Transcript of Flooding John Backley,OCC and The Environment Agency.
Flooding
John Backley,OCC and The Environment Agency
2015 Floods
Introduction:
• The role of the Vale council and other agencies
• What parishes can do and how the Vale can help – community resilience
• Major schemes – S Hinksey and Oxford and Abingdon.
3
The role of the Vale council and other agencies
• Vale acts on behalf of OCC to investigate flooding, give consent to flood structures and enforce riparian responsibility, help in emergencies. Carries out and contributes to flood schemes
• Vale engineer gives expert advice on land drainage, but responsibilities could be riparian/EA/OCC/TW
• OCC lead a co-ordinated approach under a flood strategy with EA, TW, other DCs and provide advice on land drainage on major developments
• www.whitehorsedc.gov.uk – see if you live in an area likely to flood, what to do in a flood, historical list of flood schemes and list of areas investigated after major flood event of 2014
4
The role of the parishes
• If you live or you own property that is next to watercourse that flows through your property you are a 'riparian landowner' and you have responsibility to pass the water downstream unimpeded
• Farmers, major land owners and some individuals who are riparian landowners do this themselves. Other elderly or less able residents may struggle…
• COMMUNITY RESILIENCE Parishes can help by forming community flood groups –- to identify flood areas, help keep watercourses clear, help in emergencies with flood defences, producing emergency/flood plans, making sure people are safe. OCC officers and Vale council can attend meetings, provide advice. Grant ££ available!
• Produce an emergency plan www.oxfordshire.gov.uk/cms/content/community-
emergency-plans
5
Community Flood Groups
• After the July 2007 floods the Vale council promoted the formation of community flood groups - 25 groups registered with the council.
• Between 2009 and 2013 the council provided £115,000 in grants to flood groups to assist with the purchase of equipment and to carry out small flood alleviation projects
• 2012/13 -St Helens Mill Abingdon, Longcot, Appleton, Ock Valley, Hanneys, Grove Green and Sunningwell flood groups received a total of £6,600. This covered purchase of equipment, inflatable sandbags, newsletter and insurance costs, re-instating and clearance of land drainage ditches and flow improvements in watercourse.
• 2013/14 - Carswell Marsh, Sunningwell, Charney Bassett, Hanneys received a total of £3,400. This covered a new trash screen, ditch clearance and professional flood survey report
Oxford FAS -Abingdon proposals andSouth Hinksey worksRichard Harding Project ExecutiveEnvironment Agency
7
Oxford FAS: Oxford Strategy
• Oxford Strategy (StAR) completed in 2010. Staged approach to flood risk management with approval given for stage 1 plus 100 years maintenance:
– Stage 1: Years 0 - 9: Enhanced maintenance plus short term measures (now completed including localised desilting, new culvert works and demountable defences)
– Stage 2: Years 30 – 70: Western channel
– Stage 3: Years 70 – 90: Upstream flood storage
8
Oxford FAS: Project Objectives
• Reduce flood damages to at least 1000 homes and businesses currently at risk in Oxford
• Reduce flood impacts on transport infrastructure and utilities in Oxford, particularly to Botley and Abingdon Roads, the railway line and the sewerage system;
• Safeguard Oxford's reputation as a thriving centre of commerce that is open for business
• Create and maintain new recreational amenities, wildlife habitat and naturalised watercourses accessible from the centre of Oxford
9
Oxford FAS: Assurance and approvals route
10
Oxford FAS: Indicative Timeline
• May 2015 – September 2015Site Investigations & Survey
Options development & public consultations
• November – December 2015Shortlist and preferred option agreed
• December 2016Outline Business Case approval
• December 2016 – Spring 2018Detailed design & planning applications
– Spring 2018• Full Business Case approval and construction begins
– Spring 2021 – Scheme opens
Oxford FAS: Indicative Area
12
Oxford Flood Alleviation Scheme
Oxford FAS: Network Rail
14
Abingdon