Fire Exting Inspection Log

download Fire Exting Inspection Log

of 1

Transcript of Fire Exting Inspection Log

  • 8/18/2019 Fire Exting Inspection Log

    1/1

     

    AYED EI  OSAIMI ENGINEERING CONSULTING OFFICE 

     Ayed Al Osaimi Eng ineering ConsultingOffice- Al Khobar

    Document Number  Revision No. Effective Date  Page Sequence

    GS-04 00 Jan.07,2014 Page 1 of 1

     

    FIRE EXTINGUISHER INSPECTION LOG

    MONTH: 

    ……AUGUST…… 

    YEAR: 

    …………2016 

    Prepared 

    by: 

    Signature: 

    Date: 

    Sr. # 

    Fire Exting 

    ID #  Type  Pressure

     

    Tag  Validity  Comments  Location 

    01  1  DCP  15  OK  8th

     Feb.17  Good Condition  Office Recep. Area 

    02  2  DCP  15  OK  8th

     Feb.17  Good Condition  Phy. Lab. 

    03  3  DCP  16  OK  8th

     Feb.17  Good Condition  Phy. Lab. 

    04 

    DCP 

    16 

    OK 

    8th 

    Feb.17 

    Good 

    Condition 

    Chem. 

    Lab. 

    05  5  DCP  15  OK  8th

     Feb.17  Good Condition  Lab. Gallery 

    06  6  DCP  15  OK  8th

     Feb.17  Good Condition  Material test Lab. 

    07  7  DCP  16  OK  8th

     Feb.17  Good Condition  Conc. ST Area 

    08  8  DCP  17  OK  8th

     Feb.17  Good Condition  Workshop 

    09  9  CO2  16  OK  8th

     Feb.17  Good Condition  Workshop 

    10  10  DCP  15  OK  8th

     Feb.17  Good Condition  Office 1st

     Floor 

    11 

    11 

    DCP 

    15 

    OK 

    8th

     

    Feb.17 

    Good 

    Condition 

    Office 

    1st

     

    Floor 

    12  12  DCP  15  OK  8th

     Feb.17  Good Condition  Office 2nd

     Floor 

    13  13  DCP  15  OK  8th

     Feb.17  Good Condition  Office 2nd

     Floor 

    14  14  DCP  14  OK  8th

     Feb.17  Good Condition  Office 2nd

     Floor 

    15 

    16 

    17 

    18