Fire Island Wind. CIRI, through its Fire Island Wind LLC subsidiary, is developing Southcentral Alaska ’ s first utility-scale wind project. Aerial view of Fire Island photo from fact sheet. Project Overview. Located on Fire Island, near Railbelt load center, three miles west of Anchorage - PowerPoint PPT Presentation

Transcript of Fire Island Wind

Page 1: Fire Island Wind
Page 2: Fire Island Wind

Fire Island WindCIRI, through its Fire Island Wind LLC subsidiary, is developing Southcentral Alaska’s first utility-scale wind project

Aerial view of Fire Island photo from fact sheet

Page 3: Fire Island Wind

Project Overview• Located on Fire Island, near Railbelt load

center, three miles west of Anchorage• First power fall 2012• Chugach Electric Association power purchase

agreement 25-year term starts Jan. 1, 2013

Page 4: Fire Island Wind

Project description• 11 General Electric 1.6 MW XLE wind turbines • 17.6 MW capacity • 32.8 percent net capacity factor• 51,000 MW-hours annually ~ 6,000

households• Offset 0.5 bcf natural gas consumption

annually• On-island infra-structure: roads, electrical

collection and transmission systems and operations and maintenance building with overnight facilities• Subsequent phases could include up to 33

turbines

Page 5: Fire Island Wind

Project Status Report• Chugach is buyer for up to 100 % of first phase

power• Regulatory Commission of Alaska approved inclusion

of cost for FIW power in CEA’s rates• Financing complete. All contracts and permits are

complete.

Page 6: Fire Island Wind

Transmission Interconnection

• 12.5 mile double-circuit transmission line• $25 million State of Alaska appropriation• Construction managed by CIRI• Land based construction contractor• Submarine based construction contractor• Transmission cable and switchgear• Chugach to own and maintain line at COD

Page 7: Fire Island Wind

Construction Contractors•Delaney Construction Group•Northern Powerline Constructors•Cruz Construction

Local Supplemental Contractors

• IBEW• GMC• Spernak• Chugach Electric• CRW, RSE, EPS, D&L, TBC• Hydro Ax, Alaska Structures•Carlos Tree Service, NW Landscaping

Page 8: Fire Island Wind

Project Schedule

2011

•RCA approval of power purchase agreement•Complete all commercial contracts and financing•Complete transmission-related construction contracts•Complete civil and structural BOP engineering•Order long lead-time construction materials•Complete transmission-related pre-construction field work

Page 9: Fire Island Wind

Project Schedule

Page 10: Fire Island Wind

Project Schedule

Page 11: Fire Island Wind

Project Schedule2012

• Complete on-island civil and electrical construction• Construct O&M facility• Deliver and erect wind turbines• Construct transmission interconnection• Project commissioning – wind turbines and intertie• Commercial operation

Page 12: Fire Island Wind

Project supports Alaska energy goals

Sustainable energy project • Private investment• Creates many local jobs• Locally owned and operated• Local energy supply diversification• Long-term energy price stability• Environmentally responsible