Flying Wire Update Feb 4, 2209. TEV E-11H Motor Failure Rotor coil overheated and shorted to ground....
-
Upload
conrad-terry -
Category
Documents
-
view
215 -
download
0
Transcript of Flying Wire Update Feb 4, 2209. TEV E-11H Motor Failure Rotor coil overheated and shorted to ground....
![Page 1: Flying Wire Update Feb 4, 2209. TEV E-11H Motor Failure Rotor coil overheated and shorted to ground. Stator Magnets.](https://reader036.fdocuments.in/reader036/viewer/2022070415/5697bfab1a28abf838c9b31d/html5/thumbnails/1.jpg)
Flying Wire Update
Feb 4, 2209
![Page 2: Flying Wire Update Feb 4, 2209. TEV E-11H Motor Failure Rotor coil overheated and shorted to ground. Stator Magnets.](https://reader036.fdocuments.in/reader036/viewer/2022070415/5697bfab1a28abf838c9b31d/html5/thumbnails/2.jpg)
TEV E-11H Motor FailureRotor coil overheated and shorted to ground.
Stator Magnets
![Page 3: Flying Wire Update Feb 4, 2209. TEV E-11H Motor Failure Rotor coil overheated and shorted to ground. Stator Magnets.](https://reader036.fdocuments.in/reader036/viewer/2022070415/5697bfab1a28abf838c9b31d/html5/thumbnails/3.jpg)
MFW MultiBatch
• Still many partial data captures– Out of 29 Proton injections on store 6771
• 13 had partial or flat profiles• 2 transfers appeared to have no beam at all.
• Now seem to only affect Pass 0, Bunch 1
![Page 4: Flying Wire Update Feb 4, 2209. TEV E-11H Motor Failure Rotor coil overheated and shorted to ground. Stator Magnets.](https://reader036.fdocuments.in/reader036/viewer/2022070415/5697bfab1a28abf838c9b31d/html5/thumbnails/4.jpg)
MFW Partials
Transfer # 11
Transfer #21
Transfer #9
![Page 5: Flying Wire Update Feb 4, 2209. TEV E-11H Motor Failure Rotor coil overheated and shorted to ground. Stator Magnets.](https://reader036.fdocuments.in/reader036/viewer/2022070415/5697bfab1a28abf838c9b31d/html5/thumbnails/5.jpg)
Multi-Proton Bunch Pattern Timing
![Page 6: Flying Wire Update Feb 4, 2209. TEV E-11H Motor Failure Rotor coil overheated and shorted to ground. Stator Magnets.](https://reader036.fdocuments.in/reader036/viewer/2022070415/5697bfab1a28abf838c9b31d/html5/thumbnails/6.jpg)
MFW Missing Vertical Wire
• Clean lid being prepared for installation.– Wire mounted and stress verified.– Needs to be pumped down and flown.
• Second can has clean parts but we are testing the feed through before final assembly
Vertical Gates
Vertical Loss Monitor
Horizontal Gates
Showing horizontal losses but no vertical losses