Fire Protection of PE Radiation Shielding Daniel Rosberg, WSP 2014-10-06.

13
Fire Protection of PE Radiation Shielding Daniel Rosberg, WSP 2014-10-06

Transcript of Fire Protection of PE Radiation Shielding Daniel Rosberg, WSP 2014-10-06.

Page 1: Fire Protection of PE Radiation Shielding Daniel Rosberg, WSP 2014-10-06.

Fire Protection of PE Radiation Shielding

Daniel Rosberg, WSP

2014-10-06

Page 2: Fire Protection of PE Radiation Shielding Daniel Rosberg, WSP 2014-10-06.

Borated PE – burning behaviour

Page 3: Fire Protection of PE Radiation Shielding Daniel Rosberg, WSP 2014-10-06.

Borated PE – burning behaviour

Page 4: Fire Protection of PE Radiation Shielding Daniel Rosberg, WSP 2014-10-06.

Building fire protection

Evacuation Structural elements

Page 5: Fire Protection of PE Radiation Shielding Daniel Rosberg, WSP 2014-10-06.

Building fire protection

Fire compartmentation Surface lining materials

Page 6: Fire Protection of PE Radiation Shielding Daniel Rosberg, WSP 2014-10-06.

Rescue service operation

+30 MW

Page 7: Fire Protection of PE Radiation Shielding Daniel Rosberg, WSP 2014-10-06.

Instrument fire

Length (m)

Width (m)

Height (m)

Max HRR (MW)

10 6 8 904 4 5 305 5 4 306 6 3 308 4 3 30

Page 8: Fire Protection of PE Radiation Shielding Daniel Rosberg, WSP 2014-10-06.

Sprinkler

Sprinklerbild!

Limited to 6 MW

Will limit fire spread to secondary fuel packages. Still a 30 MW fire

Page 9: Fire Protection of PE Radiation Shielding Daniel Rosberg, WSP 2014-10-06.

Protecting the shielding material

Safety distance

+

Page 10: Fire Protection of PE Radiation Shielding Daniel Rosberg, WSP 2014-10-06.

Instrument during construction

Borated PE

Borated PE

Borated PE

Borated PE

5 m – 6 MW 10 m – 30 MW

2 m – 1 MW

10 m – 30 MW

Safety criteria:135°C

7.4 kW/m2

Page 11: Fire Protection of PE Radiation Shielding Daniel Rosberg, WSP 2014-10-06.

Instrument during construction

Borated PE

Borated PE

No limit

2 m – 1 MW

10 m – 30 MW

60 mm

1GF + 1 GA

Page 12: Fire Protection of PE Radiation Shielding Daniel Rosberg, WSP 2014-10-06.

Conclusions

Fires

30 MW is the largest fire allowed Rescue service operation Roof construction

HGV fire is approx. 30 MW

Instrument fires can, however, be larger (90 MW)

Is sprinkler required?

No if instruments can be limited in size

Yes if full flexibility is required Instrument size Number of instruments being

unprotected simultaneusly

Page 13: Fire Protection of PE Radiation Shielding Daniel Rosberg, WSP 2014-10-06.

Conclusions

How to protect PE

Encasing (#1) Limit fire spread Protected fire load

Safety distances (2-5-10) Sprinkler Small instruments

…or… Combination thereof