FIRE MANAGEMENT PLAN Lot 2 Pipidinny Road North Eglinton Estate City of Wanneroo FirePlan WA November 2013 Revised October 2015

Transcript of FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in...

Page 1: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

FIRE MANAGEMENT PLAN

Lot 2 Pipidinny Road

North Eglinton Estate

City of Wanneroo

FirePlan WA

November 2013

Revised October 2015

Page 2: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan

WA 2

TABLE OF CONTENTS

1.0 INTRODUCTION 4

2.0 AIM 8

3.0 OBJECTIVES 8

4.0 DESCRIPTION OF THE AREA 9

4.1 General 9

4.2 Climate 9

4.3 Topography 9

4.4 Bush Fire Fuels 11

4.5 Land Use 11

4.6 Assets 11

4.7 Access 11

4.8 Water 14

5.0 Bush Fire Assessment 14

5.1 Bush Fire History 14

5.2 Bush Fire Risk 14

5.3 Bush Fire Hazard 14

5.4 Bush Fire Threat 15

5.5 Summary of Bush Fire Potential 17

6.0 FIRE MITIGATION 17

6.1 Hazard Management 17

6.2 Bush Fire Risk Management 18

6.3 Future Development 18

6.4 Access and Firebreaks 18

6.5 Fire Safer Areas 19

6.6 Assessment of Fire Management Strategies 19

6.7 Implementation of Fire Management Plans 20

7.0 APPENDICES 22

7.1 Works program 22

7.2 Guidelines, Specifications and Minimum Standards 22

7.3 Glossary 29

8.0 FMP COMPLIANCE CHECKLIST FOR PERFORMANCE

CRITERIA AND ACCEPTABLE SOLUTIONS 31

REFERENCES 34

Figure 1 Locality Map 5

Figure 2 Structure Plan 6

Figure 2A Layout Stages 3-9 7

Figure 3 Slope 10

Figure 4 Vegetation Types GHD Survey 12

Figure 5 Vegetation Classifications Planning for Bush Fire Protection 13

Figure 6 Bush Fire Hazard Assessment 16

Figure 7 Schematic Diagrams of distance Dwelling to retained Vegetation 25-27

Figure 8 Indicative BAL ratings Stages 3-9 28

Page 3: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Road – North Eglinton Estate.

Prepared For Satterley Property Group Prepared By FirePlan WA 10 Bracken Road Thornlie WA 6108 T: 94931692 F: 94930330 E: [email protected] Document Status

Version Comment Reviewer Review Date

Version 1 Original FMP BWH 24.07.12

Version 2 BWH 30.07.12

Version 3 City of Wanneroo 14.08.13

Version 4 Amendment to Structure Plan 28.11.13

Version 5 Amendment to Staging Plan 22.08.14

Version 6 Amendment to Staging Plan Stages 3-9

30.10.15

Disclaimer: The measures contained in this fire management plan are considered to be minimum standards and they do not guarantee that a building will not be damaged in a bush fire. All surveys, forecasts, projections and recommendations made in this report associated with the project are made in good faith on the basis of information available to FirePlan WA at the time; and achievement of the level of implementation of fire precautions will depend among other things on the actions of the landowners or occupiers over which FirePlan WA has no control. Notwithstanding anything contained therein, FirePlan WA will not, except as the law may require, be liable for any loss or other consequences (whether or not due to the negligence of the consultants, their servants or agents) arising out of the services rendered by the consultants.

Page 4: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 4

1.0 INTRODUCTION

The purpose of this Bushfire Management Plan is to detail the fire management methods and requirements that will

be implemented for Lot 2 Pipidinny Road North Eglinton Estate, refer Figure 1.

This area is predominantly Shrubland vegetation with a Bush Forever site along the northern boundary. The

development will consist of urban residential housing, neighbourhood centre, Primary School site, high School site,

community garden and sporting ovals and public open space areas. The area except for some areas of Public Open

Space (POS) will be cleared. Refer to Figure 2.

This fire management plan complies with the acceptable solutions detailed in Appendix 2 of Planning for Bush Fire

Protection and are summarised in Compliance Checklist for Performance Criteria and Acceptable Solutions at the end

of this fire management plan Section 8.

This Fire Management Plan will likewise outline the responsibility and timing for implementing and maintaining the

fire protection measures and strategies contained within, allocating these responsibilities between individual land

owners, the developers and the City of Wanneroo.

As fire management strategies may require altering to meet changing weather, environment and land use needs, it

must be advised that the provisions of the Bush Fires Act 1954 will still be enforced, in addition to this Fire

Management Plan.

The City of Wanneroo will be responsible for initiating a review of this fire management plan as it may seem

necessary to do so.

In the event of large bushfires it is essential that landowners understand that fire appliances may not be available to

protect each dwelling.

The City of Wanneroo requires the preparation of a ‘Fire Management Plan’ for the proposed development to support

the Concept Local Structure Plan. This document has been prepared to satisfy that requirement and may be amended

as part of the Planning process.

This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush

Fire Protection Edition 2 (2010). There has been consultation between the FirePlan WA and the City of Wanneroo

Fire Officer in the preparation of this Fire Management Plan.

The original Fire Management Plan dated November 2013 has been revised to take into account the changes to layout

to Stages 3-9 which are included in this Fire Management Plan.

Page 5: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 5

Figure 1 Locality Map

Page 6: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 6

Figure 2 Structure Plan

Page 7: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 7

Figure 2A Stages 3-9 Eglinton

Page 8: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 8

2.0 AIM

The aim of the Bushfire Management Plan is to reduce the occurrence of and minimise the impact of bush fires

thereby reducing the threat to life, property and the environment.

The Fire Management Plan sets out to reduce this threat by:

Identifying the objectives of this Fire Management Plan (Section 3)

Describing the site’s description, topography, cultural features and land use (Section 4);

Identifying the site’s potential bush fire issues (Section 5); and

Outlining the fire mitigation strategies for the site, including identifying the parties responsible for

undertaking these fire mitigation strategies (Section 6).

The City of Wanneroo has the responsibility and powers under the Bush Fires Act 1954 to ensure that this Fire

Management Plan, City of Wanneroo Firebreak Notice and any Special orders issued under the Bush Fires Act 1954

are complied with.

3.0 OBJECTIVES

The objectives of this Fire Management Plan are to:-

Identify bushfire hazards and propose bush fire prevention measures for the site and the interface to the Bush

Forever site adjoining the site to the north in accordance with Planning for Bush Fire Protection Guidelines-

Edition 2 2010;

Define the building construction standards where lots interface with vegetation within the site- Public Open

Space areas and the adjoining Bush Forever site;

Identify access for firefighting operations and daily maintenance;

Identify current and future landowner, developer and City of Wanneroo responsibilities for various

components of this fire management plan; and

Document in the Appendices section of this Fire Management Plan, the acceptable solutions adopted for the

development of Lot 2 Pipidinny Road North Eglinton.

Page 9: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 9

4.0 DESCRIPTION OF THE AREA

4.1 GENERAL

This Fire Management Plan applies to Lot 2 Pipidinny Road North Eglinton Estate which is to be subdivided into

urban lots.

Pipidinny Road is located along the southern boundary, Marmion Avenue forms the Western boundary, the future

Mitchell Freeway Extension is located on the eastern boundary and bush forever site is located on the northern

boundary. It is proposed to set aside land for the extension of the Perth-Joondalup Rail Line which divides the side

approximately in half. The area to the south of Pipidinny Road is proposed to be developed into urban residential

housing in the future.

The vegetation of the area consists of Open Shrub Class D and Closed Heath Class C to Open Shrub. There is one

pocket of Tuart Woodland located in the central eastern area and is proposed to be contained in an area Public Open

Space. (GHD vegetation survey Feb 2011)

The purpose of this Fire Management Plan is to detail the fire mitigation strategies for the urban interface with the

Bush Forever land and Public Open Space areas.

4.2 CLIMATE

The Mediterranean climate experienced by this area is such that the majority of rain falls in late autumn through to

late spring. This rainfall supports substantial vegetation growth which dries off in Summer/Autumn.

The combination of prevailing winds and dry vegetation poses a fire risk and bush fire control is considered essential

for the protection of life and property, and to ensure that uncontrolled burning does not degrade existing and

replanted vegetation.

The bush fire season is generally from October to the following May, but is subject to seasonal changes and drought

conditions.

4.3 TOPOGRAPHY

The site consists of old sand dune that in some areas area relatively steep around 10° but the area is generally

undulating with majority of the area being 0°-5° with some areas of 5°-10° and small areas of 10°-15° . See Figure 3

Page 10: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 10

Figure 3 Slopes.

Page 11: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 11

4.4 BUSH FIRE FUELS

The Vegetation Types map (Figure 4) has been prepared for the site. In the draft Vegetation Guide for Bushfire

Assessment in WA (September 2015) Banksia Woodland is now rated as Class D Scrub. “Banksia Woodland requires

particular consideration. The physical structure of Banksia Woodland, fire development and wind driven fire

behaviour is consistent with Class D Scrub and should be modelled as such”.

On the 4th

October 2015 a review of the vegetation classification was carried out along the northern boundary of the

Stages 3-9 and vegetation classification was carried out in accordance with the draft Vegetation Guide for Bushfire

Assessment in WA the results are as follows.

The vegetation to the North (in the Bush Forever site is Open Scrub (2-4 metres) Class D. There is some vegetation

adjoining the northern boundary in the Bush Forever Site that is identified in the flora survey as Banksia Woodland

which in the new Draft Vegetation Guide (WA) September 2015 is classified as Scrub Class D. The vegetation is

upslope from the proposed dwellings.

The Open Shrub (Class D) has bush fire fuels of approximately 25 tonnes/ha. (Table B2 AS 3959-2009).

4.5 LAND USE

The site is to be developed into Urban Residential lots School sites, neighbourhood centre and public open space/

drainage areas which restricts further development/subdivision of any of the site. If lots are further subdivided in the

future a separate Fire Management Plan is required for that subdivision.

4.6 ASSETS

Lot 2 Pipidinny Road is currently vegetated as is the adjoining areas with Pipidinny Road located on the southern

boundary of the site, Marmion Avenue on the western boundary and a Bush Forever site along the northern boundary.

The current assets are the vegetation with the Bush Forever site and proposed Public Open space areas, Pipidinny

Road, Marmion Avenue, adjoining bush lands, Power line along Pipidinny Rd. other infrastructure on Marmion

Avenue associated with traffic control (e.g. street lighting, roundabouts etc.)

The area to the south of Pipidinny Road is also to be developed into urban residential in the future which will remove

vegetation south of Pipidinny Rd.

4.7 ACCESS

The proposed road system has several entrances off Pipidinny Road and Marmion Avenue. See Figure 2.

Each stage of land release will have two (2) access/egress roads installed.

There is a 20 metre road proposed to separate the proposed dwellings and the Bush Forever site from the proposed

rail reserve to the eastern boundary of the site and the remainder of the interface will have a 20 metre road reserve

other than where POS adjoins Bush Forever.

Land for the extension of Mitchell Freeway north has been set aside along the eastern boundary of the site. However

planning for access onto the freeway is not currently publically available.

Page 12: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 12

Figure 4 Vegetation Types as per GHD Survey

Page 13: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 13

Figure 5 Vegetation Classifications as per Planning for Bush Fire Protection

Page 14: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 14

4.8 WATER SUPPLIES

4.8.1 Domestic Water Supplies.

Water supplies for domestic use will be supplied from the Water Corporation mains water supply.

4.8.2 Water for Fire Fighting

Fire Hydrants will be installed by the developer along roads in accordance with the “Water Corporation No 63 Water

Reticulation Standard” including fire hydrant road and pole markings.

5.0 BUSH FIRE ASSESSMENT

5.1 BUSH FIRE HISTORY

The site has been subject to infrequent wildfires, no documented fire history was available. However the following

comment was noted in the Landcorp Eglinton Spring Flora and Significant Tree Survey (GHD February 2011) “A

large proportion of the Study area east of Marmion Avenue has been highly disturbed by recent fires and by the

grazing of stock over time”.

5.2 BUSH FIRE RISK

The site currently has a firebreak around the boundary of the site that complies with the City of Wanneroo Firebreak

Notice. There are some firebreaks in adjoining areas but may not be of a sufficient standard to use as a boundary to

contain a bush fire. However with the design of this development and the clearing of vegetation for the urban

development the risk to the development will be greatly reduced other than the possibility of bush fires threatening

the outer edges of the development especially as along the northern boundary which remain as Bush Forever.

The extension of the Mitchel Freeway will be located on the eastern boundary, south of Pipidinny Rd will be

developed as urban residential and part of the area to the west of Marmion Avenue may also be developed as urban

residential.

The risk to dwellings located within 100 metres of external and internal vegetation will be lessened by installing an

appropriate setback between the Lot boundaries and vegetation appropriate to BAL ratings determined from Table

2.4.3 of AS 3959-2009.

If bush fires occur in the adjoining areas, Bush Forever Site or Public Open Space area, dwellings and buildings may

come under ember attack.

With smoke from the fires it may cause disruption to traffic on major local roads of Pipidinny Road and Marmion

Avenue and local roads within the development and on the future Freeway and future train services on the extension

of the Perth-Joondalup line.

5.3 BUSH FIRE HAZARD

In Planning for Bush Fire Protection Appendix 1 methodology for classifying bush fire levels is detailed. The

methodology rates bush fire hazard using vegetation type. The methodology is also based on the underlying

assumption that land in Western Australia is predominantly undulating. The methodology specifies three bush fire

hazard levels “Low”, “Moderate” and “Extreme”.

This methodology has been used in this Fire Management Plan.

The assessment of fire risk takes into account existing site conditions which include:

Page 15: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 15

Topography with particular reference to ground slopes and accessibility;

Vegetation cover – both remnant and likely revegetation; and

Relationship to surrounding development.

The Bush Fire Hazard Assessment is “Moderate” in retained vegetation areas Class D – Open Shrub.

The adjoining areas are also rated as “Moderate” with an area rated “Extreme” to the east of the proposed Freeway

Reserve

Due to the vegetation being classified as “Extreme” or “Moderate” the area is a Bush Fire Prone Area and as such

AS 3959-2009 applies to new residential areas.

Vegetation within the urban residential area will be cleared.

5.4 BUSH FIRE THREAT

The area within the development site other than areas within Public Open space will be cleared so the fire hazard will

be reduced to “Low” other than the vegetated areas of POS. The areas outside the development site will remain as or

“Moderate” until they are cleared for the Freeway Extension or developed for urban development.

The Bush Forever site, adjoining vegetation outside the site and vegetated Public Open Space within the development

are an ongoing threat to the development however setbacks complying with Planning for Bush Fire Protection and

AS 3959-2009 BAL rating will apply.

Bush fires that occur during the construction phase of the site and until houses are constructed on all lots there will be

a possible threat to the development. Best practice suggests the Bush Forever site should have a fire management

plan developed for the site by the landowner/managing authority to lessen the potential threat to residents on roads,

freeway and trains as smoke may affect these transport systems. Within the bush forever access for fire appliances is

also recommended to be brought up to the standard detailed in Planning for Bush Fire Protection as the levels

between the dwellings within the development may be different to the levels within the Bush Forever site making fire

suppression difficult from perimeter roads.

Smoke from bush fires outside the development area may cause visibility problems and exacerbate respiratory

medical conditions of residents.

Page 16: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 16

Figure 6 Bush Fire Hazard Assessment

Page 17: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 17

5.5 SUMMARY OF BUSH FIRE POTENTIAL ISSUES

Bush fire issues that have been identified for this site and adjoining land are:-

The site is vegetated with Shrub - Class D with a bush fire rating as “Moderate”.

The site is a Bush Fire Prone Area.

Lack of access within adjoining areas restricts fire fighting strategies to existing major roads.

Bush Forever site to the north is poorly managed. The Developer has no responsibility for this land as it

has been handed over to the State Government as a Bush Forever site. The Development of this Site is

not reliant on any fire management strategies being implemented in the adjoining Bush Forever Site.

Bush fires in the adjoining vegetated areas may cause visibility problems to transport systems,

exacerbate respiratory medical conditions and ember attack on dwellings within 100 metres of

vegetation.

6.0 FIRE MITIGATION

6.1 HAZARD MANAGEMENT

This section outlines the actions and works that are to be undertaken in order to be successfully implement the fire

protection strategies of this Fire Management Plan as it applies to the Eglinton North Estate.

An external road system will separate the Lots from vegetation other than where the POS adjoins the Bush

Forever site and along the eastern boundary. See Figure 2.

Along the eastern boundary lots (R10 size–Figure 2) will be sufficiently large to have the required BAL rating

setback to modified vegetation zone installed at the rear of the dwelling to comply with AS 3959-2009 BAL

construction standards. Also a 32 metre power line easement is located between the dwellings and the

proposed Freeway Reserve.

All vegetated POS area will be managed so that bush fire fuels in vegetated areas greater than 1 ha will have

bush fire fuels managed below 8tonnes/ha. This will initially be the responsibility of the Developer but in the

long term will become the responsibility of the City of Wanneroo when the POS areas are vested with them.

All road reserves adjoining POS vegetation and the Bush Forever site are to be managed to the Building

Protection Zone standard detailed in Section 7.3.

The Developer is to modify then manage road reserves that act as a setback between a dwelling and

vegetation (Vegetated POS and Bush Forever site) to the Building Protection Zone Standard until the

management of the road reserve is handed over to the City of Wanneroo.

During staged land releases the Developer will maintain a 100 metre area around the stage to be released to

the building protection Zone standard to avoid unnecessary increase in dwelling construction standards to as

3959-2009 BAL ratings.

Page 18: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 18

6.2 BUSH FIRE RISK MANAGEMENT

6.2.1 Total Fire Ban Days

A Total Fire Ban is declared because of the extreme weather conditions or when fires are seriously stretching fire

fighting resources. A Total Fire Ban is declared by DFES following consultation with Local Governments.

When a Total Fire Ban is declared it prohibits the lighting of any fires in the open air and any activities that might

start a fire. The ban includes all open fires for the purpose of cooking or camping. It also includes the use of

incinerators, welding, grinding, soldering and gas cutting equipment.

The Department of Fire and Emergency Services and the City of Wanneroo are to continue to educate the public on

what a Total Fire Ban means and what actions the public need to take.

6.2.2 Public Education Program

The City of Wanneroo is to continue to provide the community with advice on bush fire prevention and preparedness

through brochures, newspaper articles and compliance with any Fire Control Notice and/or Hazard Reduction Notice

issued to any owner or occupier under the Bush Fires Act and has relevant information set out on their web site.

The subdivider is to provide a copy of the current City of Wanneroo Fire Control Notice, The Homeowners Survival

Manual and Prepare Act Survive brochure and this Bushfire Management Plan at the time of sale of a Lot to all new

landowners whose Lot has an increased Construction standard in accordance with AS 3959. It is essential that the

Real Estate agent handling the sale of lots on behalf of the subdivider advises potential landowners that a Bushfire

Management Plan exists and that the modification of vegetation and on going fuel reduction will be required within

this development.

Other Public Safety and Community information on Bush Fires is available on the Department of Fire and

Emergency Services web site www.dfes.wa.gov.au and the City of Wanneroo website www.wanneroo.wa.gov.au

6.3 FUTURE DEVELOPMENT

This Fire Management Subdivision Plan has been prepared on the basis of the North Eglinton Local Structure Plan

being developed in accordance with the layout detailed in Figure 2. Any future development that is contrary or on

addition to this subdivision plan will require approval from the City of Wanneroo and may result in the need to

review the provisions of this Fire Management Plan or the preparation of a new Fire Management Plan.

6.4 ACCESS AND FIREBREAKS

6.4.1 Road System

The road system will have multiple links to Marmion Avenue and Pipidinny Road. In most areas an internal road will

separate areas of Public Open Space from urban development.

All road access will be designed and constructed to Council specifications and will comply with Acceptable solutions

A2.1, A2.2 of the Planning for Bushfire Protection Guidelines (2010).

Page 19: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 19

6.4.2 Internal Firebreaks

Notwithstanding the provisions of this Fire Management Plan, all lots within the site must comply with the

requirements of the City of Wanneroo Firebreak Notice, as published annually.

6.4.3 Private Driveways

Private driveways into residential homes must comply with the City of Wanneroo specifications and comply with

acceptable solution A2.5.

6.5 FIRE SAFER AREAS

In the event of a bush fire, the Incident Controller of Fire Fighting Operations will advise if an evacuation is

necessary and, in conjunction with the City of Wanneroo Emergency Services, direct residents to Safer Refuge Areas.

6.6 ASSESSMENT OF FIRE MANAGEMENT STRATEGIES

The implementation of this Fire Management Plan will be implemented at each stage of land release.

It will be the responsibility of the developer to implement the provisions of this Fire Management Plan in order to

seek clearance of those conditions of subdivision.

Likewise it is the responsibility of the City of Wanneroo to ensure that all standards required in this Fire Management

Plan are met by the developer prior to clearing any conditions of subdivision relating to this Fire Management Plan.

After any major fires that may occur during or once this development has been completed, the City of Wanneroo may

conduct a Post Incident Analysis of the fire, which may include identifying and implementing any changes that may

be needed to improve the performance of fire prevention strategies.

With the hazard management provisions detailed in this Fire Management Plan any fires that occur in the site are not

expected to devastate the community if the provisions of this Fire Management Plan are implemented by the

Developer and maintained by landowners within their Lot and by the City of Wanneroo in Public Open Space and

relevant road reserve adjoin the Bush Forever site..

In the Foreword of AS 3959- 2009 it states that “It should be borne in mind that the measures contained in this

standard cannot guarantee that a building will survive a bushfire event on every occasion. This is substantially due to

the degree of vegetation management, the unpredictable nature and behavior of fire and extreme weather conditions.”

This Fire Management Plan has been prepared in accordance with the acceptable solutions detailed in Planning for

Bush Fire Protection Edition 2 (2010).

Page 20: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 20

6.7 IMPLEMENTATION OF THE FIRE MANAGEMENT PLAN.

This Fire Management Plan will be implemented by the Developer at each stage of land release.

In implementing this Fire Management Plan, the following responsibilities have been determined:

6.7.1 Developer's Responsibilities

Prior to the issuing of Titles the developer shall be required to carry out works described in Section 6 of this Fire

Management Plan to the satisfaction of the City of Wanneroo and the Western Australian Planning Commission. The

developer will implement the follow works at each Stage of land release subject to approval of the City of

Wanneroo:-

All internal roads and access ways are to comply with the design requirements of the City of Wanneroo

except where the cost of completing construction has been bonded with the City of Wanneroo;

Implement Landscape areas where roads reserves are 15 metres wide to achieve the required distance

from Lot boundaries to retained vegetation.

Reticulated water supply (including hydrants) to be provided to the satisfaction of the “Water Corporation

No 63 Water Reticulation Standard”, provide a map of fire hydrant locations to Department for Fire and

Emergency Services (DFES) and the City of Wanneroo. Hydrants are to be identified by both pole and

road markings, except where the cost of completing construction has been bonded with the City of

Wanneroo and/or Water Corporation See Section 7.3.5;

The developer is required to lodge a Section 70A Notification on each Certificate of Title, proposed by

the subdivision to identify the existence of this fire management plan and of any lots that are imposed

with an increased building construction standard in accordance with AS 3959-2009 (BAL ratings). The

notification shall state “The Lots are subject to a Fire Management Plan”;

Prior to the issue of titles for any lots at the stage of release, the developer to provide detailed

Development Lot plans specifically identifying properties with BAL rating imposed in which the

increased building constructions standards will be applicable. This will apply to any dwellings that area

within 100 metres of vegetation in excess of 1 ha;

All vacant land is to comply with the City of Wanneroo Firebreak Notice as published annually;

All purchasers/new property owners are to be advised of the location of any hydrant that is positioned on

their Lot or verge and the requirement for the hydrant to remain unobstructed at all times;

Developer is to notify any landscaping contractor’s, under direction of the developer, of relevant hydrant

locations and the requirement to ensure the hydrant is not obstructed, covered over or damaged;

Supply a copy to each new property owner on sale of the allotment requiring an increase in dwelling

construction standard of following;-

this Fire Management Plan;

The Homeowners Bush Fire Survival Manual;

Prepare Act Survive (or similar suitable documentation); and

City of Wanneroo Fire Break Notice

.

Page 21: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 21

6.7.2 Property Owner's Responsibilities

To maintain the reduced level of risk and threat of fire, the owners/occupiers of all lots created by this proposal will

be responsible for undertaking, complying and implementing measures protecting their own assets from the threat

and risk of bush fire:

Maintain the property in good order to minimize potential bushfire fuels to mitigate the risk of fire on the

property by complying with the minimum requirements detailed in the City of Wanneroo Firebreak

Notice;

Ensure that vacant lots comply with the City of Wanneroo Annual Firebreak Notice;

Ensure that where hydrants are located on private property or their verge, the hydrant is not to be

obstructed and remain accessible at all times;

Ensure any contractor’s under direction of or working for the property owner, are notified of relevant

hydrant location on the property and the requirement to ensure the hydrant is not obstructed, covered over

or damaged.

Ensure that dwellings are construction to the current AS 3959 standard where a lot has been identified as

requiring and increased construction standard. There will be a Section 70A notification on the Land Title.

Complying with the instructions of FESA Fire Services, the City of Wanneroo and/or volunteer fire

services in maintaining the property or during the event of a bushfire.

Be aware of building conditions for lots identified. The landowner shall request a Bushfire Consultants to

reassess the BAL for those sites pre identified, with a copy of the assessment results to be submitted as

part of any building license application.

Ensure that in the event an evaporative air conditioner is installed at the property, suitable external ember

screens are installed to roof mounted units and complies with AS 3959.

Understand what is required when a Building Protection Zone is established as part of the landscaping of

the Lot and be aware that the maintenance and upkeep of the Building Protection Zone on the property is

the owners/occupiers responsibility in perpetuity.

6.7.3 City of Wanneroo The responsibility for compliance with the law rests with individual property owners and occupiers and the following

conditions are not intended to unnecessarily transfer some to the responsibilities to the City of Wanneroo.

The City of Wanneroo shall be responsible for:

Endorsing a Section 70A Notification on each Certificate of Title;

Assess each building license application received against the current AS 3959 to determine suitability of

the proposed construction;

Enforcement of the City of Wanneroo Firebreak Notice;

Once the setback distance between a lot boundary and retained vegetation has been established and

maintained to the Building Protection Zone Standard to the satisfaction of the City of Wanneroo by the

Page 22: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 22

Developer for the set period, then management of that land is transferred to the City of Wanneroo the

Council is then responsible to maintain the setback to the required standard in perpetuity;

Those parts of Public Open Space that form part of the setback distance between allotments and retained

vegetation will be managed by the City of Wanneroo and are to comply to the Building Protection Zone

standards detailed in the Fire Management Plan;

Provide fire prevention and preparedness advice to landowners upon request.

Ensure Compliance with this Fire Management Plan prior to clearance of conditions of subdivision for

each stage of land release;

Develop and Maintain Fire Fighting Facilities for the District.

7.0 APPENDICES

7.1 WORKS PROGRAM

The works program required in this Fire Management Plan must be implemented by the developer at each stage of

land release.

Landowners will be responsible for the annual compliance with City of Wanneroo Firebreak Control Notice.

Once Public Open Space areas are handed over to the City of Wanneroo, the Council will be responsible for the

annual maintenance setback distance between the Lot and retained vegetation to maintain BAL ratings on adjoin

dwellings.

7.2 GUIDELINES SPECIFICATIONS AND MINIMUM STANDARDS

The following section outlines the required specifications and minimum development standards that are required

under this Fire Management Plan.

7.2.1 Building Protection Zone

The aim of the Building Protection Zones (BPZ) is to reduce bush fire intensity close to dwellings, and to minimise

the likelihood of flame contact with buildings.

The Building Protection Zone is a low fuel area immediately surrounding a building complying with Planning for

Bush Fire Protection Acceptable Solution A4.3.

The following Building Protection Zone is to apply to the interface area between the Bush Forever site and Public

Open Space and nearby residential dwellings and along the eastern boundary and must fulfil the following conditions:

Bush fire fuels must be maintained at or below 2 tonnes per hectare and dry grass must be maintained

below a height of 50mm;

The spacing of trees are to be planted to provide for a separation of 10 metres between crowns when trees

mature;

Trees are to be progressively low pruned at least to a height of 2 metres;

Page 23: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 23

There are no tree crowns over hanging a building;

Branches, must be removed at least 2 metres back from the eaves of all buildings;

Shrubs within the Building Protection Zone have no dead material within the plant;

Trees in the Building Protection Zone have no dead material within the plant’s crown or on the bole (tree

trunk);

Fences within the Building Protection Zone are to be constructed using non combustible materials (e.g.

colour bond iron, brick, limestone);

All leaves, twigs, logs, branches must be removed from within the building protection zone. Annual falls

of leaf litter must be raked up and removed or burnt.

7.2.3 Dwelling Construction

Individual dwellings on designated lots shall be designed and built to conform with:

The Building Code of Australia; and

AS 3959 Construction of Buildings in a Bushfire Prone Area;

The minimum distance of 100 metres (from vegetation rated ‘Moderate’ or ‘Extreme’) may be reduced is compliance

with AS 3959. Under AS 3959 as the distance from the vegetation is reduced, the construction standard must be

increased. Table 2.4.3 AS 3959 sets out this relationship and Section 2 of AS 3959 details the methodology of

determining the Bushfire Attack Level (BAL).

BAL (Bushfire Attack Level) Determination Using Methodology from Section 2.2.1 of current adopted AS 3959-

2009 and Table 2.4.3 which applies to Lots interfacing the Bush Forever site, Eastern boundary and Public Open

Space is:

Table 1 Summary of Determination of BAL using Fire Danger Index 80 Vegetation

Class Setback from

Vegetation (METERS)

Slope BAL Construction Standard AS 3959-2009

BPZ (metres)

HSZ (metres)

D Shrub 19-27 upslope 19 Section 3 & 6 20 0

D Shrub 27-100 Upslope 12.5 Section 3 &5 27 0

D Scrub 15-22 0°-5° 29 Section 3 & 7 20 0

D Scrub 22-31 0°-5° 19 Section 3 & 6 31 0

D Scrub 31.1-100 0°-5° 12.5 Section 3 & 5 100 0

D Scrub 17-24 5°-10° 29 Section 3 & 7 20 0

All lots identified in this ‘Development’ (i.e. Lots within 100 metres of the Bush Forever site, Public Open Space and

reserve for the future Freeway extension) will be subject to a Section 70A notification being lodged on the Certificate

of Title, with future landowners required to construct any dwelling on these lots in accordance with the constructions

standards outlined in AS3959.

The BAL rating and setback distances below are indicative based on the existing slopes and will need to be re

assessed at the Land release stage when the levels of the site and interface will be more accurate. A map showing the

revised BAL levels and the Lots requiring increased construction standards will be provided to the City of Wanneroo

as part of the approval process a stage of land release. BAL assessments are to be carried out by a competent Fire

Consultant.

Page 24: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 24

Area Northern Boundary Railway Line Easement to Eastern boundary.

The Table above and Shrub Class D details the distance from the front of the Lot to the edge of the Bush Forever

where the slope is 5°-10° as minimum of 20 metres (which is made up of a 20 metre wide road reserve), the

construction standard of the first row of dwellings in BAL 29 and would be constructed to AS 3959-2009 BAL 29

Section 3 and 7. The minimum 20 Metres would be managed to the Building Protection Zone Standard.

Area along the Eastern boundary Power Line easement rear of Lot.

Table 1 above (Row 6) Class D Scrub details the distance from the rear of the dwelling to the minimum distance to

the rear of the Lot with a slope of 5°-10° (some areas are 0°-5°) as 35metre (power line easement is 32 metres) the

construction standard would be AS 3959-2009 BAL 19 Sections 3 & 6. The 35 metres would be installed by the

developer to be managed to the Building Protection Zone standard by the landowner.

Area along northern boundary west from Railway line easement and adjoin Public Open Space areas

Table 1 above (1st & 2

nd row) Class D scrub details the distance from the front of the Lot to the edge of vegetation

where the slope is upslope as 20 metres (which is the width of the road reserve or is a combination of road reserve

and the front setback within Lots) the construction standard of the first row of dwellings would be to AS 3959-2009

BAL 19 Sections 3 & 6. See Figure 8 for Indicative BAL Ratings.

All adjacent structures such as garages, carport and shed that are not attached to the dwelling must be separated from

the dwelling by a minimum of 6 metres otherwise the structure must comply with construction standard of the

dwelling.

Compliance with these construction standards will be assessed at the time of Building License Application by the

City of Wanneroo.

As a result of ember attack Evaporative Air conditioners can be the cause of a fire starting in a dwelling. It is a

requirement that the roof unit of an evaporative air conditioner is enclosed in a suitable external ember protection

screen. More information is available at www.fesa.wa.gov.au. and in AS 3959.

At the Building Permit Application stage a landowner may request a Fire Consultant to carry out a Bushfire Attack

Level Assessment to confirm the indicative BAL assessment provided by the Developer at the Stage of Land Release

or provide a new BAL rating that will apply to a particular Lot. A copy of the BAL report is to be sent to the City of

Wanneroo as part of the Building Permit Application.

Page 25: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 25

Figure 7 Schematic Diagram of Bush fire setback/Building Protection Zone separating dwellings and retained

vegetation - 3 pages.

The above diagram shows a 20 metre Road Reserve the same schematic layout will apply for a 25 metre Road

Reserve

Page 26: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 26

Page 27: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 27

Page 28: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

34.2

10

10

10

300m²

7.5

7.5

225m²

7.5

7.5

225m²

7.5

7.5

225m²

10

10

300m²

10

10

30300m²

10

10

300m²

10

10

300m²

7.5

7.5

225m²

7.5

7.5

225m²

33.1

24.1

31

6

64

1221m²

3792m²

13

27

4.3

10

385m²

10

10

30300m²

10

10

30300m²

10

10

30300m²

10

10

30300m²

10

10

30300m²

10

10

30300m²

10

30300m²

10

300m²

30

10

7.5

30

7.5

225m²

7.5

30

7.5

225m²

7.5

7.5

30225m²

10

30

10

300m²

7.5

30

7.5

225m²

7.5

30

7.5

225m²

7.5

7.5

30225m²

7.5

7.5

30225m²

6m LA

NEW

AY

20m

ROA

D RE

SERV

E

30m

ROA

D RE

SERV

E

20m ROAD RESERVE

20m ROAD RESERVE

20m ROAD RESERVE

30m ROAD RESERVE

25m

RO

AD

RES

ERVE

15m

RO

AD

RES

ERVE

15m

RO

AD

RES

ERVE

15m

RO

AD

RES

ERVE

15m

RO

AD

RES

ERVE

15m

RO

AD

RES

ERVE

15m

RO

AD

RES

ERVE

15m

RO

AD

RES

ERVE

15m

RO

AD

RES

ERVE

15m

RO

AD

RES

ERVE

15m ROAD RESERVE

12m ROAD RESERVE

15m ROAD RESERVE

30

12.5375m²

30

15450m²

30

15449m²

15m

RO

AD

RES

ERVE

20m ROAD RESERVE

1515

25m ROAD RESERVE

15m ROAD RESERVE

6m LANEWAY

6m LANEWAY

6m LANEWAY

15m

RO

AD

RES

ERVE

6640.1

8.5

0.6

59.4

45.9

3017m²

7.5

7.5

225m²

7.5

7.5

225m²

7.5

7.5

225m²

7.5

7.5

225m²

10

10

300m²

7.5

7.5

225m²

7.5

7.5

225m²

10

10

30300m²

10

10

30300m²

10

10

30300m²

10

10

30300m²

17.5

30

17.5525m²

17.5

30

17.5525m²

15

30

15450m²30

15450m²

12.5

30

12.5375m²30

12.5375m²

12.5

30

12.5375m²30

12.5375m²

15

30

15450m²30

15450m²

15

30

15450m²30

15450m²

15

30

15450m²30

15450m²

15

30

15450m²30

15450m²15

30

15450m²

15

30

15450m²30

15450m²

15

30

15450m²30

15450m²

15

30

15450m²

30

15450m²

12.5

30

12.5375m²

30

15450m²

30

12.5375m²

15

30

15450m²

15

30

15450m²30

15450m²

7.5

7.5

225m²

7.5

7.5

225m²

7.5

7.5

225m²

7.5

7.5

225m²

10

10

30300m²

10

10

30300m²

10

10

30300m²

7.5

7.5

225m²

7.5

7.5

225m²

7.5

7.5

225m²

7.5

7.5

225m²

10

10

30300m²

10

10

30300m²

10

10

30300m²

10

10

30300m²

10

10

30300m²

10

10

30300m² 4.2

11

14

27416m²

94.2

27

12

30356m²

10

10

30300m²

10

10

30300m²

15

15

30

450m²

14

14.5

19.9

31.1

779m²

15

15

30

450m²

30

12.5

30 5.5

7

375m²

12.5

30

12.5375m²

6

30.1

2.2

8.3

6.7

8.3

465m²

20

15

20

15

300m²

124.2

17

15

295m²

12.5

32400m²

12.5

12.5

32400m²

15

15

30

450m²

12.5

12.5

32400m²

15

15

30

450m²

23.8

4 4.27.8

39.3

662m²

15

30

15450m²

30

12.5375m²

12.5

20

8.4

11

420m²

4 14 4.2

23

13

462m²

4.2

14 4

30

13

462m²

23

11 8.5

20

419m²

208.5

11

23420m²

4 14.1 4.2

13

30

462m²

4.2

14 4

13

23463m²

11 8.520

419m²

208.5

11

23420m²

4 14.1 4.2

13

463m²

4.2

14 4

30

13

23462m²

11 8.6

20

420m²

11 8.520

420m²

4.214 4

13

23462m²

4 14 4.2

13

30

462m²

12.5

30

12.5375m²

12.5

3012

.5375m²

12.5

30

12.5375m²

12.5

30

12.5375m²

16.7

8.5

11

30 2

25

531m²

20.1

8.4

11.1

23420m²

12.5

30375m²

12.5

30375m²

12.5

30

12375m²

12.5

32400m²

12.5

32400m²

6.3

31.9

15.59

32

492m²

15

15

20

300m²

18.614.1

8.4

12.7

20

355m²

12

33.6

11.9

33.5403m²

25.94.2

8.1

39.8

30

633m²

12.5

12.5

30375m²

12.5

12.5

30375m²

12.5

12.5

30375m²

15

30

450m²

7.5

7.5

225m²

7.5

7.5

225m²

7.5

7.5

225m²

7.5

7.5

225m²

7.5

7.5

225m²

30 30 30 30 30

10

300m²

30

10

7.5

7.5

225m²

7.5

7.5

225m²

303030303030

10

30300m²

9.25.9

2.9 6.1

30

362m²

10

6m LANEWAY

26.4

16.1

34

2

5

30779m²

7.5

7.5

30225m²

64

1.78ha

19

4.2

19.1

2.2 15

29.5

475m²

15.6

15

33.8

474m²

20

15300m²30

15

30

15450m²

15

30

15450m²20

15300m²

15

30

15450m²20

15300m²

15

30

15450m²20

15300m²

15

30

15450m²20

15300m²

15

30

15450m²20

15300m²

12.5

30

12.5375m² 15

20

15300m²

17.5

174.2 14.5

20

346m²

15

15

20

300m²

17.5

14.5 4.217

346m²

14

4.2 18.6

17362m²

15

30

15

30

450m²

15

12 4.227

446m²

12.5

30

12.5375m²

15

21.6

15324m²

15

21.6

15324m²

15

30

15450m²

15

21.6

15325m²

15

30

15450m²

15

21.7

15325m²

15

30

15450m²

15

21.7

15326m²

389m²

13

13

17

22.7

17

384m²

4.25.29.6

22.5

14.8

5.314.2376m

²

33

11.8

30

25.6

560m²

15

30

15450m²

0.512

0 30

12.5375m²

57.5

30

12.5375m²

7.2

9.9

22

17

377m²

9.2

4.2

16.4

22.8

17

2.910.6

462m²

33

12.9

30

26.8596m²

7.6

8.1

4.2

17

2.2

17.2

390m²

17

22.9

17

388m²

34

3

27.

5

29.9

25.9

581m²

12.5

30

12.5375m²

12.5

30

12.5375m²

32.2

16.5

30

28.2

670m²

14.4

4.2

17

2.1

18.2

379m²

15

22

15

330m²

15

22

15

330m²

4.212.53.5

22

2.513.3 4.

3

14.9

388m²

18.5

15.7

30

26.1

637m²

12.5

30

12.5375m²

30

12.5375m²

30

12.5375m²

15

30

15450m²

12.5

30

2.510

375m²

31.2

12.9

30

7.5

518m²

13

4.2

17

2.1 16.6

348m²

15

22

15

330m²

15

22

15

330m²

14.9

4.214.1

22

15.8

4.3

368m²

31.2

14.1

30

22.8554m²

12.5

30

12.5375m²

31.2

11.9

30

20.5

486m²

4.215.9

22

18.3 2.1

17

409m²

17.5

22

17.5

385m²

14.5

4.2

172.1

18.1

381m²

22.6

13.7

21.7

19.9364m²

4.217.3

31.3

20

33.5

677m²

47.1

91.3

72

4.333

171.2

190.5

10.5

35

25

40

30

3540

25

35

15

95

104.4

75.4

52.8

52.5

46.1

36.1

36.2

40.226

53.3

64.8

8.7

4.250.94.2

21.8

62.1

30m ROAD RESERVE

25m ROAD RESERVE

25m RO

AD

RESERVE

18m RO

AD

RESERVE

115.4

550.

4

40.7

336.9

HIGH SCHOOL

PRIMARY SCHOOL

53.8

70.2

61

31.6

32.5

32.5

42130.5

42.8

8.5

43

8.5

39.1

171.5

2.3259ha

404.1

159.9

30

8.716.9

33.7

1717

33.8

33.817

16.916.9

1733.8

33.833.8

4.5159.9

5.8 238.4

73.9

45.3

16.88.4

25.2

25.1

9.8431ha

18m ROAD RESERVE

258.

19.

1

49.9

20.9

27.1

8.5

178.

9

43.1

18m ROAD RESERVE

89.3

8.5

302

39.7

33.1

134.9

363

8.4352ha

248.5

8.514

0.7

13

247.1

0.6

156.

8

4.00ha

RESERVE FOR RECREATION

RESERVE FOR RECREATION

TEMPORARYPUMP STATION

RESERVE FOR RECREATIONCONSERVATION AND DRAINAGE

18

RESERVE FORRECREATION AND

DRAINAGE

RESERVE FOR RECREATIONCONSERVATION AND DRAINAGE

RESERVE FORRECREATION AND

DRAINAGE

394m²

7.5

10

10

30300m²

7.5

7.5

225m²

7.5

7.5

225m²

7.5

7.5

225m²

7.5

7.5

225m²

10

10

30300m²

10

10

30300m²

7.5

7.5225m²

7.5

7.5

225m²

7.5

7.5

225m²DX

DX

DX

28.8

11.2

2.8

33.6

5.7

30

749m²

34

11.5

4.2

29.1

2.8

12.5

487m²

8.5

6

30

10 2.822340m²

2.810.4

30

9.4 4.2

25.1

365m²

7.58.5

222.8 11.5

30

385m²

8.5

7.5

30

11.5 2.822385m²

7.8

8.522

2.8 11.8

30

21

8.5

30

8.5

10.5 4.3

383m²

21

7

9.3

30

4.3 10

2.8

368m²

2.9

12.8

339m²

28

22.4

2.8 10.5

373m²

30

12.5

4.2

30

12

11

25.1

2.8413m²

9.5

302.8

11.5

28342m²

2.2

20.5

92.8

25.1

4.2

8

30324m²

7.5

7.5

225m²

7.5

7.5

225m²

7.5

7.5

225m²

7.5

7.5

225m²

2181m²

7.5

4.5

3

225m²

7.5

7.5

225m²

7.5

7.5

225m²

7.5

7.5

225m²

2.830.14.2

30414m²

7.5

7.5

225m²7.5

7.5

225m²7.5

7.5

225m²7.5

7.5

225m²7.5

7.5

225m²7.5

7.5

225m²7.5

7.5

225m²

64.2

25.1

2.8

7

264m² 3131m²

DX

25m

25m

2.8 18.7

16

8

30

24.1

628m²

14.7 4.22730

17.7

526m²

9.5

4.225

2.8 10.5

30369m²

POS

NEIGHBORHOOD CENTRE

MIXED USE

81.3

8.5

81 8.581

.3

8083m²

8.5

818.5

69.7

93

69.77004m²

8.5

79

8.510

4.3

91

104.

31.0001ha

47

29.9

8.5

80

27

4891m²

COMMUNITY PURPOSE SITE(INDOOR RECREATION)

18

81

8.515

1

16.2

12.2 8.5

30.1

17.8

30

15.2495m²

13.74.2

16.9

15.1

20

315m²

15

15

20

300m² 15

15

20

300m²

4.210.5

15.1

17.2

281m² 13.74.2

16.9

15.1

20

315m²

15

15

20

300m²

15

174.2 12

20

296m²

18

30

18540m² 17

30

17510m²

30

17510m²17

30

17510m²

30

17510m²17

30

17510m²

15

30

15450m²

30

15450m²

15

30

15450m²

30

15450m²

15

30

15450m²

30

15450m²

15

30

15450m²

30

15450m²

17

30

17510m²

15

30

15450m²

15

30

15450m²30

15450m²

15

30

15450m²30

15450m²

15

30

15450m²30

15450m²

15

30

15450m² 17

30

17510m²

15

30

15450m²30

15450m²

30.1

15.3

30

12.7420m²

22.9

10.7

30 8.7

514m²

7.8

21.3

15

19.5

438m²

17

17 4.214336m²

4.217

15

20

12296m²

15

12 4.217

296m²

15

20

15

20

300m²

154.2 27

18536m²

17

30

17510m²30

17510m²

17

30

17510m² 15

30

15450m²

15

30

15450m²30

15450m²

15

30

15450m²30

15450m²

15

30

15450m²30

15450m²

4.29

6 8.521

337m²

10

10

30300m²

10

10

30300m²

10

10

30300m²

2.55.9

8.9 5.5

30

342m²

7.5

7.5

225m²

82.8

28

10

30298m²

15m ROAD RESERVE

15m

RO

AD

RES

ERVE

15

20

15

20

300m²

15

12 4.217

296m²

15

30

15450m²

132 30

15450m²

15

3 30

15.5505m²

10

30

10

30300m²

7.5

7.5

225m²

7.5

7.5

225m²

12.2

0.5

30 12.5

390m²

4.228.6

4.26.

3

32.4 12.8

415m² 10

10

30300m²

6m LANEWAY

7m L

ANEW

AY

68.5

8.5

30

18

531m²

10

26.54.9

6.5294m²

7.5

7.5

225m²

8.54.2

24

4.2 8.5

336m²

10

30

10

30300m²

7.5

7.5

225m²

10

10

320m²

10

10

32320m²

10.72.2

15.3 3.9

32

496m²

10

10

30300m²

10

30

10

30300m²

30

57.3

Exiting Pt Lot 900047.87ha

(341.71ha)

Exiting Pt Lot 900052.35ha

(341.71ha)

82.255.6

15.333.5

56.742.5

54.844

8156.934.1

59.4

70.2

61

31.6

32.532.5

34.294.9

104.4

75.452.8

52.546.1

36.1

36.240.226

53.3

64.8

41.8 24.1

31

235.2

447.6

102.158.4

5858.3

58.258.3

57.759.5

14.2434 352.3 416.9

150.

212

0.3

396.

5

41.2

113.

122

9.8

189.5

221.7

64.16370.18064.169.971.2776960.284.1

23.341.4

15.7

42

N

DISCLAIMER: ISSUED FOR DESIGN INTENT ONLY. ALL AREAS AND DIMENSIONS ARE SUBJECT TO DETAIL DESIGN AND SURVEY

SUBDIVISION PLANStage 3-9, PT Lot 9000 Pipidinny Road, Eglinton

City of Wanneroo

SIZE A0

RFRFRFRFRFRF

DPDPDPDPDPDP

150217150210140905140827140825140822

DRAWNREV APPR'DYYMMDDDESCRIPTION

CADASTRAL INFORMATIONSOURCE:YYMMDD:DWG REF:PROJECTION:

REDESIGN FOR BIN PAD SITESDESIGN MODIFICATIONSCOMMUNITY & POS ADDEDMINOR DESIGN MODSRE DESIGNBASE PLAN

FEDCBA

robertsday.com.au planning·design·place

RD1 303DRAW NO.

FSAT EGLREF NO. REV.

great places_

LOCATION PLAN - EXISTING LOT APPLICATION AREA

MARM

ION

101 105 105 105

1

1

8 9100 1007 1007 1615

4

1

1

1

LEGENDSUBJECT LAND

EXISTING LOT BOUNDARY

PROPOSED LOT BOUNDARY

AVE1503

CONTOURS35

Balance of Title Lot

1

8

Existing Lots 1

Proposed Residential Lots 351Commercial Lots

1

APPLICATION AREA

PROPOSED LOT BOUNDARY(WAPC No. 148452)

1:1500 0metres 20 40 60 80

BUSHFIRE ATTACK LEVEL 19

BUSHFIRE ATTACK LEVEL 12.5

Temporary Pump Station 1

High School

1

Primary School

2

Reserves for Recreation /Conservation / Drainage

1Community Purpose

Lot Yield

laurab
Text Box
Fire Management Plan Lot 2 Pipidinny Road North Eglinton November 2013
laurab
Text Box
FIGURE 8 Indicative BAL Ratings for Stages 3-9
laurab
Text Box
28
laurab
Text Box
FMP 1592 Lot 2 Pippidinny RoAd North Eglinton V5 22.08.14
Page 29: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 29

7.3 GLOSSARY

Acceptable Solution

A statement describing an acceptable means of complying with the requirements of corresponding performance criteria.

Appliance or Fire Appliance

A fire fighting appliance (vehicle) with structural, grass and bushfire fighting capabilities, with either a 2000 litres water

capacity (2.4 appliance) or a 3000 litre water capacity (3.4 appliance) and four (4) wheel drive.

BAL – (abb) Bushfire Attack Level.

Bushfire Attack Level – an assessed rating of a site’s risk to a bushfire, based on vegetation type, slope of the land

and its proximity to buildings.

Building Construction Standard Buffer - An area 100 metres wide Including a Building Protection Zone in which an

increase in building construction standard in accordance with AS3959 will apply.

Building Protection Zone (BPZ)

Low fuel area immediately surrounding buildings. Minimum width 20 metres, increasing with slope.

Bush

Under the Bush Fires Act 1954 the term bush is defined to include trees, bushes, plants, stubble, scrub and undergrowth

of a kind whatsoever whether dead or alive and whether standing or not standing.

Bush Fire or Wildfire

A general term used to describe fire in vegetation that is not under control.

Bush Fire Hazard.

The flammability, arrangement and quantity of vegetation, dead or alive, that can be burnt in a bush fire. Development is

to be avoided in extreme bush fire hazard designated areas.

Bush fire prone area - for the purposes of this fire management plan, a bush fire prone area is an area that has been

declared as such by the relevant local government responsible for an area. Once an area is declared bush fire prone,

then AS 3959 applies to new residential development in it.

Bush Fire Risk

The chance of a bush fire starting that will have harmful consequences on life and property. It is measured in terms of

consequences and likelihood and arises from the interaction of hazards, communities and the environment.

Development Application

An application for approval to carry out a development under either a local planning scheme or regional planning scheme.

Dwelling setback – the horizontal distance between a wall of the dwelling at any point, and an adjacent lot boundary,

measured at right angles (90 degrees) to the boundary.

Emergency Access Way

Road not normally open but available to the public (using two wheel drive vehicles) for evacuation during a bush fire

emergency.

Page 30: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 30

FESA

The Fire and Emergency Services Authority of Western Australia or the replacement departmental entity as established in

the future.

Fire Break or Firebreak

Any natural or constructed discontinuity in a fuel bed used to segregate, stop and control the spread of a bush fire or to

provide a fire line from which to suppress a bush fire. This is an area cleared to reduce the risk of bush fire damage.

FDI- Fire Danger Index

The chance of a fire starting, its rate of spread, its intensity and the difficulty of its suppression, according to various

combinations of air temperature, relative humidity, wind speed and both the long and short- term drought effects.

Fire Protection

A generic term used to describe the range of services and systems used to mitigate the impact of fire on the community. It

encompasses both fire prevention and emergency response.

Fire Management Plan

Ongoing, dynamic document that sets out the medium to long term mitigation strategies for fire hazards and risks in

particular developments within local government areas.

Fire Services Access Route

Accessible by heavy four wheel drive fire fighting vehicles.

Fuel Reduction also Hazard Reduction

Removal and modification of bush fire fuel, or increase in building construction standards or a combination of the two.

Hazard Separation Zone (HSZ)

The fuel reduction area between an area bush fire hazard and the buildings (and associated building protection zones) of a

development.

Low Fuel Area

An area 100 metres wide of reduced bush fire fuels that is required to surround a Stage of land release and negates the

need to increase the standard of dwelling construction on the edge of the Stage of land release. It complies with the

Building Protection Zone standards is temporary until the next stage of land is cleared for release.

Performance Criteria.

Statement which specifies the outcomes required for the protection of life and property from bush fires.

POS - abbreviation

Public Open Space.

Page 31: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 31

8.0 FIRE MANAGEMENT PLAN COMPLIANCE CHECKLIST FOR PERFORMANCE

CRITERIA AND ACCEPTABLE SOLUTIONS

PROPERTY DETAILS: Lot 2 Pipidinny Road North Eglinton Estate Local Government: City of Wanneroo Element 1: Location Does the proposal comply with the performance criteria by applying acceptable solution A1.1? Yes No Increased dwelling construction and appropriate setback to retained vegetation managed as a BPZ. Element 2: Vehicular Access Does the proposal comply with the performance criteria by applying acceptable solution A2.1? Yes No Does the proposal comply with performance criteria Yes No by applying acceptable solution A2.2? Does the proposal comply with the performance criteria by applying acceptable solution A2.3? Yes No N/A Does the proposal comply with the performance criteria by applying acceptable solution A2.4? Yes No N/A Does the proposal comply with the performance criteria by applying acceptable solution A2.5? Yes No In accordance with City of Wanneroo standards Does the proposal comply with the performance criteria by applying acceptable solution A2.6? Yes No N/A Does the proposal comply with the performance criteria by applying acceptable solution A2.7? Yes No N/A Does the proposal comply with the performance criteria by applying acceptable solution A2.8? Yes No N/A

Page 32: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 32

Does the proposal comply with the performance criteria by applying acceptable solution A2.9? Yes No Complying with City of Wanneroo Firebreak Notice. Does the proposal comply with the performance criteria by applying acceptable solution A2.10? Yes No N/A Element 3: Water Does the proposal comply with the performance criteria by applying acceptable solution A3.1? Yes No Developer to install fire hydrants Does the proposal comply with the performance criteria by applying acceptable solution A3.2? Yes No N/A Does the proposal comply with the performance criteria by applying acceptable solution A3.3? Yes No N/A Element 4: Siting of Development Does the proposal comply with the performance criteria by applying acceptable solution A4.1? Yes No BPZ and increased dwelling construction adjoining retained vegetation Does the proposal comply with the performance criteria by applying acceptable solution A4.2? Yes No N/A Does the proposal comply with the performance criteria by applying acceptable solution A4.3? Yes No Does the proposal comply with the performance criteria by applying acceptable solution A4.4? Yes No N/A Does the proposal comply with the performance criteria by applying acceptable solution A4.5? Yes No N/A

Page 33: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 33

Element 5: Design of Development Does the proposal comply with the performance criteria by applying acceptable solution A5.1? Yes No The development uses acceptable solutions as appropriate to meet the requirements under performance criterion P5. Does the proposal comply with the performance criteria by applying acceptable solution A5.2? Yes No

Applicant Declaration: I declare that the information provided is true and correct to the best of my knowledge. Name of Person Preparing the Fire Management Plan:

Full Name: for FirePlan WA Date: 28/11/2012 FMP was Revised on 30.10.2015

Developer: Full Name: ___________________________________ Signature: ________________________ Date:

Page 34: FIRE MANAGEMENT PLAN - City of Wanneroo · This Fire Management Plan has been prepared in accordance with Acceptable Solutions detailed in Planning for Bush Fire Protection Edition

Fire Management Plan Lot 2 Pipidinny Rd North Eglinton November 2013 _________________________________________________________________________________________________________

FMP 1592 Lot 2 Pipidinny Rd North Eglinton V5 22.08.14 FirePlan WA 34

References

Australian Standards AS 3959-2009 Construction of Buildings in Bush Fire Prone Areas.

GHD Pty Ltd Landcorp –Report for Eglinton Spring Flora and Significant Tree Survey. February 2011.

Western Australian Planning Commission (WAPC), Department of Planning (DoP) and Fire and Emergency Services

Authority (FESA) 2010 Planning for Bush Fire Protection Guidelines, Edition 2

Vegetation Guide for Bushfire Assessment in Western Australia (Draft September 2015) Department of Planning.