Fish Processing Plant Environmental Effects Report for Huon Valley Seafoods Pty Ltd at 49 Wilmot Rd, HUONVILLE May 2010

Transcript of Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are...

Page 1: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Fish Processing Plant

Environmental Effects Report

for Huon Valley Seafoods Pty Ltd

at 49 Wilmot Rd, HUONVILLE

May 2010

Page 2: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 2

Contact Details for Environmental Effects Report:

Ambrose Coad & Stephen Oates

49 Wilmot Road, Huonville

TAS 7109

03 6264 1700

[email protected]

C Cover page photo: Photo of

Refer to this report as: SEAM; 2010. Fish Processing Plant Environmental Effects Report. Huon Valley Seafoods Pty Ltd

(version 5 - May 2010)

Sustainable Environmental Assessment and Management [SEAM] 1

PO Box 2064, Lower Sandy Bay 7005

160 New Town Rd, NEW TOWN 7008

Mobile 0419 330 686 Phone (03) 6228 1600 Fax 6228 1700

Email [email protected]

1 SEAM is an environmental consultancy service specialising in a range of environmental management services including environmental assessments and environmental management plans for new and

existing developments. An aspect of the work is to strive for sustainable management of our resources.

Page 3: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 3

SUMMARY

This Environmental Effects Report (EER) has been prepared to provide supporting

information to the Board of the Environment Protection Authority under Section 27 of the Environmental Management and Pollution Control Act 1994. The Huon Valley

Council have advised that the current approved use of the site is Light Industry and

that no planning approval would be required for the proposed increase in production

to 3000 tonnes per annum, subject to the operating hours remaining at 7am to 7pm

Monday to Saturday.

The following parameters form the basis of the development:

a maximum of approximately 3,000 tonnes per annum of fish will be processed;

and

products will mainly consist of marine farmed salmon, and other fish products on

a much smaller scale (E.g. shell fish, trawl fish and fish harvested on a seasonal

basis. Salmon from Macquarie Harbour will not be processed at this facility.

The key environmental management issues and recommended measures to mitigate

impacts are listed:

1. The operations will continue to focus on dry, clean up of any fish waste and

diligent attention to management of floor drains to minimise any solids to the

sewer.

2. Wastewater will be disposed of to the existing sewage connection within the

premises. Discharge levels will not exceed any trade waste agreement.

3. Solid fish waste will be taken off site by Veolia to the existing fish meal plant at

Triabunna. Solid fish waste will be stored in marked crates in a coolroom and

held for not greater than 48 hours.

4. Odour management is linked to attention to good house keeping. Good

housekeeping will continue to be a feature of the fish processing operations by

Huon Valley Seafoods.

5. Noise management will be managed in accordance with recommendations of a

specialist noise report prepared for the site.

Page 4: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 4

CONTENTS

SUMMARY ...................................................................................................... 3

FOREWORD .................................................................................................... 7

PART A - PROPONENT INFORMATION ........................................................ 8

Operator and Tennant ............................................................................................................ 8

Building Owner .................................................................................................................... 8

PART B - PROJECT DESCRIPTION ............................................................ 10

Description of Project ......................................................................................................... 10 Project Timetable ................................................................................................................ 14

Project Area & Site Plan ..................................................................................................... 15 Statutory Approvals ............................................................................................................ 15

PART C - POTENTIAL ENVIRONMENTAL EFFECTS.................................. 16

1. Flora and Fauna............................................................................................................... 16

2. Rivers, creeks, wetlands & estuaries ................................................................................ 16

3. Significant Areas ............................................................................................................. 16

4. Coastal Zone ................................................................................................................... 16

5. Marine Areas .................................................................................................................. 17

6. Air Emissions (includes odour) ........................................................................................ 17

7. Wastewater Management................................................................................................. 18

8. Solid Waste Management ................................................................................................ 23

9. Noise .............................................................................................................................. 24

10. Transport Impacts.......................................................................................................... 26

11. Other off Site Impacts ................................................................................................... 26

12. Dangerous Goods and Chemicals ................................................................................... 27

Page 5: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 5

13. Site Contamination ........................................................................................................ 28

14. Cultural & Aboriginal Heritage...................................................................................... 28

15. Sites of High Public Interest .......................................................................................... 28

16. Rehabilitation ................................................................................................................ 28

17. Council Information Requirements ................................................................................ 28

18. External Risks ............................................................................................................... 28

19. Public Health................................................................................................................. 29

20. Sustainability ................................................................................................................ 30

21. Monitoring & Review.................................................................................................... 30

22. Responsibilities ............................................................................................................. 32

PART D - ENVIRONMENTAL MANAGEMENT COMMITMENTS ................. 34

PART E - CONSULTATION PROCESS ........................................................ 37

REFERENCES .............................................................................................. 38

APPENDIX A - RELEVANT STATUTORY APPROVALS .............................. 39

APPENDIX B – NOISE MEASUREMENTS AND ANALYSIS ........................ 45

APPENDIX C – HUON VALLEY COUNCIL ADVICE ON DEVELOPMENT APPLICATION ............................................................................................... 61

Page 6: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 6

LIST OF FIGURES

1. Aerial photo of Site

2. Location Plan

3. Site Plan

4. Flow chart of Fish Processing Operations

6. Vegetation

7. Drainage Plan – Wastewater and Stormwater

List of Tables

Table 1 Proposed Timetable

Table 2 List of Statutory Approvals Held by Huon Valley Seafoods

Table 3 Refrigerant Gases

Table 4 List of Potential External Risks

Page 7: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 7

FOREWORD

Huon Valley Seafoods (HVS) has operated since September 2000 as a major processor of

Atlantic Salmon for both Spring Smoked Seafoods and Huon Aquaculture at their Port Huon

site.

In May 2008 the premises at Port Huon was sold to Huon Aquaculture and Huon Valley

Seafoods moved to the current premises at 49 Wilmot Rd Huonville. The premises was originally set up as a fruit processing plant and then in 1995 it was taken over by Osprey

Seafoods Pty Ltd for processing abalone.

Additional to this HVS has been a major supplier of other services to industry within the

Huon area including cold storage, blast freezing and ice production. The company has been

handling and freezing apples, fish heads and frames for pet food, apple juice and Atlantic

Salmon.

Following the sale of the Port Huon site most of these services have been carried out at the

current HVS site at 49 Wilmot Road, Huonville, which has included handling up to 3000 tonnes of product annually. This has all been under the above services of freezing, handling

and storage.

Loss of HVS customers has meant a reduction in work at the site. Therefore HVS is now looking to cover this loss by the expansion of the processing side from the current Level 1 of

100 tonnes of processing to approximately 3000 tonnes per annum. This requires HVS to

move to a Level 2A or 2B permit under the Environmental Management & Pollution Control Act 1994. The class of assessment as to 2A or 2B has to be determined by the Director of the

EPA.

Page 8: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 8

PART A - PROPONENT INFORMATION

Operator and Tennant

Huon Valley Seafoods Pty Ltd 49 Wilmot Rd, Huonville Tasmania 7109

03 62641700

ABN 41 094 760 246

Building Owner

Huon Valley Seafoods Pty Ltd 49 Wilmot Rd, Huonville

Tasmania 7109

03 62641700

ABN 41 094 760 246

Page 9: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

9

Figure 1 - Aerial

photo of Site

Page 10: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010

10

PART B - PROJECT DESCRIPTION

1. Description of Project

An EER is required as Huon Valley Seafoods (HVS) intend to extend their operations

from freezing and packing of fish and a small amount of processing of fish to contract

processing of salmon and other fish products to a maximum of approximately 3,000

tonnes per annum of fish. The EER aims to provide assessment and management of

any potential environmental impacts as a result of the addition of contract processing

of fish at the factory.

The following form the basis of the application:

the amount to be processed is approximately 3,000 tonnes per annum, and

products will consist mostly of marine farmed salmon, shellfish, trawl fish and

other fish harvested on a seasonal basis.

The property is situated at 49 Wilmot Road Huonville (see Figure 1). The area is

Light Industrial with several other businesses surrounding the premises as well as

several dwellings located at the front of the premises on Wilmot Rd.

A Location Plan is shown in Figure 2.

The existing factory layout which will not change in the short term as shown in

Figure 3. It is noted that a proposed freezer extension has already been approved by

the Huon Valley Council and this project will proceed in the next financial year.

The steps in the processing of fish and fish products are outlined in Figure 4. Fish

will be delivered to the factory by truck and unloaded to cool storage by a forklift.

Fish will usually arrive in sufficient time for processing so as to be ready for delivery

to market by the next morning. The business will continue to operate between 7am

and 7 pm Monday to Saturday

The fish will be processed in modern stainless steel equipment and stored on ice for

transport to market. The fish to be processed will be mainly Atlantic Salmon from

local fish farms. There will be no processing of fish from Macquarie Harbour. Fish

will be placed in a blast freezer or one of several coolrooms and be loaded into trucks

and transported to market.

The site infrastructure will include existing factory facilities and an approved but yet

to be constructed cool store on the south-west site boundary. The new cool store will

also reduce any operational noise (See later section of Noise Management).

Page 11: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 11

Figure 2 - Location Plan

Huon Valley

Seafoods

Page 12: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 12

Figure 3 - Site Plan

Page 13: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 13

Figure 4 - General Process Flow Diagram for Seafood Processing Operations

Page 14: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 14

Project Timetable

Months ending

Activity 30/4/10 21/5/10 30/6/10 Post

1/7/10

Consultation with all relevant agencies

Planning Application

determined by Council and EER to Environment Division

Commence contract processing

Issue of permit for 10/11

Table 1 – Proposed Timetable

Due to the fact that this is an existing operation the timeframe and assessment process

will hopefully tie in with the commencement of the contract pack date of 30 June

2010 2.

2 Up to 30 June 2010 the amount of fish to be processed will be less than 100 tonnes

per annum.

Page 15: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 15

2. Project Area & Site Plan

Statutory Approvals Huon Valley Seafoods Pty Ltd currently operates under an Australian Quarantine Inspection

Services rating of an “A” Establishment and intends to continue this top rating standard of

processing. It has the following approvals at its Huonville operations:

LEGISLATION PERMIT JURISDICATION

Export Control Act 1982 Certificate of Registration of an Export Registered Establishment – Registration

# 26

Australian Quarantine Inspection Service of

Department of Agriculture

Fisheries and Forestry

Export Control (Fish and

Fish Products ) Orders 2005

Approval of the Delegate of an

Approved Arrangement

Australian Quarantine

Inspection Service of Department of Agriculture

Fisheries and Forestry

Fisheries Management Act

1991

Fish Receiver Permit # 2846 Australian Fisheries

Management Authority

Food Act 2003 Certificate of Registration of a Food

Business

Huon Valley Council

Living Marine Resources

Management Act 1995

Fish Processing Licence Department of Primary

Industries Water

Corporation Act 2001 Certificate of the Registration of a

Company

Australian Securities &

Investment Commission

Table 2 – List of Statutory Approvals held by Huon Valley Seafoods.

These permits are shown in Appendix A.

Page 16: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 16

PART C - POTENTIAL ENVIRONMENTAL

EFFECTS

This section describes how the operations are to be managed and operated so as to meet

satisfactory environmental performance standards. It is a statement of proposed service and

potential environmental impacts in the context of adding contract processing of fish to the existing fish storage and handling operations. The development does not require a

Development Application under the Land Use Planning and Approval Act 1993 as determined

by the Huon Valley Council (Appendix C). However as the amount of fish to be processed

will reach level of greater than 100 tonnes of products, an assessment is required by the Board of the Environment Protection Authority (EPA). It is anticipated that the EPA will issue an

environmental protection notice based on this EER for ongoing environmental regulation.

Huon Valley Seafoods Pty. Ltd. is committed to meeting and exceeding all contemporary

environmental standards. It meets its environmental duty and seeks to obtain a Level 2

approval under the Environmental Management and Pollution Control Act 1994 for the operations.

The EER is structured by listing the potential environmental impacts for each aspect, and then

evaluating the impacts and providing measures to mitigate any significant impacts.

1. Flora and Fauna The factory is located behind residential dwellings in Wilmot Road, Huonville and the

facilities cover the entire site, with no remaining vegetation apart from a small strip of lawn along the northern boundary. It is intended to landscape the northern perimeter of the site

with trees. The eastern permitter is already landscaped with a hedge and the southern

permitter boarder other Light Industrial activities (Red Shed Restorations and Total Auto Mechanics). The western permitter extends across open pasture to the Huon River some

250m away.

2. Rivers, creeks, wetlands & estuaries The site is 250m east of the Huon River. Stormwater is collected in the Council stormwater

management system and is discharged to the Huon River.

3. Significant Areas There are no significant reserves within 1 km of the factory. There are sports grounds on the other side of Wilmot Street and the Huonville High School is over 500m to the north also on

the eastern side of Wilmot Rd.

4. Coastal Zone The site is located 250 metres east of the Huon River. It has no coastal impacts.

Page 17: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 17

5. Marine Areas The site is not located in or near any Marine Areas.

6. Air Emissions (includes odour)

Air Emissions Potential Environmental Impacts The major sources of air emissions are:

odours from existing waste in contracted waste transport vehicles

fugitive odours from the fish on receival odours from the solid waste skip bins when being loaded to trucks

any rotten or putrid fish from the processing chain that may emanate from the factory

Factory Emissions Impact Evaluation The premises are positioned to minimise odours as it is surrounded by open space on all sides.

A car park is located at the factory front and provides a buffer zone to yards of three dwellings located on Wilmot Road. A large hedge screens the factory from these dwellings

The most effective way to minimise any odours is to ensure that fish waste is stored in the

coolroom and taken off site as soon as is practicable after processing operations. This measure ensures efficient processing operations and is a sound management practice. The

premises are run on mains electricity so there are no other air emissions.

Air Emissions Mitigation Measures Air emissions are to comply with the relevant provisions of the Environment Protection

Policy (Air Quality)3. The relevant section in the Schedule states that if the regulatory

authority is satisfied that an odour from an activity is likely to cause environmental harm or

an environmental nuisance, the authority should require that the odour emission from the

source not exceed the odour criteria specified in Schedule 3 at or beyond the boundary of the land on which the source is located. Schedule 3 of the policy states that odour emissions

should not exceed 2 odour units for one hour at modelled 99.9% ile concentration. This level

is unlikely to cause complaints from people with normal odour sensitivity.

HVS aims to ensure that nuisance odours will not be detected to any significant degree

beyond the boundary of the premises as determined by odour modelling. HVS will operate a

detection system for nuisance odours which includes checking for fugitive sources regularly.

Greenhouse Gases With respect to green house gas emissions, there is no prior measurement of greenhouse gas

emissions for the operations. The operations have relied on main electricity as well as slow

combustion engine or diesel vehicles and refrigerant units. There are a total of four refrigerant units as follows:

1 blast freezer

1 holding freezer

3 The Environment Protection Policy (Air Quality) 2004.

Page 18: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 18

2 small chillers

The refrigerant units use the following refrigerant gases.

Refrigerant Gases

404A / 507 a mixture of gases including tetrafluoroethane

Table 3 - Refrigerant Gases

Gas 404A is a relatively new refrigerant gas and it does not contain any ozone depleting substances. The usage will be R404A / 507. Therefore the emission of greenhouse gases is

considered to be negligible.

The units will be serviced by Kibbey and Cooper Refrigeration Pty Ltd

Another coolroom is proposed to be installed in the north west corner of the property. It is

also proposed to landscape the property boundaries so as to provide a visual and amenity

improvement to the premises.

7. Wastewater Management

Wastewater Potential Environmental Impacts The most significant potential environmental impact is if fish processing wastewater were to

seep into the stormwater system. However this is extremely unlikely as all drains in the factory drain to the sewer system.

Wastewater Impacts Evaluation Figure 5 shows the floor drainage system for the collection of wastewater at the factory. The

wastewater collection system for the facility has been designed based on state of the art fish

processing plants as originally set by for abalone processing. Essentially the system of management by HVS is based on a waste minimization approach where floor waste is

collected by a dry clean up with broom prior to any hosing down of the floors. In the factory

there are drainage catchpoints as shown in Figure 5.

The drains have a double stainless steel mesh with openings of approximately 5 mm.

Following this initial floor waste dry clean up, the floors are thoroughly cleaned by hosing, as

the factory has an existing concrete floor and drainage system. All floor waste drains to an existing septic tank estimated to be 2700 Litres. The tank is accessible and amenities waste

discharge into the system below the tank.

The existing 2700-litre tank has been installed to allow for the processing of bulky fish and if

there is a need to hold the solids. Solids will be removed as required. The wastewater drains

to Southern Water’s sewage system at Ranelagh. A permit to discharge trade waste to sewer will be obtained from Southern Water. The maximum amount of anticipated to be discharged

to sewer is 7.8 kL / day however processing will usually only occur 3 days per week and the

existing 2700-litre tank will buffer loads to the system.

Page 19: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 19

Fish wastewater from the proposed contract processing conducted monitoring of its

wastewater stream in 2009 as recommended and advised by Southern Water. Results are listed in the table below with an average for each parameters provided as well as the

Standards for Acceptance of Liquid Trade Waste to Sewer obtained from the Tasmanian

Plumbing Regulations. Those results that are above the recommended standard are shown as shaded.

Laboratory results of samples are attached at the end of this report.

Analyte Units Mean Standards for

acceptance of Liquid

Trade Waste to

Sewers

pH 6.5 6 - 10

Conductivity µS/cm 1499

TSS mg/L 707

Ammonia mg-N/L 1.95

100

Nitrogen T mg-N/L 130 150

Phosphorus T mg-P/L 11.4 50

Oil & Grease mg/L 171 200

BOD mgO2/L 1400 600

COD mgO2/L 3266 1500

MBAS mg/L <0.25 500

Table 4 - Results of Monitoring of Contract Fish processing Wastewater

It is apparent from the results that 2 parametres exceed the Plumbing Regulations for the

Biological Oxygen Demand and the Chemical Oxygen Demand. Obviously the wastewater from the fish processing operations will contain relatively high BOD due to some blood

entering the wastewater stream. It is proposed however that the contract processing of fish

will be managed by separating out congealed blood and conduct dry clean ups prior to hosing

down the premises. Wastewater will also be held in septic tanks so that the quantities of wastewater are managed.

Wastewater Mitigation Measures It is proposed that all solid matter shall be removed from the floors by sweeping prior to the

floors being thoroughly hosed into the drainage system.

The discharge of solid matter and pollutants in liquid waste shall be prevented by all practical

means including:

good housekeeping, provision of adequate containers to avoid loss to the floor the control of spillages by sweeping, brooming, shovelling, vacuum cleaning,

impoundment

Page 20: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 20

pumping out of sludgy wastes from the separation tank if necessary (capacity 2700 litres) which is on the sewer line

separating out congealed blood and conduct dry clean ups prior to hosing down the

premises

installation of further steel mesh in drainage points

To achieve this end HVS will have comprehensive operating instructions and thorough

training and supervision of employees and contractors on site. Cleaning schedules will be conducted in accordance with the Hygiene Cleaning program outlined below.

HVS has applied for a Trade Waste Agreement to Southern Water.

Stormwater will discharge to the Council storm water system which drains to the Huon River.

All process water will be chlorinated and readings taken once daily by the Production Manager. The readings will be recorded on the Daily Hygiene Report. A residual chlorine

level will be maintained.

Page 21: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 21

Figure 5 - Drainage Plan: Wastewater and Stormwater

Page 22: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 22

HYGIENE CLEANING PROGRAM

The Food Processing Accreditation Manual of HVS details the Hygiene Cleaning program as

follows: EQUIPMENT, TABLES AND APRONS

Hosed down and scrubbed with chlorofoam after each production day and rinsed thoroughly

with a high-pressure hose. FLOORS AND DRAINS

Cleaned daily after production, with a high-pressure hose and Hypochlorite. Steam cleaned at

end of each production run. WALLS

Cleaned daily, with high-pressure hose after production.

Scrubbed with cholrofoam and rinsed thoroughly with high-pressure hose when soiled.

Steam cleaned at the end of each production run. CEILINGS AND LIGHTS

Scrubbed and cleaned with chlorofoam when soiled.

LUNCHROOM, TOILETS AND AMENITIES

Cleaned daily, after production with chlorofoam.

Soap dispensers and paper towel dispensers checked daily.

EDIBLE PRODUCT CONTAINERS AND BINS

Rinsed, scrubbed with chlorofoam and rinsed thoroughly with high-pressure hose after each

production day.

INEDIBLE PRODUCT CONTAINERS (Black)

Rinsed, scrubbed with chlorofoam and rinsed thoroughly with high pressure hose daily after

each production day.

CHILLER

Scrubbed and cleaned with high-pressure hose and chlorofoam when empty, at least once per

week. Cleaned daily, with high-pressure water in vacant areas.

TRANSPORT BINS

Cleaned with high-pressure water, immediately after emptying.

Scrubbed when Soiled.

EXTERIOR

Concrete hosed with high-pressure water immediately after receival of product and at the end

of each production day. Exterior grounds and building maintained on a regular basis as

required.

Page 23: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 23

8. Solid Waste Management

Solid Waste Potential Environmental Impacts Solid wastes are generated throughout the process of fish manufacturing at the following sources:

fish heads, and gut from the filleting line

fish skins from the skinning line putrid or rotten fish

miscellaneous packaging, domestic and commercial waste

Discharge of solid matter and pollutants in liquid waste is and will continue to be prevented

by all practical means with:

good housekeeping

provision of adequate containers to avoid loss to the floor the control of spillages by sweeping, brooming, shovelling, vacuum cleaning

impoundment and pumping out of sludges and solid wastes and collected in a separation

tank (capacity 2700 litres) which is on site.

Solid Waste Impacts Evaluation All solid wastes are to be stored in separate trays and deposited to a skip bin for daily

removal.

All solid wastes handled within the premises shall be contained as far as practicable to

prevent spillage. All wastes stored at the premises shall be held in a leak proof container,

which shall be fitted with a weather proof and animal resistant cover. The cover shall be used

at all times when waste is held in the container. These containers will be clearly marked “waste product only”.

All solid waste will be removed from the premises only by contractors with a current Waste Transport Business Environment Protection Notice licence. It is proposed that Veolia or

another licensed waste transport business continue to take solid waste, as is currently done.

Solid Waste Mitigation Measures All solid waste will be removed to a refuse disposal site or rendering plant licensed and

approved in accordance with the EMPCA. All solid waste is intended to be removed from premises within 48 hours or as soon as is practicable after. It is proposed that Veolia take

solid waste to the Triabunna fish meal plant for processing and it is hoped that in the future

fish gut will also be reused. A contingency is for fish gut to be blast frozen and exported to Asia or failing this sent to George Town Seafoods for making to silage.

Page 24: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 24

9. Noise

Noise Potential Environmental Impacts The main source of noise from the proposed fish processing plant is the refrigeration units used to run the cool rooms. Figure 6 below shows the location of a blast freezer refrigerant

unit (NW of Factory) and three other refrigerant units (SW of factory).

Transport noise is generated from pan techs and other heavy vehicles associated with general industrial activities. Wilmot Road is a major arterial road for traffic travelling to Ranelagh.

Transport impacts are discussed in the next section on Traffic Movements.

The surrounding areas are not tranquil and have noise levels commensurate with a light

industrial area (Ambient back noise levels are at 49d (B)A).

Noise Impact Evaluation Noise emissions from the existing premises have not been a significant issue apart from a

complaint from a resident to the west of the premises in 2009. This noise has been subject to an investigation and report by Pearu Terts Noise Consultant (See Appendix B). Noise

monitoring was conducted on 2/3/09 and 12/5/09. The report was commissioned to identify

the source of any noise and as a consequence works were undertaken to reduce noise levels. It is reported that the house in question is double brick with ceiling insulation and the

windows appear to be the main noise conduit. The blast freezer operates for 24 hours stints

post harvest for various clients at different times of the year and was identified as the source

of the noise.

The property is located approximately 200m away and is by no means the closest neighbour

(there are three dwellings on the eastern side of the factory that front Wilmot Rd). There is also a Furniture Restorer, known as the Red Shed, located adjacent to the factory on the SW

of the site and an auto repairer next to it on Wilmot Rd adjacent to the driveway into HVS.

In summary this is a light industrial area with a commensurate ambient background noise levels and the proposed processing is not expected to lead to an increase in noise levels. The

statistical noise analysis indicated that the area is not tranquil. Rural areas are not usually

tranquil because of farming and associated activities. Wilmot Rd carries traffic including log trucks early in the morning can be heard with an average maximum noise level of 48 dB(A).

The night time noise of the plant according to Mr Terts is likely to be heard at 9 dB(A) less

that is 39 dB(A).

It was reported that the noise level is likely to be acceptable although marginally, because of

the presence of the tonal component which makes low level noises annoying.

The owner of the dwelling that was the subject to the noise complaint to the west has a

proposed subdivision before Council proposed on the south eastern side see Figure 6. Huon

Valley Seafoods has no objection to this subdivision provided that their rights to continue to operate their business is not jeopardised.

Page 25: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 25

Noise Mitigation Measures This issue is being addressed by HVS through the adoption of the recommendations of the

independent noise report. Some enclosures and dampening treatment has been undertaken on

the plant. HVS have also positioned some containers along the south west corner to mitigate the noise impacts. The results of these noise abatement measures has resulted in an ambient

operational noise level L90 = 56d(B)A (11am) and ambient operational noise level L90 =

47.5d(B)A (9.40pm).

The report provides further recommendation as listed below:

The acoustic integrity of the compressor room can be improved;

The plant could be made to be vibration isolated from the enclosing roof and walls

Provide an “acoustic boot” for the small square hole near the door and the an acoustic

noise barrier be installed around the roof mounted fan (i.e. an acoustically lined inner skin of perforated metal with sound absorbing material about 1.5m high)

Consider installing intelligent Reversing Beeper to any vehicles operating on site

(E.g. forklift trucks)

Instigate the practice of sliding material off trucks rather than dropping the material

onto the ground

HVS intend to adopt these practices in a staged approach. It is also proposed to install a

permanent coolroom in the south west corner (see Figures 3 and 6) as a further mitigation

measure. A program of screen plantings of native vegetation is also proposed for the site.

Of note is that HVS have excellent relations with the neighbouring houses and are in regular

communication about their operations. HVS understand any potential noise issues and have been willing to take steps to abate any noise concerns.

Figure 6 – Location of Development with potential Noise Generation points and nearest Noise

Receptors

Page 26: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 26

10. Transport Impacts The traffic movements to the factory have been ongoing since the plant was established over

10 years ago. Recent traffic movements over the last year as reported by HVS were:

Apple deliveries In - February to August three trucks per day into the factory 3 times

per day for 3 day as per week (subtotal = 252 movements)

Apple deliveries Out - February to August two 20 tonne trucks per month (subtotal =

14)

Fish Head and Frame deliveries In – one truck in per day and 2 trucks out per month

(subtotal = 240 + 24 = 264)

Frozen Fish Deliveries – November – April one truck in per day for 6 days per week

and one truck out per day 4 days week (subtotal = 240)

Total Truck movements with existing operations = 870 per annum

With the change to contract fish processing the following transport movements are

anticipated:

Frozen Fish Deliveries – November – April one truck in per day for 6 days per week

and one truck out per day 4 days week (subtotal = 240)

Contract Fish processing – 3 trucks in per week and 3 trucks out per week ( subtotal =

300

Total Truck movements with proposed operations = 540 per annum

Also contract fish processing will lead to more staff movements in their own cars

however the noise impact is not considered to be of the same level as truck noise impacts.

Fort lift trucks will continue to operate with loading and unloading.

Assumptions include breaks on Public Holidays and no processing on Sundays,

operations remain between 7 am and 7 pm

It therefore can be concluded that the transport movements for HVS will in act decrease

to 60% of current traffic movement with the proposed change to the addition on contract

fish processing.

11. Other off Site Impacts There are not considered to be any other impacts apart from those listed herein. The nearest dwellings are located at the front of the premises on Wilmot Road.

Page 27: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 27

12. Dangerous Goods and Chemicals

Hazardous Waste Potential Environmental Impacts Chemical Storage

The chemicals proposed to be stored on site include ezychlor (Sodium Hypochlorite) for

sterilizing the premises. It will be stored separately and handled under strict supervision of the Quality Control Officer. The quantity to be stored is five containers each of 25 litres.

Other chemicals used include:

Alcafoam CL (Foaming chlorinated detergent / sanitiser

Pur – hand 321B (Liquid hand cleaner) Pur-Chlor 127B (Bleach and Steriliser) installed in line

Sewer – Cide (Sewer Cleansing concentrate)

Refrigerant gases including a mixture of gases such as tetrafluoroethane

All chemicals are suitably labelled with warning of toxicity, and directions for use in the

premises. Generators will operate the coolrooms and there is some storage of petrochemical

oils for maintenance. MSD sheets are all held on site.

Hazardous Waste Impact Evaluation There will be very small quantities of hazardous wastes and there are considered to be very

minor environmental issue for this activity.

Hazardous Waste Mitigation Measures All chemicals are suitably labelled with warning of toxicity, and directions for use in the

premises. None of the hazardous materials stored on site requires a Dangerous Goods

Licence. Generators operate the coolrooms and there is some storage of petrochemical oils for

maintenance.

All chemicals, pesticides and poisons will be stored separately and handled under strict

supervision of QC Officer/Manager. All chemicals are to be suitably labelled with warnings of toxicity, and directions for use in premises.

The Manager is responsible for all cleaning programs and trains new personnel on correct cleaning procedures before commencing work.

Any bunding requirements shall be in accordance with the Dangerous Goods Regulations

1998 (Part 7, Section 44), AS 1940 (1993) and AS 3780 (1994). No Dangerous Goods licences are required. As a minimum, all bunding should be impervious to the materials

stored in the bunds and be able to contain at least 110% of the volume of the largest vessel

stored in the bund.

If there is a release of any hazardous material then the Manager will advise both the EPA

Director of Environmental Management and the Huon Valley Council. Containment and

bunding in accordance with the Material Safety Data Sheets will be followed so as to prevent any adverse impacts to the community surrounding the plant.

Page 28: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 28

13. Site Contamination Before being taken over by HVS, the site was used as an abalone canning (retort processing factory) and at one time a fruit processing factory. A full site history has not been undertaken

and the history of pesticide or other chemical storage is unknown. Therefore the site status

should reflect this history and prior to any future change of use to more sensitive use such as residential sue, a detailed site history should be undertaken. However the current and

proposed use will remain as light industrial therefore site contamination investigation is not

considered to be a necessary step with this development.

14. Cultural & Aboriginal Heritage The site has no known cultural or Aboriginal heritage values and the land is not listed on the

any heritage register.

15. Sites of High Public Interest There are no known sites of any high public interest. The premises are located in a light

industrial zone.

16. Rehabilitation The plant and equipment at the premises are all of standard operational condition. The

processing facilities are all stainless steel and there is an existing drainage system for an

existing factory. If the premises close, all portable equipment will be removed and the

premises vacated.

17. Council Information Requirements The premises are in the Huon Valley Light Industrial Zone and connected to both a reticulated sewer system and a reticulated water and storm water system (see Part 7 liquid effluent for

details). It is proposed to employ up to 30 staff. The premises will operate up to 6 days per

week between 7 am and 7 pm. .

18. External Risks HVS has an Emergency Plan for its Huonville premises. The table below lists the likely

emergency events and the mitigation measures to deal with such emergencies

ISSUE MITIGATION STRATEGY Power failure Stop processing, store all fish into coolrooms

and DO NOT OPEN COOLROOMS until power returns, on resumption of power

monitor fish in accordance with Food Safety

Standards

Public safety of premises Premises has an alarm system Table 4 – List of Potential External Risks

Page 29: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 29

19. Public Health The main public health issues are addressed under the following subheadings.

Fly Control If a problem with flies is discovered during a pre operation inspection a fogging knock down fly spray “Settling Day” will be used before production commences. A complete wash down

after fogging would be employed. The same format would be employed if during production

a fly problem existed. A complete clearance of product and the above format will be implemented.

Vermin Control Bait stations will be highlighted in yellow on an internal premises plan. Bait stations to be

clearly labelled “POISON” and are checked weekly by the Manager/QC Officer and recorded

on the Hygiene and Premises Report. HVS engage a reputable pest control firm to bait the premises once per month and report and check all the base stations.

Communicable Diseases HVS has adopted the following procedure with respect to communicable diseases:

No Person, while known or suspected to be suffering from, or to be a carrier of a disease

likely to be transmitted through processed food or while affected with infected wounds, skin infections, sores or diarrhoea, is permitted to work in any food handling area in the

capacity in which there is a likelihood of such a person directly or indirectly

contaminating food with pathogenic micro-organisms.

Any person so affected must immediately report their illness to management.

Injuries Any person who has a cut or wound must not continue to handle processed food or food

contact surfaces until the injury is completely protected by a water proof covering which is firmly secured, and which is conspicuous in colour.

Personal Cleanliness A person in a food handling area must maintain a high degree of personal cleanliness. A

person must not wear any jewellery when engaged in preparing processed food except sleeper

earrings and plain wedding rings.

A person must not wear fingernail varnish if handling food with bare hands.

A person must not engage in any behaviour which could result in contamination of processed

food, such as eating, smoking, chewing anything such as gum, sticks, tobacco or betel nuts, or

any other unhygienic behaviour in food handling areas.

A person who will be engaged in handling food must wash his or her hands at the following

times:

on entering the food handling area immediately after using the toilet

after touching the nose or mouth

after handling contaminated material whenever necessary to avoid contaminating the food in the area

Page 30: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 30

A person who will be engaged in handling food must wash and disinfect his or her hands

immediately after handling any material, which might be capable of transmitting disease.

Protective Clothing A person in a food handling area must at all times:

(a) wear suitable protective clothing and footwear

(b) wear a head-covering that encloses the hair (c) if medium or high risk food is prepared in the area and the person has a beard or

moustache, or both wear a head covering that encloses the scalp hair, and the beard or

moustache, or both; and (d) if the person is wearing gloves – ensure that the gloves are in a sound, clean and

sanitary condition

If a person wears disposable gloves or other disposable protective clothing in a food handling area, the gloves or other clothing must be discarded after use and must not be reused.

Protective clothing worn by a person in a food handling area must not have an outer breast pocket and must be light coloured; and either washable or disposable.

A person in a food handling area must keep protective clothing clean so as not to present a risk of contamination to the processed food.

Protective outer clothing (including footwear, overalls, aprons, headwear and gloves) used in

a food handling area must not be worn outside the establishment.

New and existing personnel are informed of the above hygiene requirements. All personnel

are supervised and trained by the Manager/QC Officer.

20. Sustainability HVS are committed to ensuring the operations meet sustainability principals as much as

possible. They will incorporate several key environmental initiatives including and not limited to:

The existence of a sealed car park with storm water collection points Installation of their own ice making facility and appropriate disinfection procedures

Compliance with full AQIS requirements for export of their product

Continued use of the existing 2700 septic tank as a tool for pre-treatment / capture of any sludgy waste generated

Landscaping and bordering with native plants and trees

21. Monitoring & Review Monitoring is to be conducted in two parts – quarantine and environmental.

As part of the quarantine requirements there will be a comprehensive program of monitoring

for the following aspects of the operations:

ice water chlorination

sanitation

Page 31: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 31

Ice is to be manufactured from potable standard water, which conforms to Export Control

(Processed Food) Orders – Schedule 2, 24.1. The water is to be sampled not less than

monthly during periods of operation, or more frequently if required. Samples are to be analysed at a NATA registered laboratory and records are to be retained on the premises.

AQIS regional office to be notified in writing by fax within 2 working days of receipt of the

results of examination of any sample of water / ice if it does not comply with the following

any E. coli per 100 ml more than 10 coliform organisations per 100 ml

any two consecutive samples containing 1 to 10 coliforms per 100 ml

any three samples containing 1 to 10 coliforms per 100 ml in any consecutive 12 month period

There is to be a chlorination program for processing water. All process water will be

chlorinated and readings taken once daily by the Production Manager. The readings are recorded on the Daily Hygiene Report. A residual chlorine level will be maintained.

HVS is to have a Listeria sampling and testing program. Listeria analysis results are to be kept on the premises and are to be available for inspection by authorised AQIS personnel.

Testing will be performed by a NATA registered laboratory.

Environmental monitoring will occur with respect to:

wastewater quality and quantity

odour audits

solid waste generation

Wastewater monitoring for quality and quantity will occur as part of a Trade Waste

Agreement with Southern Water. Compliance with water quality objectives of the sewage discharge is expected to be met. Parameters to be analysed will be:

pH

temperature Chemical Oxygen Demand

Biological Oxygen Demand

Total Suspended Solids

Floatable Oils and Grease Rate of Discharge

Odour audits (see section 6) are also proposed to be undertaken if there are any odour complaints.

HVS will review the Environmental Management Plan at an interval of between 3 and 5

years. Reviews should include a comparison of the actual operation versus any predictions with respect to solid waste, noise, odours, trade waste and hygiene made in this document.

All personnel are supervised and trained by the Manager/QC Officer.

Page 32: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 32

22. Responsibilities The standards of Personal hygiene are outlined below.

Dress Code It is a requirement that clean factory issue overalls or coats be worn in the processing areas at

all times.

These overalls or coats must be clean and kept in a hygienic condition. Street clothing is not allowed into processing areas. Overalls, dustcoats etc must be removed before leaving the

premises for the day. Items taken home for washing must not be worn home.

Anyone entering a processing area must wear clean approved gumboots. These can either be gumboots for process workers or leather ankle boots or approved shoes for other staff. No

other footwear is acceptable. Gumboots worn outside the factory must only be worn in transit

between the factor and amenities block. They must not be worn home e.g. off concreted

areas. All personnel entering a processing area must wear factory issue hat. These hats are either

bump hats or soft cloth hats for process workers. All loose hair should be tucked into the hat.

In addition all beards and moustaches must be covered. All hair clips or grips or hair bands must be contained inside the hat, or else removed from the

hair.

Used gloves must be disposed of correctly in the bins provided

Entering processing areas

All boots and gumboots must be sanitised by walking through the footbath positioned in the

main entrance to the processing area. All personnel must wash their hands upon entering and leaving the processing area.

Hands must be washed after going to the toilet - every time.

Street clothing Jackets, jumpers and all other street clothing are not allowed to be worn over overalls in

processing areas.

The top layer of clothing worn in processing areas must be dust/laboratory coat, and warm clothing or jackets should be under these overalls.

No jackets or jumpers are to be left in the processing area. They should be kept in the lockers

provided in the amenities.

Smoking Smoking is strictly forbidden in all processing areas, lunchroom, and fish receivable areas.

Eating

Eating food, including soft drink, and chewing of gum in the processing areas is strictly

forbidden.

Page 33: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 33

First aid dressings It is important that all cuts and sores are covered with an approved dressing and the dressing be covered with a fingerstall or waterproof glove if on the hands, and a sleeve cuff if on the

arms. These can be obtained from the first aid room as appropriate.

If any dressing should get lost during production, then the supervisor should be informed immediately so it can be retrieved.

Sleeves on clothing All personnel handling fish must either roll up their sleeves to above the elbow or wear

protective sleeve cuffs.

Watches

No watches of any sort are to be worn in the processing areas.

Jewellery Because of the serious risk of contamination of product, the wearing of jewellery in

processing areas is prohibited. The only exceptions to this are plain wedding bands.

However if a wedding band contains stones of any sort, then a glove must cover it. Bracelets, brooches, bangles, chains, earrings, nose studs etc., are not permitted.

Nail polish Because nail polish can chip off and some has been found in product which has caused

customer complaints, the wearing of nail polish is forbidden, except when covered by a glove,

at all times.

Wearing of aprons All process workers are required to wear approved aprons as issued and should be kept clean

at all times and always tied back. Personal issued aprons should be used at all times, no on else's.

Sickness Anyone showing symptoms of diarrhoea or vomiting must advise their supervisor or management immediately and go to the doctor for treatment. Under no circumstances must

anyone work in processing areas when they have the above symptoms, as we risk

contaminating product.

Drivers Truck drivers and forklift operators are to obey all safety requirements and to make sure their vehicle is cleaned inside and out at end of use

General All rubbish to be placed in containers provided. Anyone who works on processing lines must report to supervisor immediately any item is

found to be missing and which may have fallen into product. i.e. contact lenses, parts of

spectacles, false teeth etc. We must do everything we can to avoid product contamination

Page 34: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 34

PART D - ENVIRONMENTAL

MANAGEMENT COMMITMENTS

This section documents environmental commitments outlined in the EER. It is proposed that

they form the basis of the environmental conditions for any Environment Protection Notice issued by the EPA. Activities are to be conducted in accordance with the requirements of

EMPCA and the Regulations thereunder and in accordance with the requirements of any

relevant State Policies. These commitments must not be construed as an exemption from any

of those requirements.

General Conditions

1) The total annual amount of products produced per annum shall be approximately 3,000 tonnes per annum.

2) A copy of this EER, permit conditions and any associated documents referred to in

the conditions will be held in a location, which is known and accessible to the

responsible person(s).

3) If there is an incident such as a spill of waste or chemicals, HVS will take every effort

to minimise the emission of a pollutant and the threat of serious or material

environmental harm. HVS also undertake to advise the appropriate authorities such as the EPA, Southern Water and the Huon Valley Council of such an incident.

4) There will be no processing of fish or fish products from Macquarie Harbour unless a Biosecurity Management Plan is submitted to the EPA for prior approval for such

processing

Wastewater Management

5) The discharge of solid matter and pollutants in liquid waste will be prevented by all practical means such as: good housekeeping, provision of adequate containers to

avoid loss to the floor, the control of spillages by sweeping, brooming, shovelling,

vacuum cleaning, impoundment and pumping out of liquid wastes and trapping into

separation tank (capacity 2700 litres).

6) All process water will be chlorinated and readings taken once daily by the Production

Manager. The readings will be recorded on the Daily Hygiene Report. A residual chlorine level will be maintained.

Stormwater Management

7) Stormwater will be managed in the Council storm water management system.

Page 35: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 35

Solid Waste Management

8) All solid waste shall be removed from both the processing floor and loading areas.

All wash down water from the processing floors will discharge to the sewer system.

9) All solid wastes handled within the premises shall be contained as far as practicable to

prevent spillage. All wastes stored at the premises shall be held in a leak proof container, which shall be fitted with a weather proof and animal resistant cover. The

cover shall be used at all times when waste is held in the container. These containers

will be clearly marked “waste product only”.

10) All solid waste (removed for a fee) will be removed from the premises only by

contractors with a current Waste Transport Business Environment Protection Notice

licence.

11) All solid waste (removed for a fee) will be removed to a refuse disposal site or

rendering plant licensed and approved in accordance with the Act4. It is intended that

all solid waste will be removed from premises within 48 hours.

Hazardous Waste Management

12) All chemicals, pesticides and poisons will be stored separately and handled under

strict supervision of QC Officer/Manager. All chemicals will be suitably labelled

with warnings of toxicity, and directions for use in premises.

13) Any bunding requirements will be in accordance with the Dangerous Goods

Regulations 1998 (Part 7, Section 44), AS 1940 (1993), and AS 3780 (1994).

14) If there is a release off site of any hazardous material then the Manager will advise

both the EPA and the Huon Valley Council. Containment in accordance with the

Material Safety Data Sheets will be followed so as to prevent any adverse impacts to the community surrounding the plant.

Air and Noise

15) HVS will manage any odours so that an environmental nuisance will not be detected

to any significant degree at places in other ownership. HVS will endeavour to detect

and check any nuisance odours or noise from fugitive sources on a daily basis.

4 It is proposed to have fish waste sent to an existing fish meal plant.

Page 36: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 36

Monitoring

16) Wastewater monitoring for quality and quantity will occur as part of a Trade Waste

Agreement with Southern Water. Compliance with water quality objectives of the

sewage discharge is expected to be met. Parameters to be analysed will be: pH

temperature

Chemical Oxygen Demand Biological Oxygen Demand

Total Suspended Solids

Floatable Oils and Grease

Rate of Discharge

17) Odour audits are proposed to be undertaken if there are any odour complaints. 18) HVS will review the Environmental Management Plan at an interval of between 3 and 5 years.

Reviews will include a comparison of the actual operation versus any predictions with respect to

solid waste, noise, odours, trade waste and hygiene.

Page 37: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 37

PART E - CONSULTATION PROCESS

Consultation has been undertaken with the Huon Valley Council and the Environment

Division as follows:

Discussions with Mr Glen Doyle (General Manager) Huon Valley Council and

Mathew Grimsey at the Huon Valley Council offices

Meeting with Dr Sarah Richards (Environmental Scientist) from the Environment

Division on 29 April 2010

Meeting with Dr Judi Marshall of Southern Water on 29 April 2010

Discussions and review of drafts of this report with Mr Shane Hogue

The EPA officers have indicated that the project is likely be a Level 2A project however this

is a matter to be determined by the Director of the EPA. In making this determination consideration needs to be taken into account the fact that the Huon Valley Council does not

require a Development Application for a new planning permit. Also historically this site has

been has very heavy processing of abalone and other foods with regular truck movements and

has not had a history of any complaints or concerns from the community of Council

HVS have prepared this EER as part of its application for the extension of operations to

include contract processing of fish and fish products. The existing permitted use is not expected to have any significant alterations, or changes or additions to transport movements,

solid waste, odour or noise levels. Wastewater discharges are a matter to be resolved with

Southern Water.

Page 38: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 38

REFERENCES AS/NZS 2107:2000; Recommended Design Sound levels and Reverberation times for

interiors

Environment Protection Authority, 2009; Environmental Effects Guidelines for the Relocation

of fish processing facility

Department of Primary Industries Water & Environment, 2009; Environment Protection Noise Policy

Department of Primary Industries Water & Environment, 2004; Tasmanian Environment Protection Policy (Air Quality)

Page 39: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 39

APPENDIX A - RELEVANT STATUTORY

APPROVALS

Certificate of Registration of an Export

Page 40: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 40

Approval by the Delegate of an Approved Arrangement

Page 41: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 41

Fish Receiver Permit

Page 42: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 42

Certificate of Registration of a Food Business

Page 43: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 43

Fish Processing License

Page 44: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 44

Certificate of Registration of a Company

Page 45: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 45

APPENDIX B – NOISE MEASUREMENTS

AND ANALYSIS

Page 46: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 46

Page 47: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 47

Page 48: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 48

Page 49: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010

49

Huon Valley Seafoods Field report for noise monitoring, 2/3/2009 and 12/5/2009

General

The blast freezer operation at 49 Wilmot (Ranelagh) Rd is extending noise to the neighbour at

“Inlet Farm”, 49 Wilmot Rd. The neighbours report noise facing the plant, inside adjacent

rooms, and on the riverside of the house (reflecting off the cliffs on the other side of the Huon

River. The house is double brick with steel over a shingle roof with ceiling insulation. The

windows would appear the main noise conduit.

The blast freezer operation (24 hr when in use) occurs post harvest times for various clients at

different times of the year. Some enclosure and dampening treatment has been undertaken on

the plant. The HVS also attempts some physical shielding by positioning stacks of containers

and parking of a truck.

The main source of the complaint was found to be mid-frequency tonal noise from the freezer

compressor plant, combined with the low frequency broadband noise eof the circulatory fan

systems.

Instruments used

Rion Precision Integrating Sound Level Meter Model NL-11, s/n 840216, with

Rion Octave Band Filter Model NX-01A, s/n 11140944, both Laboratory Certified

December 2008;

Brűel & Kjær Precision Integrating Sound Level Meter Type 2218 s/n 784345, with

Brűel & Kjær 1/3 Octave Filter Set Type 1616 s/n 661719, both Laboratory Certified

December 2008;

Brűel & Kjær Sound Level Calibrator Type 4230 s/n 1655635, Laboratory Certified

December 2008;

Brűel & Kjær Level Recorder Type 2306;

Brűel & Kjær Statistical Noise Analyser Type 4426 s/n 957489, Laboratory Certified

October 2007;

Weather Instruments (Aneroid barometer, Zeal Wet/Dry bulb Psychrometer, Suunto KB-

14/360R compass, Kaindl Windmaster 2 wind speed meter);

Steel measuring tape;

Hengstler Geotech M10 measuring wheel;

Location descriptions

The aerial photo on page A8 shows all Locations.

Location 1. 3.5 m in front of door to lean-to compressor enclosure, microphone at 1.2 m

height.

Location 2. 3.5 m in front of dual fans at southern end of shed, microphone at 1.2 m

height.

Page 50: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 50

Location 3. 7.0 m in front of main wall of lean-to compressor enclosure, microphone at

1.2 m height.

Location 4. At rear boundary fence, 32.0 m WSW, perpendicularly away from wall of

lean-to compressor enclosure, with unobscured line of sight, microphone at 1.2 m

height.

Location 5. 1.0 m from walls, inside lean-to compressor enclosure, microphone at 1.2 m

height.

Comments

The outside walls of the compressor enclosure vibrate; an indication of structural

conduction of noise via the internal struts to the roof. During the visit, the compressor/s

were on 50-60% of the time.

. There are unshielded holes in the ceiling and doorway wall of the enclosure.

. The two electric compressor motors, both rated at 2900 rpm, work simultaneously at

times, resulting in interference beating, additional to an 800Hz tonal feature.

The main shed emanates broadband low frequency noise.

Page 51: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 51

Statistical distribution of ambient noise

Location Loc 4 Loc 3

Situation ambient operation ambient operation

Date 12/05/2009 12/05/2009

Time 21:40 23:15

Duration 15 15

Samples 9000 9000

L1 53.3 60.3

L2 52.5 60.0

L5 51.8 59.5

L10 51.3 59.3

L20 50.8 58.5

L50 49.5 57.5

L90 47.5 56.0

L99 46.5 55.3

Leq (A) 49.6 57.5

Spectral (octaves) and spatial distribution of ambient noise

Location Loc 1 Loc 1 Loc 2 Loc 2 Loc 3 Loc 3 Loc 4* Loc 4* Loc 5

Date 12/5/2009 12/5/2009 12/5/09 12/5/09 12/5/09 12/5/09 12/5/09 12/5/09 12/5/09

Start time 21:40 21:41 21:45 21:46 22:00 22:10 21:20 21:50 23:00

Noise ambient operation

compressor ON Both fans One fan

compressor ON

compressor + fans ON

ambient operation

compressor ON

compressor ON

Duration 10 s Leq 10 s Leq 10 s Leq 10 s Leq 10 s Leq 10 s Leq 1 min Leq 1 min Leq 10 s Leq

A 60.7 64.3 71.1 66.6 61.5 61.5 48.4 52.4 88.5

C 70.9 71.1 66.9 67.1 91.8

Lin 70.8 69.5 69.1 60 61.4 90.4

Duration 10 s Leq 10 s Leq 10 s Leq 10 s Leq 10 s Leq 10 s Leq 1 min Leq 1 min Leq 10 s Leq

31.5 65.3 66.1 67.4 57.4 57.6 63

63 57 52 52.5 43.3 43.2 66.6

125 57.9 54.8 59.1 55.1 54.9 69.7

250 63.4 59.7 61.4 50.1 51.4 86.8

500 63.9 55.9 59.1 43.7 47.5 88.7

1k 58.9 51.6 58.5 42.9 49.7 89.5

2k 51.1 44.7 48.7 35.6 38.0 79.5

4k 40.1 35.5 41.7 26.2 26.0 66.6

8k 30.3 26.8 33.4 57

*[derived from ⅓ s]

Page 52: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 52

Spectral (octaves) distribution of ambient noise to boundary

Octave band noise spectra - ambient operations

Huon Valley Seafoods, 12/5/2009

0

10

20

30

40

50

60

70

80

90

100

31.5 63 125 250 500 1k 2k 4k 8k

Frequency band (Hz)

dB

Loc 4 12/5/2009 21:20

Ambient operation 1 min

Leq

Loc 4 12/5/2009 21:50

Compressor ON 1 min

Leq

Loc 5 12/5/2009 23:00

Compressor ON 10 s Leq

Page 53: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 53

Spectral (octaves) distribution of ambient noise within yard

Octave band noise spectra - ambient operations

Huon Valley Seafoods, 12/5/2009

0

10

20

30

40

50

60

70

80

90

100

31.5 63 125 250 500 1k 2k 4k 8k

Frequency band (Hz)

dB

Loc 1 12/5/2009 21:41

Compressor ON 10 s Leq

Loc 3 12/5/2009 22:00

Compressor ON 10 s Leq

Loc 3 12/5/2009 22:10

Compressor + fans ON

10 s Leq

Loc 5 12/5/2009 23:00

Compressor ON 10 s Leq

Page 54: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 54

Photographs

Main freezer shed, compressor lean-to enclosure, truck and loading bay, 2/3/2009

Note enclosure roof vent, and structurally supported heat exchanger on roof.

Stack of shipping containers at rear corner of yard, with neighbour in background, 2/3/2009

Page 55: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 55

Side view of HVS from midway along driveway to 59 Wilmot Rd, 2/3/2009

Composite view of main freezer shed ceiling space adjacent to compressor lean-to, 2/3/2009

Page 56: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 56

Lean-to compressor enclosure, main shed with ceiling opening, 2/3/2009

View of HVS from house at 59 Wilmot Rd, 2/3/2009

Page 57: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 57

DUAL COMPRESSOR MOTORS, FRAME EXTENDS TO CEILING, 2/3/2009 DETAIL OF ENCLOSURE DOOR AND INSULATION, 2/3/2009

Page 58: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 58

Aerial photograph showing Locations

Map shows approximate locations. Note: storage stacks currently present in the yard are absent from the photo.

Blast freezer compressor enclosure (Location 5) GR 0355 3594 (Tasmap Huonville 1:25000, 1987)

Neighbouring house GR 0333 3599 (Tasmap Huonville 1:25000, 1987)

Mapped distance from compressors to house = 225 m (calculated by grid reference difference), 210 m (direct from map), 220 m (by airphoto scale)

Page 59: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 59

Statistical Analysis, ambient operations monitoring, Location 3 and 4

Huon Valley Seafoods rear yard, 12/5/2009

25

30

35

40

45

50

55

60

65

70

0102030405060708090100

Percentage of time noise level exceeded

No

ise l

evel

dB

(A)

Loc 4 ambient operation

12/05/2009 21:40

Loc 3 ambient operation

12/05/2009 23:15

Weather observations

Date 12/05/2009

Location Loc 3

Time 22:30

Temp °C 12

Relative Humidity % 76

Pressure hPa 1015

Wind speed average m/s calm

Cloud cover x/8 8

Page 60: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 60

Third octave analysis of background noise at Location 4, rear boundary

Frequency band Hz 20 25 31.5 40 50 63 80 100 125 160 200 250 315 400 500 630 800 1k 1.25k 1.6k 2k 2.5k 3.15k 4k 5k dB(A) dB(Lin)

Ambient plant ON 1 min Leq 43.7 57.3 38 37 38.2 36.2 40.2 47.8 45.1 53.6 44.1 40.2 48.2 38.7 37.8 40 38.9 38.2 37.1 33.2 29.4 28.4 26.2 48.4 60

Ambient plant with COMPRESSORS 1 min Leq 44.3 57.5 39.6 38.9 38.5 36.8 39.6 47.5 43.3 53.7 44.2 46.5 48.2 38.3 45.4 41.6 48.6 40.5 39.4 35.7 32.8 28.5 26 52.4 61.4

Ambient noise spectra by 1/3 octaves, Huon Valley Seafoods boundary, 12/5/2009

20

30

40

50

60

70

80

20

25

31.5 40

50

63

80

100

125

160

200

250

315

400

500

630

800 1k

1.2

5k

1.6

k

2k

2.5

k

3.1

5k

4k

5k

Frequency band (Hz)

dB

Ambient plant ON 1 min Leq

Ambient plant w ith COMPRESSORS 1 min Leq

Low er limit of reportable measurement

Page 61: Fish Processing Plant - EPA Tasmania · The steps in the processing of fish and fish products are outlined in Figure 4. Fish will be delivered to the factory by truck and unloaded

Environmental Effects Report for Huon Valley Seafoods, May 2010 61

APPENDIX C – HUON VALLEY COUNCIL

ADVICE ON DEVELOPMENT

APPLICATION