19/04/04 HIFI Consortium Meeting UTRECHT 1 Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY First Stage Cryogenic IF First Stage Cryogenic IF Amplifier Amplifier Prepared by: Carmen Diez

description

First Stage Cryogenic IF Amplifier. Prepared by: Carmen Diez. OUTLINE. QM Program (Alcatel) Amplifiers IF1 High (4-8 GHz) IF1 Low (2.4-4.8 GHz) Isolators Qualification Boards FM Program (Alcatel) Amplifiers IF1 High (4-8 GHz) IF1 Low (2.4-4.8 GHz) Isolators - PowerPoint PPT Presentation

Transcript of First Stage Cryogenic IF Amplifier

Page 1: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

1

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

First Stage Cryogenic IF First Stage Cryogenic IF AmplifierAmplifier

Prepared by: Carmen Diez

Page 2: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

2

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

OUTLINEOUTLINE• QM Program (Alcatel)

– Amplifiers IF1 High (4-8 GHz) IF1 Low (2.4-4.8 GHz)

– Isolators – Qualification Boards

• FM Program (Alcatel)– Amplifiers

IF1 High (4-8 GHz) IF1 Low (2.4-4.8 GHz)

– Isolators • CDR Status/Management Meeting• Programmatic/financial concerns • Planning• Open Issues & Summary

Page 3: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

3

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

QM PROGRAM: Amplifiers: IF1 High (I)QM PROGRAM: Amplifiers: IF1 High (I)

• 2 units delivered December 2003 (EQM2 & EQM4)

• 2 units being qualified (EQM1 & EQM3) – Baseline tests done

Page 4: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

4

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

QM PROGRAM: Amplifiers: IF1 High (II)QM PROGRAM: Amplifiers: IF1 High (II)

Page 5: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

5

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

QM PROGRAM: Amplifiers: IF1 High (III)QM PROGRAM: Amplifiers: IF1 High (III)

Page 6: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

6

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

IF1 High (QM2): Gain & NoiseIF1 High (QM2): Gain & Noise

Page 7: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

7

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

IF1 High (QM2): S ParametersIF1 High (QM2): S Parameters

S22 < -15dB → Goal

Page 8: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

8

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

IF1 High (QM4): Gain & NoiseIF1 High (QM4): Gain & Noise

Page 9: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

9

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

IF1 High (QM4): S ParametersIF1 High (QM4): S Parameters

S22 < -12dB → Baseline

Page 10: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

10

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

IF1 High QM: Gain StabilityIF1 High QM: Gain Stability

0.01 0.1 1 101 10

5

1 104

1 103

0.01MODULE SPECTRUM

0.01

105

spn_G calk

h f k cal_g f k

2.160.011 f k

Page 11: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

11

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

QM PROGRAM: Amplifiers: IF1 LowQM PROGRAM: Amplifiers: IF1 Low

• Structures and Substrates being fabricated

Page 12: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

12

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

QM PROGRAM: IsolatorsQM PROGRAM: Isolators: Measurements: Measurements• 4 isolators measured

Page 13: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

13

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

QM PROGRAM: Isolators: ResultsQM PROGRAM: Isolators: Results

Page 14: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

14

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

QM PROGRAM: Qualification Boards

Qualification boards done and qualified

Resistors, Capacitors and

Transistors glued

Resistors and Capacitors soldered

Capacitors glued

Page 15: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

15

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

FM PROGRAMFM PROGRAM

• IF1 High– Structures being fabricated (problems with type of aluminium)

– Substrates being fabricated

• IF1 Low – Structures and Substrates to be fabricated once the QM units

are tested

• Isolators – To be received and measured (18 units Yebes+18 units SRON)

Page 16: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

16

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

CDR Status/Management Meeting (I)

• CDR held on the 9th of December 2003

• Management Meeting held on the 18th of February 2004

• Actions from CDR:

# Action Who When Status Remark

AI-1 CAY to change cryo cycle number in IF-1 specifications to 30 (Sec. 5.4.2.1)

CAY 31 Jan 04 Done

AI-2 SRON and CAY to sign IF-1 specifications CAY / SRON

31 Jan 04 Pending SRON action needed

AI-3 Alcatel to provide a manufacturing flow with enough detail to see the exact sequence of manufacturing steps including all inspection points

AEO 31 Jan 04 Done

AI-4 Alcatel to include the JPL recommended HEMT device burn-in in the manufacturing flow and to update the PID accordingly

AEO 31 Jan 04 Pending SRON to answer the Yebes proposal

AI-5 CAY to check availability and delivery dates for IF-1 low components, and to inform Alcatel

CAY 31 Jan 04 Done

AI-6 Alcatel to demonstrate compliance of bonding connections

AEO 31 Jan 04 Done

Page 17: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

17

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

CDR Status/Management Meeting (II)# Action Who When Status Remark

AI-8Alcatel to demonstrate component mounting with air-free Epotek

AEO 31 Jan 04 Done

AI-9 Alcatel to demonstrate mounting with air-free Ablefilm AEO 31 Jan 04 Done

AI-10 Alcatel to update the document “Thermal cycling test procedure” (doc. ref. 30007009/931).

AEO 31 Jan 04 Done

AI-11 CAY / Alcatel to provide a Design Verification Matrix to SRON.

CAY / AEO 31 Jan 04 Done

AI-12 Alcatel to include the schedule in the CDR documentation (with corresponding doc. nr.).

AEO 31 Jan 04 Done

AI-13 The HIFI Signal Chain Manager to contact Alcatel and ask for a management meeting to discuss resources and planning at Alcatel.

HIFI SCM 31 Jan 04 Done

AI-14 SRON to provide info on bake out to CAY SRON 15 Feb 04 Done

AI-15 AEO to check availability of Helicoils AEO 06 Feb Done

Page 18: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

18

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

Programmatic/financial concerns

2 QMs (Qual) (4-8 GHz)

2 QMs (Accep) (4-8 GHz)

7 FMs (4-8 GHz)

5 FSs (4-8 GHz) 2 FSs (2.4-4.8 GHz)

2 QMs (2.4-4.8 GHz)

4 FMs (2.4-4.8 GHz)

3 FMs (4-8 GHz)

• 2 Contracts signed:

• 1 Contract to be signed:

Page 19: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

19

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

CRYO IF1 (4-8 GHz) AMPLIFIER-HIFI PLANNINGCRYO IF1 (4-8 GHz) AMPLIFIER-HIFI PLANNING (I)(I)

Page 20: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

20

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

CRYO IF1 (4-8 GHz) AMPLIFIER-HIFI PLANNINGCRYO IF1 (4-8 GHz) AMPLIFIER-HIFI PLANNING (II)(II)

Page 21: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

21

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

CRYO IF1 (4-8 GHz) AMPLIFIER-HIFI PLANNINGCRYO IF1 (4-8 GHz) AMPLIFIER-HIFI PLANNING (III)(III)

Important delivery dates:

QM1 low: 19 May 2004

QM2 low: 21 May 2004

FM1 low: 14 July 2004

FM4 low: 21 July 2004

FM1 high: 7 May 2004

FM10 high: 16 June 2004

Page 22: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

22

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

OPEN ISSUES & SUMMARYOPEN ISSUES & SUMMARY 2 QM IF1 high units delivered December 2003 (EQM2 & EQM4) 2 QM IF1 high units being qualified (EQM1 & EQM3) QM IF1 low: Structures and Substrates being fabricated 4 QM isolators measured Qualification boards done and qualified FM IF1 High:

Structures being fabricated (problems with type of aluminium) Substrates being fabricated

FM IF1 Low: Structures and Substrates to be fabricated once the QM units are

tested Uncertainties about the performance of the IF1 low fabricated by Alcatel Alcatel delays very difficult to recover

Page 23: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

23

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

Page 24: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

24

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

QM & FM PROGRAMS (First Prototype)QM & FM PROGRAMS (First Prototype)

Page 25: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

25

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

QM & FM PROGRAMS (First Prototype)QM & FM PROGRAMS (First Prototype)

Page 26: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

26

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

Industry: TTI

• Bonding machine

• Experience in cryostats

• Complete receiver with S/X cryogenic amplifiers delivered to Finland

• 8.4 K @ 8.4 GHz with Fujitsu devices

(20 h k)

7 8 9 100

5

10

15

20

10

20

30

40YTX 001

Tn

(K)

F (GHz)

Noise

Gai

n (d

B)

Gain

Page 27: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

27

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

Microwave Capacitors at Cryogenic Temperature

Page 28: First Stage Cryogenic IF  Amplifier

19/04/04 HIFI Consortium Meeting UTRECHT

28

Centro Astronómico de YebesObservatorio Astronómico Nacional HIFI

CAY

3 4 5 6 7 8 90

5

10

15

20

25

30

YCF 2 InP devices comparisonOptimum noise bias

ETH T-35 TRW T-45 TRW T-42

Ga

in (

dB

)

Freq. (GHz)

0.0

2.5

5.0

7.5

10.0

12.5

15.0

Tn

(K

)

ETH T-35 TRW T-45 TRW T-42

TRW T-42 CRYO3 200×0.1 μm gate Best performance

TRW T-45 CRYO4 200×0.1 μm gate Used in DMs Space qualifiable, to be used in FMs CHOP developed

ETH T-35 200×0.2 μm gate Experimental transistor Design by request Used in MPAs

0.22 mm