FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School...

51
PREPARED BY: WWW.PROGRESSIVECM.NET FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION SPECIFICATION 2015-2020

Transcript of FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School...

Page 1: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

PREPARED BY:

W W W . P R O G R E S S I V E C M . N E T

FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION SPECIFICATION

2015-2020

Page 2: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

1

Table of Contents

1.0 Goals/Process 1.1 Goals .............................................................................................................................................8-9

1.2 Process .....................................................................................................................................10-11

1.3Acronyms/Definitions ...................................................................................................................12

2.0 Existing and Projected Conditions 2.1 Programs ................................................................................................................................. 13-15

2.2Enrollment ................................................................................................................................16-19

2.3Sites/Facilities ........................................................................................................................ 20-22

2.4Utilization&Capacity .............................................................................................................. 23-25

2.5 Technology ................................................................................................................................26-27

2.6EnergyManagementProgram ............................................................................................... 28-29

3.0 Educational Specification 3.1FacilityGoals&Concepts ........................................................................................................30-31

3.2SpaceRequirements ...............................................................................................................31-35

4.0 Capital Improvement Plan 4.1CapitalFunding ........................................................................................................................36-37

4.2TotalCapitalNeeds .......................................................................................................................38

4.3CapitalPlan ............................................................................................................................. 39-40

4.4CapitalPlanImplementation...................................................................................................41-45

5.0 Master Plan Support Material 5.1FacilityInventory ...........................................................................................................................46

5.2Site/SchoolDetail ....................................................................................................................47-48

5.8DetailedSpace&RoomRequirements(Ed.Spec) ...............................................................49-50

TABLE OF CONTENTS

Page 3: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

2ACKNOWLEDGEMENTS

Teresa OgasFounder*

Physical Address: 1800MainSt.,Bldg200LosLunas,NM87031

Phone:(505)866-7632

Website:www.SODAcharter.net

Original Charter Date:2008

First Charter Renewal: 2013

Current Enrollment Cap: 525

GerriBennetBusiness Manager

KennethGriegoPresident

MichaelOgasPrincipal

RonaldArmijo,KimberlyBerlat,BradleyBratcher,EricBrown,SoniBuda,JenniferChavez,BonnieDodge,AdrienneDuran,JoAnnFernandez,AmeliaGarcia,DoreenaGarcia,SusanGarcia,RitaGarcia,SofieGranger,KathyHajner,LorenaHerrera,PatriciaHerrera,JanelleHoman,KerraHowe,SkyJackson,JeffJolly,ChristineKittrell,KristineLucero,RosanneMcNiel,MarshaMoyers,MichelleNelson,MikeOgas,TalysaOgas,TomasitaOshiro,TerryPlatt,PatriciaResendiz,LanikaRodrigues,MariamRyan,AmandaSaiz,MaryAnnSilva&MargaretVanderHeyden.

EricBrownVice-Principal

Dr.DavidSchniederMember

PatriciaHolmProgram Administrator

GeneCarbajalVice-President*

FrancesConroyCounselor

MichaelOgasFounder*

MaryAnnSilvaSecurity

KaraHoweIT Manager

BillDavis, Facility Master PlannerIanF.Harmon, Facility Master Planner5301BeverlyHillsNE,Albuquerque,NM87113Phone:(505)890-1359|Fax:(505)898-3537

JuanitaSenaMember

CarolShadronNurse

BillSprickFacilities Master Planning Manager

KathyChavezCo-Founder

* Facility Planning Committee Members

School of Dream Academy Governing Board

School of Dreams Academy

School of Dream Academy Administration

Consultant

Participants

Public School Facilities Authority (PSFA)

Page 4: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

3

SCHOOL OF DREAMS ACADEMY

GOVERNING COUNCIL

MINUTES – JANUARY 13, 2015 - REGULAR MEETING

I. CALL TO ORDER

President Kenny Griego called the meeting to order at 6:00 pm.

Council Members in Attendance: Kathy ChavezJuanita SenaKenny Griego, PresidentDr. David SchneiderGene Carabajal

Members Excused: Theresa Ogas

Others Present: Mike OgasDeborah FoxBill Davis

II. PLEDGE OF ALLEGIANCEThe Pledge of Allegiance was led by Mr. Gene Carabajal

III. ANNOUNCEMENT OF MEETING

Mr. Ogas stated the meeting had been announced in accordance with the Open Meetings Act {Pursuant to 10-15-1 H NMSA 1978 Annotated} and was a legal constituted meeting of The School of Dreams Academy Governing Council.

IV. APPROVAL OF AGENDA

There will be no Closed Executive Session

Ms. Kathy Chavez moved to approve the agenda seconded by Dr. David Schneider. There being no discussion, Mr. Griego called for a vote. Motion passed unanimously.

V APPROVAL OF MINUTES –

A. Regular Meeting – December 02, 2014

Ms. Sena moved to approve the minutes for December 02, 2014, seconded by Dr. David Schneider. There being no discussion, Mr. Griego called for a vote. Motion passed unanimously.

INTRODUCTION

Page 5: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

Scho

ol o

f Dre

ams

Acad

emy

2015

- 20

20Fi

ve-Y

ear D

istri

ct M

aste

r Pla

nPr

epar

ed b

y: P

rogr

essi

ve C

onst

ruct

ion

Man

agem

ent

4

VI DISCUSSION ITEMS:

A. Founders Report

• Kathy Chavez was so impressed with the Holiday Dance Recital. She said the students were amazing. It flowed well. She was so proud of staff and students. It was their first time on stage and they we experts. Belen School was gracious and impressed everything was left in order and clean.

B. Principal’s Report

• We held a band concert as well as a guitar concert during the holidays. We definitely need more space to hold all our activities.

• There were 22 winners for the Scholastic Art. There was an 8th and 10th grader who were GOLD Key Winners.

• We began the meetings for the Early College High School in conjunction with UNM-VC.

• Our students are starting to apply for scholarships.

• Paige Torres was selected to attend the NC Women In Technology Conference. She was selected from 1 of 35 young ladies who will attend the conference.

• Ms. Oshiro will be the instructor for the first College Art Class. She currently has 18 students enrolled.

• We are anticipating 20 students graduating from night school.

• It was suggested by Mr. Gene Carabajal to track the graduated students and map their success.

• There was a discussion on changing graduation from Thursday, May 16 to Friday, May 15th.There is a conflict with Los Lunas HS and Valencia HS having their ceremony on the same day. Mr. Ogas suggested we change the time to 9:00am and keep the date due to the fact that it is entered into the calendar.

VII. ACTION ITEMS

a. Approval of the December 2014 Budget Reports/Expenditures $275,870.35

All expenditures and revenue have been reviewed by the audit committee prior to the board meeting. Ms. Bennett presented the board with the budget reports/expenditures for the month of December. All expenditures went towards fixed costs of rent, salaries/benefits, utilities communication, and supplies/materials. All expenditures has been reviewed and approved by Principal Ogas with all supporting documentation attached.

Page 2 of 4

INTRODUCTION

Page 6: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

5Mr. Ogas recommended for approval of the budget reports, expenditures with the journal entries for themonths of December 2014.

Mr. Griego requested a motion to approve the December 2014 budget with the recommendation of Mr. Ogas; Motion by Ms. Juanita Sena seconded by Ms. Chavez. There being no discussion, Mr. Griego called for a vote. There being no discussion, Mr. Griego called for a vote with the following: (Dr. Schneider – Yes) (Juanita Sena – Yes) (Kathy Chavez – Yes) (Kenny Griego –Yes) (Mr. Carabajal excused on an emergency) Motion passed unanimously

b. Approval of December 2014 Revenue Report $330,039.50

Mr. Griego requested a motion to approve the December 2014 Revenue reports. Ms. Kathy Chavez moved with the recommendation of Mr. Ogas to Approve the Revenue Report for the month of December; seconded by Dr. Schneider. There being no discussion, Mr. Griego called for a vote with the following: (Dr. Schneider – Yes) (Juanita Sena – Yes) (Kathy Chavez – Yes) (Kenny Griego – Yes) (Mr. Carabajal excused on an emergency) Motion passed unanimously.

c. Approval of Riverfront Plaza Lease Addendum #4

All four leases are combined and it does not change any of the terms. It was looked over very carefully by the School lawyer Susan Fox. SODA will request an audit. There is no increase in the lease.

Mr. Griego requested a motion to approve the Riverfront Plaza Lease Addendum #4. Ms. Juanita Sena moved with the recommendation of Mr. Ogas; seconded by Ms. Kathy Chavez. There being no discussion, Mr. Griego called for a vote with the following: (Dr. Schneider – Yes) (Juanita Sena – Yes) (Kathy Chavez – Yes) (Kenny Griego – Yes) (Mr. Carabajal excused on an emergency) Motion passed unanimously.

d. Approval of Facility Master Plan

The governing council with the recommendation of Mr. Ogas adopted plan with any technical changes needed to meet PSFA requirements.

Mr. Griego requested a motion to approve the Facility Master Plan. Ms. Kathy Chavez moved with the recommendation of Mr. Ogas seconded by Ms. Sena. There being no discussion, Mr. Griego called for a vote with the following: (Dr. Schneider – Yes) (Juanita Sena – Yes) (Kathy Chavez – Yes) (Kenny Griego – Yes) (Mr. Carabajal excused on an emergency) Motion passed unanimously.

VIII Closed Executive Session – Discussion of Acquisition of Property For School of Dreams Academy {Pursuant to 10-15-1(H) (8)} NMSA 1978 Annotated}

Page 3 of 4

INTRODUCTION

Page 7: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

Scho

ol o

f Dre

ams

Acad

emy

2015

- 20

20Fi

ve-Y

ear D

istri

ct M

aste

r Pla

nPr

epar

ed b

y: P

rogr

essi

ve C

onst

ruct

ion

Man

agem

ent

6

No Executive Session

IX. Public Comments:

None X. Announcement of meeting – Regular Board Meeting – February 3, 2015.

XI. ADJOURNMENT

Ms. Juanita Sena moved to adjourn the meeting and seconded by Ms. Kathy Chavez. There being no discussion, Mr. Griego called for a vote with the following results: (Dr. Schneider – Yes) (Juanita Sena – Yes) (Kathy Chavez – Yes) (Kenny Griego – Yes) (Mr. Carabajal excused on an emergency) Motion passed unanimously.

The meeting was adjourned at _ 7:10pm.

Approved this 2014.Signed:

______________________________Kenny Griego, President

Attest: _____________________________sg

Page 4 of 4

INTRODUCTION

Page 8: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

7INTRODUCTION

Introduction

TheintentoftheFacilitiesMasterPlanistoidentifyexistingfacilityconditions,pastandfutureenrollment,reviewofthedistrict’seducationalprogram,theidentificationofneworreplacementfacilitiestomeettheneedsofthedistrict.

ThisFacilitiesMasterPlanisdesignedtobeaflexibleplanningtooltoidentifyfacilityissuesandprogrammaticneedstothecommunity,parents,staffandtheSchoolBoardofEducation.Itisdesignedtoofferperiodicinputandrevisionasconditionschangeandnewneedsareidentifiedwithinthedistrict.Theplanidentifiescapitalneedsandallocatesresourcestoaddressthefollowingfacilityissues:

·· Life/health/safety

·· Educational, programmatic & curriculum needs

·· Provision for growth (additions & new construction)

·· Facility Renewal Needs (renovations/ refurbishment)

·· Educational technology

·· Energy management

TheEducationSpecificationsareadetaileddescriptionoftheSchoolofDreamsfacilityneedsinordertomeettheeducationalprogramintheschool’scharter.

Facilities Master Plan Sections

TheFacilitiesMasterPlaniscomprisedoffivemainsections:

MasterPlanSupportingMaterialcontainsdetailedinformationaboutschoolfacilities,evaluations,plans,andotherinformation.

Goals/Processprovidesinformationaboutthecharterschool’sgoalsandtheplanningprocess.

EducationalSpecificationstodescribethephysicalenvironmentinordertodelivertheschool’seducationalprogramandaccommodatethecharterschool’scurrentandfutureenrollment.

CapitalImprovementPlanprovidesinformationaboutcapitalneeds,projectpriorities,andimplementationstrategies.

ExistingandProjectedConditionsprovidesinformationaboutfacilitiesusedbytheschool,enrollment,technology,andcapitalresources.

5

1

3 4

2

Page 9: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

81.0 GOALS/PROCESS

1.1 Goals

EDUCATIONAL GOALS

Allstudentswillincreasetheircomprehensionandapplicationofinformationalreadingmaterial

acrossthecurriculum

Allstudentswillimprovetheirwritingskillsacrossthe

curriculum.

Allstudentswillimprovetheircomprehensionandapplicationofmathskillsacrossthecurriculum.

1.1.1 Educational Goals

ThemissionoftheSchoolofDreamsAcademyistograduatestudentsoftheRioGrandeValleywhoembraceaneducationwhichemphasizesscience,technology,engineering,artsandmathematics(STEM),whilefocusingondevelopingwell-roundedindividualswithgoodcharacter,whoarereadyforpost-secondarysuccess.

Educationissubjecttoconstantchangesaccordingtotheneedsoftoday’sleaners.Theworldiseverchanging,thereforechildrenmustbeabletomeetthechallengesofthesocietyinwhichtheywillfunction.Theapproachtothischallengeisassuringthateachchildisofferedasoundprogramregardlessofrace,religion,orsocio-economicstatus.EducatorsintheSchoolofDreamsAcademybelievethatallchildrenshouldreceiveawell-roundededucation.ThequalityofeducationattheSchoolofDreamsAcademyisdependentuponacompetentandprofessionalstaff.Thisphilosophydemandstheexpertiseofhighlyqualifiedteachersandeducationalfacilitiesthatcansupportthechallenginglearningenvironment.

ThemissionofSchoolofDreamsAcademyistopreparestudentsofValenciaCountytobecomecompetent,self-sustainingindividualswithapassionforlearningandlife.Studentswillbeaffordedtheopportunitytoexcelinthecoresubjectareasthrougharigorouscurriculumwithemphasisonthearts,technology,charactereducationandservicelearninginorderthattheyhavetheskillsnecessaryforsuccessinpostsecondaryeducationandcareerchoices.Studentswillcometoschooleachdayknowingthattheyarecaredforandthattheschoolsupportsthemandtheirfamiliesinthepursuitoftheirgoals.

ThevisionoftheSchoolofDreamsAcademyistoberecognizedasabeaconofeducationalsuccesses,studentachievement,andcharacter;shiningacrossNewMexicofromtheheartoftheRioGrandeValley.

Governing Council Goals

-Wewillensuredisciplineandstudentsafety.

·· Wewillimproveacademicachievement.

·· Wewillcontinuetoimplementtechnologytoraiseacademicachievement,improvelearning efficiency,increasestudentmotivation,focusoninquiring,collaborating,problemsolving,student centeredlearning,andinterdisciplinaryinstruction.

-Wewillencourageandfacilitateparent/guardiancommunityinvolvementinourschools.

Page 10: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

Scho

ol o

f Dre

ams

Acad

emy

2015

- 20

20Fi

ve-Y

ear D

istri

ct M

aste

r Pla

nPr

epar

ed b

y: P

rogr

essi

ve C

onst

ruct

ion

Man

agem

ent

9

1.1 Goals

1.0 GOALS/PROCESS

1.1.2 Facility Goals

- Createanenvironmentthatsupportsstudentachievementintechnologyandthearts.

·· Provideasafe,sound,andhealthylearningenvironment.

·· Providearesourceofculturaleducationforthecommunity

- Createaneducationalsettingwhichfostersdevelopmentofpositiveself-identity,character,and behavior

1.1.3 Facility Concepts

Site Concepts

·· Locatethecampustobeconvenienttopartnerfacilities,providingstudentswithinstructionaland extracurricularopportunities

·· LocatenearpublicfacilitiesthatofferservicesthatcomplementtheinstructionalfacilitiesatSODA, suchaslibraries,parks,andhighereducationfacilities.

·· Provideadequatesitespacetoaccommodatenecessarysupportfunctions,suchasstaffandvisitor parking,loading/unloadingforstudenttransportation,andusableandsaferecreationareas,and outdoorinstruction.

Function Concepts

·· Provideadequatespaceduringfacilitytransitionstoallowforenrollmentgrowth

·· Provideappropriateclassroomspacestoaccommodatethetrilateraldeliverymethod

·· Createsharedinstructorofficespacestofacilitatecollaborationamongteachingstaff

Page 11: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

10

1.2 Process

1.0 GOALS/PROCESS

PCMworkedwiththeSchoolofDreamsadministrationandstafftogainanunderstandingofandtodocumenttheschool’sgoals,programsanddeliverymethodsandidentifyexistingandfuturefacilityneeds.Theschooliscurrentlylocatedinleasedfacilitiesthatdoesmeetstatefacilitystandardsandsupportthecharter’seducationalneeds,howeverwithaexpansionoftheschools’studentcapto525students,theexistingfacilitywillbetoosmallinthefuturetomeettheneedsofthestudents.Theplanningprocesswasmanagedbytheschool’sprincipalandwasfacilitatedbyPCM.

Authority and Decision Making Process

Allmajoroperationaldecisionsoftheschoolwillbemade,ordelegatedtoadministrativepersonnelbytheGoverningCouncil,includingbutnotlimitedtofiscalmanagement;compliancewiththeNewMexicoCharterSchoolsActandotherapplicablestateandfederaleducationlawsandregulations;andoversightoftheselection,recruitment,discipline,andpromotionofallmajorschoolleaders(collectively,the“SchoolLeaders”)includingbutnotlimitedtotheprincipal(chiefexecutiveofficer),thespecialeducationdirector,andthebusinessmanager.

EricBrownMikeOsasKenyGriegoCareKhone

Page 12: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

Scho

ol o

f Dre

ams

Acad

emy

2015

- 20

20Fi

ve-Y

ear D

istri

ct M

aste

r Pla

nPr

epar

ed b

y: P

rogr

essi

ve C

onst

ruct

ion

Man

agem

ent

11

1.2 Process

1.0 GOALS/PROCESS

Facility Assessments

FacilityAssessmentswereconductedbyPCMforthefacilityleasedandoperatedbytheSchoolDistrict.Theassessmentsincluded:

··Sitevisits

··MeetingwithPrincipal

··FacilityWalk-throughswithPrincipalandHeadCustodian

··ReviewofState’sFacilitiesAssessmentDatabase

··CapacityandUtilizationStudyforthefacility

Facility Master Plan Committee Meetings:

Oncethefacilityassessmentwascompletedandthedatagathered,meetingswiththeFacilityMasterPlanCommitteecommenced.ThefirstcommitteemeetingwasusedtoexplainthepurposeofafacilitiesmasterplanandidentifythetasksandresponsibilitiesoftheFacilitiesCommittee.SeveralsubsequentmeetingswereheldwherethefacilitydatawasthenpresentedtotheFacilitiesCommitteeforreview.

Page 13: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

12

1.3 Acronyms/Definitions

1.0 GOALS/PROCESS

ADA: AmericanswithDisabilitiesAct

CAP: Capacity

CAT: Categorical

CD: ComputerDisk

COWS:ComputeronWheelsSystem

CMU: ConcreteMasonryUnit

DCU: DeficienciesCorrectionUnit

ED: Education

EETT: EnhancingEducationThroughTechnology

EPSS: EducationalProgramforStudentSuccess

FAD: FacilityAssessmentDatabase

FED: Federal

FMP: FacilitiesMasterPlan

GIS: GeographicInformationSystem

GOBonds:GeneralObligationBonds

GSA: GeneralServicesAdministration

GSF: GrossSquareFeet

HB33:HouseBill33

HS: HighSchool

IEP: IndividualizedEducationalPlan

Lab: Laboratory

Maint:Maintenance

MACC:MaximumAllowableConstruction Cost,oraprojectconstructionbudget (comparabletocontractor’sbid)

NASF: NetAssignableSquareFeet,orthetotal ofallassignableareasinsquarefeet

No.: Number

Perm: Permanent

P.E.: PhysicalEducation

PED: PublicEducationDepartment

Port: Portables

PMP: PreventiveMaintenancePlan

PSCOC:PublicSchoolcapitalOutlayCouncil

PSFA: PublicSchoolsFacilitiesAuthority

PTR: Pupil/TeacherRatio

RETA: RegionalEducationalTechnology Assistance

REG: Regular

SB-9: SenateBill-9

SPED: SpecialEducation

SF: SquareFeet

Sq.Ft.:SquareFeet

SODA: SchoolofDreamsAcademy

TPC: TotalProjectCost,orthetotalcostof theprojectincludingfees,moveable equipment,landacquisition(if any),administrationandcontingencies

VOAG: Vocational/Agricultural

Page 14: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

13

2.1 Programs

2.0 EXISTING & PROJECTED CONDITIONS

2.1.1 Organization

TheSchoolofDreamsAcademy(SODA)enrollsstudentsinthemiddleandhighschoolgrades7ththrough12thgrades.Theschoolassignsstudentstograde-levelcoursesaccordingtocoursecompletioninamonitoredself-pacedenvironment.Allstudents,includingEnglishLanguageLearners(ELL)andthoserequiringspecialeducationandrelatedservices,willhavethebenefitofanindividualizedlearningplandesignedtoaddresstheirspecificneedsandtomeettheirindividualgoalswithinthelearningspectrum

SODAoffersquality,research-basedcoreacademicprogramenhancedbyseveralvirtuallearningprograms.Assuch,SODAhasevolvedfromtheconceptofonlinelearningprograms(E2020nowEdgunityandALEKS)tooneinwhichweusetherepositoryofinformation(videos,primarysources,quizzes,tests,lectures,journalsetc.)withsupportprogramsandteachercreatedprojectstocreateablendedmodulethatfitsourstudent’sdiverseneeds.

Programs & Delivery Methods

SchoolofDreamsAcademyutilizesEducation2020asthecoreacademiccurriculumforsubjectstaughtingradessevenththroughtwelfth.Education2020isencompassingstudentsatallskilllevelstorealizeacademicsuccess.Theinstructionalprogramsarealignedtostateandnationalstandards,andhavebeensuccessfullyimplementedinschooldistrictsacrossthecountrysince1998.TheEducation2020onlinecoursewareisledbyhighlyqualifiedmasterteacherswithauniqueapproachofcombiningbest-practicepedagogywithnext-generationtechnologythatenablesstudentstolearnattheirownpaceandtoproducemeaningfulgains.Theacademiccurriculumcomplieswiththepremiseof“highlyqualified”undertheNochildLeftBehindAct.

TheEducation2020(E2020)coursewaresupportsa“failureisnotanoption”approachbyensuringthatstudentsmasterthecontentofeachlessoninthecoresubjectsbeforeprogressingontoadditionallessons.Itengagesstudentsinthelearningprocessthroughanimations,simulations,video-basedpresentations,onlinecontent,vocabularydevelopmentandexplorationactivitiesthatsupporteachlessonpresentedbythevirtualclassroomteacher.Onlineembeddedhomework,evaluations,andothermultimediaactivitiesreinforcestudentunderstandingwithcontentmasterythatismeasuredandensuredthroughformulativeandsummativeassessmentsgivenateachsegment.

Inadditiontothecontentrichnessandconsistentdelivery,theuseofE2020ensuresthatthetotalprogramisdeliveredinasecuredenvironmentwhichlimitsstudentstochatsande-mailonlywithteachersandpreventsthemisuseofthevirtualschoolenvironmentandcontent.TheSchoolofDreamsAcademycommitmenttosmallclasssizesandindividualizedinstructionissupportedbytheinstructionalframeworkofferedthroughE2020.Thevirtualclassroomsolutionoperatesasaone-to-oneeducationalexperience.

Page 15: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

Scho

ol o

f Dre

ams

Acad

emy

2015

- 20

20Fi

ve-Y

ear D

istri

ct M

aste

r Pla

nPr

epar

ed b

y: P

rogr

essi

ve C

onst

ruct

ion

Man

agem

ent

14

2.1 Programs

2.0 EXISTING & PROJECTED CONDITIONS

2.1.1 Programs & Delivery Methods

Individualized Learning Plan

EachstudentisguidedunderanIndividualizedLearningPlan(ILP)designedaroundtheirindividualsituationanddeterminedthroughdiscussionwithparentsandstafftoprovideareasonableroadmaptofollow.TheILPisdevelopedtoincludeshortandlongtermgoalswhicharereviewedquarterlybyschoolstaff,students,andparents.Studentscoordinatewiththeirteachersandparentstoidentifyspecificareastotargetforimprovementanddevelopstrategiesforachievinggoalsbasedonmeasurableindicatorsofaccomplishment.

ForSpecialEducationstudents,theILPcomplementsandsupportstheirIndividualizedEducationPlan(IEP)whichisrequiredundertheIndividualswithDisabilitiesEducationAct.TheILPalsoincludesalanguageacquisitionplanforEnglishLanguageLearnerswithinaduallanguagephilosophyinamannerthatdoesnotcompromiseorhindertheirchancesforacademicsuccess.

Arts Education

ArtsEducationattheSchoolofDreamsAcademyincludesfourseparateanddistinctdisciplines:Dance,Music,TheatreArts,andVisualArts-eachwithit’sownbodyofknowledgeandskills.TheintentforArtsEducationistoallowacomprehensiveunderstandingofoneormoreoftheartstobeaccomplishedbyeachstudent.Involvingthe“wholechild”inartseducationgraduallyteachesstudentstoperceiveandthinkinnewways.Theartshelpprovideextendedmeaningtoacademicsbydevelopingintuition,sensitivity,reasoning,imaginationanddexterity.Itbenefitsbothstudentandsocietybyallowingactiveengagement,disciplinedandsustainedattention,persistence,andrisktaking.Italsoincreasesschoolattendanceandeducationalaspirations.(CriticalLinks,2002;NCSCS,2000)CommunityServiceLearning

AccordingtotheLearnandServeClearinghouse,thedefinitionforService-Learning“isateachingandlearningstrategythatintegratesmeaningfulcommunityservicewithinstructionandreflectiontoenrichthelearningexperience,teachcivicresponsibility,andstrengthencommunities”.SchoolofDreamsAcademyalsointendstopartnerwithYouthDevelopmentInc.(YDI)ineffortstoestablishatrue“wraparound”communitythatwillsupportstudentsandfamiliesaccordingtotheparametersoftheYDImission:“Toworkwithourcommunitytocreateandeffectivelyimplementaresults-basedcontinuumofservicesassuringthatchildren,youth,andfamiliesachievetheirfullpotential.”

2.1.2 Anticipated Program Changes

TheSchoolofDreamsAcademyhasadoptedamaximumclassroomloadingpolicyofamaximumof25studentsperclass.

DuringtheFacilityMasterPlanandEducationalSpecificationsdevelopmentprocess,SODAdiscoveredapotentialdemandforPre-KandFirstgrade.Therefore,theSODAiscurrentlyresearchingthefinancial,educational,andfacilityimpactsofthispotentialchange.ItisenvisionedthatSODAmaybeginacceptingPre-KandFirstGradeclassesviaportables,howevermoreresearchanddiscoveryneedstobeperformed.

Page 16: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

15

2.1 Programs

2.0 EXISTING & PROJECTED CONDITIONS

2.1.3 Shared/Joint-Use Facilities

Work Study

Awork-studyprogramprovidesanimportantstepintheeducationalprocessbyassistingstudentstomakesmoothertransitionsfromhighschooltoadultlife.Thisallowsthemabetterchanceofbecomingemployedandinmeetingpersonallong-rangegoals.

Valencia Campus

TheSchoolofDreamsAcademyoffersawidearrayofconcurrentcourses,inwhichstudentscanearnhighschoolandcollegecreditsimultaneously.StudentsmaytaketheUNMCOMPASSassessmentintheFallorSpringtodeterminetheireligibilityforEnglish101orMath120.StudentswhoareeligiblemayenrollintheEnglish101(Composition)courseortheMath120course,bothofwhicharetaughtonlinebyUNMprofessorswithsupport,reinforcementandadditionalteachingprovidedbySchoolofDreamsAcademyinstructionalstaff.

Night School

TheSchoolofDreamsAcademyofferstheCreditRecoveryProgramtoanystudent(allages)thathasdroppedout,isinneedofcredits,and/orwantstograduatewithaHighSchoolDiploma.TheSchoolofDreamsisworkingwiththedropoutrates,improvinggraduationrates,closingthegraduationandachievementgapsandbuildingacommunitytosupportstudentsuccess.TheCreditRecoveryProgramcreatesopportunitiesforstudentsuccessbygivingstudents’confidencetopursuetheirgoals,providingflexiblepacingandschedulesofinstruction,adaptingstyles,providingextrapracticeandcommunicatingfeedbacktostudents.Studentscanworkcloselywithteacherseitherindividuallyorinsmallgroupstocompletecourseworkorcreditsrequiredtograduate.Whiletheenvironmentandclassroomhasasetroutine,theconnectionbetweentheteachersandthestudentsarestrong.Studentsaremotivatedbytheirsuccessasindividualsandasagroup.Modificationsarealsomadeonanindividualstudentlevel.StudentswithIndividualEducationalPlans,(IEP’s)orstudentswhoareclassifiedasSpecialEducationneedveryspecificaccommodationsandmodificationsinordertosuccessfullyaddresstheirlearningneeds.Parentparticipationisabsolutelyencouraged.Theteachershaveanopendoorpolicywithparents,andtheyarewelcomeatanytimeintotheclassroom.Phonecallsande-mailsarealsoverycommoncommunicationtoolsinadditiontoprovidingdetailedreportssuchasstudentprogressorgradereports.

Page 17: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

Scho

ol o

f Dre

ams

Acad

emy

2015

- 20

20Fi

ve-Y

ear D

istri

ct M

aste

r Pla

nPr

epar

ed b

y: P

rogr

essi

ve C

onst

ruct

ion

Man

agem

ent

16 2.0 EXISTING & PROJECTED CONDITIONS

2.2 Enrollment

2.2.1 Historical Enrollment

TheenrollmentatSchoolofDreamsisflexiblebasedupontheEducation2020programthatisusedbytheschoolthatallowsforselfpacedlearning.Thiseducationalprogramallowsforadditionalstudentsintheclassroomwithoutasignificantincreaseinteachingstaff.

Enrollmentinitiallyservedgradessevenththroughninthduringthefirstyearofoperation(2010-2011).Subsequentgradesarebeingaddedeachyearuntil2012-2013whengradessevenththroughtwelfthwillbeofferedattheschool.TheschoolrecentlyreceivedacapincreasebythePublicEducationDepartmentto525students.Byincrementallyaddingapproximately70studentsperyear,thecapwillnotbereacheduntilthe2015/16schoolyear.Thisincreaseinstudentswillrequirerelocationtoanotherfacilitytoaccommodatetheenrollment.

Thefollowingchartshowstheprojectschoolenrollmentbygradelevelwiththe2010-11schoolyearastheofficial40daycount.

2.2.4 Classroom Loading Policy

SODA’scharterrenewalapplicationstatesthatadesirablepupil/teacherratio(PTR)willbe20:1.Withoneteacherineachclassroomformostcourses,theclassroomloadingmaximumwouldbe20students.Anexceptionistheteam-taughtgroupprojectswhichwillallowupto40students.Duetothedifficultiesofretainingthisstudentpopulation,calculationsofclassroomneedusedaclassroomloadingfactorof25.

SCHOOL OF DREAMS ACADEMY ENROLLMENT PROJECTIONS

2014-2015 2015-2016 2016-2017 2017-2018 2018-2019 2019-2020Grade7 52 67 73 77 83 91Grade8 63 71 77 81 89 89Grade9 75 77 88 85 92 94Grade10 67 88 93 96 94 97Grade11 53 75 89 99 101 100Grade12 71 67 83 99 108 109Total 381 445 503 536 567 580

SCHOOL OF DREAMS ACADEMY HISTORICAL ENROLLMENT

2010-2011 2011-2012 2012-2013 2013-2014Grade7 38 33 41 48Grade8 61 56 51 63

Grade9 41 73 57 58

Grade10 41 55 73 63Grade11 0 38 44 69Grade12 0 0 60 72Total 181 255 326 373

Page 18: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

172.0 EXISTING & PROJECTED CONDITIONS

2.2 Enrollment

2.2.5 Classroom Needs

Thefollowingchartisaroomsummaryanalysisdepictingclassroomneedsbasedonagrowingenrollmentandtheprojectedenrollmentcapof525studentsenvisionedforthenewfacility.

Page 19: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

Scho

ol o

f Dre

ams

Acad

emy

2015

- 20

20Fi

ve-Y

ear D

istri

ct M

aste

r Pla

nPr

epar

ed b

y: P

rogr

essi

ve C

onst

ruct

ion

Man

agem

ent

18 2.0 EXISTING & PROJECTED CONDITIONS

2.2 Enrollment

2.2.5 Classroom Needs (continued)

Page 20: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

192.0 EXISTING & PROJECTED CONDITIONS

2.2 Enrollment

2.2.5 Classroom Needs (continued)

Page 21: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

Scho

ol o

f Dre

ams

Acad

emy

2015

- 20

20Fi

ve-Y

ear D

istri

ct M

aste

r Pla

nPr

epar

ed b

y: P

rogr

essi

ve C

onst

ruct

ion

Man

agem

ent

20

2.3 Sites/Facilities

2.0 EXISTING & PROJECTED CONDITIONS

2.3.1 District Boundary Map

TheSchoolofDreamsAcademyislocatedwithinthegeographicareacurrentlyservedbytheLosLunasPublicSchoolDistrict(LLS)inLosLunas,NewMexico.TheareaissituatedtwentymilessouthofAlbuquerquewithinValenciacounty.

Page 22: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

212.0 EXISTING & PROJECTED CONDITIONS

2.3 Sites/Facilities

2.3.2 Site & Facility Inventory

Facility Description

SchoolofDreamsAcademyiscentrallylocatedinthevillageofLosLunasat1800MainStreet,adjacenttotheeastbankoftheRioGrandeRiver.Theone-storycampuscontainsapproximately13,548squarefeetofleasedretailspaceinRiverfrontPlaza.

Structural/Exterior Closure:

Thebuildingisanewsinglestorysteelframedstructurewithstuccoexterior.ThebuildingisaccessibledirectlyfromtheparkinglotandmeetsallADArequirementsforaccessibility.Theparkinglotisusedforparkingbystaffandstudentsaswellasusedforpick-upanddropoffofstudents.Asthisfacilityisleasedfromaprivatelandowner,allfacilityimprovementsandrepairsarecoveredaspartoftheleaseagreementbythelessor.

Interiors:

Allinteriorwallsareconstructedwithsteelstudsandgypsumboard.Thereisacombinationofcarpetingandpolishedconcreteflooringthroughoutallleasedspaces.Theschoolhasasmokedetectionandfirealarmsystemandthebuildingisfullysprinkled.Classroomsandcorridorshaveaudio/visualfirealarmannunciatorsandthereareemergencyalarmpullslocatedategressdoors.Theschooldoeshaveasecuritysystemaswellasacameramonitoringsystem.Thetelephonesystemhasanintegralpublicaddresssystemandphonesareinstalledineachclassroom.

Riverfront Plaza

Page 23: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

Scho

ol o

f Dre

ams

Acad

emy

2015

- 20

20Fi

ve-Y

ear D

istri

ct M

aste

r Pla

nPr

epar

ed b

y: P

rogr

essi

ve C

onst

ruct

ion

Man

agem

ent

22 2.0 EXISTING & PROJECTED CONDITIONS

2.3 Sites/Facilities

2.3.5 Statewide Adequacy Standards

NewMexico’sstatewideadequacystandardsforprimaryandsecondaryeducationalfacilities(NMAC6.27.30)aretheguidelinesforpublicschooldistrictsto“...provideandsustaintheenvironmenttomeettheneedsofpublicschools.”TheguidelinesareaminimumfacilitystandardtoestablishequityamongalleducationalfacilitiesthatserveNewMexicopublicschoolstudents.Alternativeandcharterschoolsmayseekavarianceforfacilities,sincetheydonotnecessarilyconformtothestandard’sprograms,deliverymethods,andfacilityneedsandbudgets.Insuchcases,schoolsmeettheintentofthefacilityrequirementsthrough“alternativemethods.”However,alternativeandcharterschoolsmustprovidetheminimumsquarefootageallowancesforgeneralclassroomspacesidentifiedintheadequacystandards.Section3.2.5SpaceNeedsindicatesconformancewithadequacystandardsforminimumsquarefootageperstudent.

TheimplementationofspaceneedsforSODAwillmeetthefollowingrequiredstandards,listedbelowwithstatutesectioncitationsinparentheses:

6.27.30.8 General Requirements

•Buildingstructuralsoundness(A.1)•Weather-tightexteriorenvelope(A.2)•Interiorsurfacecondition(A.3)•Interiorfinishharmfulelements(A.4)•Buildingsystemintegrity(B.1)•Plumbingtype/accessibility(B.2)•Adequatefirealarmsystem(B.3)•Adequatetwo-waycommunicationsystem(B.4)

6.27.30.10 Site

•Studentdrop-offpedestrianpathway(A)•Protectionofbuildingstructuralintegrity(C)•Potentialofflooding,ponding,orerosion(C)

6.27.30.12 Academic Classroom

•Appropriatesize(A)•Lighting(C)•Temperaturerange(D)•Acoustics(E)•Airquality(CO2PPM)(F)

Page 24: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

232.0 EXISTING & PROJECTED CONDITIONS

2.4 Utilization & Capacity

2.4.1 Utilization

Utilizationanalysisidentifiesexistingclassroomuseandthenumberofclassroomsthataccommodatecurrentstudentenrollment.Ananalysisbasedonthemasterscheduleofacademicyear2014-15isinSection5.Theaverageutilizationrateofallinstructionalspacesattheschoolis71%.

Page 25: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

242.0 EXISTING & PROJECTED CONDITIONS

2.4 Utilization & Capacity

MIDDLE/HIGH SCHOOL UTILIZATION WORKSHEET

bsprick 10:52 AM2/11/2015

1 2 3 4 5 6 7

# of St.

% Rm Occ. G

rad

e

Teacher Name

Subject# of St.

% Rm Occ. G

rad

e

Teacher Name

Subject# of St.

% Rm Occ. G

rad

e

Teacher Name

Subject# of St.

% Rm Occ. G

rad

e

Teacher Name

Subject# of St.

% Rm

Occ. Gra

de

Teacher Name

Subject# of St.

% Rm Occ. G

rad

e

Teacher Name

Subject# of St.

% Rm Occ. G

rad

e

Teacher Name

Subject

A3 351 14 27 n 0% 0% 0% 0% 17 121% Chavez NM Health 27 192% Chavez NM History 0% 44 45% 6

A5 234 9 27 n 4 43% 8 HomanEnglish / Algebra

3 32%7th-8th

HomanEnglish/Pre-

Algebra9 96% 7th Homan

English / Geometry

9 96% 8th HomanPre-Algebra

/ English8 85% 7th Homan Algebra 8 85% 8th Homan

Pre-Algebra / English

0%41 63% 6

D1 1,020 41 27 y 32 119%7th-8th

Oshiro Art 14 52%7th-8th

Oshiro Art 9 33% Oshiro Art 29 107%9th-12th

Oshiro Art 20 74% Oshiro Art 24 89% Oshiro Art 14 52%7th-12th

Oshiro Advisory 142 75% 7

D2A 726 29 27 y 27 100% Duran US Hist 22 81% Duran US Hist 22 81% Duran World Hist 18 67%9th-12th

Duran World Hist 21 78%9th-12th

DuranWorld Hist / NM Hist.

31 115% 9th Duran NM Hist 22 81%9th-12th

Duran Advisory 163 86% 7

D2B 526 21 27

n

11 52% 10th RodriguezTest Prep / English II

0 0% 0% 17 81%10th-12th

Herrera Spanish II 28 133%10th-12th

Herrera Spanish I 33 157%10th-12th

Herrera Spanish I / II 25 119%9th-12th

Herrera Advisory 114 77% 5

D3 1,401 56 27 20 74%7th-8th

McNiel PE / Dance 34 126%7th-12th

McNiel PE / Dance 18 67%7th-12th

McNiel PE / Dance 19 70%7th-12th

McNiel PE / Dance 11 41%7th-12th

McNiel PE / Dance 16 59%7th-12th

McNielPE / Team

Sports24 89%

7th-12th

McNiel Advisory 142 75% 7

D4 1,121 45 27 2 7% BrownOffice /

Teachers Aid

47 174% Brown Robotics 26 96% Brown Robotics 3 11% Brown Work Study 26 96% Brown Robotics 6 22% Brown Work Study0%

110 58% 6

L1A 646 26 27 25 97% Berlat English II 26 101% Berlat English I 27 104% Berlat English I 16 62% Berlat English II 20 77% Berlat English I 19 74% Berlat English II 23 89% Berlat Advisory 156 86% 7L1B 720 29 27 23 85% Buda Economics 18 67% Buda Study Skills 20 74% 12th Buda English III 31 115% 12th Buda English III 21 78% Buda English IV 9 33% P. Herrera Yearbook 22 81% P. Herrera Yearbook 144 76% 7L2A 496 20 27 26 131% Jackson Government 21 106% Jackson Digital Arts 8 40% Jackson Drafting 14 71% Jackson Digital Arts 19 96% Jackson Film 6 30% Jackson Digital Arts 19 96% Jackson Advisory 113 81% 7

L2B 708 28 27 8 30% PlattPhysical Science

22 81% PlattEarth

Science26 96% Platt

Earth Science

26 96% PlattLife

Science15 56% Platt

Earth Science

15 56% Platt Life Science 23 85% Platt Advisory 135 71% 7

L3 1,048 42 27 26 96% Hajner Biology 18 67% Hajner Biology 22 81% Hajner Horticulture 9 33% Hajner Biology 18 67% Hajner Biology 12 44% Hajner Horticulture 22 81% Hajner Advisory 127 67% 7L4A 520 21 27 15 72% Dodge Algebra II 31 149% 10 Dodge Geometry 18 87% 10 Dodge Geometry 18 87% Dodge Pre-Calc 28 135% Dodge Algebra II 9 43% Dodge BEMP 22 106% Dodge Advisory 141 97% 7

L4B 846 34 27 29 107% OlgasPhysical Science

28 104% Olgas Chemistry 17 63% OlgasPhysical Science

2 7% Olgas Physics 22 81% OlgasPhysical Science

8 30% OlgasSuper

Computing16 59% Olgas Advisory 122 65% 7

MP 2,261 90 2728 104% Jolly Guitar 27

100%Jolly Guitar 18

67%Jolly

Guitar II, III, IV

35 130% Jolly Chorus0% 0%

20 74% Jolly Advisory 128 68% 5

P1A 600 24 2713 54%

8Kittrell English

0%25

104% 7Kittrell English 22

92% 8Kittrell English 23

96% 7Kittrell English 23 96% 8 Kittrell English 26 108%

8th - 7th

Kittrell Advisory 132 79% 6

P1B 600 24 27 0% 5 21% 7 Armijo Pre-Algebra 23 96% 8 Armijo Math 18 75% 7 Armijo Pre-Algebra 20 83% Armijo Math 20 83% 8 Armijo Pre-Algebra 20 83% 8 Armijo Advisory 106 63% 7

P2A 600 24 27 13 54%7th - 8th

BratcherBeginning

Band15 63%

7th - 8th

BratcherBeginning

Band11 46%

7th - 8th

BratcherIntermediate

Band15 63% Bratcher Jazz Band

0% 0% 0%54 32% 4

P2B 600 24 27 28 117% Resenddiz Algebra I 16 67% Resendiz Algebra I 34 142% Resendiz Fin. Literacy 29 121% Resendiz Algebra I 0% 15 63% Resendiz Algebra I 26 108% Resendiz Advisory 148 88% 671% 73% 72% 73% 74% 67% 69% 2,262 71%

1) Max # of St./Sq. Ft.= The maximum number of students allowed per the Statewide Adequacy Standards square feet.2) PED Max PTR/Clm = PED's maximum pupil / teacher ratio per class period.3) % Rm Occ. = The number of students column divided by either the PED Max./PTR/Clm column or the Max #of St./Sq ft column, which ever column is the smaller maximum allowed by A.S. or PED. 4) Tot. St. = The total number of students in the specific instructional space throughout the day. 5) PED Max. PTR/Day = The maximum pupil teacher ratio allowed by PED for specific teacher per day allowed.6) Tot. % Rm Occ. / Day = Total average percentage room is occupied throughout the day. (count all periods in average)7) Occ. # of Pd.'s / Day = Occupied number of periods occupied per day. (Prep period may be counted as utilized if teacher does not have a separate office from classroom)8) % Pd. / Day = The average percent of occupied periods (occupied number of periods divided by the number of periods available per day).

1

1Number of Lunch Turns Per Day

PERIOD 7Time:

Number of Lunch Turns Per Day

PERIOD 2Time:

5

4

TOTALS 381 52 24

4

14

11

3

3

5

410th Grade

11th Grade

12th Grade

52

63

75

67

53

71

7th Grade

NUMBER OF / SPECIAL NEEDS STUDENTS PER

GRADE

CURRENT NUMBER OF TEACHERS

8th Grade

9th Grade

GRADE LEVEL

CURRENT STUDENT 40TH DAY

COUNT

15

8

PED Max. PTR /Day

Tot. % Rm

Occ. / Day

Occ # of

Pd.'s / Day

Max # of St./ Sq Ft

Clrm NSF

A. S. Y /N

PED MAX PTR / Clm

PERIOD 1Time:8:15 - 9:45 Rm

#Tot. St.

PERIOD 6Time:

PERIOD 5Time:

PERIOD 4Time:

PERIOD 3Time:

Page 26: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

252.0 EXISTING & PROJECTED CONDITIONS

2.4 Utilization & Capacity

2.4.2 Capacity

Aschool’sstateddeliverymethods,usuallyexpressedintermsofclassroomloadingandPTR,determinethecapacityofacharterschoolfacility.TheNewMexicoPublicSchoolFacilityAdequacyStandardsrequireaminimumof25netsquarefeetperstudentforhighschoolclassroomsand28netsquarefeetformiddleschoolclassrooms.ThecapacityanalysiscomparesthecapacityconsideringtheminimumamountofsquarefootagerequiredperstudentbyNewMexicoAdequacyStandardsversustheallowableclassroomloadingcapacityaccordingtostatestatute.Thereportedcapacityisthelesser(morestringent)ofthetwonumbers.Themaximumfunctionalcapacityofcurrentfacilityis349at85%efficiency.Theanticipatedenrollmentisprojectedof525studentswilldeemthecurrentleasedfacilityaboveitsfunctionalcapacity.Thisismostlikelytooccurbythe2015-16schoolyear.Therefore,asstatedingreaterdetailinSection4,SODAhasdevelopedthreeoptionstoprovideafacilitythataccommodateditsprojectedgrowthwhileatthesametimemeetingtheminimumNMAdequacyRequirements.PleaserefertoSection4forthevariousoptionstoaccommodatetheanticipatedgrowthinenrollmentandneedforgreatercapacity.

A3 History Classroom 351 14 25 14A5 Math Classroom 234 9 25 9D1 Art Specialized 1,020 41 25 25

D2A US Hist Classroom 726 29 25 25

D2BTest Prep / English II

Classroom 526 21 25 21

D3 PE / Dance Specialized 1,401 56 25 25D4 Robotics Specialized 1,121 45 25 25L1A English II Classroom 646 26 25 25L1B Economics Classroom 720 29 25 25L2A Government Classroom 496 20 25 20

L2BPhysical Science

Classroom 708 28 25 25

L3 Biology Classroom 1,048 42 25 25L4A Algebra II Classroom 520 21 25 21

L4BPhysical Science

Classroom 846 34 25 25

MP Guitar Specialized 2,261 90 25 25P1A English Classroom 600 24 25 24P1B Math Classroom 600 24 25 24

P2ABeginning

BandSpecialized 600 24 25 24

P2B Math Classroom 600 24 25 24

601 475 431

349

Total Capacity

Capcity with 85% Efficiency

Reported Capacity Gen Classrrooom

Rm #Class

room NSFRoom Name Classification

Capacity per Adeaquacy

Capacity per Loading

Page 27: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

Scho

ol o

f Dre

ams

Acad

emy

2015

- 20

20Fi

ve-Y

ear D

istri

ct M

aste

r Pla

nPr

epar

ed b

y: P

rogr

essi

ve C

onst

ruct

ion

Man

agem

ent

26 2.0 EXISTING & PROJECTED CONDITIONS

2.5 Technology

2.5.1 Overview of District’s Technology Plan

Strategies for improving academic achievement and teacher effectiveness

SchoolofDreamsAcademyiscommittedtointegratingthelatesttechnologyavailableintoclassrooms.Allstudentswillbegivenaccesstocomputerlabs,internetaccess,laptopswhenneededtocompletespecialschoolprojectsandallotheradvancementsoftechnologythatbecomeavailablewithinthescopeoftheschool’sresources.TheuseofalltechnologyandequipmentwillbetoimproveacademicachievementasmeasuredagainstStateContentStandards,Benchmarks,andPerformanceStandards,includingtechnologyliteracy.Allteacherswillbetrainedinthelatesttechnologyinordertoeffectivelyintegratethisknowledgeandtheseresourceseffectivelyintothecurriculumandinstruction.

Goals

·· Learningwillbesignificantlyimproved,usingappropriatetechnologies,leadingto highachievementinStateBoardofEducationadoptedcontentstandards.

·· Educatorshavethecapacitytoestablishstudent-centered,technology-enhancedlearning environmentsthatresultinincreasedstudentperformanceandeconomicviability.

·· Studentsandeducatorswillhaveaffordable,universalaccesstohigh-speed,robust telecommunications,andallschoolswillbemodernizedfortechnology.

·· SchoolofDreamswillutilizefundingavailabletosupportplanning,implementing,andassessing initiativesforintegratingtechnologyintoallclassroomsandschools.

Steps to increased accessibility

AllstudentsandteacherswillhaveincreasedaccesstotechnologythroughtheuseofEducationTechnologyFundsto:

·· Purchasehardware,software,andtrainingthatwillcontinuetointegratetechnologyintoeach classroomtoenhancethestudent’sabilitytoincreasetheirperformanceinallcontentstandards andbenchmarks.

·· Ensureallteachersarepreparedtointegratetechnologyeffectivelyintocurriculaandinstruction information,utilizationandcapacityofeachfacilitywasanalyzedasitrelatestotheState’s AdequacyStandards.

Page 28: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

272.0 EXISTING & PROJECTED CONDITIONS

2.5 Technology

2.5.1 Overview of District’s Technology Plan (continued)

Promotion of curricula and strategies that promote technology integration

- Allcurriculawillhavetechnologyintegrationplans(hardware··andsoftware)incorporatedintothem.

·· SmartBoardsand/ordesktopcamerasandprojectorswillbeincorporatedintoeachclassroomas fundsbecomeavailable.

AccordingtoresearchbyCARET(CenterforAppliedResearchinEducationalTechnology),“Technology’simpactonteachingandlearningisafunctionoftheextenttowhichsystematicallyincorporatedintoschoolplansthatdescribeveryspecificwaysthattechnologyisintegraltocurriculum,instructionandschooladministration.”

Professional Development

Annualtechnologytrainingforeachstaffmemberwillberequiredtokeepthemcurrentonthelatesthardwareandsoftwareavailableforeducation.

·· Provideon-goingtrainingintechnologywhenneeded.Answerquestionsregardinghardware, software,internetande-mailresources.Assistwithanytechnologicalproblemsthatmayarise.

··Teachersandstaffwillbeencouragedtoseekopportunitiesforprofessionaldevelopmentin technology,suchasRETA,andIntelTeachtotheFuture.

Technology Type and Costs ·· Upkeepandreplacementofhardware

·· ReplacementandpurchaseofthelatestsoftwareandInternetaccess.

·· Costsmayvary,andotherfundingmaybesought.

Innovative Delivery Strategies

·· CommunicationofSchooleventsandactivitiesthroughawellmaintained,up-to-datewebsite consistingofschedules,classroomevents,dailyactivities,homeworkandclassroomassignments.

Benchmarks and Performance Standards

Informationtechnologywillhelplinkteacherstotheoverallworldwidecommunityofeducatorsandresourcesthatwillprovideincreasedaccesstopeersupportandadvice.

·· Studentswillcontinuetobeinthetopoftheirclusterinscoresandinthetop20percentinthe stateinCTBSandCompetencytestingscoresasaresultofincreasedaccesstotechnology availabletopracticeskillsinReadingandWriting.

Page 29: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

Scho

ol o

f Dre

ams

Acad

emy

2015

- 20

20Fi

ve-Y

ear D

istri

ct M

aste

r Pla

nPr

epar

ed b

y: P

rogr

essi

ve C

onst

ruct

ion

Man

agem

ent

28 2.0 EXISTING & PROJECTED CONDITIONS

2.6 Energy Management Program

2.6.1 District-Wide Energy Management Program

TheSchoolofDreamsAcademypolicygoalistosavescarceresourceswithoutinfringementupontheeducationalmissionoftheSchoolDistrict.EffectiveenergymanagementisaresponsibilityofallSODApersonnelto:

··Improvethecomfortandsafetyofschools

··Provideavehicleforschoolstomakeimprovementswithoutupfrontcapitalexpenditures

Inanefforttoguaranteeenergysavings,alloperationsoftheSchoolfacilitiesaregovernedbythefollowingspecifics:

A. Lighting

1. Duringworkhours,alllightingwillbeturnedoffinanyareathatisunoccupiedwithcertain exceptions.Theseexceptionsincludecorridors,stairwells,exitsrequiredbycode,and inareaswithslow-startlighting.Slowstartlightingareasshouldbeturnedoffifareaistobe unusedforfourhoursormore.

2. Afternormalworkhours,alllightingwillbeturnedoffinunoccupiedareas.

3. Thefollowingstandardlightinglevelsshallbemaintained:

a.Classroomsandoffices-50footcandles.

b.Corridors-20footcandles.

c.Storage-10footcandles.

4. Lightsinboiler,electric,custodial,storageandotherserviceroomsaretobeturnedononly whilesomeoneisoccupyingtheroom. 5. Roomlightsaretobeturnedonbytheuser,notinadvancebythecustodian. 6. Ifnaturaldaylighteliminatestheneedforlights,theyshouldbeturnedoff. 7. Officelightsaretobeturnedoffduringbreaks,atlunchtime,andforanyperiodoftimewhen theofficeisnotoccupied. 8. Undernocircumstanceswilldecorativelightingbepermitted. 9. OnlyExteriorlightingthatprovidesilluminationforsafeentryintothebuildingoraccessto parkinglotswillbepermitted,alsoduringhoursrequiredforactivities.

B. Temperature Control

1. Temperaturesaretobemaintainedbetween70and75degreesduringbothheatingand coolingseasons.Specialconsiderationmaybegiventocertainpreschoolandspecial educationclassroomsifnecessary.

2. Personnelwillnotobstructunitventilators,ventilationductsorreturnairgrillswithbooks, charts,furniture,plants,etc.

3. Allwindowsanddoorsmustbekeptclosedduringtheheatingseasonandinareaswith refrigeratedairconditioninginoperation. 4. Usageofentrancesandexitstoallbuildingsshallbelimitedwherepossibletoprevent heating/coolingloss. 5. Brokenwindows,doors,etc.shallbereportedimmediatelyandrepairedinatimelymanner.

Page 30: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

292.0 EXISTING & PROJECTED CONDITIONS

2.6 Energy Management Program

2.6.1 District-Wide Energy Management Program (continued)

B. Temperature Control (continued)

6. Unauthorizedpersonnelorstudentsfoundtamperingwithtemperatureregulatingdevices suchasthermostatsorcontrolvalveswillbesubjecttodisciplinaryaction.

7. PortablespaceheatersofanykindarebannedfromusewithinDistrictfacilitiesasamatterof safety,exceptwhereprovidedbytheMaintenanceDepartment.

8. Employeesandstudentsareencouragedtowearsweaters,sweatshirts,orsimilarclothing whenitisapparentthattheheatingplantisnotuniformlymaintainingthedesired temperaturethroughoutallsectionsofafacility.

C. Scheduling

1. Smallgroupactivitieswillnotbescheduledinlargeareassuchasauditoriums,gymnasiums, ormulti-purposerooms.Useofsuchareaswillbecoordinatedwiththecustodialstafftoallow reducedlighting,heatingandcoolingduringperiodsofnon-use.

2. Attheendoftheschoolorofficeday,allwindowsshallbeclosed,theblindsorshadesdrawn toapproximately3/4thedistancefromthetopofthewindowtothewindowsill,andthelights turnedoff.Cleaningstaffwillturnlightsononlyfortheperiodwhenaspecificareaisbeing cleaned.

D. Other

1. Hotwaterforwashingandshowerswillbemaintainedat105degrees.Foodservice operationsrequiringhighertemperaturelevelsbycodeshalluseaseparateheaterorbooster.

2. Refrigeratorsand/orsimilarappliancesshallbelimitedintheirusetocertaindesignated areasasdeterminedbytheprincipalorsimilarfacilityauthority.

3. Electricairdeodorizersarenotauthorizedintheclassroomsorbuildings.

E. Summer Energy Tips

1. Remembertounplugallvendingmachines(drinksandsnacks)andtoremoveanyfoodthat willspoil.Ifmorethanonerefrigeratorisinuse,combinecontentsintoonerefrigeratorand unplugthosethatareempty.

2. Turnoffallpilotlightsfortheheatingsystemandwaterheatersifnotneeded.

3. Limitunnecessaryaccesstobuilding.

Page 31: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

303.0 FACILITY REQUIREMENTS (ED SPEC)

3.1 Facility Goals & Concepts

3.1.1 Goals

TheSchoolofDreamsAcademy(SODA)wascreatedtoprovideauniqueprogramofeducationfor7ththrough12thgradestudentsthatwillpreparethemforthefuturebyencouragingindependent,self-motivatedlearningthatiscombinedwithspecialtyartsprogramsandservicelearningrequirements.Theschoolsfacilitygoalsincludethefollowing:

·· Supporttheschool’smission

·· Meetstudents’academicneedsbyallowingforself-pacedlearningindedicatedgradelevellearning labs,andprovidingallnecessaryspecialeducationservicestothemeettheeducationalneedsof thestudents.

·· Incorporateavarietyofinstructionalmethods,includingsmallandlargergroupinstruction, individualization,hands-onactivities,servicelearning,andspecialtyartsprograms.

·· ExceedstatestandardsasmeasuredbyindividualstudentgrowthontheNewMexicocriterion- referencedtest

·· LocatetheschoolinLosLunastogivestudentsinLosLunasandBelenacharterschoolalternative tothetraditionalpublicschoolsetting.

·· Partnerwithcommunityorganizationstoenhanceandsupplementtheeducationalprogram.

3.1.2 Concepts

Site Needs

InevaluatinglongtermsiteneedsSODAhasidentifiedthefollowingsiteconceptsthatwillhelpitmeetitschartergoals:

General

·· Adequatespaceonsiteformaintainingcurrentandfuturesiteactivities;

·· Facilityshouldbelocatedifpossibleatthecenterofthepopulationitserves,aswellas,nearpublic facilitiesthatcomplementtheinstructionalfacilitiesofSODA,suchaslibraries,parks,andhigher educationinstitutions;

·· Adequatesitespacetoaccommodatenecessarysupportfunctions,suchasstaffandvisitor parking,loading/unloadingforstudenttransportation,andusableandsafeoutdoorrecreation areas.

Function

·· Provideadequatepermanentspacetoaccommodatecurrentandfutureprogrammaticneeds;

·· Providesufficientandflexibleclassroomspacestoaccommodatevaryinggrouplearningsizes;

·· Maintainadjacencyofclassroomstoallowfortransitionbetweenschoolinstructionalspacesand specialtyprogramareas;

·· Provideforflexibilitytomeetfutureprogramneedsandstudentgradepopulationfluctuations;

·· Allowforcommunityuseoffacilitywithoutcompromisingsecurityforstudents,includingnight classes.

Page 32: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

Scho

ol o

f Dre

ams

Acad

emy

2015

- 20

20Fi

ve-Y

ear D

istri

ct M

aste

r Pla

nPr

epar

ed b

y: P

rogr

essi

ve C

onst

ruct

ion

Man

agem

ent

31 3.0 FACILITY REQUIREMENTS (ED SPEC)

3.1 Facility Goals & Concepts

3.2 Space Requirements

3.1.2 Concepts (continued)

Sustainability

·· Providedaylightandviewstotheoutdoorstoenhancelearning;

·· Provideforonsitewaterretentioninsmallerareasthroughoutthesite,inlieuofdrainingtoone locationatthebottomofthesite.Usewaterharvestingtechniquesfromroofareasofthebuilding forirrigation;

·· Orientthebuildingsforenergyefficiency;

·· Reduceenergyusethroughinstallationofenergy-efficientsystemsanddevices,andthrough conservationpoliciesthatgovernenergy-usingbehaviors

Technology

·· Maintainaccesstoinformationtechnologyineveryclassroomtofacilitatecomputer-andInternet- basedinstruction;

·· Provideforeaseoftechnologyupgradesandwirelesscapabilities.

3.2.1 Space Summary

ThespacerequirementstoaccommodatetheprogramsofferedatSODAweredeterminedbasedontheneedsoftheschoolthroughinterviewswithstaffandadministration.Thespaceneedsanalysisidentifiesthetotalamountofsquarefootagerequiredbytheschooltoserveaprojectedenrollmentof425students,grades7-12intheircurrentleasedfacilities.

ThefollowingdescriptionsandallocationsofspacesidentifyallnecessaryspacesforSODAtomeettheschoolsprogrammaticrequirementsanddescribetherelationshipsthatareuniquetoeachspace.

3.2.1 Site Requirements

WhileSODAiscurrentlylocatedinprivateleasedfacilities,thecurrentgoaloftheschoolistobeinafacilitythatisdesignedfortheirspecificprogrammaticneedsby2015.Theproposedschoolsiteislocatedona17acreparcelthatallowsformultipleoutdooreducationandgatheringareas,accesstoallpartsofthefacilityandampleparkingforstudents,staffandcommunitymembers.

Whilethecurrentproposedsiteplanningconfigurationoftheschoolcoupledwiththefinancialstrategyfordevelopingthepropertycallsfortheschooltobelocatedononly7acresofthetotal17acresite,therewillbeplentyofareafortheschooltoexpandandofferthestudentsadditionaleducationalopportunities.

Thefacilitymasterplancallsforanelementaryschooltobelocatedonaportionoftheremaining10acresofthesite,incloseproximitytotheschoolinordertotakeadvantageofsharedusespaces.Currently,parentsofstudentsareresponsiblefortheirtransportationtoandfromschool.Thechartbelowidentifiesthespecificsiteneeds:

Page 33: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

323.0 FACILITY REQUIREMENTS (ED SPEC)

3.2 Space Requirements

3.2.1 Site Requirements (continued)

SITE REQUIREMENTS Number Unite Size Total GSF AcresMiddle School/HighSchool Permanent Buildings 1 52,146 52,146 1.20

Amphitheater 1 6,000 6,000 0.14Student/Staff/Visitor Parking 150 350 52,500 1.21

Outdoor Activity Area 1 10,000 10,000 0.23Fleet Parking 10 700 7,000 0.16

Construction Program Staging 1 10,000 10,000 0.23Future MS/HS outdoor Activity Area 1 174,240 174,240 4.00Future Elementary School Buildings 1 35,700 35,700 0.82

Future Outdoor ES Outdoor Activity Area 1 43,560 43,560 1.00Additional Future ES Parking AEA 40 350 14,000 0.32

CombinedBus Drop-Off Arrea 1 30,000 30,000 0.69Net Area 435,146 9.99

(Tare = roads, landscaping/hardscape and unusable area) Tare @ 25% 108,787 2.50Total Gross Aea Needed 543,933 12.49

Page 34: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

Scho

ol o

f Dre

ams

Acad

emy

2015

- 20

20Fi

ve-Y

ear D

istri

ct M

aste

r Pla

nPr

epar

ed b

y: P

rogr

essi

ve C

onst

ruct

ion

Man

agem

ent

33 3.0 FACILITY REQUIREMENTS (ED SPEC)

3.2 Space Requirements

3.2.3 Descriptions and Diagrams of Required Spaces Administration Area

Theadministrationareaislocatedtoprovidetwocriticalfunctionsfortheschool.Thefunctionsareembeddedintheschoolmission:

·· Secure“gatekeeper”functionattheentrytocontrolwhoentersthebuilding.

·· Welcomeallvisitorsandfacilitatetheapplicationprocessfornewstudents.

·· DirectaccesstotheServiceLearningAreatomonitorgroupsandstaging.

·· Inadditiontothesecurelobbyareawithareception/securityandwaitingarea,theadministration coreprovidesspaceforthePrincipal,administrativeassistant,OfficeManager,andHealthArea (clinicroomandnurseoffice).TheTeacher’sworkroomspaceisneededforpreparationofteaching materialsandteacherplanning.

Core Classrooms - Learning Laboratories

TheprimaryeducationmodelatSODAistheEducation20-20programforgrades7th-12th.Thiseducationmodelutilizesaself-pacededucationplanforeachstudentandtheschoolusesalarge“computer”labenvironmentforprogramdeliverywhichallowsfor32-40studentsinoneclassroom.TheLearningLabsarethecorecomponentoftheSODAcurriculumandeachlabre-quiresalockablestorageroomformaterialsandcomputerequipment.Whilemanyeducationalenvironmentspointtoawireless/laptopmodel,theSODAneedisbaseduponthefollowingkeyideas:

Diagnostic computer testing

Interactivecomputerprogramsfordeliveryofcorecurriculum:·· Studentsdonotowncomputers/laptopsanddependupontheschoolcomputers (homework/self-study).

·· Securitydrivesfacilitydecisions-computerlabiseasilysecuredandmonitored.

·· Thelocationofthecomputerlabsadjacenttoadministrationisidealtosupporttestingandstudy.

Whiletheschool,initsearlystages,usedcombinedLearningLabsthathavecombinedgradelevels andasenrollmentincreasedSODA’shasmorerecentlytendedtodividetheselargerlabsinto smallerlabsforbetterteachertostudentratio.SODAwantstohavemorethanoneLearning Labpergradelevelingrades7th-12thgrades.

Small Group Classrooms

Whiletheschool’seducationalmodeliscomputerbased,thereisaneedtohavesmallhalf-sizeclassroomswithstoragecabinetsforsmallgrouppullouttoprovidesupplementarycurriculumservicestostudents.Theintentionistohaveonehalf-sizeclassroompergradelevelandwhentheseclassroomsarenotinuse,theycanbeusedtoprovidespecialeducationservicesandasstudyareasforstudents.

Multi-Use Classroom

Theexistingmulti-useclassroomatSODAisusedprimarilyforbandandinstrumentinstruction.Theclassroomhasdedicatedinstrumentandmusicstorageareas.Inadditiontoitsuseasamusicclassroom,itisalsousedasagatheringareaforstudentsforlargegroupmeetingsandlectures.

Page 35: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

343.0 FACILITY REQUIREMENTS (ED SPEC)

3.2 Space Requirements

3.2.3 Descriptions and Diagrams of Required Spaces Administration Area (continued)

Science Laboratories

Aspartoftheadditionalsquarefootageneededattheexistingfacilityanewsciencelabwillbeprovidedforusebystudentsintheuppergradelevelsandasecondwillbenecessaryoncetheschoolreachescapacity.Forthelowergradelevels7th-9th,thesciencecurriculumusespresentationofinformationwithinteractivecomputerprograms,hands-onsciencekitsandsciencetextbooks(bookanddigital).Thismethodisadequatebutnotfulfillingthemissionofhigheracademicachievementenvisioned.

Afullsciencelabwillprovideworkinglaboratoryareaswithcounter-topspaceforexperiments.Thisincludesaccesstowater,power,portablegasburners,andafullarrayofscienceequipmentappropriatetothehighschoolsciencecurriculum.Theclassroomshallbeofsufficientsizetostorebasiclaboratorymaterials(glassware/utensils)andequipment.Specializedequipmentwillbestoredinsciencecabinetsanddistributedasneeded.

Student Dining Facilities

SODAdoesnotcurrentlycookorservefood.Theschoolassumesthatstudentswillbringlunchorpurchaselunchfromtheschool’sfoodvendor.However,inthenewfacility,itisdesiredtopre-parefoodandserveitinthenewmulti-usefacility:

·· UseofthenewMulti-purposeArea·· Outdoorcourtyardwithseatingandtablesforuseinwarmweather(futureconsideration)

Service Learning

Acentralcommonareaisrequiredforinformalgatheringtosupportstrongrelationshipsbetweenstudentsandcommunity.Theareaalsoprovidesawaitingareaforthetransitiontimebetweendayclassesandeveningclasses.Wirelessaccessisprovidedthroughouttheschoolandcommonareaalsoservesasastudyarea.

Media Center

SODAdoesnotprovideaformalmediacenter.Theschoolisfocusedonprovidingdigitalaccesstoinformationandsharedusewithexistingneighborhoodlibraries.

Art

Oneoftheschool’ssignatureprogramsisvisualarts,whichincludespainting,drawing,ceramics,sculptureandotherartmedia.Theartclassroomisusedtodeliveralltypesofthevisualartsprogramandneedstohaveadedicatedstorageandkilnroomtoprovidetheeducationalprogram.

Performing Arts

AnothersignatureprogramatSODAisthePerformingArts,thecurrentclassroomisdedicatedprimarilytodance,howevernowthatenrollmenthasincreased,andamusicprogramisoffered,theprogramwillincludedramaandmusicprogramsthatwillrequireadditionalspace.Theperformingartsclassroomwillneedtohavegeneralstorage,propstorageandchangingroomsincorporatedintothefinaldesign.Thereisalsoarecordingroomandcontrolroomrequired.

Summary

TheSpaceNeedsWorksheetshowninthefollowingsectionidentifiestheschoolsspaceneeds.Withtherecentadditionof6,000squarefeetofclassroomtheschoolcurrentlyisat21,500totalnetsquarefeetandhasacapacityof380students.ThetablepresentedisapreliminarytoolfortheeducationspecificationprocessforthePhaseIIfacility.

Page 36: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

Scho

ol o

f Dre

ams

Acad

emy

2015

- 20

20Fi

ve-Y

ear D

istri

ct M

aste

r Pla

nPr

epar

ed b

y: P

rogr

essi

ve C

onst

ruct

ion

Man

agem

ent

35 3.0 FACILITY REQUIREMENTS (ED SPEC)

3.2 Space Requirements

Page 37: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

364.0 CAPITAL IMPROVEMENT PLAN

4.1 Capital Funding

4.1.1 Historic and Current Funding

Initssecondyearofoperations,SODAreceivedfacilitiesfundingfromthePSCOCleaseallowancetosatisfyitsentirebudget.Thiscostisapproximately$700perstudentperyear,andwillvaryslightlyfromyeartoyear.The40-dayofficialenrollmentnumberfortheacademicyearof2010-11was181.SODAcurrentlyhas190studentsatthistime.However,withanofficialenrollmentof181,theleaseallowancefundingwastotalapproximately$106,467thisschoolyear.

4.1.2 Current Capital Expenses

Currentleaseexpensesforthefacilityare$319,752annuallyandthisexpensewillincreaseasadditionalsquarefootageisneeded.Operationalfundscovertheshortfallfromleasepayments.

4.1.3 Potential Sources of Revenue

ThefollowingsourcesoffundingforfacilitiescapitalprojectsmaybeaccessedbySchoolofDreams:

·· FutureannualleasepaymentfromPSCOCForplanningpurposes,thefundingamountexpected fromthePSCOCwillcontinueannuallyatroughly$700perMEM.Whenenrollmentincreasesto theprojectedlevelof525,theleasepaymentswillincreasetoatotalofapproximately$367,500 annually.

AnnualdistributionperMEMofmillleviesfromtheLosLunasPublicSchools(LLPS)HB33isapotentialsourceoffunds,iftheschoolentersintoaMemorandumofUnderstanding(MOU)withthedistrictbeforethenextelection(2015).BasedondistributionperMEMtocharterschoolscurrentlyholdingMOUs,fundswouldbeexpectedat$662/MEMx525=$347,550.

·· PSCOCcapitaloutlay,acompetitiveprocess(seenextpage)

·· Legislativeappropriation

·· Design,Build,Lease,PurchaseOption

·· Federalgrants

·· Privatefund-raising(giftsandgrants)

Page 38: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

Scho

ol o

f Dre

ams

Acad

emy

2015

- 20

20Fi

ve-Y

ear D

istri

ct M

aste

r Pla

nPr

epar

ed b

y: P

rogr

essi

ve C

onst

ruct

ion

Man

agem

ent

37 4.0 CAPITAL IMPROVEMENT PLAN

4.1 Capital Funding

4.1.4 Capitalization Potential

Theschoolwillreceiveapproximately$42,000-$55,000peryearadditionallyasenrollmentincreasesuntilitmax’soutat525students.

School Year Enrollment Total MEM Reim (@ $700 cash flow per student)

2010-2011 181 $126,700.00

2011-2012 242 $169,400.00

2012-2013 308 $215,600.00

2013-2014 378 $264,600.00

2014-2015 448 $313,600.00

2015-2016 525 $367,500.00

4.1.4 Capitalization Potential

TheNewMexicolegislatureprovidescapitalfundingforpublicschools,througheitherdirectallocationorcapitaloutlayfromthePSCOC,forrenewalornewconstructionprojects.Eachschoolfacilityinthestateisrankedwithrespecttoallotherfacilitiesinthestate,andassignedaconditionindexvaluewhichdescribesphysicalandprogrammaticdeficiencies.TheNewMexicoconditionindex(NMCI)valueisacompositederivedfromthecosttorepairdeficienciesasrelatedtothereplacementcostofthefacilities.

Charterschoolsareeligibleforfundingafteroperatingsuccessfullyforsixconsecutiveyears(firstyearforplanninginadvanceofopening,secondthroughfifthyearsforoperations,andsixthyearforcharterrenewalprocess).SODAwillbeeligiblewhenithasundergonethecharterrenewalprocess(AY2014-15).FundingfromthePSCOCfollowsamatchingformulathatvariesbydistrict.State-charteredschoolsfollowtheformulaofthedistrictwheretheyarelocated.SODAwouldfollowtheLLPSmatchingformula(currently,thestateshareequals81%,requiringa19%localmatch).

PSCOCsatisfiesfacilityfundingneedsstatewidebymeetingthegreatestneedsfirst.ThePSCOCgenerallyfundsawardapplicationsforprojectsinthetop100ontherankedlistofpublicschoolfacilitiesneedsineachfundingcycle.

PSCOCfundingisappliedprimarilytocorrectdeficienciesinafacility.Deficienciesareprioritizedbasedonastatutethatoutlinestheprioritizationcriteriafordeficienciescorrection(6.27.41ofNMAC).1

TheSODAfacilityiscurrentlyrankedat721.

Page 39: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

38

4.2.1 Financial Challenges for a Charter School

TheactionstakenbytheSchoolofDreamsAcademyaretheresultofdefiningneedsandthenexploringfinancialoptionswhichmustalsobewithinrealisticfinancialresourcescurrentlyavailabletoNewMexicoCharterschools.SchoolofDreamsAcademy,asapubliccharterschool,hasseveraloptionstopurchase,leaseorlease/purchaseclassroomspaceasopposedtotraditionalschoolbuildingestablishment.

Acharterschoolisgrantedfundingperyearbaseduponstudentenrollmentonthe40thday.SchoolofDreamsAcademyhasestablishedasuccessfuleducationalmodel,attractedandsustainedenrollment,andplansforincreasedenrollmentinthenearfuture.Theschoolthroughitsfoundationsanditsfacilitydevelopmentmanagementconsultanthasidentifiedmultipleopportunitiesforfundingtheirnewschoolprojectatverycompetitiverates.Indoingsotheyareabletostretchthefundingdollarstomeetthechallengesofhousinganeducationalprogram.

The sources of income for the state charter school are the following:

·· LeasereimbursementdollarsfromtheStateofNMbaseduponenrollment. Thisiscurrentlyavalueof$735perenrolledstudent.

·· Anon-profitfoundation,TheSchoolofDreamsEducationFoundation,wasformedin2013forthe solepurposesofacquiringorbuildinganewfacilityfortheSchool.TheFoundationwillalsoraise fundsbyapplyingforgrantsandloansforthefacility.

Facility expenses for the School of Dreams Academy include:

·· Leaseofclassroomspaceincludingthecostfornecessaryimprovementstosupportthe educationalneedsofstudentsandtomeetPSFAAdequacyStandards.

·· Buildingrenovationcostsandsiteimprovementcosts.

Operational Cost:

·· Averageutilitycostdependingontheacquiredleasespace

·· Faculty&Staffsalaries

- OtherOperationalcostsrelatedtodeliveringtheeducationalprogramoftheSchool

4.2.2 Owner/Developer/School Relations

ThesuccessfulcollaborationbetweenHanson&PrezzanoBuildersandtheSchoolofDreamsAcademyisanenormousaccomplishmentforbenefitofstudents.Agreementsbetweenbothpartiesachievedthefollowing:

Thebuilder/developerhasmadetenantimprovementstothebuildingandsiteforSchoolof DreamsAcademy.Theleaseamountisbaseduponbaseleasecostwithamortizedrenovation/ improvementcosts.Theannualleaseratefortheschoolincreasesannuallywiththeleaseratefor the2014/15schoolyearat$319,752.SchoolofDreamsAcademyisresponsibleforfunding thegapbetweenleasereimbursementincomeandactualleasecost.

4.0 CAPITAL IMPROVEMENT PLAN

4.2 Total Capital Needs

Page 40: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

Scho

ol o

f Dre

ams

Acad

emy

2015

- 20

20Fi

ve-Y

ear D

istri

ct M

aste

r Pla

nPr

epar

ed b

y: P

rogr

essi

ve C

onst

ruct

ion

Man

agem

ent

39

4.3.1 Capital Needs

DuringtherecentFacilityMasterPlanprocessconductedthisyear,thesteeringcommitteeidentifiedthreeoptionsforprovidingfuturefacilitiestoaccommodateSODA’sspaceneedsinconjunctionwiththeincreaseinenrollment.Theyincludethefollowing:

1. Continuetoleasetheexistingfacilitiesandaddsquarefootageuntilenrollmentincreases suchthatrelocationtonewfacilitiesarerequired.

2. Acquirethecurrentfacilitiesthatarebeingleasedandconstructaddition

3. AcquirelandandbuildanewfacilityintheLosLunasArea

ThefollowingparagraphsdescribethethreeoptionsandcostsinconjunctionwiththeabilityofSchoolofDreamstocapitalizethosecostsgiventheexpectedcashflow.Option1isthepreferredoptionforaccommodatingSODA’sshorttermfuturespaceneeds,howevertheschoolhasreachedacapimposedbythesizeofthefacilityandcannotreachitsofficialcapbecausethereisnomorespacetogrowintoattheexistingsite.

Nowthattheirenrollmentreaches390students,thecurrentfacilitiesareveryovercrowdedandoverutilized.Thefollowingconsistsoftheschool’sbestcollectivethinkingbyboththeBoardofgovernorsoftheschoolandtheBoardofDirectorsoftheirfoundation,theirdevelopmentconsultantandfinancialadvisors.

Option 1 - ContinuetoLeaseExistingFacilitiesandaddsquarefootageasneeded.

Theoptionentailscontinuingtoleasetheexistingfacilitiesandleasingadditionalsquarefootageasneededasenrollmentincreases.Theschoolcurrentlyoccupiesbothbuildingscompletelyandhasleasedspaceintheformoftwoportablesforatotalof24,500squarefeet.Inpreparationfortheincreaseinenrollmentfortheupcomingschoolyear,SODAisfacingamajordilemma,inthatthereisnomorespaceavailabletoleaseandaddenrollment.Inotherwords,theenrollmentattheexistingsiteiscappedbytheavailablespacetolease.Thenorthbuildingwillonlyhave1,500squarefeetremainingwhichiscurrentlybeingleasedbyaprivatebusinessandisunavailableatthistime.

Aspartofthestaterequirementthatallcharterschoolsbeinapublicbuildingownedbyschooldistrict,state,stateinstitution,politicalsubdivisionofstate,federalgovernment,federalagency,tribalgovernment;unlesstheschoolhasenteredintoaleasepurchaseagreement.In2015-2015,withtheexpectedenrollmentincrease,SODAwillneedtoconsiderwhethertomoveforwardwithOption2or3.

Option 2 - AcquireExistingFacilitiesandConstructionAddition

Thisoptionwouldincludethepurchaseoftheexistingsiteandfacilitiesthatarecurrentlybeingleasedandconstructingadditionalclassroomstoaccommodatetheincreasedenroll¬mentandprogramneeds.Ifanagreementcanbereachedonareasonablepurchaseprice,theexistingfacilitiescouldbeacquiredandnewconstructioncompletedthroughadesign,build,lease,purchaseagreementwithaprivatefinancier.

4.0 CAPITAL IMPROVEMENT PLAN

4.3 Capital Plan

Page 41: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

40

Option 3 - AcquireNewPropertyandConstructNewFacility

TheoptionincludespurchasingpropertyinLosLunas(oracquiringalease/purchaseagreement)thatwillprovideSODAwithenoughacreagetoexpandinthefutureandmeetallsiteneeds.Ideallythepropertyshouldbeabletosupportthenewfacility,parking,andoutdoorgatheringandsportsareasaswellasbeaccessiblebypublictransportation.Onceanalternativesiteisprocured,anewfacilitywillbeconstructedandthesitedevelopedtoprovidethefacilitiesneededfortheschoolsprogramrequirementsthroughthedesign,build,lease,purchaseagreementwithaprivatefinancier.

4.0 CAPITAL IMPROVEMENT PLAN

4.3 Capital Plan

Page 42: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

Scho

ol o

f Dre

ams

Acad

emy

2015

- 20

20Fi

ve-Y

ear D

istri

ct M

aste

r Pla

nPr

epar

ed b

y: P

rogr

essi

ve C

onst

ruct

ion

Man

agem

ent

41

4.4.1 Recommended Short Term Option 1

Option 1 - ContinuetoLeaseExistingFacilitiesandaddsquarefootageasneeded.

Continuetoleaseexistingfacilitiesandaddadditionalsquarefootagetomeetincreasedenrollment.Withtheexpectedenrollmentincreaseexpectedforthe2011/12schoolyear,SODAwillneedtoleaseanadditional4,500squarefeetofspacewithintheexistingfacilities.

Thecurrentleaseexpensesfortheexisting16,500squarefeetis$319,752withtheschoolreceiving$106,467fromthePSCOCMEMreimbursement.Theschoolcurrentlysupplementsthereimbursementwith$213,295fromoperations.Beginningthe2011/12schoolyeartheleasepaymentswillbeincreasingto$429,202andwillincludetheadditionalsquarefootage.Withenrollmentexpectedtoincreaseto410studentsnextyearthePSCOCMEMreimbursementisanticipatedtobe$169,400,whichwillstillrequiretheschooltosupplementtheleasepaymentswith$259,802fromoperations.

BaseduponthePSCOCMEMreimbursementschedulebelowitwilltakeuntilthe2015/16schoolyeartobegintoclosethegapinreimbursementandthesupplementationofoperationcosts.However,thisisunattainableasthecapacityoftheexistingfacilitiescannotsupporttheenrollmentof525students.ThePSCOCMEMreimbursementcouldbeusedtowardstheacquisitionofnewfacilities.

4.0 CAPITAL IMPROVEMENT PLAN

4.4 Capital Plan Implementation

School Year Enrollment Total MEM/Lease (@ $735 cash flow per student)

2010-2011 181 $126,700.00*

2011-2012 242 $169,400.00*

2012-2013 308 $223,000.00**

2013-2014 378 $275,050.00**

2014-2015 400 $295,000.00***

2015-2016 425 $312,375.00***

2016-2017 450 $330,750.00***

*(Calculated using Lease Reimbursement amount of $700/FTE)

**(Calculated using Lease Reimbursement amount of $725/FTE)

***(Calculated using Lease Reimbursement amount of $735/FTE)

Page 43: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

42

4.4.2 Property Acquisition Withoutbeingabletoaddasignificantfacilityaddition,theexistingleasedfacilitiesarenowovercapacity.Afterpreliminarynegotiationstoacquiretheexistingfacilityprovedtobetoocostlyandunobtainable,itisapparentthatthisisnotaviableoption.Therefore,theschoolwillneedtoconsiderOption2tomeetSODA’sfacilityneeds.

Option 2 - AcquireNewPropertyandConstructNewAddition

Atthistimethecurrentfacilitiesdon’tmeettheschool’sneeds.Theexistingleasedoeshaveaprovisionforpropertyacquisitionfromthecurrentowner.Thetotalnetsquarefootagethatwouldbeavailableforpurchaseis22,500squarefeetandanadditional25,000squarefootadditionwouldbeneededtomeettheprogramrequirementsfor525students.Thepropertyhasexistinginfrastructureandadequateparkingavailableonafouracrelot.Whiletheschoolhasthefirstrightofrefusaloption,thepropertyisnotcurrentlylistedforsale.

Option 2 - ConstructionofNew47,875SFfacility

LandAcquisition(6.5AcresMin) ..........................................................$898,000Infrastructure..........................................................................................$500,000NewConstruction ............................................................................... $7,200.000Furnishings .............................................................................................$400,000SoftCosts ........................................................................................... $2,000,000

Total Project Cost ................................................................... $ 10,998,000.00

Option 3 - Acquire New Property and Construct New FacilityIndeterminingthesizeofthenewfacility,theschool’seducationprogramwastakenintoaccountasidentifiedinSection5.DuetothenatureoftheschoolseducationprogramofEducation20/20whichallowsforaself-pacedlearningenvironmentinlargecomputerlabs,thesquarefootageperstudentcanbereducedto90squarefeetforanewfacility,whichisbelowthemaximumamountallowedforhighschoolsof145squarefeetperstudentforanenrollmentof525.

Option 3 - Property Acquisition & Facility Addition

PropertyAcquisition(4Acres+Buildings) ...................................... $5,200,000Infrastructure.........................................................................................$555,650NewConstruction(25,375SF) ..........................................................$4,375,000Furnishings ............................................................................................$400,000SoftCosts .......................................................................................... $1,200,000

Total Project Cost ........................................................................$ 11,330,650

4.4.1 Recommended Short Term Option 1Thechartbelowidentifiesthetimelinethattheschoolwillneedtofollowinordertohavefacilitiesreadyfortheincreaseinenrollmentexpectedin2016/17.

4.0 CAPITAL IMPROVEMENT PLAN

4.4 Capital Plan Implementation

Page 44: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

Scho

ol o

f Dre

ams

Acad

emy

2015

- 20

20Fi

ve-Y

ear D

istri

ct M

aste

r Pla

nPr

epar

ed b

y: P

rogr

essi

ve C

onst

ruct

ion

Man

agem

ent

43 4.0 CAPITAL IMPROVEMENT PLAN

Cost Tracking Summary

Page 45: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

44

4.4.3 Priority Implementation Timeline

Thechartbelowidentifiesthetimelinethattheschoolwillneedtofollowinordertohavefacilitiesreadyfortheincreaseinenrollmentexpectedin2014/15.

YEAR 2014 2015MONTHS Aug. Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July Aug. Sept.

ACTIVITY

FMPCompletionw/EstimateofCosts

DesignProfessionalSelection

CMARSelection

CMAR-Pre-constructionServices

ProgramValidation

DP-SchematicDesign-Building

CMAR-SchematicEstimate-Building

DP-SchematicDesign-Site-BP#1

CMAR-SchematicEstimate-Site

DP-DesignDevelopment-Building

CMAR-DesignDevelopment-Building

DP-DesignDevelopment-Site-BP#1

CMAR-DesignDevelopment-Site-BP#1

DP-CDs-siteBP#1

CMAR-CD-Site-BP#1-GMP$$

DP-CDs-Building

CMAR-CD-Building

DP-100%CDs-BuildingFinalGMP

CMAR-100%CDsBuilding-GMP

Construction-Site

Construction-Building

4.0 CAPITAL IMPROVEMENT PLAN

4.4 Capital Plan Implementation

CONSTRUCTABILITY & VE

DBBCM

AR

Page 46: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

Scho

ol o

f Dre

ams

Acad

emy

2015

- 20

20Fi

ve-Y

ear D

istri

ct M

aste

r Pla

nPr

epar

ed b

y: P

rogr

essi

ve C

onst

ruct

ion

Man

agem

ent

45

Option 2 - AcquireNewPropertyandConstructNewFacility

TheoptionincludespurchasingpropertyinLosLunas(oracquiringalease/purchaseagreement)thatwillprovideSODAwithenoughacreagetoexpandinthefutureandmeetallsiteneeds.Ideallythepropertyshouldbeabletosupportthenewfacility,parking,outdoorgatheringandsportsareasaswellasbeaccessiblebypublictransportation.Onceanalternativesiteisprocured,anewfacilitywillbeconstructedandthesitedeveloped

4.0 CAPITAL IMPROVEMENT PLAN

4.4 Capital Plan Implementation

Page 47: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

465.0 MASTER PLAN SUPPORT MATERIAL

5.1 Facility Inventory

Facility Name State ID Address ZIP Phone Fax Principal / Site

Manager Open Date Age (Years)

Construction Dates State FCI Site Acreage Owned or

Leased?Total Perm Bldg Area

Total Port Bldg Area

Total Bldg Area (GSF) Grades

Current YearEnrollment (40

day)

No. of Permanent

Classrooms

No. Double Portables

No. of Portable Class- rooms

Total Class- rooms

Port CR % of Total

GSF Per Student

High School

SODA Mid and High School 505001 1800 Main St 87031 505-866-7632 505-866-0780 Mr. Ogas 2010 3 2010 4.16 5.00 Leased 20,345 2,500 22,845 7th-12th 381 14 2 4 18.0 22% 60.0

Sub-Totals 5.00 20,345 2,500 22,845 381 14.00 2.00 4.00 18.00 22.2% 60.0

Administration and SupportAdmin. Office 505001 1800 Main St 87031 505-866-7632 505-866-0780 Mr. Ogas 2010 3 2010 4.16 0 Leased 0 0 0.0 NA NA

Sub-Totals 5.00 0 0 0 0.00

District Totals 5.00 20,345 2,500 22,845 0.00 496.00 14.00 2.00 4.00 18.00

School of Dreams Academy Facility InventoryFacilities Inventory Data

Page 48: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

475.0 MASTER PLAN SUPPORT MATERIAL

5.2 Site/School Detail

5.2.1 School of Dreams Academy

InordertodevelopacomprehensiveCapitalImprovementPlanforSchoolofDreamsCharterSchool,itmustfirstbeacknowledgedthattheconditionofthefacilityisdirectlyrelatedtotheoverallenvironmentinwhichteachingandlearningoccurs.Toobjectivelydeterminetheexistingconditionsofschoolfacilitiesandsites,comprehensivefacilityassessmentswereconductedbyPCM,Inc.,inconjunctionwiththePSFAFacilityAssessorDennisSchneider.Therewerefourcomponentstothefacilityassessmentprocesswhichtookintoconsiderationthefollowing:

- The“actual”··physicalconditionofallbuildingsystems

·· Siteconditions(playgrounds,bus/parentpick-up&dropparking,etc.)

·· Theavailabilityoftechnologyateachsite

·· Theeducationalsuitability/adequacystandards

Thefacilityassessmentsweredevelopedusinganindustrystandardscoringsystem;thatworksinconjunctionwiththeStateofNewMexico’sFacilityAssessmentDatabase.AnyrecentlycompletedrenovationandfacilityimprovementprojectsshouldbedocumentedinthePSFAFacilityAssessmentDatabase(FAD)andanyremainingfacilitycapitalimprovementprojectsneedtobeprioritizedaccordingly.

Thefacilityassessmentprocessinvolvesdetailedassessmentstoaddressbuildingsystems,codeconcerns,accessibilityandenvironmentalconcerns,siteissues,buildingfunctionalityandadequacystandardscompliance.Aspartoftheoverallfacilityassessmentthefollowingisalistingofsomeofthemajoritemsthatwereincluded:

·· TrafficPatterns

·· Parent&Busdropandpick-up

·· SafetyandSecurity

·· LearningStyleVariety

·· Classroomssizes

·· LibraryAdjacency

·· Storage

·· EaseofSupervision

Finalresultsoftheassessmentreportswereusedindeterminingtheneededfacilityimprovementsandsystemsreplacement.

Page 49: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

Scho

ol o

f Dre

ams

Acad

emy

2015

- 20

20Fi

ve-Y

ear D

istri

ct M

aste

r Pla

nPr

epar

ed b

y: P

rogr

essi

ve C

onst

ruct

ion

Man

agem

ent

48 5.0 MASTER PLAN SUPPORT MATERIAL

5.2 Site/School Detail

5.2.2 Photographs

Sampling Of Observed Conditions - Building Systems

- Outdatedandobsoleteelectricaldistributionandbranchpanelswith··limitedcircuitcapacity.

·· EnergyefficientlightfixturesusingT-8lampsandballasts

·· ParentandBusdrop-offandpickupareaimprovementsneeded.

·· Agedplumbingandsewersystemsneedingreplacement.

·· AgedandobsoleteHVACequipmentincludingchilledwaterandhotwatercirculatingpumpsand piping,fancoilunits,andexhaustfans.

·· Agedandwornroofsystems.

·· Hotwaterboilers,storagetanks,andpipingrequiringreplacement.

·· HazardousMaterial-flooring,ceilings,mastic,pipinginsulation,etcrequireimmediateremediation andremoval.

Page 50: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

School of Dream

s Academy

2015 - 2020Five-Year Facilities M

aster PlanPrepared by: Progressive Construction M

anagement

495.0 MASTER PLAN SUPPORT MATERIAL

5.8 Detailed Space & Room Requirements (Ed. Spec)

Allclassroomspaceshallbesufficientforappropriateeducationalprogramsfortheclasslevelneedsandshallmeetorexceedtherequirementsper6.27.30.8-22ACADEMICCLASSROOMSPACEAdequacyStandardsStatuteasfollows:

5.8.1 Technology & Communications Criteria

Classrooms – For each General and Special classroom space as follows:

1.Wirelesscapabilityineachinstructionalroomtosupport25studentcomputersat 100Mbpsand1hard-wiredinstructorcomputercoaxialwiringtosupportcablebroadcasts.

Devices

1.Computers-Laptoportabletcomputersfor25studentsineveryinstructionalroomEachtablet shallhaveakeyboardandwirelessmouseforeachdesktopcomputerforeachstaff.

2.PeripheralDevices-Classrooms-Onesmartboardorwhiteboardpensystemperinstructional roominterconnectedhardwaretoprojectioncapabilityineachinstructionalroombywayof mediahub,LCDprojector,andprojectionscreen.

3.Network-Networkingcapabilitiesinclude:mediahubtoprojector,audiosystem,anddigitallarge screenTV.

Communications

1.Firealarmandemergencynotificationsystem.Aschoolfacilityshallhaveafirealarmand emergencynotificationsystemasrequiredbyapplicablestatefirecodesandemergency procedures.

2.2-waycommunicationsystem.Aschoolfacilityshallhavea2-wayinternalcommunicationsystem betweenacentrallocationandeachclassroom,isolatedofficespace,library,physicaleducation space,cafeteria,andotherregularly-usedspaces.

5.8.2 Power Criteria

Providepowerforthenewbuildingsthroughprimaryandsecondarydistributionsystemsperapplicablecodesandfinalengineeringdesigndrawingsforthecampusandeachindividualbuilding.Eachclassroomwillhaveminimumof3-quadplex110/120vreceptaclesperwall,withanyadditionalreceptaclesperrequirementsforeachspecificroom.Inaddition,specificspecialclassroomsmayhaveneedfor220/240vreceptacles.Seeattachedroomcriteriasheets.

5.8.3 Lighting and Day Lighting Criteria

1.Eachgeneralandspecialtyclassroomshallhavealightsystemcapableofmaintainingatleast 50foot-candlesofwell-distributedlight.Provideappropriatetasklightinginspecialtyclassrooms whereenhancedvisibilityisrequired.

2.Thelightlevelshallbemeasuredataworksurfacelocatedintheapproximatecenterofthe classroom,betweencleanlightfixtures.

Page 51: FIVE-YEAR FACILITIES MASTER PLAN/EDUCATION · PDF fileV APPROVAL OF MINUTES ... Belen School was gracious and impressed everything was ... Chavez moved with the recommendation of

Scho

ol o

f Dre

ams

Acad

emy

2015

- 20

20Fi

ve-Y

ear D

istri

ct M

aste

r Pla

nPr

epar

ed b

y: P

rogr

essi

ve C

onst

ruct

ion

Man

agem

ent

50 5.0 MASTER PLAN SUPPORT MATERIAL

5.8 Detailed Space & Room Requirements

5.8.4 Environmental Conditioning Criteria

3.Eachgeneralandspecialtyclassroomshallhaveaheating,ventilationandairconditioning (HVAC)systemcapableofmaintainingatemperaturebetween68and75degreesFahrenheit withfulloccupancy.

4.Thetemperatureshallbemeasuredataworksurfaceintheapproximatecenterofthe classroom.

5.Eachgeneral,scienceandartsclassroomshallhaveanHVACsystemthatcontinuallymovesair andiscapableofmaintainingaCO2levelofnotmorethan1,200partspermillion.

6.Theairqualityshallbemeasuredataworksurfaceintheapproximatecenteroftheclassroom. [6.27.30.12NMAC-N,9/1/02;A,8/31/05;A,12/14/07]

5.8.5 Classroom Acoustics Criteria

7. Eachgeneralandspecialtyclassroomshallbemaintainableatasustainedbackgroundsound leveloflessthan55decibels.

8.Thesoundlevelshallbemeasuredataworksurfaceintheapproximatecenteroftheclassroom.

5.8.6 Furnishing and Equipment Criteria

1.Eachgeneralandspecialtyclassroomshallcontainaworksurfaceandseatforeachstudent intheclassroom.Theworksurfaceandseatshallbeappropriateforthenormalactivityofthe classconductedintheroom.

2.Eachgeneralandspecialtyclassroomshallhaveaworksurfaceandseatfortheteacherand fortheaideassignedtotheclassroom,anditshallhavesecurestorageforstudentrecordsthat islocatedintheclassroomorisconvenienttoaccessfromtheclassroom.

3.Eachgeneralandspecialtyclassroomshallhaveanerasablesurfaceandasurfacesuitable forprojectionpurposes,appropriateforgroupclassroominstruction,andadisplaysurface.A singlesurfacemaymeetoneormoreofthesepurposes.

5.8.7 Table Types

1.Eachgeneralandspecialtyclassroomshallhaveaworksurfaceandseatforeachstudentin theclassroom.Theworksurfaceandseatshallbeappropriateforthenormalactivityoftheclass conductedintheroom.

5.8.8 Storage Types

1.Eachgeneralandspecialtyclassroomshallhavestorageforclassroommaterialsoraccessto convenientlylocatedstorage,anditshallhavesecurestorageforstudentrecordsthatislocated intheclassroomorisconvenienttoaccessfromtheclassroom.

5.8.9 Criteria Sheets

PleaserefertotheprovidedRoomCriteriasheetsasappropriateinformationtosupportindividualspacerecommendations.