Flight Procedures Cover Page Task Action: Task Type ...
Transcript of Flight Procedures Cover Page Task Action: Task Type ...
Flight Procedures Cover Page Task Action:FLIGHT CHECK
Task Type:Graphical DP
Estimated Chart Date:07/16/2020
APWS Task ID:018CAD3F096C42EA972BFC11B5A12E22
APWS Request ID:B867A092FC0B49E99980AEA4677AACF1
Procedure:HALF MOON BAY (OBSTACLE) ONE HALF MOON BAY CA KHAF
Enroute:YES
Specialist:Lafferty, James
Agreement Number:
Airport ID:KHAF
Airport Name:HALF MOON BAY
Airport City:HALF MOON BAY
State:CA
Facility ID: Facility Type: Flight Inspection Remark Type:New FC Slot
Procedure Comments:CANCELS FDC 9/8539.
CONTACT: DAVID TEFFETELLER 202-267-5177.
page 1 of 1
Data as of: 01/08/2020 13:55:46 CST
AL-6675 (FAA)
HALF MOON BAY ONE DEPARTURE (OBSTACLE)
(HAF1.OSI)FIG
HALF MOON BAY ONE DEPARTURE (OBSTACLE)
(HAF1.OSI)FIG
HALF MOON BAY, CALIFORNIA
HALF MOON BAY
HALF MOON BAY, CALIFORNIA
(HAF)
(HAF)
NOTE: Chart not to scale.
tandard.RWY 30: S
or 2500-3 for climb in visual conditions.
tandard with minimum climb of 360' per NM to 3100, RWY 12: S
TAKEOFF MINIMUMS
Trees beginning 2234' from DER, 23' left of centerline, up to 192' MSL.
Trees beginning 1921' from DER, 161' left of centerline, up to 172' MSL.
Tree, pole beginning 1490' from DER, 102' right of centerline, up to 160' MSL.
Tree 1263' from DER, 628' right of centerline, 156' MSL.
ree beginning 1248' from DER, 83' left of centerline, up to 160' MSL. Rwy 30: T
ree 2556' from DER, 212' left of centerline, 104' MSL.Rwy 12: T
TAKEOFF OBSTACLE NOTES
OSI113.9
WOODSIDE
Chan 86
R-225
1100
(242°
T)
XXX.X
OAKLAND CENTER
135.1 307.2
NORCAL APP CON
145°
3500
PYE113.7
Chan 84
HADLY
POINT REYESPYE
R-1
44
150°
R-255(272°T)
(161°T)
(NARRATIVE ON FOLLOWING PAGE)
(165°T)
(160°T)
HALF MOON BAY
NOT FOR NAVIGATION
PROTOTYPE-
AL-6675 (FAA)
DEPARTURE ROUTE DESCRIPTION
HALF MOON BAY ONE DEPARTURE (OBSTACLE)
(HAF1.OSI)FIG
HALF MOON BAY ONE DEPARTURE (OBSTACLE)
(HAF1.OSI)FIG
HALF MOON BAY
HALF MOON BAY, CALIFORNIA
HALF MOON BAY
HALF MOON BAY, CALIFORNIA
(HAF)
(HAF)
proceeding on course.
Climb in visual conditions to cross Half Moon Bay airport at or above 2400 before
VCOA RWY 12: Obtain ATC approval for VCOA when requesting IFR clearance.
at or above 3500 before proceeding on course.
PYE R-144 to HADLY, then on OSI R-255 to OSI VOR/DME. Cross OSI VOR/DME
limb to 1100, then climbing left turn on heading 150° and on TAKEOFF RWY 30: C
OSI VOR/DME. Cross OSI VOR/DME at or above 3500 before proceeding on course.
limbing right turn on heading 145° and on OSI R-225 to TAKEOFF RWY 12: C
PROTOTYPE-NOT FOR NAVIGATION