LIFE+ Return of Rural Wetlands Finland, Ruovesi, Kulmala wetland creation

Transcript of Finland, Ruovesi, Kulmala wetlandcreation · The aimsand premisesof Kulmala wetlandcreation The...

Page 1: Finland, Ruovesi, Kulmala wetlandcreation · The aimsand premisesof Kulmala wetlandcreation The aimsof thewetlandcreation: To developmodelwetlandof waterfowlhabitat To increasebiodivrsityin

LIFE+ Return of Rural WetlandsFinland, Ruovesi, Kulmala wetland creation

Page 2: Finland, Ruovesi, Kulmala wetlandcreation · The aimsand premisesof Kulmala wetlandcreation The aimsof thewetlandcreation: To developmodelwetlandof waterfowlhabitat To increasebiodivrsityin

Wetland area before creation 2011

Photo: Juha Kuukka

Photo: Timo Niemelä

Page 3: Finland, Ruovesi, Kulmala wetlandcreation · The aimsand premisesof Kulmala wetlandcreation The aimsof thewetlandcreation: To developmodelwetlandof waterfowlhabitat To increasebiodivrsityin

The aims and premises of Kulmala

wetland creation

The aims of the wetland creation:

� To develop model wetland of waterfowl habitat

� To increase biodivrsity in an agricultural area

� To improve water protection

The premises of wetland creation:

� The wetland will be constructed on land owned by the private

� The soil in the area is erosion sensitive, like fine sand and silt

� The catchment area is about 200 hectares and mainly ditched

� It is possible to create the wetland mainly by damming but also digging

will be used to increase the area size

Page 4: Finland, Ruovesi, Kulmala wetlandcreation · The aimsand premisesof Kulmala wetlandcreation The aimsof thewetlandcreation: To developmodelwetlandof waterfowlhabitat To increasebiodivrsityin

Embankment construction• The base (footprint) of the embankment was cleared of any organic matter prior

to construction

Photo: Timo Niemelä

Page 5: Finland, Ruovesi, Kulmala wetlandcreation · The aimsand premisesof Kulmala wetlandcreation The aimsof thewetlandcreation: To developmodelwetlandof waterfowlhabitat To increasebiodivrsityin

Installing water control structure

• Full-round flashboard riser made from HDPE (high-density polyethylene) pipe wasinstalled to control water levels and dewater the wetland

• The riser was installed within the existing drainage canal system

• Beavers or muskrats are not present here, so they don´t cause any problems

Photo: Timo Niemelä

Page 6: Finland, Ruovesi, Kulmala wetlandcreation · The aimsand premisesof Kulmala wetlandcreation The aimsof thewetlandcreation: To developmodelwetlandof waterfowlhabitat To increasebiodivrsityin

HDPE (or ”PE-HD”) fullround flasboard riser

• For pond and wetland water level control

• All joints is important to do with stainless steel screws, mainhole can be locked

• Increase – decrease style of incremental movable boards

Kuva: Timo Niemelä

The costs of the riser:

• diameter 800 mm, height 3000 mm: 1000

€, incl. tax

• inlet and outlet pipes: 560/500 mm SN8

plastic pipes, and other supplies 1 000 €,

incl. tax

Page 7: Finland, Ruovesi, Kulmala wetlandcreation · The aimsand premisesof Kulmala wetlandcreation The aimsof thewetlandcreation: To developmodelwetlandof waterfowlhabitat To increasebiodivrsityin

• The riser was placed in embankment where the openings and access hatch can be

accessed from shore

Photo: Timo Niemelä

Installing water control structure

Page 8: Finland, Ruovesi, Kulmala wetlandcreation · The aimsand premisesof Kulmala wetlandcreation The aimsof thewetlandcreation: To developmodelwetlandof waterfowlhabitat To increasebiodivrsityin

• The emergency spillway was constructed to provide an escape for excess water above the

designed level

Photo: Timo Niemelä

Construction of the emergency spillway with stoplogs

Page 9: Finland, Ruovesi, Kulmala wetlandcreation · The aimsand premisesof Kulmala wetlandcreation The aimsof thewetlandcreation: To developmodelwetlandof waterfowlhabitat To increasebiodivrsityin

• A rocky emergency spillway was designed about 50 cm lower than the settled top of the embankment

• 200 tons of rock were transported to the spillway, costs about 1 050 € (rocks) and 550 € (transporting)

Photos: Timo Niemelä

Construction of the emergency spillway…

Page 10: Finland, Ruovesi, Kulmala wetlandcreation · The aimsand premisesof Kulmala wetlandcreation The aimsof thewetlandcreation: To developmodelwetlandof waterfowlhabitat To increasebiodivrsityin

• Stop-log system (”wooden wall”) was built of planks size 42 mm thickness x 145 mm width

Photo: Timo Niemelä

Construction of the emergency spillway…

Page 11: Finland, Ruovesi, Kulmala wetlandcreation · The aimsand premisesof Kulmala wetlandcreation The aimsof thewetlandcreation: To developmodelwetlandof waterfowlhabitat To increasebiodivrsityin

• Stop-log water control structure can be used to regulate water level

Photo: Timo Niemelä

Construction of the emergency spillway…

Page 12: Finland, Ruovesi, Kulmala wetlandcreation · The aimsand premisesof Kulmala wetlandcreation The aimsof thewetlandcreation: To developmodelwetlandof waterfowlhabitat To increasebiodivrsityin

Embankment construction…

• The embankment was constructed with soil excavated from wetland area

• Soil transporting was done as a voluntary work by the landowner

Kuva: Timo Niemelä Photo: Timo Niemelä

Page 13: Finland, Ruovesi, Kulmala wetlandcreation · The aimsand premisesof Kulmala wetlandcreation The aimsof thewetlandcreation: To developmodelwetlandof waterfowlhabitat To increasebiodivrsityin

Patopenkereen rakentaminen

Kuva: Timo Niemelä Kuva: Timo Niemelä

• Fill materials was put in lifts about 20-50 cm thick and compacted it by running over the

entire surface with the excavator

• The top of the embankment was built 50 cm higher than designed water level

• The embankment with 1:2 side slopes is enough because suitable grass–cutting machines

are used for side slopes maintanance by the landowner

Page 14: Finland, Ruovesi, Kulmala wetlandcreation · The aimsand premisesof Kulmala wetlandcreation The aimsof thewetlandcreation: To developmodelwetlandof waterfowlhabitat To increasebiodivrsityin

Summary of the construction works

• The embankment: length 190 m, top width 3,5 m, mean height 1,4 m

• Total costs of the construction works: 63 working hours x 73,80 €/ h = 4649 €, incl. tax

• The excavator: Hitachi Zaxis 210 LC equipped with rototilt head

Photo: Timo Niemelä

Page 15: Finland, Ruovesi, Kulmala wetlandcreation · The aimsand premisesof Kulmala wetlandcreation The aimsof thewetlandcreation: To developmodelwetlandof waterfowlhabitat To increasebiodivrsityin

Construction of artificial islands and

other excavation work to increase biodiversity

Photo: Timo Niemelä

• Some artificial islands and other resting places were done for waterfowl, also deeper ponds

to create microhabitats for fauna was excavated

• Total costs of these excavation work: 24 working hours x 73,80 €/ h = 1770 €, incl. tax

Page 16: Finland, Ruovesi, Kulmala wetlandcreation · The aimsand premisesof Kulmala wetlandcreation The aimsof thewetlandcreation: To developmodelwetlandof waterfowlhabitat To increasebiodivrsityin

Kuva: Timo Niemelä

Kuva: Timo Niemelä

Kulmala wetland, total area of 1,3 hectares is favored wetland

for waterfowl like dubbling ducks

Photo: Juha Kuukka

Page 17: Finland, Ruovesi, Kulmala wetlandcreation · The aimsand premisesof Kulmala wetlandcreation The aimsof thewetlandcreation: To developmodelwetlandof waterfowlhabitat To increasebiodivrsityin

Kulmala wetland 4.7.2015

Photo: Marko Muuttola

Page 18: Finland, Ruovesi, Kulmala wetlandcreation · The aimsand premisesof Kulmala wetlandcreation The aimsof thewetlandcreation: To developmodelwetlandof waterfowlhabitat To increasebiodivrsityin

Kulmala wetland 4.7.2015

Photo: Marko Muuttola