FIRST WESTERN ELECTRO MECHANICAL PROFILE.pdf

download FIRST WESTERN ELECTRO MECHANICAL PROFILE.pdf

of 52

Transcript of FIRST WESTERN ELECTRO MECHANICAL PROFILE.pdf

  • FIRST WESTERN G.C.

    PROFILE AND PRE-QUALIFICATIONS

    PUMPS & BOOSTER SETS PRODUCTS, SERVICES & COMPLETE WATER MANAGEMENT SOLUTIONS

    Water Management Solutions Suppliers & Contractors

    . 116026 21391 6673764 02 :02 6673764

    P.O. Box 116026 Jeddah 21391 Saudi Arabia Tel: 02 6673764 Fax: 02 6673764

  • FIRST WESTERN G.C.

    INTRODUCTION

    We are a very well establish supplier and contractor in the western region. Our work however; is not limited to western region.

    We are an authorized dealer and contractor of KSB Pumps Arabia Ltd. We have a huge client base were KSB Pumps Boosters, Pumps and

    control panels has been supplied and many mechanical and

    electrical field installations were executed at their projects.

    We have been working in different fields starting from electromechanical contracting to industrial equipments supply and

    installations and industrial mechanical contracting.

    We are also a recommended contractor by Atlas Copco for installation of complete compressed air equipments and network.

    Thank you for your interest in First Western G.C and assuring you of our

    best-continued services at all times.

    First Western staff

  • FIRST WESTERN G.C.

    PRODUCTION DEPARTMENT

    PUMPS AND CONTROL

  • FIRST WESTERN G.C.

    INTRODUCTION TO PRODUCTION DEPARTMENT

    First Western Staff has a long experience in fluid dynamic and thermal

    engineering for more than a decade. Part of our experience is

    represented through our collaboration with KSB PUMPS ARABIA.

    Our services in that field represent a total engineered solution from

    concept until completion.

    Original KSB Pumps and control system are sized, designed at our

    office premises and fabrication takes place at KSB Arabia Ltd. Factory

    in Riyadh 2nd industrial city.

    Noting that our projects department has a huge part in the success of

    our Pumps Department as most of our pumps are installed by our own

    staff.

    Follows a sample of projects where our systems has been approved

    and installed.

  • Date: 12 Aug 2009

    TO WHOM IT MAY CONCERN

    FIRST WESTERN G.C. guarantees that all KSB products submitted and supplied

    are original KSB Pumps Arabia products.

    Pumps origin : as per KSB Certificate of Origin attached

    Control panels : Telemechanique & Merlin Gerin

    VFDs : Altivar of Group Schneider

    Electric motors : KSB Motors for Vertical Pumps

    Siemens Motors for Horizontal Pumps

    Assembly : KSB Pumps Arabia Ltd - Riyadh

    Warranty : All items supplied by First Western G.C. are guaranteed

    against manufacturing defects under normal operating

    conditions for 12 months.

    Best regards,

    FIRST WESTERN G.C.

  • FIRST WESTERN G.C.

    EYE ON PRODUCTION DEPARTMENT PROJECTS.

    REFERENCE PROJECTS LIST

  • the Text Box Tools tab to change the formatting of the pull quote text box.]

  • FIRST WESTERN G.C.

    KSB PUMPS CERTIFICATES & APPROVALS

  • FIRST WESTERN G.C.

    PROJECTS DEPARTMENT

    ELECTROMECHANICAL AND PIPING WORKS.

  • FIRST WESTERN G.C.

    SWCC SHOIBA BARGES INFRASTRUCTURE AND PUMP STATION

    Located in on the western coastal city (Shoiba) and within the

    restricted zone at Saline Water Conversion Corp- SWCC we have

    executed a challenging project Barges Infrastructure.

    Our performance was more than professional as we were able to

    hand over the pipe net work, valves, pumps and lamination work in a

    detailed and closely followed schedule under exhausting pressure

    from authorities to deliver this critical project.

    Such performance and both engineering and personal awareness

    enabled us to gain both the project owner and the authorities trust

    which led to assigning us to take the responsibility of doing the same

    challenging project in the southern city of Shoqaiq.

    A complete barge loaded desalination plant of 30,000 cu.m/day was

    connected through sea laid 6 flexible PE 100 tubes of 125 mm size to a

    common GRP 700 mm shore anchored header.

    The header was connected through 700 mm GRP pipes to SWCC

    strategic potable water tank.

    Excavation of soil with many under ground utilities and road crossings

    as well as above round laid GRP 700 mm pipes.

  • FIRST WESTERN G.C.

    Our scope of work included supply and installation of :

    1) Lamination material and fittings of 700 mm GRP pipe.

    2) Stain-less Steel 700 mm clamps with anchors.

    3) Installation of 700 mm GRP pipes ( both above and under

    ground).

    4) Supply and installation of CS reducers and fitting (1000 mm, 800

    mm, 700 mm).

    5) Installation of main 120,000 cu.m tank main gate valve of 800 mm.

    with necessary steel structure.

    6) Fabrication and installation of steel walk-ways for service and

    maintenance access.

    Diesel pumping station from diesel tank to diesel operating barge

    loaded generator was also fabricated supplied, installed and

    commissioned.

  • FIRST WESTERN G.C.

    SWCC SHOQAIQ BARGES INFRASTRUCTURE AND PUMP STATION

    120 KM North of southern city of Gizan lays a coastal city of Shoqaiq

    embracing one of SWCC Saline Water Conversion Plants.

    As every project has its own unique aspects and governing

    environment, we have executed the infra-structure and mechanical

    work by using PE 100 pipes instead of GRP as we have previously done

    in SWCC-SHoiba.

    More than 3,200 LM of 500 mm PE100 pipes were shipped from Jeddah

    to SWCC-Shoqaiq.

    Complete excavation, bedding, pipe laying, compacting and back-

    filling were done.

    Our Scope of Work included:

    1) Supply and installation of 125 mm PE100 flexible hoses from sea

    anchored Barge to the shore area.

    2) Fabrication and installation of Steel Header located on top of barge.

    3) Polyethylene fusion welding of 500 mm PE joints. More than 270 joints

    were welded both above and under ground.

    4) Casting and laying of pipe concrete supports with steel clamps.

  • FIRST WESTERN G.C.

    5) Fabrication and installation of CS fitting and reducers (1000 mm, 600

    mm, 500 mm, 400 mm)

    6) Installation of ELECTROMAGNATIC FLOWMETERS. Both 500 mm and 400

    mm with supply and installation of shielded cables and conduits for our

    mini panels installed near SWCC main Switch Gear Panels.

    7) Tank connection points by installation of 2 gate valves of 500 mm in

    size after drainage of SWCC main potable water tank.

    8) Supply of Electric driven pumps set with control panel and coble

    network and piping. Used to pump diesel from land tank to barge

    generator tanks.

    Our performance here was up to client expectations and satisfaction

    as in our previous project at SWCC Shoiba.

    Located in on the western coastal city (Shoiba) and within the

    restricted zone at Saline Water Conversion Corp- SWCC we have

    executed a challenging project Barges Infrastructure.

    A complete barge loaded desalination plant of 30,000 cu.m/day was

    connected through sea laid 6 flexible PE 100 tubes of 125 mm size to a

    common GRP 700 mm shore anchored header.

    The header was connected through 700 mm GRP pipes to SWCC

    strategic potable water tank.

    Excavation of soil with many under ground utilities and road crossings

    as well as above round laid GRP 700 mm pipes.

  • FIRST WESTERN G.C.

    Our scope of work included supply and installation of :

    1) Lamination material and fittings of 700 mm GRP pipe.

    2) Stain-less Steel 700 mm clamps with anchors.

    3) Installation of 700 mm GRP pipes ( both above and under ground).

    4) Supply and installation of CS reducers and fitting (1000 mm, 800 mm,

    700 mm).

    5) Installation of main 120,000 cu.m tank main gate valve of 800 mm.

    with necessary steel structure.

    6) Fabrication and installation of steel walk-ways for service and

    maintenance access.

    Diesel pumping station from diesel tank to diesel operating barge

    loaded generator was also fabricated supplied, installed and

    commissioned.

  • FIRST WESTERN G.C.

    KING ABDUL AZIZ INTERNATIONAL AIRPORT KAIA

    HAJJ TERMINAL COMPLEX

    FIRE FIGHTING NETWORK BLOCK A & B

    As most of our projects, the Hajj Terminal Complex has a critical time

    limit of execution.

    With main fire lines of 8 and 6 in size and a sprinklers network of piping reaching up to 5,000 LM this project represents a challenge of

    management and effectiveness of man-power utilization.

    The project is due to finish in November 2009 and we are on the edge

    of handing over more than 80% of the project.

    Yet another success for First Western Staff.

    Project located at Jeddah KAIA.

  • FIRST WESTERN G.C.

    KING ABDUL AZIZ INTERNATIONAL AIRPORT KAIA

    REHABILITATION OF LOAD CENTER

    FIRE FIGHTING NETWORK & FM 200

    In collaboration with our client (SELA-PASS TRADING) we have

    executed the installation of fire fighting network and FM 200 at KAIA.

    The project consisted of installation of:

    1) Conventional sprinkler lines at 9 LM height

    2) Deluge System for 5 main chillers.

    3) FM 200 complete supply and installation.

    4) Fire alarm network

    More projects are being studied and shall be executed with our loyal

    client SELA PASS TRADING.

    Project located at Jeddah KAIA.

  • FIRST WESTERN G.C.

    REZA INVESTEMENT GROUP

    REZA HYGEIN

    COMPRESSED AIR SYSTEM AND NETWORK

    A new appreciated relation with new client was established through

    installation of Altas Copco Compressors, Dryers, Air Reservoir and

    control system.

    Two 15 KW compressor with connected with filters and air dryer to a GI

    pipes network of 160 LM.

    Project located at Jeddah industrial city (phase 2).

  • FIRST WESTERN G.C.

    REZA INVESTEMENT GROUP

    REZA HYGEIN FACTORY JEDDAH

    EXHAUST FANS

    Following to handing over the compressor room to our client REZA

    HYGIEN, we were rewarded a new contract to supply and install 12

    Roof and Wall mounted exhaust fans of 10,000 CFM.

    Fans are due to be at Jeddah port by first of November 2009.

    Project located at Jeddah industrial city (phase 2).

  • FIRST WESTERN G.C.

    RABYA GARDEN CENTER

    50 MUNICIPAL GARDENS PROJECT

    A unique relation binds us with RABYA GARDEN CENTER, a loyal client

    that awarded us the 50 Gardens Project.

    Our Scope of Work at each garden consists of :

    1) Supply and installation of Simplex Vertical inline multi stage pumps

    with SS 304 construction.

    2) Supply and installation of disc filter 2

    3) Supply and installation of Fertilizer tank 200 Liters

    4) Supply and installation of Chemical Fertilizer Injector

    5) Supply of 200 Liter pressure vessel

    6) Supply of Auto/Manual control panel.

    Project located at different locations in Jeddah City.

  • CASTING OF CONCRETE SUPPORTS OFR 700MM GRP PIPES

    SWCC SHOIBA

    GRP PIPING WITH STEEL STRUCTURAL SUPPORTS SWCC SHOIBA 2008

  • EXCAVATION WORKS AND PIPING WORKS OF 700 MM GRP POTABLE WATER LINES SWCC SHOIBA - 2008

    INSTALLATION OF 800X700 CS REDUCER AT SWCC

    SHOIBA MAIN POTABLE WATER STORAGE TANKS -

    2008

  • GRP 700MM PIPING (LAMINATION TYPE) WITH SS316 CLAMPS AND CONCRETE SUPPORTS

    POTABLE WATER LINES (SWCC SHOIBA) - 2008

    00

  • INSTALLATION OF COMPRESSED AIR SYSTEM

    ATLAS COPCO COMPRESSORS, DRYERS, FILTERS AND AOR RECEIVER TANK

    NATIONAL AUTOMATION INDUSTRIES (JUFFALI TRUCKS) 2007

  • PVC PIPING & SUPPORTS AT SWCC

    SHOQAIQ 2009

    PE 500 PIPES AT SWCC SHOQIAQ 2009

    PE WELDING OF 500MM JOINTS

  • EXCAVATION, PIPE LAYING, WELDING, BACKFILLING AND TESTING

    PE 500 MM

    SWCC SHOQAIQ 2008/2009

  • INSTALLATION OF COMRESSED AIR SYSTEM UNITS AT BANAWAI PACKAGING FACOTRY JEDDAH 2010

  • INSTALLATION OF DEISEL PUMPING STATION WITH DIESEL UNDERGROUND PIPES

    INSTALLATION OF SIEMENS 500MM DIA ELECTROMAGNETIC FLOWMETERS

  • INSTALLATION OF 125MM PE PIPES NETWORK FROM SWCC AREA TO FLOATING BARGE AT YANBU 2010

    Binder1First Western Profile & Pre-Qualificationscan0001scan0001ss

    PROFILE PHOTOS