Industrial Plant Fire resulted in the total destruction of one portion of the facility housing high tech
CNC equipment. A second building required major restoration.
![Page 2: Fire Damage: Industrial Plant Fire](https://reader030.fdocuments.in/reader030/viewer/2022032618/55b9de2ebb61eb7e1c8b47a9/html5/thumbnails/2.jpg)
Called out for Emergency services, Integrated Restoration provided
temporary power, heat, and lighting. We immediately instituted a necessary structural dry out. We also installed a temporary security door separating the
two affected structures.
![Page 3: Fire Damage: Industrial Plant Fire](https://reader030.fdocuments.in/reader030/viewer/2022032618/55b9de2ebb61eb7e1c8b47a9/html5/thumbnails/3.jpg)
The Integrated Restoration project entailed the demo and complete rebuild
of the North Building of the manufacturing complex from footers
up.
![Page 4: Fire Damage: Industrial Plant Fire](https://reader030.fdocuments.in/reader030/viewer/2022032618/55b9de2ebb61eb7e1c8b47a9/html5/thumbnails/4.jpg)
The reconstruction entailed shot blasting the existing concrete floors as prep for the restoration of the epoxy
floor coating that was in both damaged structures.
![Page 5: Fire Damage: Industrial Plant Fire](https://reader030.fdocuments.in/reader030/viewer/2022032618/55b9de2ebb61eb7e1c8b47a9/html5/thumbnails/5.jpg)
From the manufacturer of the new building siding, we received the
material and color match. The paint was matched and applied to the
remaining structure. At project’s culmination, the entire “new”
manufacturing facility was uniform in color and profile.
![Page 6: Fire Damage: Industrial Plant Fire](https://reader030.fdocuments.in/reader030/viewer/2022032618/55b9de2ebb61eb7e1c8b47a9/html5/thumbnails/6.jpg)
Concurrent with the North building demo and rebuild, Integrated
Restoration crews were restoring the South building shop and management
offices.
![Page 7: Fire Damage: Industrial Plant Fire](https://reader030.fdocuments.in/reader030/viewer/2022032618/55b9de2ebb61eb7e1c8b47a9/html5/thumbnails/7.jpg)
After rebuild, cleaning, prime and painting, mechanicals were brought up to code. Machinery was installed. The manufacturing company was back up
and running in their new facility.