Creating a Working SREC Bootloader SDK Project for Version 12
Fixing the Maryland SREC market
-
Upload
leah-wilkinson -
Category
Environment
-
view
53 -
download
0
Transcript of Fixing the Maryland SREC market
![Page 1: Fixing the Maryland SREC market](https://reader031.fdocuments.in/reader031/viewer/2022011721/58793e381a28ab23468b5a7d/html5/thumbnails/1.jpg)
Fixing the Maryland SREC MarketNovember, 17, 2016
Implications for the Maryland Industry • An EPC Perspective – jobs and activity• Residential rooftop market• Commercial market• Community Solar• Wholesale projects
![Page 2: Fixing the Maryland SREC market](https://reader031.fdocuments.in/reader031/viewer/2022011721/58793e381a28ab23468b5a7d/html5/thumbnails/2.jpg)
Success Under the SunRenewable Generators Registered in GATS
Maryland RPS has delivered statewide in-service systems topping 620 MW
Maryland PV Generation exceeding 2016 RPS goal 1.4% of State Load (200% of goal)
35,000 Systems 4,200 jobs 2016 on track for 208 MW This is Infrastructure scale.
![Page 3: Fixing the Maryland SREC market](https://reader031.fdocuments.in/reader031/viewer/2022011721/58793e381a28ab23468b5a7d/html5/thumbnails/3.jpg)
Closer Look at 2016 – SRECs Matter
Residential Market is performing, however… Since June 2016 Maryland delivered an average of
10MW/Month Since March 2016 Maryland commercial sector
effectively stalled
GATS Registrations (as of 11/15/2016)
2016 MW/MonthNo. of
Systems Ave Size kW
Jan 35.5 1,218 29.1
Feb 33.3 1,544 21.6
Mar 18.7 1,554 12.0
April 13.2 1,231 10.7
May 27.2 1,748 15.6
June 14 1,391 10.1
July 11.9 1,257 9.5
Aug 11.2 1,189 9.4
Sept 11 1,074 10.2
Oct 9.6 992 9.7NovDec
Total: 185.6 13198 14.1
![Page 4: Fixing the Maryland SREC market](https://reader031.fdocuments.in/reader031/viewer/2022011721/58793e381a28ab23468b5a7d/html5/thumbnails/4.jpg)
A Little Sunblock needed from a new RPS2016 PROJECTED FROM MD GATS DATA
Percent of2016*
Res 1-20kW 15,485 131 63%C&I 21kW -99kW 280 7.9
C&I 100kW - 1MW 21 9.3C&I1-3 MW 12 17
C&I Total 313 34.2 16%Utility Scale (3-30MW) 3 43 21%
Totals: 15,801 208 MW
* Since June just 7M of C&I or Utlitiy projects were registered
No. of Systems MW in Service
LIFETIME MD GATS DATA Percent ofLifetime
Res 1-20kW 34,444 281.6 45%C&I 21kW -99kW 983 30.6
C&I 100kW - 1MW 234 79C&I1-3 MW 65 117
C&I Total 1,282 226.6 36%Utility Scale (3-30MW) 9 116 19%
Totals: 35,735 624 MW
MW in ServiceNo. of Systems
![Page 5: Fixing the Maryland SREC market](https://reader031.fdocuments.in/reader031/viewer/2022011721/58793e381a28ab23468b5a7d/html5/thumbnails/5.jpg)
The Over-ride RPS (HB1106/SB0921) 25% by 2020, 2.5% Solar Carve-out
Tier 1 2017 2018 2019 2020 Renewables- 11.95% 14.3% 18.45% 22.5%Solar carve out: 1.15% 1.5% 1.95% 2.5%
2017 PROJECTED FROM MD GATS DATA Percent of
2016*Res 1-20kW 15,485 131 44%
C&I 21kW -99kW 480 14C&I 100kW - 1MW 32 16
C&I1-3MW 36 56C&I Total 548 86 29%
Utility Scale (3-30MW) 5 80 27%Totals: 16,038 297 MW
No. of Systems MW in Service
![Page 6: Fixing the Maryland SREC market](https://reader031.fdocuments.in/reader031/viewer/2022011721/58793e381a28ab23468b5a7d/html5/thumbnails/6.jpg)
The Maryland RPS - RPS Policies Matter
![Page 7: Fixing the Maryland SREC market](https://reader031.fdocuments.in/reader031/viewer/2022011721/58793e381a28ab23468b5a7d/html5/thumbnails/7.jpg)
The Fix.
• Support Annapolis on a New RPS
• Stay engaged
• Keep building
• Promote cumulative success
• MDV SEIA Matters
![Page 8: Fixing the Maryland SREC market](https://reader031.fdocuments.in/reader031/viewer/2022011721/58793e381a28ab23468b5a7d/html5/thumbnails/8.jpg)
Links and Contact Information
PJM GATS (Generation Attribute Tracking System): https://gats.pjm-eis.com/gats2/PublicReports/RenewableGeneratorsRegisteredinGATSBerkeley Lab: https://emp.lbl.gov/projects/renewables-portfolio
Contact:Standard Solar, [email protected]