Fitman webinar 2015 06 Socio-Economic Impact Assessment Methodology
FITMAN Phase III Presentation
-
Upload
fitman-fi -
Category
Presentations & Public Speaking
-
view
112 -
download
3
description
Transcript of FITMAN Phase III Presentation
FITMAN: Future Internet Technologies for MANufacturing
An introduction to FITMANand what it can provide to you
(c) 2014 I-VLab and other members of the FITMAN consortiumwww.fitman-fi.eu
FITMAN Goals
Contributing to the Social-Technological-Economical-Environmental-Political sustainability (STEEP) of
EU Manufacturing Industries.
Provide the FI PPP with industry-led use case trials in Smart, Digital and Virtual Factories of the Future (FoF)
Test and assess the suitability, openness and flexibility of FI-WARE Generic Enablers.
FITMAN impact
(c) 2014 I-VLab and other members of the FITMAN consortiumwww.fitman-fi.eu
FITMAN Outputs
One generic and flexible Trials Verification and Validation Framework, encompassing concepts, methods and tools for Manufacturing Trials
One FITMAN Generic Platform for Manufacturing Industries, as a collection of several Generic Enablers
Three FITMAN Specific Platforms as a collection of several Specific Enablers Implementations
Smart Factory Platform
Digital Factory Platform
Virtual Factory Platform
Ten FITMAN Trials Platforms as instantiation of the selected Generic and Specific Enablers for 10 industry-driven multi-sectorial Trials
(c) 2014 I-VLab and other members of the FITMAN consortiumwww.fitman-fi.eu
Smart Factory
Facilitate production capacity as a service
Make start-up production activities easier and more efficient
Support advanced human-computer interaction
The Smart Factory domain concerns the shop floor level of manufacturing. It includes automation of machines, use of robots, transfer between workstations, and collection and management of data to develop agile manufacturing and to facilitate customization.
(c) 2014 I-VLab and other members of the FITMAN consortiumwww.fitman-fi.eu
Fast, flexible and intelligent integration of information
Real-time links with shopfloor data
Digital Factory
Highly modular event-driven architecture
The Digital Factory domain concerns digitalization of the product along the manufacturing chain, from the design phase to the production of goods, in order to optimize life cycle management.
(c) 2014 I-VLab and other members of the FITMAN consortiumwww.fitman-fi.eu
FlexibilityCollaboration Tangible and intangible asset management
Virtual Factory
The Virtual Factory domain concerns manufacturing ecosystems involving multiple companies organized in a network to facilitate value creation.
(c) 2014 I-VLab and other members of the FITMAN consortiumwww.fitman-fi.eu
FITMAN Trials: locations and sectors
Trial 1: Automotive manufacturer
Trial 2: Automotive supplier
Trial 3: Aeronautics manufacturer
Trial 4: White goods manufacturer
Trial 5: Textile/clothing industry
Trial 6: Plastic industry
Trial 7: Construction industry
Trial 8: Manufacturing resource management
Trial 9: LED lighting
Trial 10: Furniture industry
(c) 2014 I-VLab and other members of the FITMAN consortiumwww.fitman-fi.eu
FITMAN offers information and support to selectedPhase III consortia and the SMEs and web entrepreneurs
that will apply in the Open Call Expansions in the domain of
ICT in Manufacturing.
Support for FI-PPP Phase III participants
(c) 2014 I-VLab and other members of the FITMAN consortiumwww.fitman-fi.eu
FITMAN Package Phase III
The package is available atfitman-fi.eu/phase-iii-package
Information to Phase III consortia
• Verification and validation method
• Methodologies for SMEs engagement
• Business and technical indicators
• Best practices• Lessons learned
Information to SMEs & web entrepreneurs
• FITMAN architecture• Specific Enablers for
Manufacturing• Service/application
development support• Innovation support• Business models• Legal issues
(c) 2014 I-VLab and other members of the FITMAN consortiumwww.fitman-fi.eu
Services Support
Dedicated email address for queries: [email protected]
Questions and answers will be hosted on the FAQ: fitman-fi.eu/phase-iii-package/support/faq
A forum is online at:fitman-fi.eu/phase-iii-package/support/forum
Notification of updates Via social media: twitter.com/FitmanFI and
linkedin.com/groups?gid=4986259 Via email: please request this by contacting us on the email
address above
10
(c) 2014 I-VLab and other members of the FITMAN consortiumwww.fitman-fi.eu
For more on FITMAN support to Phase III, contact us on [email protected] or visit www.fitman-fi.eu/phase-iii-package
Contact information
@FitmanFI
Future Internet Technologies for MANufacturing industries - FITMAN
Future Internet Technologies For Manufacturing Industries - FITMAN
http://www.slideshare.net/FitmanFI
https://www.youtube.com/channel/UCT_zyTfmi2GAbGRQ5SduHyw
(c) 2014 I-VLab and other members of the FITMAN consortiumwww.fitman-fi.eu
FITMAN Beneficiaries
Core Consortium (10 partners)
Original Equipment Manufacturers (4 partners)
SME Networks and Associated S/T (14 partners)