Fisheries and Aquaculture Enterprise Development for the Adivasi (Tribal) Communities in the Northern and Northwestern Regions of Bangladesh Annual Progress and Financial Report (January 2008 – December 2008) The WorldFish Center, Bangladesh and South Asia House No: 22B, Road no: 7, Block – F Banani, Dhaka – 1213 Bangladesh January 2009

Transcript of Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure...

Page 1: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

Fisheries and Aquaculture Enterprise Development for the Adivasi (Tribal) Communities in the Northern and Northwestern Regions of Bangladesh

Annual Progress and Financial Report (January 2008 – December 2008)

The WorldFish Center, Bangladesh and South Asia House No: 22B, Road no: 7, Block – F

Banani, Dhaka – 1213 Bangladesh

January 2009

Page 2: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

This report is prepared by The WorldFish Center, Bangladesh and South Asia Office. The

views expressed are those of The WorldFish Center and do not represent any official view of

the European Commission

ii

Page 3: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

Table of Content

Section Description Page

Table of Content iii

List of Annex v

List of Abbreviations vi

1 Introduction 1

2 Progress of work and achievement in 2008 1

2.1 Technology and Enterprises Development 1

2.2 Capacity Building Program of Adivasi Household Members 2

2.3 Network Development with Local Support Agencies 3

2.4 Exchange Visit of the Project Beneficiaries 4

2.5 Participation in the National Program 4

2.6 Process Monitoring for Continuous Improvement 4

2.7 Livelihood Monitoring for Impact Studies 5

2.8 Action Research on Technologies and Enterprise Development 5

2.9 Development of Communication and Dissemination Strategies 7

2.10 Strategy of Secondary Adopters 7

2.11 Training Workshop for the Project Staffs 7

2.12 Achievement in 2008 8

2.12.1 Foodfish and fingerling production in ponds 9

2.12.2 Fingerling and foodfish production in rice fields 10

2.12.3 Fingerling production in cages 10

2.12.4 Habitat restoration 10

2.12.5 Entrepreneurship development in aquaculture and related activities 10

2.13 Fish Week Award – 2008 for Best Performance 11

2.14 Farmers Affected by Flash Flood 12

3 Budgets and Expenditure of 2008 12

iii

Page 4: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

Section Description Page3.1 Human Resources 12

3.2 Travel 12

3.3 Equipments and Supplies 12

3.4 Local Office 13

3.5 Other costs, Services 13

3.6 Other 13

iv

Page 5: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

List of Attachments

Annex 1 Logical Framework of the Adivasi Fisheries Project (AFP) 14

Annex 2 Accomplished planned activities mentioned in the Log frame 19

Annex 3 Name of the NGOs participates and Caritas programs participate in

the spread strategy workshop

22

Annex 4 Expenditure of Adivasi Fisheries Project 2008 24

v

Page 6: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

vi

List of Abbreviations

AFP Adivasi Fisheries Project

BFRF Bangladesh Fisheries Research Forum

BFRI Bangladesh Fisheries Research Institute

DEEDS Development for Extension and Education Services

DFO District Fisheries Officer

DOF Department of Fisheries

FFS Farmer Field School

GDP Gender and Development Program

ICDP Integrated Community Development Program

LE Lead Entrepreneur

NGO Non Governmental Organization

NRMP Natural Resource Management Project

PMS Participatory Management System

RDRS Rangpur Dinajpur Rural Service

ROM Result Oriented Monitoring

UAO Upazilla Agriculture Officer

UNO Upazilla Nirbahi Officer

UFO Upazilla Fisheries Officer

Page 7: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

1. Introduction

The European Commission (EC) supported “Fisheries and Aquaculture Enterprise

Development for the Adivasi (Tribal) Communities” project also known as Adivasi Fisheries

Project (AFP) is implemented in the Northern and Northwestern Regions of Bangladesh. The

project started from January 2007 and will be continued till December 2009. The WorldFish

center in collaboration with Caritas Bangladesh and Bangladesh Fisheries Research Forum

(BFRF) is implementing the project.

The purpose of the project was to increase fish production, household nutrition, income and

alternative employment opportunities of vulnerable Adivasi (tribal) people through promotion

of small-scale aquaculture and enterprise related activities. The AFP is designed to bring the

unused and/or underused seasonal ponds and rice fields into improved productive capacities

with methods that are feasible, affordable and acceptable to poor Adivasi households. Also

initiatives are taken to ensure that many Adivasi households who are lacking the resources for

aquaculture production can also participate in fish harvest, trading of fish seed and foodfish

as successful income earning small enterprises.

Year 2008 was the second year of the AFP. The major activities which were completed in

2008 are completion of the Farmer Field School (FFS) manual, training of the project staff,

capacity building program and exchange visits of the project beneficiaries, and formation of

the network forum for the Adivasi communities. Five action research, which started in 2007,

were completed and two new action research started in this year. In April 2008, the Result

Oriented Monitoring (ROM) mission of the European Commission evaluated the project

activities and expressed their satisfaction with the overall project performance. This report

presents the progress of work and achievement of 2008.

2. Progress of work and achievement in 2008

This section briefly describes the progress of the activities which was planned for 2008.

Many of the activities which were implemented in 2008 are the follow-up activities of the

previous year. The activities are directly linked to the logical framework of the project

(Annex 1). A summary of progress of the activities against the activities planned is also

presented in Annex 2.

2.1 Technology and Enterprise Development

A total of 3650 Adivasi households were selected and thereby participated in the Adivasi

Fisheries Project in 2007. The distribution of Adivasi households according to the

technologies used is shown in Table 1. In 2008, 56 households (1.5% of total households)

dropped out from the program. The reasons behind these drop outs were due to the migration

from village to district towns and leasing out or selling the pond/rice field to others. For the

program of 2009, the project support will be provided to all the existing farmers so that they

can receive the full benefits of the project for the entire period of 3 years.

1

Page 8: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

Table 1: Distribution of the project participants by technology (number of beneficiaries)

Technologies Project participants in 2007

Drop out in 2008

Total project participants in 2008

Food fish and fingerling

production in pond 1251 13 1238

Food fish and fingerling

production in rice plot 533 6 527

Fingerling production in cage 493 5 488

Habitat restoration 44 3 41

Fingerling trading 157 3 154

Food fish trading 414 11 403

Netting 758 15 743

Total 3650 56 3594

2.2 Capacity Building Program of Adivasi Household Members

The Adivasi Fisheries Project is using the Farmer Field School (FFS) approach as a tool for

effective dissemination of the knowledge on aquaculture technologies and other aquaculture

related activities to the project beneficiaries. The AFP formed 120 FFS in the project area in

July 2007. A total of 3202 FFS sessions were organized in 2008 against the set target of 2800

FFS sessions (2 FFS session per month per FFS). A total of 402 additional sessions was

organized based on the immediate need of the beneficiaries. The schedule of the FFS sessions

was developed through a participatory discussion with the project participants at the

beginning of the year.

(a) (b)

Picture 1: Capacity building training of the LEs (a) Upazilla Fisheries Officer of Birgonj

(b) WorldFish staff is playing the facilitating role in the training

In 2008, 664 Lead Entrepreneurs (LE) was selected based on the representation of

aquaculture technologies and gender (Table 2). These LEs were trained by the WorldFish

Center and Caritas staff on FFS operation, leadership development and monitoring. These

LEs played the major role in 2008 for running the FFS session.

2

Page 9: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

Table 2: Distribution of the Lead Entrepreneurs by technology and Gender (number of beneficiaries)

Technologies Male Female Total Food fish and fingerling

production in pond 173 57 230

Food fish and fingerling

production in rice plot 86 32 118

Fingerling production in cage 53 37 90

Habitat restoration 5 0 5

Fingerling trading 36 0 36

Food fish trading 74 6 80

Netting 99 6 105

Total 526 138 664

2.3 Network Development with Local Support Agencies

The project team took active initiative to establish close linkages with the local government

agencies and service providers of fisheries and aquaculture activities. Representatives from

the different government agencies such as Upazilla Nirbahi Officer (UNO), District Fisheries

Officer (DFO), Upazilla Fisheries Officer (UFO), Upazilla Agriculture Officer (UAO),

Barendra Multipurpose Society, Upazilla Livestock Officer (ULO), NGO staffs and other

service providers participated in the workshops held at the regional level in 2008. Experts of

the training team from the Department of Fisheries worked as resource personnel to train the

field staff and Adivasi community members in 2008. They also participated in the

development of Farmer Field School (FFS) Manuals for Trainers.

(a) (b)

Picture 2: (a) UNO of Phulabari Upazilla is addressing in the network forum meeting

(b) UNO, SUFO and UAO of Kaharole Upazilla is visiting the project beneficiaries

As an initiative for strengthening the relationship of Adivasi community members with the

extension agencies and service providers, 12 networking committees were formed in the

project area in 2008. The network committees were developed as a federation of FFS within

an administrative boundary (e.g. Upazilla). Each committee consists of 13 – 17 Adivasicommunity members. The development of the FFS Networking through LEs was one of the

3

Page 10: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

attempts of the project to strengthen the implementation of project activities and ensure

sustainability of the project activities for a longer term in order to achieve greater benefits for

poor Adivasi people.

2.4 Exchange Visit of the Project Beneficiaries

In order to fill up the gaps in each FFS and learn from each other’s experiences, a local cross

visit from one FFS to another was organized by the project. The purpose of this activity was

to exchange ideas and experiences, learn from each other on practical work and identify the

strengths and required improvements in activities. In 2008, a total of 650 project beneficiaries

participated in the exchange visits

2.5 Participation in the National Program

The farmers’ ‘rally’ is one important tool used in technology dissemination and informing a

wider community about the success of the program. The project is encouraging the project

beneficiaries to participate in the national program such as fish week, agricultural fair etc.

Due to the project initiative huge number of Adivasi households attended the fish week

program such as rally and meeting in 2008. The participation of Adivasi Fisheries Project

(AFP) beneficiaries was highly appreciated by the upazilla administration.

(a) (b)Picture 3: Project participants of AFP are in the Fish Week Rally- 2008 (a) Birampur

Upazilla of Dinajpur (b) Jhinaigati Upazilla of Sherpur distict

2.6 Process Monitoring for Continuous Improvement

As a part of monitoring and evaluation, the Participatory Monitoring System (PMS) was

developed and introduced in the Adivasi Fisheries Project in 2008. Six participatory

monitoring record books were developed based on the major project activities (fish culture in

pond, fingerling production in rice field, fingerling production in cages, fish and fingerling

trading, habitat restoration and netting). These PMS books were developed under an action

research. Several participatory sessions were organized with the farmers in the development

process.

The beneficiaries are maintaining records of their activities in the PMS book with the help of

the Lead Entrepreneurs (LE) during the Farmer Field School (FFS) sessions. The LEs

4

Page 11: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

received day long training on PMS in 2008. The Caritas Assistant Field Officers (AFO) is

playing the role of facilitation in the process.

2.7 Livelihood Monitoring for Impact Studies

The project team undertook a broader study to assess the livelihood changes as a result of

project intervention. For the purpose, to collect the information of the year 2007, a total of

433 project participants and 150 non-project farmers were surveyed using structured

livelihood questionnaires at the beginning of 2008. Following the advice of ROM mission,

the survey was conducted to collect the information of 2008. This survey will be conducted

again at the end of 2009 to see the impact of the project intervention.

2.8 Action Research on Technologies and Enterprise Development

A total of five action research initiated in 2007 were completed in 2008. The outcomes of the

studies presented by the research team in workshops and important outcomes directly shared

with field staffs working in the project. Proposals of the seven other action research

developed, two of the research is started in 2008 (Table 3). Other action research studies are

going to be started from the beginning of 2009.

Table 3: Action Research of 2008 and 2009 SL#

Description of the studies Leader of Research Team

Status

1 Adivasi Perception on Fish

Culture- A Socio-Cultural

and Anthropological Study

on 11 Communities of

Northern Bangladesh.

Prof. Mesbah

Kamal

Department of

History, Dhaka

University (DU)

Field research completed, data analyzed,

outcomes presented to stakeholders in

two regional seminars (Dinajpur and

Mymensingh), also presented in

National Level Seminars (arranged by

BFRF at Dhaka). Important findings on

perceptions of different types of Adivasi

communities shared with project teams

to include in FFS curriculum.

2 Studies on Farmers Field

School (FFS) as an

effective institution

developed for Adivasi people in their communities

for promotion of

aquaculture and

aquaculture related

activities in the project

areas.

Prof. Dr. Thomas

Costa (Principal

Investigator, PI)

Dept. of

Anthropology,

DU, Dhaka-1000.

Field research completed data analyses

and reports completed. Guidelines to

manage effective farmer field school

(FFS) approach developed and provided

to the field team. The outcomes of the

research presented to important

stakeholders in regional workshops and

national seminars.

4 Fish Culture in Ponds and

Rice Fields by Poor

Adivasi Households in

Northwest and Northern

Bangladesh: Performances

evaluation and livelihood

aspects

Prof. Mostafa Ali

Reza Hossain

Professor

Faculty of

Fisheries,

Bangladesh

Agriculture

University (BAU)

Field research completed, data analysis

done and important outcomes presented

to stakeholders in regional workshops.

Guidelines will be developed based on

important findings to share with the

field staff for effective implementation

of the technologies.

5

Page 12: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

SL#

Description of the studies Leader of Research Team

Status

5 Development of small

entrepreneurs on

aquaculture related

activities by Adivasihouseholds in northern

Bangladesh

Dr Nesar Ahmed

Associate

professor

Faculty of

Fisheries, BAU

Field research completed, outcomes of

the studies presented to stakeholders in

workshop. Guidelines on important

outcomes to feedback to FFS will be

completed and delivered by beginning

of 2009.

6 Studies on impacts of

adoption of aquaculture and

related activities of Adivasi

Fisheries Project on

nutrition of Adivasihouseholds in the project

areas

Dr. Abu Torab

M.A Rahim,

Professor,

Institute of

Nutrition and

Food Science,

DU

Proposal development and refinement

completed and field studies started.

7 Developing and assessing

the effectiveness of the

Participatory Monitoring

System (PMS) in Adivasi

Fisheries Project (AFP)

Dr. Benoy Kumar

Barman and Dr.

KM Jahan,

WorldFish Center

Field studies related to PMS tools

development completed, the 6 different

PMS tools (pond fish culture, rice fish

culture, cages fingerling rearing,

fingerling and foodfish trading, habitat

restoration, and netting team for fish

harvest) developed based on findings.

Survey on assessment will be carried out

at the beginning of 2009.

8 Studies on the feasibility of

production of Cuchia by

Adivasi households in the

project areas

Mr. Arif Azad,

Dr. Faruque, Dr.

Binoy

Chakrabarty &

Mr. Nittya Ranjan

Biswas

Department of

Fisheries

Proposal developed and under process

of review. Studies will be started from

February’ 2009.

9 Studies on the feasibility of

culture of turtle by Adivasihouseholds in the project

areas

Prof. Nawshad

Alam, BAU

Proposal developed, presented and

reviewed. The study is going to start

from February’2009.

10 Studies on technology and

institutional aspects of

aquaculture habitat to

improve production of non-

stocked fish and other

aquatic flora and fauna for

the benefits of Adivasihouseholds in the project

areas.

Mr. Arif Azad,

Dr. Faruque, Dr.

Binoy

Chakrabarty &

Mr. Nittya Ranjan

Biswas

Department of

Fisheries

Proposal developed and under process

of review. Studies will be started from

February’ 2009.

11 Enhancing effectiveness of

cage aquaculture in Adivasicommunities towards

accumulation of asset-base

Dr. Mahfuzul

Haque, BAU

Proposal developed, presented and

reviewed. The study is going to start

from February 2009.

6

Page 13: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

SL#

Description of the studies Leader of Research Team

Status

and reduction of

vulnerability

12 Studies on the gender

perspective of households

involved in aquaculture and

related activities under the

Adivasi Fisheries Project in

the project areas- Does it

increases the intra-

household equity and

empowerment of female

members in the

households?

Dr. Benoy Kumar

Barman,

WorldFish Center

Proposal developed and under process

of review. Field studies is going to start

from March 2009

2.9 Development of Communication and Dissemination Strategies

A total 18 workshops was organized in 2008 to disseminate the project findings to different

stakeholders. The outcome of the five action researches, which was completed in 2008, was

disseminated to project staff, scientists and other stakeholders through presentations in the

two regional workshops in 2008. Twelve workshops at the upazilla levels were organized as

an effort to strengthen the linkage of Adivasi communities with upazillla administration and

other service providers. Four workshops at the region level were organized to develop the

capacity of the NGOs working with the Adivasi communities. The communication

documents such as posters, brochure and policy briefs are under preparation now which will

be published by the middle of 2009.

2.10 Strategy of Secondary Adopters

One of the important objectives of the project is to extend aquaculture technologies and

related activities to the neighboring Adivasi households during the project period. A total of

6000 households from the Adivasi communities are targeted as secondary adopters under this

project. To reach the target, four training workshops at the region level were organized with

the NGOs working with the Adivasi communities. A total of 73 participants from 22 NGOs

participated in these workshops (Annex 3). The programs of Caritas other than AFP such as

ICDP, DEEDS and GDP will also be linked with these capacity building initiatives. A total of

64 staffs of these programs were trained (Annex 3). It is expected that through these NGOs

and Caritas programs, a total of 3000 Adivasi community members will get the opportunity to

adopt the aquaculture technologies practiced by the AFP participants.

2.11 Training Workshop for the Project Staffs

Two training workshop was organized in the northwest regions in February 2009. The

objectives of these workshops will be to share the ideas and experiences gained in the year

2008. The manuals on aquaculture technology, entrepreneurship development and Farmer

Field School (FFS) operation was developed during this year. The FFS manuals developed

for field staff was reviewed during these workshops for fine tuning of the manuals. The

experts from Department of Fisheries (DFO) and Bangladesh Agricultural University (BAU)

acted as a facilitator in the training program.

7

Page 14: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

2.12 Achievements in 2008

The preliminary results of the project beneficiaries shows that the project made a positive

impact on improving productivity, income and food security status of the Adivasi households.

In November 2008, a short survey was conducted to evaluate the impact of project

intervention. About 10% of the total beneficiaries were surveyed. The information of the

survey was collected from the Participatory Management System (PMS) record book. The

same information was previously collected in 2007 and was considered as a baseline for

comparison. Table 2 shows that after the project intervention, the total income of the project

households grew from Tk. 47702 in 2007 to Tk. 58230 in 2008. The difference was mainly

accounted for increases in farm and fish income as no significant income increases were

observed from other sources. Prior to project intervention, income derived from fish culture

and other aquaculture related activities contributed to 3% of total household income, whereas

after project intervention fish production made important contributions of 15% to total

income.

Table 4: Household income (Tk/household) following aquaculture intervention Income sources 2007 2008

Farm income (excluding fish) 18842 21592

Income from fish culture and other

aquaculture related activities 2065 8635

Off-farm income 15864 16277

Non-farm income 8057 8824

Remittance 2873 2902

Total income 47702 58230

Contribution of fish to total income (%). 4 15

Figure 1 shows that in the aftermath of technology transfer and adoption of improved

management and better species-combination, both the amount of production and disposition

to household consumption per hectare of pond and rice plot increased substantially. Hence,

we can say that increased fish supply coming from family farms would increasingly go to

fulfill the consumption needs of the household.

8

Page 15: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

509

271 225

13

1943

1190

514

239

0

500

1000

1500

2000

2500

Total Production Sold Consumed Given away

kg/h

a

2007 2008

Figure 1: Distribution of Disposal of Fish Harvest from pond and plot in 2007 and 2008

Figure 2 shows a positive impact of the project on improving food security status. The results

show that the food deficit period of the Adivasi households has been reduced. In 2008, the

food deficit period reduced from an average of 1.8 months (before the project intervened) to

an average of 1.2 months.

Figure 2: Food security status of the Adivasi households in 2007 and 2008

The impact varies between different interventions. The detail impact based on the

interventions is mentioned below:

2.12.1 Foodfish and fingerling production in ponds

A total of 1238 selected households are involved in fish production in their homestead ponds.

Among the fish producers in pond, 1202 farmers are producing food fish and 36 farmers are

producing fingerling. Estimates showed that productivity increased substantially after the

project intervention. The productivity of the ponds increased from 753 kg/ha in 2007 to 2751

kg/ha in 2008. Income from fish culture increased substantially among project farmers. The

total income of the pond holding Adivasi households grew from Tk. 59,100 in 2007 to

Tk. 71,630 in 2008. Prior to project intervention, income derived from fish culture

Surplus

(month) 5.0

Deficit

(month) 1.8

Balance

(month) 5.2

Surplus

(month) 5.4

Balance

(month) 5.4

Deficit

(month) 1.2

Food security status in 2008 Food security status in 2007

9

Page 16: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

contributed to 5% of total household income, whereas after project intervention fish

production made important contributions of 11% to total income. As the pond farmers are

now more familiar with the technologies and they have established good network with

different service providers (fingerling trader, input traders, extension agencies etc.), it is

expected that the returns in terms of productivity and income will be higher in 2009 as

compared to 2008.

2.12.2 Fingerling and foodfish production in rice fields

A total of 527 households were selected to carry out fingerling and foodfish production in the

rice fields. Among the rice-fish farmers, 245 Adivasi households produce fingerling in Boro

season, 211 households produce food fish in Aman season and 71 households produce

fingerling and fish in both the seasons. Estimates shows that fish productivity of the plot

increased from 80 kg/ha in 2007 to 522 kg/ha in 2008. The total income of the Adivasi rice-

fish households grew from Tk. 55,155 in 2007 to Tk. 67,091 in 2008. The contribution of fish

to total income of the households also increased from 3 % in 2007 to 6 % in 2008.

2.12.3 Fingerling production in cages

A total of 488 households are involved in fingerling production in cages in AFP. On an

average, the cage farmers received an income of Tk. 1786 from 1.3 cycles in 2008. The

households produced an average of 1500 fingerlings in 2008. The contribution of fish to total

income of the households was 5%.

2.12.4 Habitat restoration

In AFP, 41 households are participating in habitat restoration activities. The habitats are

created in five water bodies (3 in the Northern region and 2 in the Northwest region). The

activities of habitat preparation were completed in the first quarter of 2008. It was observed

that after the establishment of the habitats, availability of fish species and other aquatic

animals increased in the water bodies. During 2008, on an average, the households received

46 kg of fish and 107 kg aquatic animals. On the other hand, in 2007 harvest of fish and other

aquatic animal was 13 kg and 32 kg respectively. Estimates show that on an average the

income generated from the habitat was Tk 3886 in 2008 as compared to Tk. 900 in 2007.

2.12.5 Entrepreneurship development in aquaculture and related activities

A total of 1300 households were involved in 2008 in food fish trading, fingerling trading and

as members of fish harvesting (netting) teams. The members selected for these activities are

from the poorest section of the Adivasi households (without having ponds, land resources,

etc) and they live in government khas lands or in the lands of private owners. The results

showed that during 2008, on an average, the households generated an income of Tk. 15114

from these activities, whereas in 2007 the average income generated was Tk 3083. As the

project is providing continuous support to these stakeholders for developing a network with

different stakeholders, it is expected that the income generated from these activities will be

much more in 2009 as compare to 2008.

2.13 Fish Week Award – 2008 for Best Performance

10

Page 17: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

FISH WEEK 2008 has been celebrated all over Bangladesh from the 23rd to the 28th

of

August to promote the sustainable development of this sector and to create awareness of its

importance among the general public. Among the different activities, ranging from rallies to

fairs, a few talented fish farmers received the appreciation they deserve in the form of awards

and recognition. During Fish Week, three farmers from the AFP received best farmer awards

in three Upazillas based on their extraordinary performance on adopting new aquaculture

technology.

One award went to Shudhir Hembrom from Birampur Upazilla, Dinajpur District, who

harvested 20 kg of fingerlings worth Tk. 2000 from a 1 cubic meter cage, within only a

month and thirteen days. He started off with only 2 kg of fry and an investment of Tk 417. In

Kaharol Upazilla cage farmer, Mr. Rajen Hasda, was also one such selected best farmer. With

an investment of only Tk 650, he stocked 2.5 kg of fry and harvested 23.5 kg of fingerlings

worth Tk. 3055 within a month and nineteen days only. The third farmer to achieve this

award was Uttam Hajong from Kalmakanda Upazilla, Netrakona District for fingerling cum

food fish (table fish) production in a pond. He was able to produce 760kgs of food fish from a

0.12 hectare pond within a time span of only six months. What started off with an overall

initial investment of Tk30, 800 including 4000 fingerlings of Tk 3000, turned into 760 kg

food fish worth Tk 54,800. His net profit was Tk 29000.

(a) (b)

Picture 4 (b) Rajen Hasda from Kaharol Upazilla

won the award for fingerling production in cage Upazilla w

in cage

Picture 4 (a) Shudhir Hembrom from Birampur

on the award for fingerling production

(c)

Picture 4 (c) Uttam Hajong from Kalmakanda

Upazilla won the award for fish production in pond

2.14 Farmers Affected by Flash Flood

11

Page 18: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

In 2008, due to the flash flood, Naltitabari (32 ponds and 18 rice fields), Durgapur, Kalmakanda

Upazilla of Sherpur and Netrokona district respectively were severely affected. It was estimated

by Caritas that the loss of fish and vegetables in the pond dike of AFP farmers were around Tk.

139, 096.

Flood losses also occurred in Khalchanda village where a mud built embankment near a big

depression was totally damaged. The 36 members of the Kuch community who reside in the

village depend on this resource for fish consumption. The irrigation water for the rice fields also

comes from this depression. Due to damage of the embankments 6 rice-fish and 9 cage farmers of

AFP were not able to do fish culture in 2008. There is a need to construct a brick built

embankment. The construction will not only help the project participants of AFP, but will also

help the other Kuch community member’s who stay in the village. The affected community

members seek support from the AFP to minimize this loss due to the flash flood. A contingency

request will be placed to the EC for on January 2009 for this purpose.

3. Budgets

The total expenditure of 2008 is EURO 276,849 which is 73% of the total allocated direct

eligible costs of EURO 381411 (Annex 4). The expenditure based on major line items is

given below.

3.1 Human Resources (salaries and per diems/travel)

The total expenditure on human resources was EURO 140,401 against the total allocated

amount which is 93% of total allocated budget of EURO 151,398 in 2008. The deviation was

due the under spending in per diems for travel by the Caritas and BFRF staffs. As the Caritas

staffs are based on the unit office, the expenditure is less. The money spent in this line item of

WorldFish center exceeds the total allocation due to the increase of the per diem rate from

July 2008. The WorldFish staffs involvement at the field level also increased for mentoring

support, capacity building training and monitoring and research.

3.2 Travel

In 2008, the total expenditure on travel was EURO 5,744 in 2008 (20% of the total

allocation). There was major deviation on spending for travel due to the under spending in the

inter-district and intra district line items. As the staffs are using the motorbikes for field visits

and travel less money was spent from these line items. However, taking into account the

volume of activities to be carried in 2009, with more involvement of most of the project staff,

the spending under the heading of travel will be increased. Moreover, a portion of the money

under this line item will be allocated to other line items in 2009. In this regard, budget

revision request will be placed to EC.

3.3 Equipments and Supplies

The total expenditure of equipments and supply in 2008 was EURO 22,644 which is 51% of

the allocated amount of EURO 44,000. The deviation is mainly for the under spending in the

line items of purchasing motorbikes, computer, furniture’s etc. Although the money is

allocated for motorbikes and computers but as the unit required for these items is already

purchased, the money left under these items will not be used. During the budget revision the

12

Page 19: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

13

remaining amount for purchasing motorbikes and computers will be reallocated in other items

where the money will be required.

3.4 Local Office

The total expenditure for local office was EURO 41,430 which is 81% of the budgeted

amount of EURO 50850 in 2008. The deviation of expenditure under these line item is

mainly for the under spending in the line item of rent of venue for workshops. In 2008, a

number of workshops were organized at the local and regional level. But as the costs at the

local level for workshop venue is cheaper compare to the allocated amount, the cost was

minimum.

3.5 Other Costs, Services

In 2008, under this line item the total money spent was EURO 55,647 which is 67% of the

allocated amount of EURO 83,263. The deviation is because of the under spending in

publication and communication, website hosting etc. The communication documents are

under preparation now, which will be published by the middle of 2009. The project team will

take action to prepare website of the project in 2009. Another reason of the under spending

the lower unit rate of some of the line items such as training and workshop facilitators and

resource person remuneration of DOF, BFRI and NGOs etc compared to the rate which was

expected at the beginning of the project. The budget revision of 2009 will take care about

these issues.

3.6 Other

Under this sub-item the total amount budgeted in 2008 was EURO 23400. However, due to

the recommendation of the ROM mission an amount of EURO 8400 which was allocated as

revolving was not distributed among the beneficiaries. In 2008 the expenditure under “other”

was EURO 10,982 which is 73% of the total budgeted amount (excluding the money for

revolving fund).

Page 20: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

Ann

ex 1

: L

ogic

al F

ram

ewor

k of

the

Adi

vasi

Fis

heri

es P

roje

ct (

AF

P)

Inte

rven

tion

Log

ic

OV

ISO

VA

ssum

ptio

ns

Overall Objectives

To

p

rom

ote

th

e w

ides

pre

ad

ado

pti

on

o

f

aquac

ult

ure

an

d

fish

erie

s m

anag

emen

t pra

ctic

es

acro

ss

the

Adi

vasi

co

mm

un

itie

s su

pport

ed

by

go

ver

nm

ent

and

n

on

-go

ver

nm

ent

agen

cies

fo

r

redu

ctio

n o

f pov

erty

an

d f

ood

sec

uri

ty

Pover

ty

of

the

Adi

vasi

p

eop

le

redu

ced

. L

arg

e

pro

po

rtio

n

of

them

inv

olv

ed

in

aqu

acu

ltu

re

and

rela

ted i

nco

me g

ener

atin

g a

ctiv

itie

s

GoB

st

atis

tics

and

sect

or

per

form

ance

rep

ort

s

Project purpose

To in

crea

se f

ish p

roduct

ion

, house

hold

nutr

itio

n,

inco

me

and

alt

ern

ativ

e em

plo

ym

ent

op

po

rtu

nit

ies

of

poor

vu

lner

able

Adi

vasi

(T

ribal

) peo

ple

in t

he

No

rth

an

d

No

rth

wes

t re

gio

n

of

Ban

gla

des

h

thro

ug

h p

rom

oti

on

of

smal

l sc

ale

aqu

acu

ltu

re a

nd

aqu

acu

ltu

re r

elat

ed e

nte

rpri

se d

evel

op

men

t

By

the

end

of

pro

ject

, fi

sh

pro

du

ctio

n,

ho

use

ho

ld

nu

trit

ion

, in

com

e,

emp

loy

men

t o

pp

ort

un

itie

s o

f th

e

Adi

vasi

house

hold

s in

crea

se

in

the

pro

ject

ar

eas.

Spec

ific

ally

:

- A

nnual

ly 8

.3 m

illi

on l

arg

e si

ze f

inger

ling p

roduce

s

f

rom

po

nd

, ri

ce-f

ield

an

d c

ages

- F

oo

dfi

sh p

rod

uct

ion

of

po

nd

an

d r

ice-

fish

plo

t

i

ncr

ease

fro

m 0

.7 m

t per

hec

tare

to 2

.5 m

t per

h

ecta

re

-A

ver

age

inco

me

fro

m a

qu

acu

ltu

re a

nd

aq

uac

ult

ure

rela

ted a

ctiv

itie

s w

ill

be

double

d a

nd

co

ntr

ibu

tio

n t

o

tota

l in

com

e in

crea

se o

n a

ver

age

fro

m 2

% t

o 8

%.

-F

req

uen

cy o

f fi

sh co

nsu

mp

tio

n o

f th

e h

ou

seh

old

s

incr

ease

fro

m 6

mea

ls p

er m

on

th t

o 1

2 m

eals

per

mo

nth

.

-E

mp

loym

ent

op

port

unit

ies

dev

elop f

or

1,3

29 p

oor

lan

dle

ss

Adi

vasi

h

ou

seh

old

s th

rou

gh

aq

uac

ult

ure

ente

rpri

se

rela

ted

acti

vit

ies

(fry

an

d

food

fish

trad

ing,

net

ting)

Bas

elin

e re

port

,

mo

nit

ori

ng

re

po

rts,

fin

al

rep

ort

an

d

rep

ort

o

n

imp

acts

asse

ssm

ent

Most

of

the

mem

ber

s of

ult

ra-p

oo

r h

ou

seh

old

s in

th

e

Adi

vasi

co

mm

un

itie

s

acti

vel

y p

arti

cipat

e in

dif

fere

nt

types

of

acti

vit

ies

acco

rdin

g t

o t

hei

r in

tere

st

and n

eed

s. B

udg

ets

and

pro

gra

mm

e s

ucc

essf

ull

y

man

age

Expected results

1.

Imp

rov

ed

acti

on

p

lan

fo

r th

e sm

oo

th

imple

men

tati

on o

f th

e pro

ject

act

ivit

ies

Ince

pti

on

ph

ase

com

ple

ted

wit

hin

6 m

on

th o

f p

roje

ct

star

ting

and

reco

mm

endat

ion

inco

rpora

ted

to

stre

ngth

en t

he

pla

n o

f ac

tion.

Ince

pti

on

re

po

rt,

annual

re

port

s,

monit

ori

ng

and

eval

uat

ion

re

po

rt,

imp

act

asse

ssm

ent

rep

ort

, m

id

term

eval

uat

ion

report

and

asse

ssm

ent

thro

ugh f

ield

vis

its

Poli

tica

l si

tuat

ion b

eco

mes

con

du

ctiv

e to

fie

ld a

ctiv

itie

s.

Adi

vasi

peo

ple

an

d o

ther

stak

ehold

ers

pro

vid

e

accu

rate

in

form

atio

n.

Act

ivit

ies

is n

ot

dis

rup

ted

by

the

loca

l in

flu

enti

al.

Res

earc

her

s ar

e dev

ote

adeq

uat

e on r

esea

rch

acti

vit

ies

14

Page 21: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

Inte

rven

tion

Log

ic

OV

ISO

VA

ssum

ptio

ns2

. D

evel

op

pro

du

ctiv

e as

sets

fo

r th

e p

oo

r A

diva

si

ho

use

ho

lds

for

fish

pro

du

ctio

n t

hro

ug

h r

eno

vat

ion

of

smal

l h

om

este

ad p

on

ds,

ric

e fi

eld

s, d

itch

es a

nd

low

lan

d a

reas

- A

to

tal

of

12

51

ho

mes

tead

pond

s an

d 5

33 r

ice

plo

ts o

f th

e

Adi

vasi

ho

use

ho

lds

dev

elo

p f

or

fish

pro

du

ctio

n.

- P

repar

e ca

ges

for

493 l

andle

ss A

diva

si h

ou

seh

old

s fo

r fi

sh

pro

du

ctio

n

- P

rep

are

hab

itat

fo

r fi

sh a

nd

oth

er a

qu

atic

an

imal

to

ben

efit

44

Adi

vasi

house

hold

s

3.

Em

plo

ym

en

t o

pp

ort

un

itie

s cr

eate

fo

r la

nd

less

po

or,

vu

lner

able

an

d d

isad

van

tag

ed A

diva

si p

eople

thro

ug

h

pro

mo

tio

n

of

aqu

acu

ltu

re

rela

ted

ente

rpri

se d

evel

op

men

t

Pro

vid

e ca

pit

al s

upport

(g

rant)

to 1

,329 p

oor

landle

ss A

diva

sih

ou

seh

old

s t

o i

nv

olv

e th

em i

n f

inger

ling

and f

ood f

ish t

radin

g,

and n

etti

ng

Expected results

4.

Far

mer

F

ield

S

cho

ol

(FF

S)

dev

elo

p

fo

r

effe

ctiv

e dis

sem

inat

ion

of

the

aquac

ult

ure

tech

nolo

gie

s t

o A

diva

si h

ou

seh

old

s

- 6

64

L

ead

E

ntr

epre

neu

rs

(LE

s)

cap

acit

y

dev

elo

p

as

a

faci

lita

tor

to r

un t

he

FF

S s

essi

on

- L

evel

of

un

der

stan

din

g o

f al

l th

e L

Es

abo

ut

FF

S o

per

atio

n

and

aq

uac

ult

ure

te

chnolo

gy

impro

ved

due

to

the

capac

ity

buil

din

g i

nit

iati

ve

of

the

pro

ject

- F

FS

man

ual

dev

elo

ped

to

org

aniz

e th

e F

FS

ses

sio

n

- O

rgan

ize

28

80

FF

S s

essi

on

in

th

e p

roje

ct a

rea

wit

h

aver

age

par

tici

pat

ion o

f 70%

of

the

HH

in e

ach s

essi

on

- G

over

nm

ent

staf

fs

par

tici

pat

ion

in

com

munit

y

level

incr

ease

d d

ue

to t

he

init

iati

ve

of

the

net

work

foru

m

- A

bo

ut

40

%

of

the

mem

ber

s o

f ea

ch

FF

S

par

tici

pat

es

in

exch

ange

vis

its

org

aniz

e by t

he

pro

ject

Ince

pti

on

report

,

ann

ual

re

po

rts,

mo

nit

ori

ng

an

d

eval

uat

ion

report

,

imp

act

asse

ssm

ent

rep

ort

, m

id

term

eval

uat

ion

report

an

d

asse

ssm

ent

thro

ug

h

fiel

d v

isit

s

Po

liti

cal

situ

atio

n

bec

om

es

condu

ctiv

e to

fiel

d a

ctiv

itie

s.

Adi

vasi

peo

ple

and

oth

er s

takeh

old

ers

pro

vid

e ac

cura

te

info

rmat

ion

. A

ctiv

itie

s

is n

ot

dis

rup

ted

by

th

e

loca

l in

flu

enti

al.

Res

earc

her

s ar

e

dev

ote

adeq

uat

e on

rese

arch

act

ivit

ies

15

Page 22: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

Inte

rven

tion

Log

ic

OV

ISO

VA

ssum

ptio

ns5

. E

ffec

tiv

e m

on

ito

rin

g a

nd

dem

and

-led

act

ion

rese

arch

for

addre

ssin

g t

he

const

rain

ts i

den

tifi

ed

and t

echnolo

gy r

efin

emen

t

- P

arti

cip

ato

ry M

on

ito

rin

g S

yst

em (

PM

S)

dev

elo

ped

an

d

livel

ihood i

mpac

t st

udy c

arri

ed o

ut

to m

on

ito

r ch

ang

es o

f

pro

ject

in

terv

enti

on

- A

tota

l 12 r

esea

rch i

ssues

iden

tify

bas

ed o

n t

he

nee

d o

f

Adi

vasi

house

hold

s an

d r

esea

rch o

utc

om

es i

nco

rpora

te i

n t

he

imp

lem

enta

tio

n p

lan

.

- 6

gu

ide

lin

e m

anu

als

dev

elo

ped

bas

ed o

n t

he

acti

on

res

earc

h

ou

tco

mes

6.

Adopti

on

of

tech

nolo

gie

s at

se

condar

y

and

tert

iary

le

vel

w

ithin

an

d

nea

rby

the

Adi

vasi

com

munit

ies

A t

ota

l of

6,0

00 A

diva

si h

ouse

hold

s in

volv

e in

th

ese

acti

vit

ies

wit

hin

th

e p

roje

ct p

erio

d.

7.

Pro

duct

ion

of

hig

h

qual

ity

com

munic

atio

n

pro

du

cts

for

po

licy

m

ak

ers

and

re

lev

ant

stak

eho

lder

s

- 4

bro

chu

res,

3 p

oli

cy b

rief

, 2

po

ster

s, 1

vid

eo d

ocu

men

tary

and 2

pee

r re

vie

w j

ourn

al a

rtic

le (

subm

itte

d)

Expected results

8. P

roje

ct m

anag

emen

t te

am o

per

atio

nal

-

Sta

ffs

of

Worl

dF

ish C

ente

r, C

arit

as a

nd B

FR

F r

ecru

ited

an

d

full

y e

quip

ped

- U

nder

stan

din

g o

f th

e pro

ject

sta

ff i

mpro

ved

due

to t

he

capac

ity b

uil

din

g t

rain

ing o

n a

quac

ult

ure

tec

hnolo

gy, fa

rmer

fiel

d s

chool

oper

atio

n a

nd

en

trep

ren

eurs

hip

dev

elo

pm

ent

- P

roje

ct c

oo

rdin

atio

n m

eeti

ng

hel

d b

y-

mo

nth

ly

Ince

pti

on

report

,

ann

ual

re

po

rts,

mo

nit

ori

ng

an

d

eval

uat

ion

report

,

imp

act

asse

ssm

ent

rep

ort

, m

id

term

eval

uat

ion

report

an

d

asse

ssm

ent

thro

ug

h

fiel

d v

isit

s

Po

liti

cal

situ

atio

n

bec

om

es

condu

ctiv

e to

fiel

d a

ctiv

itie

s.

Adi

vasi

peo

ple

and

oth

er s

takeh

old

ers

pro

vid

e ac

cura

te

info

rmat

ion

. A

ctiv

itie

s

is n

ot

dis

rup

ted

by

th

e

loca

l in

flu

enti

al.

Res

earc

her

s ar

e

dev

ote

adeq

uat

e on

rese

arch

act

ivit

ies

16

Page 23: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

Inte

rven

tion

Log

ic

Mea

nsC

osts

(E

UR

) A

ssum

ptio

ns

1.1

Sco

pin

g a

nd

dia

gn

ost

ic s

tud

y

1.2

Sel

ecti

on o

f w

ork

ing a

rea

and 1

20 A

diva

si c

om

munit

ies

for

gro

up

form

atio

n

1.3

Co

nse

nsu

s b

uil

din

gs

wit

h g

ov

ern

men

t o

ther

im

ple

men

tin

g a

gen

cies

1.4

Est

abli

sh l

ink

age

wit

h l

oca

l g

ov

ern

men

t ag

enci

es a

nd

NG

Os

1.5

Arr

ang

e re

gio

nal

an

d n

atio

nal

in

cepti

on w

ork

shop

1.6

Pro

du

ctio

n a

nd

dis

trib

uti

on

of

wo

rksh

op

fin

din

gs

to S

tak

eho

lder

s

2.1

Sel

ecti

on o

f th

e pro

ject

par

tici

pan

ts f

or

pond a

nd r

ice-

fish

in

terv

enti

on

2.2

R

e-ex

cav

atio

n/

ren

ov

atio

n

of

the

po

nd

an

d

rice

-fis

h

plo

t fo

r fi

sh

pro

du

ctio

n

2.3

Iden

tify

the

wat

erbody s

uit

able

fo

r se

t up c

ages

and h

abit

at r

esto

rati

on

2.4

Co

nse

nsu

s b

uil

din

g w

ith

th

e o

wn

ers

of

pri

vat

e o

r m

ult

iple

ow

n w

ater

bo

dy

for

set

up

cag

es a

nd

hab

itat

res

tora

tio

n

2.5

Est

abli

sh p

roto

cols

to

man

age

cap

ital

gra

nts

fo

r fi

sh p

rod

uct

ion

in

po

nd

,

rice

plo

t an

d c

ages

3.1

Sel

ecti

on o

f th

e pro

ject

par

tici

pan

ts f

or

fish

and f

inger

ling t

radin

g,

and

net

tin

g

3.2

Org

aniz

e m

eeti

ng w

ith t

he

vil

lager

s (A

diva

si a

nd

no

n-A

diva

si)

to f

ind

ou

t

the

feas

ibil

ity o

f fi

sh a

nd f

inger

ling t

radin

g, an

d n

etti

ng i

n t

he

area

3.3

Est

abli

sh p

roto

cols

to

man

age

cap

ital

gra

nts

for

foodfi

sh a

nd f

inger

ling

trad

ing

and

net

tin

g

Activities

4.1

Cap

acit

y b

uil

din

g p

rog

ram

usi

ng

FF

S p

rin

cip

les

4.2

Iden

tify

Lea

d E

ntr

epre

neu

rs (

LE

’S)

for

tech

no

logy i

den

tifi

cati

on,

refi

nem

ent

and d

emonst

rati

on

4.3

Org

aniz

e ca

pac

ity

bu

ild

ing

pro

gra

m f

or

the

LE

s

4.4

Fo

rmat

ion

of

net

wo

rk f

oru

m t

o s

tren

gth

en t

he

rela

tio

nsh

ip o

f A

diva

si

com

munit

ies

wit

h t

he

exte

nsi

on a

gen

cies

and

oth

er s

takeh

old

ers

4.5

Org

aniz

e ex

chan

ge

vis

its

for

LE

s to

sh

are

idea

s an

d e

xp

erie

nce

s

Month

ly a

nd Q

uar

terl

y A

nnual

Rep

ort

, M

on

ito

rin

g a

nd

Eval

uat

ion R

eport

are

the

sourc

es

of

info

rmat

ion a

bout

the

pro

gre

ss

of

wo

rks

Bu

dg

et b

reak

do

wn

fo

r th

e ac

tio

n

(in

EU

RO

)

1. H

um

an r

eso

urc

e

2. L

oca

l T

rav

el

3. E

qu

ipm

ent

and

su

pp

lies

4. L

oca

l off

ice-

veh

icle

and

suppli

es

5. O

ther

co

st a

nd

ser

vic

es

6. In

put

cost

for

ben

efic

iari

es a

nd

trai

nin

g t

o b

enef

icia

ries

and

pro

ject

sta

ffs

Tot

al d

irec

t el

igib

le c

osts

4401

28

5625

0

1677

00

1206

00

1711

75

1604

00

1116

253

Poli

tica

l si

tuat

ion

bec

om

es c

onduct

ive

to

fiel

d a

ctiv

itie

s.

Adi

vasi

peo

ple

an

d o

ther

stak

eho

lder

s p

rov

ide

accu

rate

in

form

atio

n.

Acc

ess

to g

ov

ern

men

t

and

oth

er l

oca

l in

stit

ute

fo

r

lin

kag

e d

evel

op

men

t,

Inte

rnal

confl

icts

does

no

t

ham

per

fie

ld

dem

onst

rati

on

17

Page 24: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

Inte

rven

tion

Log

ic

Mea

nsC

osts

(E

UR

) A

ssum

ptio

ns

5.1

Pro

gre

ss m

onit

ori

ng f

or

conti

nuous

impro

vem

ent

thro

ugh p

arti

cipat

ory

mo

nit

ori

ng t

ool

5.2

Im

pac

t st

udy f

or

eval

uat

ing t

he

chan

ges

of

livel

ihood i

ndic

ators

due

to

pro

ject

par

tici

pat

ion

5.3

Act

ion r

esea

rch o

n t

ech

nolo

gie

s an

d e

nte

rpri

se d

evel

op

men

t an

d

refi

nem

ent

of

the

tech

nolo

gie

s

5.4

Tra

inin

g w

ork

sho

p o

rgan

ized

fo

r th

e p

roje

ct s

taff

s to

im

ple

men

t th

e

acti

on r

esea

rch o

utc

om

e at

the

fiel

d l

evel

5.5

Wo

rksh

op

s at

reg

ion

al a

nd

nat

ion

al l

evel

to

dis

sem

inat

e th

e o

utc

om

es

6.1

Org

aniz

ing w

ork

sho

p f

or

NG

Os

wo

rkin

g w

ith

Adi

vasi

to d

isse

min

ate

the

aquac

ult

ure

tec

hnolo

gie

s

6.2

Org

aniz

ing

tra

inin

g f

or

the

nei

gh

bo

rin

g A

diva

si c

om

munit

ies

wit

h t

he

hel

p o

f p

roje

ct L

Es

6.3

Org

aniz

ing

fie

ld d

ay a

nd

ral

ly f

or

a w

ider

im

pac

t in

th

e p

roje

ct a

rea

7.1

Publi

cati

on o

f re

levan

t co

mm

unic

atio

n p

rod

uct

s su

ch a

s p

ost

ers,

bro

chure

s, p

oli

cy b

rief

s an

d v

ideo

do

cum

enta

ry f

or

TV

ch

ann

el

7.2

Pub

lish

pee

r re

vie

wed

jo

urn

al a

rtic

les

8.1

Pro

ject

sta

ffs

recr

uit

ed a

nd

eq

uip

ped

8.2

Pro

ject

sta

ffs

trai

ned

8.3

Pro

ject

co

ord

inat

ion

mee

tin

g h

eld

on

sch

edu

le

8.4

Reg

ion

sp

ecif

ic y

earl

y w

ork

pla

n p

rep

are

on

sch

edu

le

8.5

Rep

ort

s p

rod

uce

d o

n s

ched

ule

18

Page 25: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

Ann

ex-2

: A

ccom

plis

hed

plan

ned

acti

viti

es m

enti

oned

in t

he L

og f

ram

e

LLoo gg

ff rraa mm

eeaa cc

tt iivv ii

tt iiee ss

AAcc tt

ii vvii tt

ii eess

ppll aa

nnnn

ee ddff oo

rrtt hh

eerr ee

ppoo rr

tt iinn

ggpp

ee rrii oo

ddPP

rr oogg rr

ee ssss

aa ggaa ii

nnss tt

ppll aa

nnnn

ee ddaa cc

tt iivv ii

tt iiee ss

VVaa rr

ii aann

cc ee(( ii

ffaa nn

yy ))ww

ii tthh

rr eeaa ss

oo nnss

AAcc tt

ii oonn

tt oobb

eett aa

kkee nn

Est

abli

sh l

ink

ages

wit

h l

oca

l g

ov

ern

men

t

agen

cies

an

d N

GO

s

Lin

kag

e st

rength

en w

ith 1

5 l

oca

l

go

ver

nm

ent

agen

cies

an

d 1

0 N

GO

s

Est

abli

sh c

lose

lin

kag

e w

ith

5

loca

l gover

nm

ent

agen

cies

(DO

F,

DA

E,

DO

L,

Bar

end

ra

Mult

ipurp

ose

A

uth

ori

ty,

Upaz

illa

A

dm

inis

trat

ion)

and

22 N

GO

s.

Lin

kag

e es

tab

lish

ed w

ith

5

loca

l gover

nm

ent

agen

cies

inst

ead

of

15

.

Acc

ord

ing

to

RO

M

mis

sion

esta

bli

shin

g

rela

tio

nsh

ip w

ith

DO

F a

nd

DA

E i

s th

e m

ost

im

po

rtan

t

for

the

succ

ess

of

AF

P.

In

2009

we

wil

l w

ork

fo

r

stre

ng

then

ing

the

rela

tionsh

ip

wit

h

5

agen

cies

, w

hic

h i

s al

read

y

dev

elo

ped

. M

ore

ov

er,

in

2009 t

he

pro

ject

wil

l tr

y t

o

stre

ngth

enin

g

rela

tionsh

ip

wit

h

Upaz

illa

an

d

Unio

n

Par

ish

ad

Tec

hnolo

gy a

nd E

nte

rpri

ses

Dev

elopm

ent

A t

ota

l of

3650 a

dopte

d t

he

aqu

acu

ltu

re t

ech

no

log

ies

or

inv

olv

ed

in a

quac

ult

ure

rel

ated

act

ivit

ies

3594 b

enef

icia

ries

adopte

d t

he

aqu

acu

lture

te

chno

log

ies

and

inv

olv

ed i

n a

quac

ult

ure

rel

ated

acti

vit

ies

56

ben

efic

iari

es d

rop

ou

t in

2008

Pro

ject

sta

ffs

wil

l in

crea

se

ind

ivid

ual

co

mm

un

icat

ion

wit

h

ben

efic

iari

es

to

min

imiz

e th

e dro

p o

ut

rate

Cap

ital

gra

nt

dis

burs

emen

t an

d r

evo

lve

20%

rev

olv

ing f

und

rev

olv

ed

Th

e gra

nt

dis

burs

ed

to

the

ben

efic

iari

es

in

2007.

Acc

ord

ing

to

the

advic

e of

RO

M

mis

sion

gra

nt

wil

l not

be

rev

olv

ed

Cap

acit

y b

uil

din

g o

f ben

efic

iari

es u

sing F

FS

appro

ach

2800 t

rain

ing s

essi

on o

rgan

ized

in

12

0 c

om

mu

nit

ies

fro

m J

anu

ary t

o

Dec

emb

er

A

tota

l of

3202

FF

S

sess

ion

was

o

rgan

ized

in

th

e p

roje

ct

area

Iden

tifi

cati

on o

f L

ead

Entr

epre

neu

rs (

LE

s)

on

tec

hn

olo

gy

an

d e

nte

rpri

se

60

0 L

Es

iden

tifi

ed w

hic

h i

ncl

ud

es

12

0 L

Es

of

the

firs

t y

ear

66

4

LE

s id

enti

fied

. T

wel

ve

trai

nin

g

was

org

aniz

ed

to

dev

elo

p

thei

r ca

pac

ity

fo

r

runnin

g t

he

FF

S s

essi

on

Fo

rmat

ion

of

the

net

wo

rk f

oru

m f

or

LE

s 1

2 n

etw

ork

foru

m e

stab

lish

ed i

n 1

2

Upaz

illa

s

12 n

etw

ork

foru

m a

lrea

dy

esta

bli

shed

in 1

2 U

paz

illa

s

19

Page 26: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

LLoo gg

ff rraa mm

eeaa cc

tt iivv ii

tt iiee ss

AAcc tt

ii vvii tt

ii eess

ppll aa

nnnn

ee ddff oo

rrtt hh

eerr ee

ppoo rr

tt iinn

ggpp

ee rrii oo

ddPP

rr oogg rr

ee ssss

aa ggaa ii

nnss tt

ppll aa

nnnn

ee ddaa cc

tt iivv ii

tt iiee ss

VVaa rr

ii aann

cc ee(( ii

ffaa nn

yy ))ww

ii tthh

rr eeaa ss

oo nnss

AAcc tt

ii oonn

tt oobb

eett aa

kkee nn

Ex

chan

ge

vis

its

for

LE

s E

xch

ang

e v

isit

s o

f 6

00

LE

s

conduct

ed

A t

ota

l of

53 e

xch

ange

vis

its

org

aniz

ed in

A

FP

w

her

e 6

50

LE

s par

tici

pat

ed

Pro

gre

ss m

onit

ori

ng f

or

conti

nuous

imp

rov

emen

t an

d d

evel

op

men

t o

f

par

tici

pat

ory

monit

ori

ng s

yst

em

Par

tici

pat

ory

monit

ori

ng s

yst

em

is

esta

bli

shed

in 1

20 F

FS

for

3650

Ad

ivas

i h

ou

seh

old

s in

vo

lved

in

th

e

pro

ject

to

mo

nit

or

the

chan

ges

in

thei

r li

vel

ihood

Par

tici

pat

ory

monit

ori

ng

syst

em

is

esta

bli

shed

in

the

pro

ject

are

a fo

r 3650 A

div

asi

ho

use

ho

lds

to

mo

nit

or

the

chan

ges

in

th

eir

livel

ihood

Impac

t st

udy f

or

eval

uat

ing t

he

chan

ges

of

liv

elih

oo

d i

nd

icat

ors

(P

roje

ct b

enef

icia

ries

-

433

and

Non-p

roje

ct b

enef

icia

ry -

15

0)

Imp

act

stu

dy

of

20

08

co

mp

lete

d a

nd

bas

elin

e re

port

pre

par

ed

Acc

ord

ing

to

th

reco

mm

endat

ion

of

RO

M

mis

sion

2008

surv

ey

is

not

con

du

cted

. R

esu

lts

of

the

surv

ey

2007

(bas

e li

ne)

is

pre

par

ed.

To s

how

th

e im

pac

t

surv

ey

wil

l be

conduct

ed

agai

n o

n 2

009

.

e

Act

ion

res

earc

h o

n t

ech

no

log

ies

and

ente

rpri

se d

evel

op

men

t

5 a

ctio

n r

esea

rch c

om

ple

ted a

nd 7

new

act

ion r

esea

rch s

tart

ed

5

acti

on

rese

arch

st

arte

d

in

20

07

co

mp

lete

d.

2 n

ew a

ctio

n

rese

arch

st

arte

d.

5

acti

on

rese

arch

pro

po

sal

dev

elo

ped

5

new

ac

tio

n

rese

arch

n

ot

yet

sta

rted

To

star

t 5

new

ac

tion

rese

arch

by

Feb

ruar

y 2

00

9

Ref

inem

ent

of

pro

ven

tec

hn

olo

gie

s 6

Gu

idel

ines

Man

ual

dev

elo

ped

bas

ed o

n a

ctio

n r

esea

rch

6 G

uid

elin

es M

anu

al

dev

elo

ped

bas

ed o

n a

ctio

n

rese

arch

Wo

rksh

op

to

del

iver

res

earc

h o

utc

om

e as

par

t o

f co

mm

un

icat

ion s

trat

egie

s

1 n

atio

nal

lev

el

2

reg

ion

al

lev

el

wo

rksh

op

org

aniz

ed

Publi

sh r

elev

ant

com

munic

atio

n p

rodu

cts

1 p

oli

cy b

rief

an

d 1

pro

ject

bri

ef

1 p

oli

cy b

rief

, 1 p

roje

ct b

rief

and 1

post

er i

s under

pre

par

atio

n

Pu

bli

sh p

eer

rev

iew

ed j

ou

rnal

art

icle

s 2 a

rtic

les

subm

itte

d i

n p

eer

revie

wed

jou

rnal

bas

ed o

n a

ctio

n r

esea

rch

2

arti

cles

ar

e now

under

pre

par

atio

n

for

pee

r re

vie

w

sub

mis

sio

n

20

Page 27: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

21

LLoo gg

ff rraa mm

eeaa cc

tt iivv ii

tt iiee ss

AAcc tt

ii vvii tt

ii eess

ppll aa

nnnn

ee ddff oo

rrtt hh

eerr ee

ppoo rr

tt iinn

ggpp

ee rrii oo

ddPP

rr oogg rr

ee ssss

aa ggaa ii

nnss tt

ppll aa

nnnn

ee ddaa cc

tt iivv ii

tt iiee ss

VVaa rr

ii aann

cc ee(( ii

ffaa nn

yy ))ww

ii tthh

rr eeaa ss

oo nnss

AAcc tt

ii oonn

tt oobb

eett aa

kkee nn

Str

ateg

ies

to d

isse

min

ate

and a

dopti

on o

f

tech

nolo

gie

s by s

econdar

y a

dopte

rs

Tota

l 3000 h

ouse

hold

s w

ill

adopt

and

ben

efit

s as

sec

on

dar

y

ado

pte

rs

73

sta

ffs

of

22

NG

Os

and

64

staf

fs

of

Car

itas

3

p

rog

ram

s

(IC

DP

, D

EE

DS

, G

DP

) w

ho

are

alre

ady w

ork

ing w

ith th

e

Adiv

asi

com

munit

ies

wer

e

trai

ned

to

dis

sem

inat

e th

e

tech

nolo

gie

s to

3000 A

div

asi

ho

use

ho

lds

Tra

inin

g o

f T

rain

ers

3 f

oll

ow

up t

rain

ing c

onduct

ed

3 t

rain

ing

wo

rksh

op

org

aniz

ed

Pro

ject

coord

inat

ion

mee

tin

g h

eld

on

sch

edu

le

6 p

roje

ct c

oo

rdin

atio

n m

eeti

ng

hel

d

6 m

on

thly

pro

ject

co

ord

inat

ion

mee

tin

g h

eld

in

du

e ti

me.

Page 28: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

Annex 3: Name of the NGOs participates and Caritas programs participate in the spread strategy workshop Ngo Name Region No of participants

Socio-Economic Rural Advancement

Association-SERAA Northern

3

Sabalumby Unnayan Samity (SUS), Netrakona

Northern

4

Eventful Bangladesh Society

Northern

1

Hazong Matha Rashmoni Kallayan Parishod-

HMRKP Northern

2

Social Economic Development Organization-

SEDO Northern

5

Association for Socio-economic Advancement

Bangladesh-ASEAB Northern

3

Garo Baptist Convention-GBC

Northern

7

Social Progress Services-SPS

Northern

3

SHOURAB-Samaj Kallayan Sangstha

Northern

3

Unnayan Sangha

Northern

2

Habitat Bangladesh

Northern

1

Primary Health Care Project-PHCP

Northern

2

SUSTAIN

Northwest 6

Christian Commission Development in

Bangladesh Northwest 4

World Vision, Bangladesh

Northwest 4

RDRS, Bangladesh

Northwest 3

ASHRAI

Northwest 4

Gram Bikash Kendra

Northwest 2

Bangladesh Northern Evangelic Lutharian

Church Northwest 4

Panchbibi Upazila Adivasi Multipurpose

Development Organization (PUAMDO) Northwest 5

Samaj Unnayan Proshikhon Kendra

Northwest 3

Uttara Development Program Society Northwest 2

Integrated Community Development Project

(ICDP) / Caritas Bangladesh Northern 17

22

Page 29: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

23

Ngo Name Region No of participants

Development Extension Education Services

(DEEDS) / Caritas Bangladesh

Northern 13

Gender Development Project (GDP) / Caritas

Bangladesh Northern 2

Integrated Community Development Project

(ICDP) / Caritas Bangladesh Northwest 23

Development Extension Education Services

(DEEDS) / Caritas Bangladesh Northwest 9

Page 30: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

Ann

ex 4

. Exp

endi

ture

of

Adi

vasi

Fis

heri

es P

roje

ct 2

008

Des

crip

tion

of

Exp

ense

s B

udge

t 20

08

Act

ual E

xpen

ditu

re 2

008

1. H

uman

Res

ourc

es

Uni

t#

of U

nit

Uni

t ra

te

(E

UR

O)

Cos

t (E

UR

O)

# of

Uni

t U

nit

rate

(E

UR

O)

Cos

t (E

UR

O)

1.1

Sal

arie

s (g

ross

am

ou

nts

, lo

cal

staf

f)4 -

Wo

rld

Fis

h C

ente

r

1

.1.1

Reg

ion

al P

ort

foli

o D

irec

tor

(10

% F

TE

) M

an-m

on

th

1.2

1

00

31

12

03

7

1.2

1

1,7

11

.4

14

05

4

1

.1.2

Pro

ject

Co

ord

inat

or

(1)

(70%

FT

E)

Man

-mo

nth

9

14

28

1

28

52

9

1,3

35

.2

12

01

7

1

.1.3

Ad

min

istr

atio

n M

anag

er (

25%

FT

E)

Man

-mo

nth

3

92

3

27

69

5

63

1.8

2

84

3

1

.1.4

. P

ort

foli

o A

sso

ciat

e (2

5%

FT

E)

Man

-mo

nth

3

74

5

22

35

5

35

9.8

1

61

9

1

.1.5

Acc

ou

nta

nt

(25

% F

TE

) M

an-m

on

th

36

19

1

85

7

54

13

.1

18

59

1

.1.6

Res

earc

h A

sso

ciat

e (1

) (9

4%

FT

E)

Man

-mo

nth

1

21

15

8

13

89

6

12

1,1

40

.2

13

68

2

1

.1.7

Res

earc

h A

ssis

tan

ts (

4)

Man

-mo

nth

4

83

87

18

57

6

48

34

4.1

1

65

19

1

.1.8

Dat

a A

nal

yst

(1)

Man

-mo

nth

1

24

24

5

08

8

12

36

2.2

4

34

6

1

.1.9

Dri

ver

(1

) M

an-m

on

th

12

223

2

676

1

22

20

.8

2649

1

.1.1

0 M

esse

ng

er (

1)

Man

-mo

nth

1

21

79

2

148

1

21

69

.7

2036

1.2

Sal

arie

s (g

ross

am

ou

nts

fo

r p

artn

ers

-(C

arit

as&

BF

RF

)

1

.2.1

Dev

elo

pm

ent

Dir

ecto

r (1

0%

FT

E)

Man

-mo

nth

1

.2

86

0

10

32

1

.2

81

5.1

9

78

1

.2.2

Dir

ecto

r o

f F

ish

erie

s (2

5%

FT

E)

Man

-mo

nth

3

71

9

21

57

3

74

7.6

2

24

3

1

.2.3

Pro

ject

Tec

hn

ical

Co

ord

inat

or

M

an-m

on

th

12

30

4

36

48

1

23

12

.2

37

46

1

.2.4

Pro

ject

Off

icer

M

an-m

on

th

12

308

3

696

1

22

96

.8

3562

1

.2.5

Acc

ou

nts

Off

icer

(2

5%

FT

E)

Man

-mo

nth

3

39

1

11

73

3

38

1.7

1

14

5

1

.2.6

Fie

ld O

ffic

ers/

JPO

-2

(re

gio

nal

lev

el)

Man

-mo

nth

2

42

09

5

01

6

24

19

9.8

4

79

5

1

.2.7

Fie

ld A

ssis

tan

ts -

18

(fi

eld

lev

el)

Man

-mo

nth

2

16

1

42

3

06

72

2

16

1

37

.6

29

72

0

1

.2.8

BF

RF

Coord

inat

or

(25%

FT

E)

Man

-month

3

900

2700

3

982.8

2948

1

.3.9

BF

RF

Pro

ject

Man

ager

(25

% F

TE

) M

an-m

on

th

33

00

9

00

3

32

7.0

9

81

1.3

Per

die

ms

for

mis

sio

ns/

trav

el5

1

.3.1

Ab

road

(st

aff

assi

gn

ed t

o t

he

Act

ion

)

1

.3.2

Lo

cal

(Wo

rld

Fis

h s

taff

) P

er d

iem

3

00

2

57

50

0

78

5

12

.7

10

00

1

1

.3.3

Lo

cal

(Car

itas

an

d B

FR

F s

taff

) P

er d

iem

1

10

0

10

11

00

0

89

4

3.1

2

77

1

1

.3.4

Wo

rksh

op

s/m

eeti

ng

par

tici

pan

ts

Per

die

m

25

9

30

77

70

2

33

2

5.3

5

88

6

Subt

otal

Hum

an R

esou

rces

1513

98

1404

01

2. T

rave

l6

2.1

. In

tern

atio

nal

tra

vel

(ai

r)

2.2

Do

mes

tic

trav

el (

air)

24

Page 31: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

Ann

ex 4

. Exp

endi

ture

of

Adi

vasi

Fis

heri

es P

roje

ct 2

008

(con

td.)

Bud

get

2008

A

ctua

l Exp

endi

ture

200

8 D

escr

ipti

on o

f E

xpen

ses

Uni

t#

of U

nit

Uni

t ra

te

(E

UR

O)

Cos

t (E

UR

O)

# of

Uni

t U

nit

rate

(EU

RO

) C

ost

(EU

RO

)

2.2

.1 D

hak

a-D

inaj

pu

r-D

hak

a (r

ou

nd

) P

er f

lig

ht

2

.2.2

Lo

cal

tran

spo

rtat

ion

2

.2.2

.1 I

nte

r d

istr

icts

(tr

ain

/bu

s)

Per

mo

nth

9

50

1

51

42

50

6

96

7

.3

50

81

2

.2.2

.2 I

ntr

a d

istr

ict

(tax

i)

Per

mo

nth

9

50

1

51

42

50

3

28

2

.0

66

3

Subt

otal

Tra

vel

28,5

00

5,74

4 3.

Equ

ipm

ent

and

supp

lies7

3

.1 R

ent

of

veh

icle

s

Per

veh

cile

4

02

50

1

00

00

4

12

52

.9

10

36

9

3

.1.1

Purc

has

e o

f m

oto

rby

kes

P

er v

ehci

le

41

80

0

72

00

3.2

Fu

rnit

ure

, co

mp

ute

r eq

uip

men

t

3

.2.1

Furn

iture

for

fiel

d o

ffic

es (

tab

le,

chai

rs, fi

le c

abin

et)

Nu

mb

er

10

1

80

1

80

0

3

.2.2

Co

mp

ute

rs w

ith

acc

esso

ries

Nu

mb

er

2

15

00

3

00

0

8

10

0.3

8

02

3.3

Mac

hin

e, t

oo

ls

3.4

Sp

are

par

ts/e

qu

ipm

ent

for

mac

hin

es,

too

ls

3

.4.1

. C

om

pute

rs,

furn

iture

, eq

uip

men

ts a

nd

mo

torb

yk

es

Nu

mb

er

65

25

0

16

25

0

89

11

0.7

9

85

4

3.5

Oth

er (

ple

ase

spec

ify

)

3

.5.1

Wo

rksh

op

mat

eria

ls

Nu

mb

er

38

3

15

57

50

2

01

8

.1

16

18

Subt

otal

Equ

ipm

ent

and

supp

lies

44,0

00

22,6

44

4. L

ocal

off

ice

4.1

Veh

icle

cost

s (f

uel

) P

er m

on

th

12

35

0

42

00

1

24

24

.1

50

89

4.2

Off

ice

ren

t

4

.2.1

Ren

t of

ven

ues

for

work

sho

ps

Per

mo

nth

1

11

200

1

320

0

64

56

.0

2736

4.2

.2 L

oca

l an

d C

entr

al O

ffic

e re

nt

P

er m

on

th

12

60

0

72

00

1

24

79

.3

57

51

4.3

Co

nsu

mab

les

- o

ffic

e su

pp

lies

P

er m

on

th

15

10

00

1

50

00

1

21

,18

4.7

1

42

16

4.4

Oth

er s

erv

ices

(te

l/fa

x,

elec

tric

ity

/hea

tin

g,

mai

nte

nan

ce)

Per

mo

nth

1

28

00

1

12

50

1

21

,13

6.5

1

36

38

Subt

otal

Loc

al o

ffic

e 50

,850

41

,430

5.

Oth

er c

osts

, ser

vice

s8

5.1

Pub

lica

tio

ns/

Co

mm

un

cati

on

s

5

.1.1

Po

licy

bri

ef

Nu

mb

er

100

1

01

000

5

.1.2

Bro

chu

res

Nu

mb

er

16

0

10

16

00

25

Page 32: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

Ann

ex 4

. Exp

endi

ture

of

Adi

vasi

Fis

heri

es P

roje

ct 2

008

(con

td.)

Bud

get

2008

A

ctua

l Exp

endi

ture

200

8 D

escr

ipti

on o

f E

xpen

ses

Uni

t#

of U

nit

Uni

t ra

te

(E

UR

O)

Cos

t (E

UR

O)

# of

Uni

t U

nit

rate

(EU

RO

) C

ost

(EU

RO

)

5.1

.3 L

eafl

et

Nu

mb

er

20

0

10

20

00

5

.1.4

Far

mer

Fie

ld S

cho

ol

(FF

S)

man

ual

N

um

ber

2

3

24

5

63

3

1

59

.7

47

9

5.2

Stu

die

s, r

esea

rch

9

5

.2.1

Act

ion

res

earc

h

Nu

mb

er

10

33

00

3

30

00

7

4,6

23

.2

32

36

2

5.3

Au

dit

ing

co

sts

Nu

mb

er

37

50

5.4

Eval

uat

ion c

ost

s

5

.4.1

Im

pac

t st

ud

y a

nd

ev

alu

atio

n o

f th

e p

roje

ct

Nu

mb

er

14

75

0

47

50

1

3,4

22

.4

34

22

5.5

Tra

nsl

atio

n,

inte

rpre

ters

5.6

Fin

anci

al s

erv

ices

(b

ank

gu

aran

tee

cost

s et

c.)

Nu

mb

er

0.5

5

00

2

50

1

83

3.0

8

00

5.7

Co

sts

of

con

fere

nce

s/se

min

ars

5

.7.1

Work

shop f

acil

itat

ors

P

er d

ay

60

1

00

6

00

0

69

2

8.6

1

97

5

5

.7.2

Tra

inin

g f

acil

itat

ors

P

er d

ay

55

1

00

5

50

0

12

1

31

.4

37

99

5

.7.3

Res

ourc

e per

sons

from

DO

F/B

FR

I fo

r re

fres

her

cours

eP

er d

ay

60

100

6

000

3

21

0.9

3

50

5

.7.4

Work

shop f

acil

itie

s P

er d

ay

6

15

00

9

00

0

34

2

09

.4

71

20

5.8

V

isib

ilit

y a

ctio

ns

5

.8.1

Ex

chan

ge

vis

it b

etw

een

ben

efic

iari

es g

rou

ps

Gro

up

s 7

01

00

7

00

0

53

93

.0

49

32

5

.8.2

New

spap

er a

dv

erti

sem

ent

Nu

mb

er

63

00

1

80

0

14

06

.6

40

7

5

.8.3

Web

site

ho

stin

g a

nd

mai

nte

nan

ce

Nu

mb

er

71

50

1

05

0

Subt

otal

Oth

er c

osts

, ser

vice

s 83

,263

55

,647

6.

Oth

er

6

.1 D

evel

op

men

t o

f h

om

este

ad p

on

ds

and

ric

e fi

eld

s

6

.1.1

Pond r

eno

vat

ion

N

um

ber

6

.1.2

Ric

e fi

eld

s re

no

vat

ion

s N

um

ber

6

.1.3

Net

fo

r fi

shin

g g

rou

ps

N

um

ber

6

.1.4

Cag

e fo

r fi

ng

erli

ng

s p

rod

uct

ion

N

um

ber

6

.1.5

Hab

itan

t re

sto

rati

on

N

um

ber

6

.2 I

np

ut

cost

s

6

.2.1

Pon

d m

anag

emen

t

Nu

mb

er

6

.2.2

Ric

e fi

eld

s m

anag

emen

t

Nu

mb

er

6

.2.3

Hap

a

Nu

mb

er

6

.2.4

Cap

ital

fo

r fr

y a

nd

fo

od

fish

tra

der

s N

um

ber

6

.2.5

Cag

e m

ater

ials

N

um

ber

26

Page 33: Fisheries and Aquaculture Enterprise Development for the ... · initiatives are taken to ensure that many Adivasi households who are lacking the resources for ... capacity building

27

Ann

ex 4

. Exp

endi

ture

of

Adi

vasi

Fis

heri

es p

roje

ct 2

008

(con

td.)

Bud

get

2008

A

ctua

l Exp

endi

ture

200

8 D

escr

ipti

on o

f E

xpen

ses

Uni

t#

of U

nit

Uni

t ra

te

(E

UR

O)

Cos

t (E

UR

O)

# of

Uni

t U

nit

rate

(EU

RO

) C

ost

(EU

RO

)

6.2

.6 R

evo

lvin

g f

un

ds

(12

0 F

FS

gro

up

s)

Nu

mb

er

12

07

08

40

0

6

.2.7

Tra

inin

g o

f F

ield

Ass

ista

nts

& R

esea

rch

Ass

ista

nts

N

um

ber

4

05

02

00

0

6

.2.8

Tra

inin

g o

f F

FS

mem

ber

s (1

20

gro

up

s)

Nu

mb

er

12

0

50

60

00

1

20

3

9.8

4

77

4

6

.2.9

LE

's m

eeti

ng

s G

rou

ps

70

10

0

70

00

6

21

00

.1

62

09

Subt

otal

Oth

er

23,4

00

10,9

82

7. S

ubto

tal d

irec

t el

igib

le c

osts

of

the

Act

ion

(1-6

)

38

1,41

1 27

6,84

9 8

. P

rov

isio

n f

or

con

tin

gen

cy r

eser

ve

(max

imu

m 5

% o

f 7

,

subto

tal

of

dir

ect

elig

ible

cost

s of

the

Act

ion)

1

90

71

9. T

otal

dir

ect

elig

ible

cos

ts o

f th

e A

ctio

n (7

+ 8

) 40

0,48

2

276,

849

10

. A

dm

inis

trat

ive

cost

s (m

axim

um

7%

of

9,

tota

l dir

ect

elig

ible

cost

s of

the

Act

ion)

2

80

34

1

93

79

11. T

otal

elig

ible

cos

ts (

9+10

) 42

8,51

6

296,

228