FLOW FL AIRS Operation Wireless Capturing the Cell Phone Jewels
-
Upload
wade-fulton -
Category
Documents
-
view
20 -
download
1
description
Transcript of FLOW FL AIRS Operation Wireless Capturing the Cell Phone Jewels
FLOWFLOWFL AIRS Operation FL AIRS Operation
WirelessWireless
Capturing the Cell Phone Capturing the Cell Phone Jewels Jewels
Statewide Coverage for 2-1-1Statewide Coverage for 2-1-1
Janet Bard Hanson, Ph.D.Janet Bard Hanson, Ph.D.
2-1-1 Big Bend, Inc. 2-1-1 Big Bend, Inc. Thursday, September 7, 2006Thursday, September 7, 2006
““Hilton Tampa Airport Westshore” Hilton Tampa Airport Westshore” Updated January 2012Updated January 2012
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 22
Florida 2-1-1 Jewels Florida 2-1-1 Jewels
Access to 2-1-1 for all Access to 2-1-1 for all Floridians whether Floridians whether using land lines or using land lines or cellular phones. cellular phones.
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 33
ChallengesChallenges• Number of wireless access lines has Number of wireless access lines has
surpassed or will surpass landlinessurpassed or will surpass landlines• Many Floridians are using wireless as Many Floridians are using wireless as
primary telephoneprimary telephone– Lower cost for long distanceLower cost for long distance– Good option for people with poor creditGood option for people with poor credit– Supports transitory residency Supports transitory residency (Snow Birds, College Students, Evacuees)(Snow Birds, College Students, Evacuees)
• Cellphones are used by people in Cellphones are used by people in vulnerable situations such as domestic vulnerable situations such as domestic violence, hurricane evacuees, college violence, hurricane evacuees, college students away from home students away from home
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 44
Strategies for Solution Strategies for Solution
2-1 1 Centers have been working with the 2-1 1 Centers have been working with the wireless providers in their areas to forward wireless providers in their areas to forward calls to their individual center. This calls to their individual center. This system has been successful in many system has been successful in many areas, however, some centers have had areas, however, some centers have had multiple issues and barriers to achieving multiple issues and barriers to achieving this goal. this goal.
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 55
Strategies for Solution Strategies for Solution
The need for a Statewide System The need for a Statewide System became apparent to serve as an became apparent to serve as an umbrella to provide total coverage for umbrella to provide total coverage for the state – in all areas and all providers the state – in all areas and all providers without effecting current individual without effecting current individual agreements already in place. agreements already in place.
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 66
Concept Development Concept Development
• The Florida Operation Wireless The Florida Operation Wireless System was conceived to provide a System was conceived to provide a flexible yet comprehensive system. flexible yet comprehensive system.
• The conceptual model was developed The conceptual model was developed during the Summer of 2005. After during the Summer of 2005. After presentation to FLAIRS in September, presentation to FLAIRS in September, a committee was formed to develop a committee was formed to develop an Invitation to Negotiate for the an Invitation to Negotiate for the FLOW system. FLOW system.
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 77
Project Timeline - 2006Project Timeline - 2006 Task Completion DateIssue ITN (Posted on Website) February 13, 2006
Vendor question deadline February 23, 2006
Addendum release (Posted on website) March 1, 2006
Vendor responses due March 14, 2006
Vendor notification and negotiaion March 22, 2006
ITN Review Work Group March 23, 2006
Proposal Presentation- 2-1-1 Network April 16, 2006
Projected Project Commencement Date May 26, 2006
FLAIRS Board Acceptance June 22, 2006
SUNCOM Network Service Agreement Signed July 11, 2006
CSA (Communication Service Authorization) Submitted July 24, 2006
Initial FLOW Team Planning Meeting August 2, 2006
Project Presentation to 2-1-1 Network Partners September 7, 2006
Build Communication Network September 15, 2006
Partner Statement of Understanding Signed September 30, 2006
Develop Speech Recognition Application October 27, 2006
Statewide Roll-out November 10, 2006
Develop Reporting Format November 15, 2006
Monitor, Test and Tune December 15, 2006
Project Implementation January 5, 2007
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 88
Hybrid SystemHybrid System
Calls to programmed Towers and Calls to programmed Towers and Switches would go straight to local 2-Switches would go straight to local 2-1-1 call center (No cost to 2-1-1 1-1 call center (No cost to 2-1-1 center) center)
The individual 2-1-1 Centers have The individual 2-1-1 Centers have made arrangements with their local made arrangements with their local wireless providers. wireless providers.
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 99
Hybrid SystemHybrid System
Calls to “non-programmed” Towers Calls to “non-programmed” Towers would go to FLOW Center (2-1-1 would go to FLOW Center (2-1-1 Center charged for incoming calls Center charged for incoming calls from FLOW Center)from FLOW Center)
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 1010
Types of Types of Routing - TranslationRouting - Translation
Tower – BasedTower – Based• Tower, site and Tower, site and
company dependentcompany dependent• Requires regular Requires regular
maintenance as towers maintenance as towers are addedare added
• Requires TELCO Requires TELCO maintenancemaintenance
• Cost associated with Cost associated with each towereach tower
• Limited capacity for Limited capacity for redirecting of callsredirecting of calls
Switch-basedSwitch-based• Hard-wired at Hard-wired at
switch from multiple switch from multiple exchanges/large exchanges/large areaarea
• Less complexLess complex• Little ongoing Little ongoing
maintenancemaintenance• Often no charge by Often no charge by
TELCOTELCO
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 1111
FLOW SYSTEMFLOW SYSTEM((FLFL AIRS AIRS OOperation peration WWireless)ireless)
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 1212
Cell phone user dials 2-1-1Cell phone user dials 2-1-1
Call is picked up by nearest Telco Call is picked up by nearest Telco TowerTower for that specific service within the for that specific service within the
geographic area (cell) geographic area (cell)
Tower
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 1313
Call sent (usually by land lines) toCall sent (usually by land lines) to
Tower
Company Company SwitchSwitch
Tower
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 1414
Switch directs call to Specific 1-Switch directs call to Specific 1-800800
Company Company A SwitchA Switch
2-1-1 2-1-1 Network Network
Distribution Distribution CenterCenter
FLOW CenterFLOW Center
Company Company A SwitchA Switch
Company Company B SwitchB Switch
Company Company C SwitchC Switch
Company Company C SwitchC Switch
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 1515
Caller uses IVR/Menu System to Caller uses IVR/Menu System to select area where they need select area where they need
information. information.
2-1-1 2-1-1 Network Network DistributDistribut
ion ion
FLOW FLOW CenterCenter
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 1616
Distribution CenterDistribution Center directs call to directs call to appropriate 2-1-1 Centerappropriate 2-1-1 Center based on caller based on caller
requestrequest
2-1-1 2-1-1 Network Network DistributDistribut
ionion
FLOW FLOW CenterCenter
Switchboard Switchboard of Miamiof Miami
2-1-1 2-1-1 Big BendBig Bend
Center for Center for InformationInformation
and Crisis Servicesand Crisis Services
211 Brevard211 Brevard
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 1717
Regional 2-1-1 Call Center Regional 2-1-1 Call Center receives callreceives call
2-1-1 2-1-1 Big BendBig Bend
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 1818
ITN Requirements ITN Requirements • Solution must have capacity to serve Solution must have capacity to serve
every Florida cell phone callerevery Florida cell phone caller
• Solution may be service-based (No Solution may be service-based (No equipment purchase or investment equipment purchase or investment by FLAIRS)by FLAIRS)
• Solution must accommodate hybrid Solution must accommodate hybrid system (exclude certain areas)system (exclude certain areas)
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 1919
ITN Requirements ITN Requirements • Solution must be simple for caller – Solution must be simple for caller –
preferably voice recognitionpreferably voice recognition• Solution must accommodate existing Solution must accommodate existing
2-1-1 Center equipment. 2-1-1 Center equipment.
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 2020
ITN Requirements ITN Requirements • Vendor must provide monthly billing Vendor must provide monthly billing
itemized and detailed by service, itemized and detailed by service, usage, location, originating wireless usage, location, originating wireless provider and call center. provider and call center.
• Vendor must agree to bill and receive Vendor must agree to bill and receive payments from each 2-1-1 Center payments from each 2-1-1 Center based on percentage utilization of based on percentage utilization of overall minutes of usage and/or calls overall minutes of usage and/or calls delivered. delivered.
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 2121
ITN Requirements ITN Requirements
• Proposal and cost must be based on Proposal and cost must be based on a ten minute call - 240,000 calls a a ten minute call - 240,000 calls a year (first year) with ability to upsize year (first year) with ability to upsize ( 10 – 50%) or downsize (20%) ( 10 – 50%) or downsize (20%) without significant price difference without significant price difference
• Proposal should be based on 1, 2 or 3 Proposal should be based on 1, 2 or 3 year contract periods year contract periods
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 2222
ITN Requirements ITN Requirements • Installation and activation of service Installation and activation of service
must be a seamless transition and must be a seamless transition and accommodation of current wireless accommodation of current wireless telephone solutionstelephone solutions
• Proposal must include IVR solution Proposal must include IVR solution for English and Spanish speaking for English and Spanish speaking callers with suggested solution for callers with suggested solution for Creole Creole
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 2323
ITN Requirements ITN Requirements
• Proposal should include possible Proposal should include possible options and costs associated with options and costs associated with potential disaster rerouting and call potential disaster rerouting and call overflow service offering overflow service offering
• Proposal must include proposed Proposal must include proposed pricing including all taxes and fees. pricing including all taxes and fees.
• Proposal must include billing Proposal must include billing incrementsincrements
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 2424
FLOW System CostsFLOW System Costs• Cost of Programming Switches Cost of Programming Switches (Hopefully none)(Hopefully none)
• Cost of FLOW Center translationCost of FLOW Center translation– Development of IVR/Set-up feeDevelopment of IVR/Set-up fee
• Per Call CostsPer Call Costs– IVR Redirect/Take back and transfer IVR Redirect/Take back and transfer
• Per Minute Costs Per Minute Costs – Cost of 1Cost of 1stst 800 number (time) 800 number (time)
• [[Each switch would have unique 800 number]Each switch would have unique 800 number]
– Cost of 2nd 800 number (time)Cost of 2nd 800 number (time)• [Each 2-1-1 Center would have a unique 800 number][Each 2-1-1 Center would have a unique 800 number]
– Cost of IVR Treatment Cost of IVR Treatment
• Monthly chargesMonthly charges– IVR System PortIVR System Port– Other PortsOther Ports
• Other Taxes and FeesOther Taxes and Fees
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 2525
FLOW System CostsFLOW System Costs
• Cost of FLOW Center translationCost of FLOW Center translation– Development of IVR/Set-up feeDevelopment of IVR/Set-up fee
$80,370.00$80,370.00
• Per Call CostsPer Call Costs– IVR Redirect/Take back and transferIVR Redirect/Take back and transfer
$0.03$0.03
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 2626
FLOW System CostsFLOW System Costs
• Per Minute Costs Per Minute Costs – Cost of 1Cost of 1stst 800 number $0.029 per 800 number $0.029 per
minute minute •[[Each switch would have unique 800 number]Each switch would have unique 800 number]
– Cost of 2nd 800 number (time) $0.049 per Cost of 2nd 800 number (time) $0.049 per minuteminute
•[Each 2-1-1 Center would have a unique 800 [Each 2-1-1 Center would have a unique 800 number]number]
– Cost of IVR TreatmentCost of IVR Treatment•$0.053 per minute (Estimated time = 1 $0.053 per minute (Estimated time = 1
minute) minute)
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 2727
FLOW System CostsFLOW System Costs• Monthly chargesMonthly charges
– Recurring Circuit ChargeRecurring Circuit Charge•Non-speech trunk 84 units $23.54 per unitNon-speech trunk 84 units $23.54 per unit
– $1,977.36$1,977.36
•Speech trunk 12 units $80.38 per unit Speech trunk 12 units $80.38 per unit – $964.56$964.56
• Other taxes and feesOther taxes and fees– Florida Gross Receipts Surcharge 2.5%Florida Gross Receipts Surcharge 2.5%– Federal Carrier Universal Service Fee 10.9%Federal Carrier Universal Service Fee 10.9%
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 2828
Current Steps - ChallengesCurrent Steps - Challenges• Complete Memorandum of Complete Memorandum of
Understandings with 2-1-1 Network Understandings with 2-1-1 Network MembersMembers
• Review all city names in Florida. Review all city names in Florida. Associate with area code, county and Associate with area code, county and 2-1-1 Network Center. 2-1-1 Network Center.
• Determine policy for handling calls Determine policy for handling calls requesting information for “White requesting information for “White Areas”Areas”
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 2929
Who is the Partnership Team?Who is the Partnership Team?
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 3030
Florida DMS toll-free network providerHighest possible reliability through SONET facilitiesNetwork was not disrupted by KatrinaEmergency routing capabilitiesDedicated State of Florida Account Team
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 3131
• Hosted Automated Speech Recognition (ASR) Hosted Automated Speech Recognition (ASR) and IVRand IVR
• Live Operator ServicesLive Operator Services
• Highly responsive to your needsHighly responsive to your needs
• Services part of existing Centrex Agreement with Services part of existing Centrex Agreement with DMSDMS
• Dedicated CenturyLink/PATlive Account TeamDedicated CenturyLink/PATlive Account Team
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 3232
• Existing vendor agreements that meet your Existing vendor agreements that meet your requirements. Competitively bid and approved for requirements. Competitively bid and approved for your use.your use.
• Allows Agencies to purchase without term Allows Agencies to purchase without term commitments commitments
• Relationships with major telecom vendorsRelationships with major telecom vendors• Manages ESF2 (Emergency Support Function for Manages ESF2 (Emergency Support Function for
Communications). Your communications are a Communications). Your communications are a priority during emergencies.priority during emergencies.
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 3333
Project ManagementProject Management
• Mahmoud Sondossi will be the lead Mahmoud Sondossi will be the lead Project Manager for DMS. Project Manager for DMS.
• Each vendor will assign a Project Each vendor will assign a Project Manager Manager
• Weekly implementation meetings Weekly implementation meetings throughout the entire processthroughout the entire process
• Ongoing monthly meetings to discuss Ongoing monthly meetings to discuss changes, invoicing and service issues changes, invoicing and service issues
F L O WF L O WContactsContacts
FLAIRS
Dr. Janet Bard Hanson, FLOW Project Manager Randy Nicklaus, 2-1-1 Network Member
Florida Department of Management Services
Mohammad AmirzadehRaghib Qureshi
CENTURYLINK
Tom AveryPATLIVE
Victor DaurioKen Devivo
Deltacom
Chad Parnell
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 3535
AT&T,Verizon T-MobileOthers
Deltacom
211 Network Centers
Sprint/PATLive ASR
How will FLOW work?How will FLOW work?
DeltacomTake-back & transfer
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 3636
Ordering ServicesOrdering Services
• FLAIRS has opened a DMS accountFLAIRS has opened a DMS account• FLAIRS will submit a CSA on behalf of FLAIRS will submit a CSA on behalf of
each 211 Network Centereach 211 Network Center• DMS will forward orders to CenturyLink DMS will forward orders to CenturyLink
and Deltacom for provisioningand Deltacom for provisioning• Change requests submitted by FLAIRS Change requests submitted by FLAIRS
through the CSA processthrough the CSA process
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 3737
InvoicingInvoicing
• Each Network Center is invoiced individually by Each Network Center is invoiced individually by DMSDMS
• FLAIRS receives a consolidated invoice FLAIRS receives a consolidated invoice
• Invoice chargesInvoice charges– Shared costs pro-rated by % of call volumeShared costs pro-rated by % of call volume
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 3838
Questions/Comments?Questions/Comments?
Janet Bard Hanson, Ph.D.Janet Bard Hanson, Ph.D.
• Director of Management and Director of Management and Information ProgramsInformation Programs
• 2-1-1 Big Bend, Inc.2-1-1 Big Bend, Inc.
•www.211bigbend.org
04/20/2304/20/23FLAIRS - J.B.Hanson, Ph.D. FLAIRS - J.B.Hanson, Ph.D.
2-1-1 Big Bend 2-1-1 Big Bend 3939
Credits:Credits:
• ““2-1-1 and Wireless Update” 2-1-1 and Wireless Update” Presentation by Lucinda Nord, Presentation by Lucinda Nord, Indiana 2-1-1 at 2005 AIRS Indiana 2-1-1 at 2005 AIRS Conference, Tucson, Arizona Conference, Tucson, Arizona