07.10.14 Application scrutinised, shortcomings communicated to firm on 08.12.2014. Capability assessment done on 18 & 19.05.2016. Assessment shortcomings communicated to firm on 21.09.2016. Reply received on 09.11.2016, verification done on 17.04.2017. Further shortcomings noticed, communicated to firm on 08.05.2017.

27. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Kay Bouvet Engineering Ltd., Satara, (Maharshtra)

07.10.14 Application scrutinised, shortcomings communicated to firm on 29.12.2014. Firm’s reply received on 16.02.2015, shortcomings again observed, communicated to firm on 09.04.2015. Firm’s reply received on 16.09.2015. Vide letter dated 08.01.2016, it has been advised to firm to submit STR compliance along with compliance of other shortcomings before 07.02.2016, for further processing of the case. Reply received on 09.02.2016, shortcomings communicated to firm on 15.03.16. Firm has to comply STR, communicated vide letter dated 19.06.2017.

28. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Chandra Udyog, NH-6, Salap (Math Bagan), Domjur, Howrah – 711409

15.07.15 Application & QAP has been scrutinised, shortcomings communicated to firm on 18.02.2016.

Page 34: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

34

29. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Fedders Loyd Corportaion Ltd., PSL Engineering Pvt Limited District – Mandla, M.P

13.10.15 Application & QAP has been scrutinised, shortcomings communicated to firm on 18.02.2016.

30. Fabricated Bogie Frame & Bolster Assembly for locomotive

Rana Udyog Pvt.Ltd., VILL - SULATI, P.O. KANDUA, N.H. -6, P.S. SANKRAIL, DIST HOWRAH

12.02.16 Application scrutinised, shortcomings communicated to firm on 14.07.2016.

31. Fabricated Bogie Frame & Bolster assembly for locomotives

Shape Engine Co.Ltd., C-2, Bahadrabad Industrial Area , Haridwar, Uttarakhand

29.04.16 Application scrutinised, shortcomings communicated to firm on 20.08.2016.

32. Truck frame assembly for EMD locomotives

M/s UP Steels, Nara, Meerut Road Distt. Muzaffarnagar U.P.

16.07.12 Capacity assessment has been done on 26.09.2013. Shortcomings of assessment communicated to firm on 08.10.2013. Prototype inspection upto stage-II has been done, intimated to firm on 06.07.16. QAP and documents regarding change in name also asked. 1

st stage of 2

nd casting cleared. Letter sent to

firm to intimate status of installation of Plano-miller on 16.06.2017. Reply awaited.

33. Truck frame assembly for EMD locomotives

M/s Titagarh Wagons Limited1, Abdul Quddus Road, West Bengal

19.06.14 Application scrutinised. Shortcomings communicated to firm on 23.07.2014. Capacity & capability assessment done on 16 & 17.02.16. Assessment shortcomings communicated to firm on 02.03.2016. IC of 02 truck frames against DLW P.O. has been issued on 05.01.2017.

34. Primary vertical damper for EMD locomotives

M/s India Auto Industries Pvt.Ltd. Janakpuri, New Delhi

24.01.12 Capacity assessment has been done on 21.03.2013. Shortcomings of assessment communicated to firm on 09.04.2013. Prototype inspection completed on 24.04.2017. Firm has been recommended for developmental order on 09.05.2017.

35. Primary vertical damper for EMD locomotives

M/s Suomen Vaimennin Oy- Finland C/o River Engg. Pvt Ltd,

04.04.13 Firm has been cleared for developmental order on 30.08.2013, intimated to CDE/DLW. DLW has intimated that dev order has been placed to firm for 180 Nos. of Primary dampers. Prototype cleared on 10.07.2017.

36. Primary vertical damper for HHP locomotives

M/s Escort Limited (Railway Equipment Division), Plot No -115 ,Sector -24, Faridabad

09.07.14 Application shortcoming communicated to firm vide letter dated 31.07.2014. Capacity assessment done on 09.01.2015. Prototype inspection completed & IC issued on 04.07.2016. Fitment detail received from DLW on 24.07.2017.

37. Primary vertical damper for HHP locomotives

M/s Jagtar Singh & Sons Hydraulics Pvt. Ltd., Najafgarh, New Delhi

07.10.14 Application scrutinised, shortcomings communicated to firm on 31.10.2014. Reply received on 28.01.15, shortcomings communicated to firm on 13.04.15. Reply received on 12.05.15. Shortcomings communicated on 02.06.2015. Reply received on 13.07.15, shortcomings communicated to firm on 12.10.15. Revised QAP received on 10.03.2016, shortcomings communicated on 30.05.2016. As there is no response from the firm, a closure notice issued on 09.06.2017. Case under review.

38. Secondary Yaw Damper for EMD locomotives

Suomen Vaimennin Oy- Finland C/o River Engg. Pvt Ltd,

24.06.11 A clearance letter sent to CDE/DLW on 14.01.2013 for developmental order of 05 loco sets subject to condition that initial 02 nos. of prototype dampers pass during testing. DLW has intimated that dev order has been placed to firm for 56 Nos. of Secondary dampers. Prototype cleared on 10.07.2017.

39. Secondary Yaw Damper for EMD

M/s India Auto Industries Pvt.Ltd.

24.01.12 Capacity assessment has been done on 21.03.2013. Shortcomings of assessment communicated to firm

Page 35: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

35

locomotives Janakpuri, New Delhi

on 09.04.2013. Prototype inspection completed on 24.04.2017. Firm has been recommended for developmental order on 09.05.2017.

40. Secondary Yaw Damper for HHP locomotives

M/s Escort Limited (Railway Equipment Division), Plot No. -115 , Sector -24 Faridabad

09.07.14 Application shortcoming communicated to firm vide letter dated 31.07.2014. Capacity assessment done on 09.01.2015. Prototype inspection completed & IC issued on 04.07.2016. Fitment detail received from DLW on 24.07.2017.

41. Bearing adapter with journal bearing assembly (Without bushing traction rod) for EMD locomotives.

M/s FAG Bearings India Ltd., Maneja, Vadodara- 390 013

20.04.12 Capability assessment done on 20 & 21.11.2014. Prototype inspection completed on 07.01.2016. Material under field trial of one year.

42. Rubber Spring assembly –A & B for WDP4

M/s Prag Industries (I) Pvt. Ltd., E-7 Talkatora Industrial Estate, Lucknow

08.05.12 Letter sent to CMPE/SWR & CMPE/NFR for consideration of developmental order of 10 loco sets on 24.08.2012. Reminder sent to CMPE/SWR & CMPE/NFR on 24.06.13, for dev. Order. Status of dev order asked from CMPE/NWR & CMPE/ECoR on 04.11.2015.

43. Half cylinder wear for EMD locomotives

M/s A-One Enterprises Pvt. Ltd, Gurgaon.

24.07.12 Firm has been recommended for development order of 05 loco set on dated 28.04.2014. Firm has got developmental order from DLW and offered for prototype inspection on 11.05.15. Inspection completed from 08.08.15. Fitment detail asked from DLW on 30.10.2015 of 51 nos. of half cylinder wear.

44. Half cylinder wear for EMD locomotives

M/s Shree Meenakshi Polymer, site-II, Loni Road, Mohan Nager,Ghaziabad

13.04.15 Shortcomings communicated to firm on 08.05.2015. Reply received on 27.05.15. Shortcomings again observed, communicated to firm on 02.06.2015. Reply received on 26.08.2015. Shortcomings again observed, communicated to firm on 14.10.15. Reply received on 30.11.15 & 08.01.2016. Shortcoming again observed, communicated to firm vide letter dated 15.02.16. Reply received on 20.02.16, found in order. Capability assessment to be done by RDSO officer. Capability assessment was done on 02.09.16 and shortcoming communicated to firm on 03.10.16. Reply received on 09.11.16 & 24.11.16. After compliance of shortcomings. Firm was recommended for developmental order on 18.01.2017

45. Vertical and Lateral Hydraulic Dampers (WDM3D)

M/s India Auto Industries Pvt.Ltd. Janakpuri, New Delhi

03.12.12 Capacity assessment has been done on 21.03.2013. Shortcomings of assessment communicated to firm on 09.04.2013. Vide letter dated 03.02.2015, clarification regarding design capability, past experience with M & P asked from firm. Firm submitted compliance on 14.02.2015. Inspection plan for type testing has been finalised. Vide letter dated 13.10.15, firm has been asked to offer prototype sample. Firm has intimated vide letter dated 12.11.2015 that prototype sample will be ready upto 25.11.2015. Prototype inspection completed on 23.06.2017. Firm has been recommended for developmental order on 28.06.2017.

46. Vertical and Lateral Hydraulic Dampers (WDM3D)

M/s Knorr Bremse India Pvt Ltd., Palwal, Haryana

07.08.13 Firm has been recommended for development order of 05 loco sets on dated 15.05.2014. Inspection done on 01.08.2015. IC issued on 28.08.2015. Material under fitment at DLW and DMW.

47. Bushing Rubber for EMD locomotives

B.D. Bansal Steel Industries, Chembur, Mumbai

29.04. 15 Application scrutinised, shortcomings communicated to firm on 22.05.2015. Reply received on 22.06.15 & 10.07.15, shortcoming communicated to firm on 07.10.2015. Reply received on 12.10.15. Shortcoming again observed communicated to firm vide letter dated 05.02.16. Reply received on 15.10.16. Shortcoming again observed communicated to firm vide letter dated 31.10.16.

Page 36: fnukad % 17-08-2017 dks os.Mj vkosnu dh fLFkfr CURRENT ... of fresh... · SD.Dev.28LAV-1 dated 21.07.2017. 9. Gauge complex with AFI, HHP Loco ... System,Computer / Microprocessor

36

Reply received on 25.11.16. After compliances of shortcoming, capability assessment was done 06.06.2017. Noticed shortcomings were communicated on 15.06.2017. Reply received on 01.08.2017. Case under scrutiny.

48. Bushing Rubber for EMD locomotives

M/s Frontier Alloy Steels Ltd., Jamni Wala Road, Jamboo Khala, Tehsil Paonta Sahib,Distt. Sirmaur

13.10.15 Application scrutinised, shortcomings communicated to firm on 02.12.15. Reply received on 11.02.2016, Shortcomings again observed, communicated to firm on 10.03.2016. Reply received on 23.05.2016. DD/VDG nominated for Capability & capacity assessment. A letter was issued for confirmation to the firm on 06.07.2016. Reminder sent on 16.11.16. After compliances of shortcoming, capability assessment was done 31.08.2017. Case under review.

49. Centre Pivot Block assembly

M/s Shree Meenakshi Polymer, site-II, Loni Road, Mohan Nager, Ghaziabad

13.04.15 Application scrutinised, shortcomings to be communicated to firm.08.05.2015. Reply received on 27.05.15. Shortcomings again observed, communicated to firm on 02.06.2015 and 16.09.2015. Reply received on 06.11.15 & 08.01.2016. Shortcoming again observed, communicated to firm vide letter dated 15.02.16. Reply received on 20.02.16, found in order. Capability assessment to be done by RDSO officer. Capability assessment was done on 02.09.16 and shortcoming communicated to firm on 03.10.16. Reply received on 09.11.16 & 24.11.16. After compliance of shortcomings. Firm was recommended for developmental order on 18.01.2017

50. Centre Pivot Block assembly

M/s A-One Enterprises Pvt. Ltd, Gurgaon.

05.05.15 Shortcomings to be communicated to firm on 07.09.2015. Reply received on 29.10.15, shortcomings communicated on 23.11.2015. Reply received on 29.12.2015. Shortcoming again observed, communicated to firm vide letter dated 08.01.16. Reply received on 19.01.16. Capability assessment to be done by RDSO officer. Capability assessment was done on 03.09.16 and shortcoming communicated to firm on 03.10.16. Reply received on 17.10.16. Compliance of shortcomings to be verified, planned on 22.08.2017.

51. Centre Pivot Block assembly

M/s Electroplast, Ghaziabad

27.07.16 Due to change of work address, application has been closed on 11.08.2017.

52. Kit for TBU for WDG5 locomotives (DLW Part No. 17456216, VTS No. 00363)

Ametsis Ingenieríay Asesoría Técnica SL, C/ Ciudad de Frías 16, 28021, Madrid, Spain

16.03.16 Application scrutinised, shortcomings communicated to firm on 02.06.2016.

53. Equaliser beams, Compensating beams and Links of locomotive high adhesion bogies& Equaliser beams (long & short) of Trimount locomotive Bogies

M/s Razzlakshmi Enterprise, Kona Check Post, Benaras Road, Howrah - 711114

27.07.16 Application scrutinised, shortcomings communicated to firm on 12.09.2016. After compliance of the shortcomings, capability assessment done on 05.07.2017, shortcomings communicated on 10.07.2017. Vide letter dated 20.04.2017, firm asked for some time to comply with the assessment shortcomings

54. Bushing Car body for WDG5 locomotives

M/s Stork Rubber Product Pvt., Gurgaon

15.12.16 Application scrutinised, shortcomings communicated to firm on 04.05.2017. Reply is awaited.