Float Inc LNG Terminal

2
05April2013 1 Float Inc. Proposal of the LNG Terminal

Transcript of Float Inc LNG Terminal

Page 1: Float Inc LNG Terminal

05April2013 1

Float Inc. Proposalof the LNG Terminal

Page 2: Float Inc LNG Terminal

05April2013 2

Float Inc. Proposalof the LNG Terminal

Constructed in reinforced concrete 320m L, 130m B, 38.5m H

(41,600m²) 4 hectares deck space 550,000 tonnes displacement, fully

loaded 400,000 m3 LNG storage in 10

membrane-tanks dockage for offloading LNG tankers -

offshore “Slo-Rol” anti-roll, anti-pitch system

perimeter “PSP” buoyancy, wave de-coupling

cylinder structure “spread mooring” with suction-pile

anchors 1 billion ft3/day re-gasification - in co-

generation = 28Mm3 per day GNL The energy production of this baseload

facility, operating at 90% utilization, is: 1.05GW (rating) x 0.9 utilization X

8760 (hrs/yr) = 8,278 GWhr/yr. All while delivering

80,000 cubic meters per day of potable water

and 28 million cubic meters per day of natural gas.

CO2 footprint = 30% less than fuel oil