www.coordinadorelectrico.cl
Juan Carlos AranedaTransmission Planning Manager
Flexible Transmission Expansion in the
Chilean Electricity Market
www.coordinadorelectrico.cl
www.coordinadorelectrico.cl
• Transmission Planning Process
• Long Term Vision in Transmission
• New Transmission Planning Criteria
Agenda
• SIC-SING Interconnection and the National Power System
• Flexibility in Transmission Expansion
www.coordinadorelectrico.cl
We are an independent technical public-service
organization that coordinates the operation of the
national electric grid, ensuring a secure, reliable
and economic energy supply, and guaranteeing
open access to the transmission systems
Coordinador Eléctrico Nacional
14
www.coordinadorelectrico.cl
S/E
KIMALS/E
NUEVA
CARDONESS/E
NUEVA
MAITENCILLO
S/E
LOS CHANGOSS/E
POLPAICO
S/E
CUMBRE
SIC-SING INTERCONNECTION PROJECT
140 km 400 km 189 km 135 km 408 km
S/E
NUEVA
PAN DE AZUCAR
212 km
Com.2017 Com.2017-2018Com.2020
500 kV Transmission linesCom.2017KAPATUR 220 kV
S/E
KAPATUR
www.coordinadorelectrico.cl
S/E TEN -GIS (TEN)
S/E Kapatur (STN/Saesa)
G
G
G
G
G
S/E Angamos(Gener)
S/E Kelar(Tamakaya)
S/E Cumbres(TEN) S/E Nueva
Cardones(Interchile)
S/E Cardones(Transelec)
S/E Kimal (SATT/Saesa)
S/E Nueva Maitencillo(Interchile)
S/E Nueva Pan de Azúcar
(Interchile)
S/E Los Changos (TEN)
GANG1
Kelar
CTM3 G
CTM3 V
IEM
LT 2x220 kV Kelar Kapatur(Tamakaya)
LT 2x220 kV Angamos Kapatur(Gener)
LT 2
x22
0 k
V L
os
Ch
ango
s K
apat
ur
(Tra
nse
lec)
A S/E Laberinto
A S/E O’Higgins
LT 2x500 kV Los Changos Cumbres(TEN)
LT 2x220 kV TEN Los Changos(TEN)
LT 2x500 kV Cumbres Nueva Cardones(TEN)
LT 2x500 kV Nueva Cardones Nueva Maitencillo(Interchile)
LT 2x220 kV Cardones Nueva Cardones(Interchile)
LT 2x500 kV Nueva Pan de Azúcar Polpaico
(Interchile)
LT 2x500 kV Nueva Maitencillo Nueva Pan de Azúcar
(Interchile)
LT 2x500 kV Los Changos Kimal(Transelec)
Proyectos TEN
Proyectos Transelec
Proyectos Interchile
Proyectos Saesa
Instalaciones Existentes
Proyectos Engie
S/E Polpaico(Transelec)
S/E Diego de Almagro
(Transelec)
S/E Nueva Diego de Almagro
(Celeo Redes)
LT 2x220 kV Cumbres Nueva Diego de Almagro
(Celeo Redes)
Proyectos Celeo Redes
ANG2
S/E Pan de Azúcar
(Transelec)S/E
Maitencillo(Transelec)
GCTM2
SIC-SING INTERCONNECTION PROJECT
www.coordinadorelectrico.cl
Installed Capacity: 24,000 MWPeak Demand: 11,000 MW
NATIONAL POWER SYSTEM in 2018
Fuente: Comisión Nacional de Energía
7.097MW29%
4.859MW20%
3.733MW15%
3.762MW16%
2.789MW 12%
1.333MW6%
516MW2%
Hidráulica Carbón Gas
Diesel/Fuel oil Solar Eólica
Otros
NPS3,100 km
www.coordinadorelectrico.cl
Transmission Planning and Delivery (from 2017 on)
Coordinator proposes
Transmission Projects to CNE
Long-Term Energy Planning Process(Developed every 5 years by Ministry of Energy)
Scenarios
CNE Transmission Planning Study and
Evaluation
Experts Panel resolves
discrepancies
Enactment of Transmission
Expansion Decree
Transmission Projects Tendering
(National and Zonal)
ANNUAL TRANSMISSION PLANNING PROCESS
Upgrade and Expansion projectstendered by the Coordinator(National and Zonal transmission)
Market agents proposetransmission projects to CNE
www.coordinadorelectrico.cl
Phase 2: Analysis of
expansion requirements
Demand Forecasting
Generation Scenarios
Diagnosis of use of the
Transmission System
Projects conceptual engineering
• Equipment selection
• Unilinear diagrams
• Plant diagrams
• Project schedule
• Investment valuation
Project economic
evaluation:
With and without the
project
Definition of alternative
projects
Power system studies
Phase 1: Projection of main
variables
Transmission Planning Methodology
Transmission Expansion projects Proposal
Phase 3: Evaluation and project definition
www.coordinadorelectrico.cl
Base Scenario
1045 MW
3155 MW
700 MW
360 MW
219 MW
720 MW
913 MW
376 MW
40 MW
70 MW
949 MW
613 MW
40 MW
2255 MW
700 MW
360 MW
1953 MW
376 MW
40 MW
70 MW
1280 MW
613 MW
40 MW
118 MW
681 MW
1442 MW
VIII RegiónScenario
PozoAlmonteScenario
445 MW
24 MW
1045 MW
445 MW
219 MW
720 MW
24 MW
2929 MW
438 MW
250 MW
118 MW
681 MW
1326 MW
493 MW
587 MW1442 MW
TaltalScenario
5050 MW
1811 MW
48 MW
375 MW
5646 MW
711 MW
48 MW
3429 MW
438 MW
250 MW
1326 MW
493 MW
587 MW
375 MW
Solar
Wind
Hydro
Thermal
Geothermal
Biomass
Generation Scenarios
www.coordinadorelectrico.cl
• Minimize supply risks, considering events, such as:
➢ cost increase or unavailability of fuels
➢ delays or unavailability of energy infrastructure
➢ Natural disasters or extreme hydrology conditions
• Promote the offer and facilitate competition in order to supply
consumers at minimum price
• Economically efficient and necessary projects in the different
energy scenarios
• Modification of existing transmission facilities in an efficient way
Transmission planning must include roominess and redundancies in
order to incorporate all previous criteria
New Transmission Planning Criteria
www.coordinadorelectrico.cl
1. Adequacy:
➢ CAPEX < NPV[ Δ(OPEX+CENS)]
2. Security of Service: N-k criteria
➢ Resilience: resist LPHI events
3. Competition: Open Access to the Grid
4. Sustainability: Efficient use of Territory
5. Robustness: Long Term Vision and
Flexibility
New Transmission Planning Criteria
www.coordinadorelectrico.cl
Flexible Transmission:
Robust Planning
Technology
Smart Grid
Flexibility in Transmission Expansion
www.coordinadorelectrico.cl
Flexible Transmission: Robust Planning
▪ Anticipatory planning: make decisions under uncertainties
▪ Stripes for new transmission lines with Strategic Environmental Evaluation
▪ Roominess in the design of new transmission infrastructure
▪ Upgrade and uprate of existing lines and substations
▪ Zonal transmission:
• Access to cities and towns
• Shared services infrastructure
• Distributed generation
www.coordinadorelectrico.cl
Flexible Transmission: Technology
▪ Transmission support associated to Variable Renewable Energy:
• Size and location of reserves
• Inertia constraints
• Battery Energy Storage Systems – BESS:
➢ Expansion deferral
➢ Congestion relief
▪ Flexible AC Transmission Systems: FACTS
▪ HVDC:
• Long lines with LCC vs VSC
• Multi-terminal option
• Lines vs Cables
• Back-to-Back Converters
www.coordinadorelectrico.cl
FACTS: Reactive power compensation
SVC Domeyko–50 / +120 MVAr
SVC Plus Diego de Almagro–100 / +140 MVAr
SVC Cardones–60 / +100 MVArSVC Maitencillo
–28 / +24 MVAr
SVC 1 Pan de Azúcar–28 / +24 MVAr
SVC 2 Pan de Azúcar–28 / +24 MVAr
SVC Polpaico–65 / +100 MVAr
STATCOM Cerro Navia–65 / +140 MVAr
SVC Puerto Montt–40 / +70 MVAr
Status: In operation
www.coordinadorelectrico.cl
FACTS: Reactive power compensation
2017 Recommended project (under tendering)
NUEVA PAN DE AZÚCAR 220
2x100 MVAr
SVC +50/-150 MVAr
75 MVAr
75 MVAr
212 km
NUEVA MAITENCILLO 500 NUEVA PAN DE AZÚCAR 500 POLPAICO 500
75 MVAr
75 MVAr
175 MVAr
175 MVAr
175 MVAr
175 MVAr
54%
54%
53/2%
53/2%
53/2%
53/2%
408 km
Obras propuesta actual
TCR 200 MVArinductivos
FC 5° armónica
FC 7° armónica
≈ 50 MVAr capacitivos
Proposal: - Modification of series compensation- Shunt reactors- Reactive power variable compensation
- Overvoltage
- Voltage variability
www.coordinadorelectrico.cl
FACTS: Reactive power compensation
Recommended project - ALTERNATIVE
- Overvoltage
- Voltage variability
Proposal: - Modification of series compensation- Shunt reactors- Reactive power variable compensation
NUEVA PAN DE AZÚCAR 220
2x100 MVAr
75 MVAr
75 MVAr
212 km
NUEVA MAITENCILLO 500 NUEVA PAN DE AZÚCAR 500 POLPAICO 500
75 MVAr
75 MVAr
175 MVAr
175 MVAr
175 MVAr
175 MVAr
54%
54%
53/2%
53/2%
53/2%
53/2%
408 km
Proposed project
STATCOM +/- 100 MVAr
MSR 50 MVAr
STATCOM + MSR +100/-150 MVAr
www.coordinadorelectrico.cl
FACTS: Phase-Shifting Transformers
Cerro Navia SubstationT1: 350 MVA – 220/220 kVT2: 350 MVA – 220/220 kV
Tocopilla SubstationT1: 100 MVA – 110/110 kVT2: 100 MVA – 110/110 kV
Objective: Control power flows in specific lines of the power system.
www.coordinadorelectrico.cl
FACTS: Fixed Series Compensation
1x345 kV Andes-SaltaAndes: 36% (408 km)
2x500 kV Los Changos-CumbreLos Changos: 65/2% (400 km)Cumbre: 65/2% (400 km)
2x500 kV Cumbre-Nueva CardonesCumbre: 55% (189 km)
2x500 kV Nueva Maitencillo-Nueva Pan de AzúcarNueva Pan de Azúcar: 55% (212 km)
2x500 kV Nueva Pan de Azúcar-PolpaicoNueva Pan de Azúcar: 53% (408 km)
1x500 kV Ancoa-Alto Jahuel C1Ancoa: 56% (241 km)
1x500 kV Ancoa-Alto Jahuel C2Ancoa: 58% (257 km)
2x500 kV Ancoa-Alto Jahuel C3 and C4Ancoa: 44% (256 km)
1x500 kV Charrúa-Ancoa C1Ancoa: 50% (183 km)
1x500 kV Charrúa-Ancoa C2Ancoa: 53% (196 km)
2x220 kV Colbún-La CandelariaLa Candelaria: 60% (214 km)
www.coordinadorelectrico.cl
Flexible Transmission: Smart Grid
System Monitoring, Control and Protection – Conceptual View
WAMPAC: Wide Area Monitoring, Protection and ControlDLR: Dynamic Line Rating / PMU: Phasor Measurement UnitSIPS: System Integrity Protection Scheme / RAS: Remedial Action SchemeIED: Intelligent Electronic Device
Dynamic and Static Line Capacity
www.coordinadorelectrico.cl
Long Term Vision in TransmissionParinacota
Cóndores
Tarapacá
Lagunas
Collahuasi
Encuentro
Kimal
Los Changos
Kapatur
Kimal
Pozo Almonte
Pozo Almonte
500 kV220 kVProjects in construction
Alternative
N.O.
N.O.
N.O.: Normallly Open
G
500 kV220 kVProposed projectCommon alternative Additional alternative 1
Additional alternative 2
Andes
TEN GIS
Los Changos
Cumbre
Nueva Diego de Almagro
Kapatur
Nueva Taltal
Diego de Almagro
Paposo
Carrera Pinto
Kimal
Generation Pole
Cumbre
Paposo
Diego de Almagro
Nueva Diego de Almagro
Taltal
Los Changos
Carrera Pinto
San Andrés
Cardones
Maitencillo
Punta Colorada
Pan de Azúcar
Don Goyo
La CebadaPunta Sierra
Los Vilos
Nogales
Polpaico
Quillota
Nueva Cardones
Nueva Maitencillo
Nueva Pan de Azúcar
500 kV220 kVTaltal project
Alternative 1 Alternative 2
Generation pole
(Polpaico-Lo Aguirre-Other bus)
x2
x2
x2
x2
Las Palmas
(Polpaico-Lo Aguirre-Other bus)
x2
x2
www.coordinadorelectrico.cl
Long Term Vision in Transmission
Alto Jahuel
Ancoa
Charrúa
Entre Ríos 500 kV 220 kV
Alternative 1 Alternative 2
Possible international interconnection
Polpaico
Lo AguirreCerro Navia
Chena
Los Almendros
El Salto
Alto Jahuel
Ancoa
Charrúa
Entre Ríos
Polpaico
Lo Aguirre
Cerro Navia
Chena
G
(Polpaico-Lo Aguirre-Other bus)
El Salto
Gran Mendoza
Argentina
Gran Mendoza
Argentina
(Los Almendros, La Florida, other bus)
Los Almendros
(Los Almendros, La Florida, other bus)
C1 C2 C3 C4
C1 C2 C3 C4
C2 C3 C4
C2 C3 C4
C+ C-
www.coordinadorelectrico.cl
Long Term Vision in Transmission
Charrúa
Mulchén
Cautín
Ciruelos
Valdivia
Rahue
Tineo
Pichirropulli
Puerto Montt
Río Malleco
Melipulli
500 kV 220 kV
Alternative
Nueva Ancud
www.coordinadorelectrico.cl
Coordinador face current challenges associated to:
▪ the interconnection of SIC and SING to create a unique (long)
national power system (3,100 km)
▪ implementing the new transmission planning and delivery
processes
▪ developing and applying the new transmission planning
criteria
Flexibility in transmission expansion is reflected via robust
planning, technologies and smart grids
In Summary