FLANG ES ELDIN LUG

8
FLANGE TEST & WELDING PLUG OPERATING PROCEDURES www.USAIndustries.com • [email protected] (713) 941-3797 • (800) 456-8721 315 State Street • S. Houston, TX 77587 M-PIP-PP-FTP-FWTP-1.0

Transcript of FLANG ES ELDIN LUG

Page 1: FLANG ES ELDIN LUG

FLANGE TEST & WELDING PLUG OPERATING PROCEDURES

www.USAIndustries.com • [email protected]

(713) 941-3797 • (800) 456-8721

315 State Street • S. Houston, TX 77587

M-PIP-PP-FTP-FWTP-1.0

Page 2: FLANG ES ELDIN LUG

FLANGE TEST & WELDING PLUG OPERATING MANUAL www.USAIndustries.com | (713) 941-3797 ©2020, USA Industries, Inc.

M-PIP-PP-FTP-FWTP-1.0

FLANGE TEST & WELDING PLUG OPERATING PROCEDURES

1. Before Installation

• Verifystampingoncompressionringisequivalenttothepipesizeandschedulebeingtested.The compressionringshouldbestampedwiththeO.D.,pipesize,andpipeschedule.EXAMPLE:For 1”schedule80thesealO.D.shouldbethesameasthecompressionringO.D.

• Inspecttheraisedface(gasketsurface)ofthef langeplugandmatingf langetobetested.Damageor surfaceimperfectionsmayresultinleakageandshouldberepairedpriortotesting.

• CleananddrythepipeI.D.Removeallmoisture,debrisandexcessivescale.

PLEASE READ THROUGH ALL OPERATING PROCEDURES THOROUGHLY AND CAREFULLY BEFORE ATTEMPTING INSTALLATION. COMPLIANCE TO THESE INSTRUCTIONS CAN PREVENT SAFETY HAZARDS.

PRESSURE TESTING IS INHERENTLY DANGEROUS. STRICT ADHERENCE TO THESE OPERATING INSTRUCTIONS AND INDUSTRY SAFETY PRACTICES COULD PREVENT

INJURY TO PERSONNEL.

ALL PERSONNEL MUST BE CLEAR OF TEST PLUG WHEN PRESSURE TESTING. FOR SAFETY, AN INCOMPRESSIBLE LIQUID SUCH AS WATER SHOULD BE USED AS THE TEST MEDIUM. RESIDUAL AIR OR GAS IS TO BE EVACUATED FROM THE PIPE PRIOR TO TESTING.

Theseoperatinginstructionsgivestep-by-stepinstructionsontheuseoftheflangetestandweldingplug.Thisplugcanbeusedintwodifferentconfigurationsasatestplugandaweldingplug.Thelatterplugconfigurationallowstheflange-to-pipeweldtobetestedafterwelding.Theweldplugconfigurationaidsintheweldingoftheflangetopipewhilemonitoringupstreampressureandalsoallowstheweldtobetestedafterwelding.Followstepslabeled:

TP Test Plug configuration WP Weld Plug configuration TP/WP Test & Weld Plug configurations

Page 3: FLANG ES ELDIN LUG

FLANGE TEST & WELDING PLUG OPERATING MANUAL www.USAIndustries.com | (713) 941-3797 ©2020, USA Industries, Inc.

M-PIP-PP-FTP-FWTP-1.0

FLANGE TEST & WELDING PLUG OPERATING PROCEDURES

1. Attachment of Test Plug to Mating Flange

• AnyweldspatterordropsthatprotrudesintopipeI.D.morethanclearancelistedintable1mustbe removedtoallowpluginstallation.

• Ifinstallationdepthislimitedinlengthofpipe,onecomparisonoftubesbetweentheflangeandseal canbemovedtotheoppositesideoftheflangetoreducethedistancebetweensealandflange.For¾”-1” sizes,thecompressiontubethatisbeingrepositionedmustbeplacedbetweentheflangefill-vent porttubeassemblyandtheupstreammonitorporttube.(Seediagramonpage3).

• Applygaskettomatingflangefaceandpositionflangeplugagainstmatingflange.Rotateplugas requiredlocatingpurgeventathighestpointandinstallingflangebolts.Tightenboltsinacross- likepatterntoproperlysealtheflangegasket.

Attachment of Welding Plug Setup to Mating Flange

• Thedistancebetweentheflangeandthewasherandsealassemblyshouldbeapprox.12”.Ifnot,check toseebothcompressiontubesareinstalledbetweentheflange,sealandcompressionringassembly.

• Puttheflangetobeweldedonthepipeusinganalignmenttool.(Theflangetestandweldingplugisnot designedtosupportorpositionflangetobewelded).Applygaskettomatingflangefaceandinsert theflangeplugintotheflangeandpipewiththeinertgaspurgeportsorientedatthetopandbottomof theflange.Tightenboltsinacross-likepatterntoproperlysealtheflangegasket.

2. Tightening & Expansion of Seal Element

• Correcttightnessofhexnutiscriticaltotheoperationoftheflangetest&weldingplug.Aleakofthe sealisusuallyanindicationthehexnut(s)wasnotadequatelytightened.Thenormaltorquelistedin table1shouldbeadequateformostinstallations.However,duetovariationswithinpipeI.D.finishes thetorquemayneedtobeincreaseduptothemaximumtorquevaluelistedintable1.Ifatthe maximumtorque,theplugstillleaks,verifythecorrectsealandcompressionringsarebeingused.

For Sizes 3/4” - 2-1/2”:• TightenhexnutinnormalinstallationtorquelistedinTable1,usingacalibratedtorquewrench.Ifshaft spinswhilehexnutisbeingtightened,acrow’s-footandpipewrenchopenedandwrenchmustbeused. (SeeTable1forcrow’s-footsizes).

For Sizes 3” - 8”:• Forsizes3”andlarger,tightenthehexnutbyhandtoremoveanyslackfromtheparts.Thenusea¾” driveorlargerimpactwrenchcapableofproducingthetorquevalueslisteninTable1.Adeepimpact socketisrequired,(seeTable1forimpactsocketsizes).Theuseofanimpactwrenchwillprevent theshaftfromspinningandenablethecountingofturnslistedinTable1toreachtherequiredtorque.

TP

WP

TP/WP

Page 4: FLANG ES ELDIN LUG

FLANGE TEST & WELDING PLUG OPERATING MANUAL www.USAIndustries.com | (713) 941-3797 ©2020, USA Industries, Inc.

M-PIP-PP-FTP-FWTP-1.0

FLANGE TEST & WELDING PLUG OPERATING PROCEDURES

• Ifanimpactwrenchanddeepsocketarenotavailable,twowrenchesmaybeused.Thesecondis requiredtoholdtheshaftwhileturningthehexnuttherequirednumberoftimes.

• Thetorquemaybecheckedwithacalibratedtorquewrenchandshouldbebetweenthenormaland maximumvalueslistedinTable1.

3. Preparation for Welding

• Makeconnectiontoupstreammonitorportthatwillclearlyindicateanincreaseofpressureorthe presenceofdangerousgases.Inaddition,attachingapproximately50ft.ofhosetotheventportand locatingtheendofthehosedownwindfromtheweldareamayventupstreamvapors.

FOR NORMAL CONDITIONS WHERE INERT GAS PURGE IS NOT REQUIRED:• Removepipeplugsfromfillandventplugsontheflangeormakeconnectionstofillandventportsas

requiredbyweldingsafetyprocedures.

IF INERT GAS PURGE IS REQUIRED:• Removepipeplugsfromthefillandventportsontheflange.

• Connectinertgassupplytofillport.Makeconnectionstoventportasrequiredtomonitororregulate theflowofinertgas.

• Initiateinertgaspurgeandadjustinertgaspressureregulatorasrequiredtomaintainaslightpositive pressureduringwelding.Asweldingproceeds,adjustinertgasflowasneededtoinsureweldquality.

4. Welding

• Beginweldingtheflangetothepipewhilemonitoringupstreampressure.Stopweldingimmediately iftheupstreampressureincreaseswhichindicatesflowintheline.Duringweldingthepipeattheseal locationmustnotbecometoohottotouchbyhand,discontinueweldingandallowpipetocool.

WP

WP

NOTE: DO NOT LET THE WELD PROTRUDE INTO THE PIPE I.D. BY MORE THAN THE VALUES LISTED IN TABLE 1 OR GRINDING OF THE PIPE I.D. MAY BE REQUIRED FOR PLUG REMOVAL.

Page 5: FLANG ES ELDIN LUG

FLANGE TEST & WELDING PLUG OPERATING MANUAL www.USAIndustries.com | (713) 941-3797 ©2020, USA Industries, Inc.

M-PIP-PP-FTP-FWTP-1.0

FLANGE TEST & WELDING PLUG OPERATING PROCEDURES

5. Hydrostatic Pressure Test

• Removetheventplug

• Connecthydropumptofillportonflange

• Slowlybegintofillthepluguntilwaterflowsfromthevent.Discontinuewaterinputandinstalltheventplugleaktight.RefertoTable2forthemaximumtestpressurefortheflangetestplug.Thetestpressuremustneverexceedthedesiredpressurewithpumpforaminimumoffiveminutespriortolosingisolationvalve.Thiswillallowpartstosettle.Continueholdingthedesiredpressuretomeettestingrequirement.IfpressuredropsoffalargeamountoraleakbetweensealandtubeI.D.isdetected,tightenthehexnutuntilleakissealed.(DONOTexceedmaximuminstallationtorque).Afterthetestiscompleted,releaseallpressure.

• Removethefillandventplugstodrainwater

• Removealltestingequipment.

• Loosenthehexnut(s)tofullyrelaxseal.

• Loosenandremovehexnutsandflangemountingboils.

• Withdrawtheflangetestplugfromthepipe.

Inspect Plug After Use:Surfaceimperfectionsontheflangefaceshouldbefixedpriortofurthertesting.Replacewornordamagedflangegasketsandseals.Cleananddrypriortostorage.Keepandstoretheseinstructionswithflangetestplug.

TP/WP

WARNING: Never attempt to adjust the flange test & welding plug while under pressure. Never exceed the test pressures in Table 2.

Size: Clearance Between Plug & Pipe (in)

Normal Installation Torque (ft-lbs)

Maximum Installation Torque

(ft-lbs)Wrench Size (in) Deep Impact

Socket Size” (in)

3/4” .035 50Do Not Exceed Normal Torque

9/16” 9/16”

1” .055 100 200 9/16” 9/16”

1-1/4” .068 25 40 1/2” 15/16”

1-1/2” .085 25 40 1/2” 15/16”

2” .130 35 50 1/2” 15/16”

2-1/2” .125 100 200 1” 2-5/8”

Table 1:

Page 6: FLANG ES ELDIN LUG

FLANGE TEST & WELDING PLUG OPERATING MANUAL www.USAIndustries.com | (713) 941-3797 ©2020, USA Industries, Inc.

M-PIP-PP-FTP-FWTP-1.0

FLANGE TEST & WELDING PLUG OPERATING PROCEDURES

Size:Clearance

Between Plug & Pipe (in)

Normal Installation Torque

(ft-lbs)

Maximum Installation Torque

(ft-lbs)

Estimated # of Turns of Hex Nut

Wrench Size to Hold Shaft (in)

Deep Impact Socket Size (in)

3” .193 200 400 5 1 2-5/8”

3-1/2” .204 200 400 5 1 2-5/8”

4” .220 200 400 5 1 2-5/8”

6” .250 400 900 6 1-5/8” 3-1/8”

8” .250 400 900 6 1-5/8” 3-1/8”

Table 1:

Table 2:

Undernormalconditionsa200-lb.Manwouldrequireatleasta1-ft.levertoachieve200ft.-lbs.Thesamemanwouldrequireatleasta2-ft.levertoachieve400ft.–lbs.

Class (lb) Maximum Test Pressure (psi) Bar:

150 450 31

300 1,125 77

400 1,500 103

600 2,250 155

Page 7: FLANG ES ELDIN LUG

FLANGE TEST & WELDING PLUG OPERATING MANUAL www.USAIndustries.com | (713) 941-3797 ©2020, USA Industries, Inc.

M-PIP-PP-FTP-FWTP-1.0

FLANGE TEST & WELDING PLUG OPERATING PROCEDURES

For Sizes 3/4” - 1”:

1. Removehexnutandjamnutfrombottomofshaft.

2.Removecompressionringsandsealfromshaft.

3. Installfirstcompressionring,sealandsecondcompressionring.Compressionringsarestampedwiththelinesizeandschedule.Sealsarecolorcodedforyourconvenienceandstampedwiththelinesizeandschedule.

4. Installjamnutontoshaftasfaraspossible.Installhexnutandtightenhexnutagainstjamnutwithawrench.

5. Plusisreadyfortesting.

For Sizes 1-1/4” - 3”:

1.Removehexnutandjamnutfromshaft.

2.Removecompressionringswitho-ringsandsealfromshafttakingcarenottodamageo-ringinI.D.ofcompressionring.Inspecto-ringandreplaceifwornordamaged.

3.Lubricateo-ringinI.D.ofcompressionringwithgreaseandcarefullyinstallwasherontoshaft.Compressionringsarestampedwiththelinesizeandschedule.Sealsarecolorcodedforyourconvenienceandstampedwiththelinesizeandschedule.

Page 8: FLANG ES ELDIN LUG

FLANGE TEST & WELDING PLUG OPERATING MANUAL www.USAIndustries.com | (713) 941-3797 ©2020, USA Industries, Inc.

M-PIP-PP-FTP-FWTP-1.0

FLANGE TEST & WELDING PLUG OPERATING PROCEDURES

For Sizes 1-1/4” - 3” Continued:

4.Installsealandcompressionring.

5.Installjamnutontoshaftasfaraspossible.Installhexnutandtightenhexnutagainstjamnutwithawrench.

6.Plusisreadyfortesting.

For Sizes 3” - 8”:

1.Removehexnutandjamnutfromshaft.

2.Removecompressionring,sealando-ringcompressionringfromshaft,takingcarenottodamageo-ringinI.D.ofcompressionring.Inspecto-ringandreplaceifwornordamaged.

3.Lubricateo-ringinI.D.ofwasherwithgreaseandcarefullyinstallwasherontoshaftsothattaperedsidewillbepositionedagainstseal.Compressionringsarestampedwiththelinesizeandschedule.Sealsarecolorcodedforyourconvenienceandstampedwiththelinesizeandschedule.

4.Installsealandtaperedwashersothattaperedsidewillbepositionedagainstseal.

5.Installjamnutontoshaftthreadsfirstasfaraspossible.Installhexnutandwrenchtightenhexnutagainstjamnut.

6.Plugisreadyfortesting.