Floodplain Management City of Phoenix Management 101614.pdfFloodplain Management City of Phoenix....
Transcript of Floodplain Management City of Phoenix Management 101614.pdfFloodplain Management City of Phoenix....
Planning, Design & Programming DivisionStreet Transportation Department
Hasan Mushtaq, P.E., Ph.D., CFM
Floodplain Management
City of Phoenix
Floodplain Management
• Floodplain Administration• Local Drainage Program• Master Drainage Planning/CIP
• Dam Safety Program• AZPDES/NPDES Permit
Floodplain Management• Regulate private development and public
infrastructure projects:– Federal Emergency Management Agency (FEMA)– National Flood Insurance Program (NFIP) – Code of Federal Regulation (CFR)– State Standards, Arizona Dept. of Water Resources– Chapter 32B – Floodplains, Phoenix City Code– Storm Water Policies and Standards Manual
• 100 YEAR FLOOD• Special Flood Hazard Area (SFHA)• Flood Insurance Rate Maps (FIRM)
Local Drainage Program
• Reduce or eliminate local flooding• Benefits small group of citizens• Cost-effective solutions• Limited resources• Approximately $500,000/yr.• Short term benefits
Local Drainage Program
• Local Drainage Database• More than 650 Locations Citywide• Funding via 2001/2006 Bonds• Study, Design and Construction• Cycle time is approximately 2 years• Average cost is $750,000/project
Estimated Cost: $479 million
Local Drainage Program
Example Project60th Street and Hollyhock StreetStudy 35KConstruction 471K
Total 506K
Design, Construction & Management DivisionCompletion 18 months
Master Drainage Planning/CIP
• Large Planned Community Districts (PCD)– Drainage Infrastructure review & approval– Subdivision plan review
• Area Drainage Master Study (ADMS)– Hydrology & Hydraulics review– Alternatives Analysis & Concept Designs
• Capital Improvement Projects– Flood Mitigation Projects
• METRO ADMS• 90 sq. miles• Downtown SD
Projects• $12.0 M• FCDMC cost
share of $6.0M
Master Drainage Planning/CIP
BeforeRemoved 2,286 properties from the floodplain
After
Master Drainage Planning/CIP
Cave Creek Wash Re-delineation
Master Drainage Planning/CIPLaveen ADMP•27th Avenue and South Mountain Avenue Basin•43rd Avenue and Dobbins Basin•44th Avenue and Carver Basin•47th Avenue Channel System•51st Avenue and Dobbins Basin•51st Avenue and Elliot Road Basin•67th Avenue Channel (Southern to South Mountain Avenue)•Reservation Channel (Dobbins Road to Laveen Area Conveyance Channel)
Arcadia Drainage Improvement Projects•40th Street Storm Drain•Arcadia Drive Storm Drain•Camelback Road Storm Drain (West)•Lafayette Blvd. Storm Drain•Camelback Road Storm Drain (East)
METRO ADMPDurango Curve basinEncanto Park Golf Course BasinPalo Verde Golf Course BasinVan Buren Street Storm Drain ProjectThomas Road Storm Drain Project (60th Street to Old Cross Cut Canal)Central Avenue Storm Drain (Bethany Home Road to Arizona Canal)Jefferson Street/I-17 Storm Drain Project
Durango ADMP•DRCC – Phase II•Sunland Avenue Channel•Western Canal Channel
Hohokam ADMP•Basin 5/Circle K Park•14th/15th Street Storm Drain•Basin 1/Ardmore Road Storm Drain•South Mountain/17th Way Storm Drain•Basin 11 and Outfall Storm Drain•20th Street/Euclid Avenue Storm Drain•19th Street/South Mountain Avenue SD•Basin 10/Head Scout Pueblo BSC
South Phoenix/Laveen ADMP27th Avenue/Dobbins Road BasinSouth Phoenix/Laveen Drainage Improvement Project
Other Projects•20th Avenue and Turney Basin•Skunk Creek Levee at CAP•43rd Avenue Storm Drain Outfall Project•Pecos Basin Outfall Project•Salt River Channelization at 67th Avenue•Palisene-Paradise Ridge Drainage Project•Skunk Creek Channel at Pinnacle Peak RoadEstimated Cost:$709 million
Master Drainage Planning/CIP
Cost: $212 million
Flood Mitigation ProjectsName Cost (millions)
10th Street Wash Basins 1 & 2 $5.2510th Street Wash Storm Drain Project $3.1023rd Avenue/Roeser Road Basin $9.0024th Avenue/Camelback Road Detention Basin $11.0026th Avenue/Verde Lane Detention Basin $4.2527th Avenue Storm Drain Project, Southern Avenue to Salt River $1.0043rd Avenue SD Project and Baseline Road SD Project $18.5043rd Avenue/Baseline Road Basin $3.5043rd Avenue/Southern Avenue Basin $7.0075th Avenue Storm Drain and Durango Regional Conveyance Channel – Phase I $32.009th Avenue Storm Drain Project, Peoria Avenue to ACDC $4.60Aguila Golf Course BasinArcadia Drive Storm Drain Project $4.00Bethany Home Road Outfall Channel Project $70.00Downtown Storm Drain Project $9.50Lafayette Boulevard Interceptor Drain Project $8.30Laveen Area Conveyance Channel Project, 43rd Avenue to 79th Avenue $20.50
Total $211.50
Master Drainage Planning/CIP
• Pinnacle Peak West ADMP
• Cave Creek ADMP
• Middle Indian Bend ADMP
• Tempe ADMP
• Ahwatukee ADMP
Ongoing ADMS/P
Dam Safety Program
Federal Emergency Management Agency (FEMA)
Arizona Department of Water Resources (ADWR)
Flood Control District of Maricopa County (FCDMC)
Dam Safety Program
• Develop and maintain the Dam Safety Program
• Coordinate Intergovernmental Agreements for Dam Safety Projects
• Review Study, Design Reports, & Final Plans
• Participate in the Emergency Action Plans
Detention Dam No. 7Cost shared with Flood Control District of Maricopa CountyConstruction Cost $1.2 million
AZPDES / NPDES Permit
Green InfrastructureLow Impact Development
● AZPDES Permit, March 2009
● Permit requirements for Compliance
2013 Study
Evaluate & Identify barriers- City Codes- Development Regulations- Other City Policies
Recommendations
Phased in Implementation
AZPDES / NPDES Permit
● Green Building Code – Planning & Development Department
● Storm Water Policies & Standards Manual – Street Transportation Department
● Two (2) City Ordinances were adopted, 07/02/2014- Complete Streets Guiding Principles- Complete Streets Advisory Board
● Design Standards for GI and LID elements by the Maricopa Association of Governments (MAG)