Planning/Budgeting Review and Approval Process Process
Designed and Developed By
Jothi Periasamy&
Siva Namuduri
Planning/Budgeting Review and Approval
Through
SAP BPC NW 7.5
Planning/Budgeting Review and Approval
a community service
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter ExpertFinance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Planning/Budgeting Review and Approval Process
Executive Summary:
This document demonstrates, step by step how to implement a Planning/Budgeting Review and Approval Process through the Work
Status functionality in BPC 7.5 NW (same steps may work in MS version as well). It is assumed that reader is proficient in BPC
terminology in SAP NetWeaver technologies and also the application navigating in BPC and its user interfaces.
Solutions Building Blocks:
• Application : MYAPP (FINANCE/REPORTING type) that is in application set MYSET is used
• Dimensions : MYAPP uses the following dimensions (minimum required properties and dimensions are used to keep it
simple):
Dimension Name Dimension Type User Defined Properties
Designed and Developed By
Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter ExpertFinance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Dimension Name Dimension Type User Defined Properties
MYACCDIM Account
MYCATDIM Category
MYENTDIM Entity Owner(60)
MYCURDIM Currency
MYTIMDIM Time
• Workflow Drivers: MYENTDIM is used as work status driver dimension, MYCATDIM + MYTIMDIM are used as additional lock
dimensions
• Reviewer and Approver: User BPCUSER332 and BPCUSER305 are used in Owner property of the work Status driver
(MYENTDIM) dimension
• Work States: Work States DEFAULT (Work In Progress) , STATE1 (Submitted for Review) , STATE2 (Approved) are used to
demonstrate how a owner and manger control the workflow
Business Scenario:
�Work status in BPC controls the access to a planning/budgeting data sets , data can be accessed through various BPC
interfaces at different phase of a Planning/ Budgeting review and/or approval process. Work status helps to ensure that the
data regions are locked down at a checkpoint and changes to the data region are limited to certain interfaces and roles. Since
Work Status can be configured for interfaces , ownership can be designated at dimension member level. When properly setup,
work Status gives very fine level of control on when the data can be locked for changes and who can designate the locks on
the data regions.
Typical Example:
• While creating budget, initially users with proper entitlements can enter/collect and modify budget data using input schedule
•After all user inputs are entered, the owner of the budgeting process advances the work status (Example : Submitted �
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
•After all user inputs are entered, the owner of the budgeting process advances the work status (Example : Submitted �
Review ) of the data set, in which only select group of users can make changes to data via input schedule
•Once review is complete the data region work status is set to Approved by budget owner. No changes are allowed to the
budget by any user via any defined user interface.
�This type of control can be exercised across interfaces (manual input / journals / comments ) using work status.
�Work status gives the ability to change the level of access for users without making any changes to user entitlements during
each Planning / Budget / Forecasting iteration. Without work status, to achieve the same level of control on data access,
multiple Task Profiles and Member Access profiles need be created and at each check point, the user need to be moved from
one task / member access profile to another task / member access profile so that the user’s capability to change the data via a
particular interface is enabled or disabled.
� In BPC work status settings are used along with Business Process flow (BPF) to enforce that appropriate locks are placed
on the data during the process.
SAP BPC NW 7.5 Work Status Key Functions:
In SAP BPC NW 7.5, the Work States are setup across all applications at the Application Set level and configured for each application by designating dimensions with Owner property for each application that uses work status
� Application Set Functions: � Add new Work State
� Modify Work State Name and/or Description
� Delete existing Work State
� Re-Order Work State order
� Update Work Status grid settings – Interfaces/ Controller
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
� Application Functions:� Select Work Status Controlling Dimensions
� Assign Dimension that has Owner property
� Populate proper owner values for the dimension member properties
� Validate Task Profiles - make sure users can access work status option
� Set proper value in Application level parameter APPROVALORG
� Data Region Functions:� Set Work Status for a specific data region (move forward/backward one state)
� Adjust Work Status for a specific data region
� Reporting Functions:� Generate system provided reports for a given date and data region
Planning/Budgeting Review and Approval Process Process
Designed and Developed By
Jothi Periasamy&
Siva Namuduri
Planning/Budgeting Review and Approval
Through
SAP BPC NW 7.5
Planning/Budgeting Review and Approval
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter ExpertFinance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Business Solutions Overview
SalesSales
Planning and Reporting Process
�SAP BPC NW 7.5SAP BW 7.0
RevenueProcess
CostProcess
Budget Process
RevenueDrivers/ Scenario
CostDrivers/ Scenario
Budget Scenario
Technology Scope
SAP NetWeaver Systems Landscape
SAP
Cash Flow
P&L
Balance Sheet
Business Solutions Architecture
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
JDE/etc
Sales
Cost
Data Source / Actuals
Sales
Revenue
Plan/Budget/Forecast/Consolidated Data Storage
�SAP BW 7.0�SAP ECC 6.0�SAP BOBJ XI 3.5�Xcelsius Dashboard
Sales
Forecast
OracleSAP
SAP
Business
Objects
Xcelsius
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Corporate Head Quarters –USA
Finance Controller
Sales Region - Asia- PacificCost Center Manager
Sales Region - Latin AmericaCost Center Manager
Sales Region - Middle East Asia
Cost Center Manager
Approve
Business Scenario : Planning/Budgeting Organizational Structure
3
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Sales Region -Asia- Pacific - SingaporeFinancial Analyst (Owner)
Sales Region -Asia- Pacific - India
Financial Analyst (Owner)
Sales Region -Asia- Pacific - Japan
Financial Analyst (Owner)
Review
Submit Submit Submit
Financial Analyst
Owner
Cost Center Manager
Manager
Controller
Manager
1
2
R1-PLAN|EXTSALES|JAN.2010|USA|INPUT|LC|NONINTCO|100
R2-PLAN|EXTSALES|FEB.2010|USA|INPUT|LC|NONINTCO|202
R3-PLAN|EXTSALES|MAR.2010|USA|INPUT|LC|NONINTCO|303Submitted
SAP BPC Excel
Data Region 1
USA
Business Scenario : Global Sales Revenue Planning Review and Approve Process
Sales Revenue Application
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
R4-PLAN|EXTSALES|JAN.2010|INDIAINPUT|LC|NONINTCO|111
R5-PLAN|EXTSALES|FEB.2010|INDIA|INPUT|LC|NONINTCO|222
R6-PLAN|EXTSALES|MAR.2010|INDIA|INPUT|LC|NONINTCO|333
R7-PLAN|EXTSALES|JAN.2010|CHINAINPUT|LC|NONINTCO|777
R8-PLAN|EXTSALES|FEB.2010|CHINA|INPUT|LC|NONINTCO|888
R9-PLAN|EXTSALES|MAR.2010|CHINA|INPUT|LC|NONINTCO|999
Review
Approved &Locked
Data Region 2
INDIA
Data Region 3CHINA
BPC Work Status Report
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Configuration- Security
BPC Admin Function
Define Work State
Ex:
�Submitted
�Review
Config- Application Set
BPC Admin Function
Define Data Region
Ex:
�Entity - Owner
�Category - PLAN
Config- Application
BPC Admin Function
Assign Work State to a Data Region
Assign Status
BPC Excel Function
1 2 3 4
Work Status Implementation Approach
Define Team Profile
Implementation Approach
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Submitted Reviewed Approved
AnalystCost Center
ManagerController
Actual Work Status Assignment
Planning/Budgeting Review and Approval Process Process
Designed and Developed By
Jothi Periasamy&
Siva Namuduri
Planning/Budgeting Review and Approval
Through
SAP BPC NW 7.5
Planning/Budgeting Review and Approval
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter ExpertFinance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Work Status Implementation-
Security Configuration Step # 1
Step I . Log into Web Admin Client using Primary Admin account (or any account with proper task profile to make
changes to work status/dimension member)
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step II . Edit task profile to entitle users to changing work status; double-click task profiles.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step III . Create new task profile (to make sure changes won’t get lost in existing profiles) –complete description – click ‘next’.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step IV . Select Work Status interface.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step V . Select SetWorkStatus task and click on right arrow to assign; press next.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step VI . Choose required users (BPCUSER305 and 332) by highlighting and pressing right arrow; press next; on next screen, review summary and click apply; press ok when dialog box appears.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Planning/Budgeting Review and Approval Process Process
Designed and Developed By
Jothi Periasamy&
Siva Namuduri
Planning/Budgeting Review and Approval
Through
SAP BPC NW 7.5
Planning/Budgeting Review and Approval
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter ExpertFinance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Work Status Implementation-Application Set Configuration
Step # 2
Step VII . Begin setting up Work Status table at AppSet level. These settings are used by all applications in the Appset.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step VIII . Since the AppSet is copied, Work Status table from source appset is also copied.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step IX . Delete the unwanted work states – excluding default, all states can be deleted from the action pane. When prompted, provide confirmation for deletion of states.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XI . Provide work state name (20 characters at most, without special characters) and description
(40 characters). Work Status Description can be edited via edit Work Status Description task
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step X . Work states can be added one at a time by selecting as a new Work State task in the Action
pane. Work Status names can be edited by double clicking on the Work Status name
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XII . Choose the required values from the drop down boxes (this can be left as-is to edit later). Click
on green checkmark to finish.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XIII . Add another work state and set the values as shown below from drop down boxes in work
status table. Then, check the work status via Excel Input Schedule (MAN) matches the table below.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri, SAP BPC Consultant E-Mail: [email protected] Periasamy, SAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME) & Finance Transformation ArchitectE-Mail: [email protected] LinkedIn: http://www.linkedin.com/in/jothiperiasamy
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Planning/Budgeting Review and Approval Process Process
Designed and Developed By
Jothi Periasamy&
Siva Namuduri
Planning/Budgeting Review and Approval
Through
SAP BPC NW 7.5
Planning/Budgeting Review and Approval
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter ExpertFinance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Work Status Implementation-Application Configuration
Step #3
Step XIV . Now we switch to Application level. Configure Work State controls for MYAPP – click on Work
State settings under MYAPP.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XV . MYENTDIM contains the owner property – select owner from drop down. Select “Yes” from drop down
for MYCATDIM and MYTIMDIM. Account Type Dimension can’t be chosen as a lock dimension in work status. Only
3-5 dimensions can be designated as lock dimensions in an Application.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XVI . Save Work Status Setting from Action pane and Click OK to continue. Application level setting
is complete with this.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XVII . Configure Owner Property on MYENTDIM dimension by choosing maintain dimension
members in action pane. Any Application using MYENTDIM can leverage the owner property
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XVIII . Enter Members and Properties as described below. Owner of Parent dimension member is
Manager of Child dimension member. BPCUSER306 is Manager of CG11,CG12,CG13,CG14 members in
the member sheet given below
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XIX . Process Changes on dimension members by clicking process dimension in action pane.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XX . Member sheet for MYACTDIM dimension is given below
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XXI . Member sheet for MYCATDIM dimension is given below
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XXII . Member sheet for MYCURDIM dimension is given below
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XXIII . Member sheet for MYTIMDIM dimension is given below
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XXIV . Process ALL dimensions – precautionary measure.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XXV . It takes a while, ALL dimension members are updated and ready to use
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XXVI . Check the Application Set Status; If Appset is offline, set the AppSet Status to Online from
Action pane. If the Appset is offline, non-Admin users can’t log into AppSet.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XXVII . Start BPC-Excel interface; choose MYSET and MYAPP in the connection wizard; Press OK
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XXVIII . log in using BPCUSER332 (Owner of dimension members CG11,CG12,CG13 and CG14 from
MYENTDIM)
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XXIX . Once Excel opens; Expand Available Interfaces in Action pane and Click on Administration.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XXX . Supply login credentials (of primary admin) to log into administration and click OK
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XXXI . Click on Set Application parameters in Action pane;
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XXXII . For APPROVALORG parameter – make sure that the value is “H1” (since we have only one hierarchy in MYENTDIM
dimension and using that.) Click Update, close web page. When multiple hierarchies are present, one hierarchy number from H1-
Hn must be entered here to designate the approval organization of the dimension.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Planning/Budgeting Review and Approval Process Process
Designed and Developed By
Jothi Periasamy&
Siva Namuduri
Planning/Budgeting Review and Approval
Through
SAP BPC NW 7.5
Planning/Budgeting Review and Approval
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter ExpertFinance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Work Status Implementation-Assign Work State to a Data Region
Step # 4
Step XXXIII . In Excel interface Check the current view settings in action pane..
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XXXIV . Changing members in the current view – Select MYACCDIM member CE0004210 – Internet Expenses
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XXXV . Similarly other dimension members are also modified in the current view. Click Data Input from action pane to
create an input Schedule.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XXXVI . Open a blank workbook to work with EVDRE
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XXXVII . Enter “=EVDRE()” in A1 and click on refresh work book. Click OK when prompted to clear existing input data
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XXXVIII . When Input Schedule is built, Click on the + sign to reveal Range Keys. Enter “DEP” in Expansion1 member set (Cell
B17); Enter “MEMBERS” in Expansion2 member set (Cell C17). Click Expand All.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XXXIX . Double check that you can enter data by looking at Workbook Type from Work Book Options under E-Tools Menu. Drop
down value must be “Input Schedule” to enter data.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XL . For Cells G14 through G17, enter value 1,2,3,4 respectively. (Data entry allowed only for base level members)
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XLI . Click on send and refresh schedule. Select Active Work book option and click refresh
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XLII . When prompted, click “Yes” to send the 4 updated records to the Application
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XLIII . Refresh Schedule results are displayed indicating successful insert on all four records
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XLIV . Click on Modify Work Status from e-submit menu. (Work Status being modified from here)
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XLV . Web Interface login screen pops-up. Log in using BPCUSER332 click OK (Owner of CG11, CG12,
CG13and CG14 members of MYENTDIM)
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XLVI . Web page with Work Status Action pane is displayed. MYCATDIM,MYENTDIM and MYTIMDIM are
displayed. (Three dimensions designated as lock dimensions for MYAPP application). Member selection can be
changed via the hypertext dimension names appearing in blue.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XLVII . Select CG1 member from MYENTDIM (Remember! CG1 is parent of CG11-CG14 and Owner of CG1
is BPCUSER306)
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XLVIII . Select 2011.JAN from MYTIMDIM (also selected is member ACTUAL from MYCATDIM – not shown
here)
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step XLIX . Try to advance the Work State from Default to Work State 1 by selecting MYWORKSTATE01 and
clicking green check mark (Can include children member using set children check box)
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step L . Error message pops up indicating that BPCUSER332 can’t control STATE01 for Selected data region.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LI . Change the member selection on MYENTDIM to CG12 only.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LII . Make member selection 2011.JAN for MYTIMDIM and ACTUAL for MYCATDIM.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LIII . Advance the work state of the data region from Default to State1 by choosing from drop box and
clicking on green Arrow. Since all member selections are base level, Set children Check box does not have any
impact.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LIV . Repeat the steps above (for same data region) to advance Work State from Staet01 (Owner
controlled) to State02 (Manager Controlled)
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LV . Error message pops up indicating that the State can’t be set by the user for the selected data region.
The State may be changed back to Default –Default State is controlled by Both Owner and Manager
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LVI . Back to Input Schedule, Try to make a change on the locked data region by entering value 5 in Cell
G15
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LVII . Click on Send and refresh data to post the changes to Application
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LVIII . Click OK when prompted to continue on one record change
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LIX . Error Message indicating that Update failed due to Error in Work Status Checking. Click Close. Save the
Input Schedule on local drive – not shown here
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LX . Launch BPC-Excel and login using user Id BPCUSER306 (Owner of the Parent member of CG12 for which
we set Work Status above). In the Work Status table, Manger of the member can make changes via input
Schedule in WorkState1.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LXI . Open the Above Saved Input Schedule (Name Book4 is used in this demo). Verify Current view to
match what is shown below.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LXII . Enter value 5 in cell G15 (The cell that was locked for BPCUSER336). Click on Send and Refresh Data
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LXIII . Choose “Active Work Sheet” and click refresh. (No difference even if Work book is chosen we have
data in only Active sheet)
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LXIV . Click Yes when prompted to continue sending one record
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LXV . Message pops up indicating send is successful. Click close and check the value.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LXVI . Click on Modify Work Status from e-submit menu– to advance the work status to State02
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LXVII . Web interface login screen pops up. Login using user BPCUSER306 (Manager of member CG12 – can
set work State 02)
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LXVIII . Make the member selection ACTUAL for MYCATDIM, CG12 for MYENTDIM and JAN.2011 for
MYTIMDIM; Click on green arrow.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LXIX . Select MYWORKSTATE02 from drop down and click green check mark. Close the window.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LXX . Try to make data entry to “locked” data region by entering value 7 in cell G15. Click Send and
Refresh Schedule. (Same user was able to make changes before advancing the work State)
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LXXI . Click on refresh to update the data back into the application.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LXXII . Click Yes to send one record
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LXXIII . Error Message pops up indicating send failed due to an error checking work status
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LXXIV . Refresh work book to fetch values from the application – just to see the values from the application
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LXXV . Input Schedule is refreshed with the values from application. Click on Home Icon in Action pane
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LXXVI . Click on Open System Reports from Action pane
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LXXVII . Web interface login screen pops up. Login using admin user credentials (BPCUSER332 in this case)
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LXXVIII . Click on Work Status Report in the action pane. Meta data on Work Status is stored outside the
BPC cube and can be viewed only through system reports
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LXXIX . Make Selections in date range and Dimension members. Click on Green check mark.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LXXX . Report pops up showing the last Work Status update on the data region.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
Step LXXXI . One more Work Status change is performed (not shown here) and report is generated again. This
time two records – one for each data region are displayed in the report.
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
These materials strictly discuss our implementation expertise, and sample coding used
our implementation or other information that does not include we official interfaces and
therefore is not supported by we. Changes made based on this information are not
supported and can be overwritten during an upgrade.
We will not be held liable for any damages caused by using or misusing the information,
code or methods suggested in this document, and anyone using these methods does so
at his/her own risk.
Disclaimer:
Planning/Budgeting Review and Approval ProcessDesigned and Developed
By Jothi PeriasamySiva Namuduri
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter Expert (SME)Finance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status
at his/her own risk.
We offers no guarantees and assumes no responsibility or liability of any type with
respect to the content of this technical article or code sample, including any liability
resulting from incompatibility between the content within this document and the materials
and services offered by we. You agree that you will not hold, or seek to hold, we
responsible or liable with respect to the content of this document.
Planning/Budgeting Review and Approval Process Process
Designed and Developed By
Jothi Periasamy&
Siva Namuduri
Thank You !!
Through
SAP BPC NW 7.5
Thank You !!
a community service
Authors:Siva Namuduri - SAP Certified Application AssociateSAP BPC Consultant E-Mail: [email protected]
Jothi PeriasamySAP EPM (BI, BPC, BOBJ) Subject Matter ExpertFinance Transformation Solutions ArchitectE-Mail: [email protected]: http://www.linkedin.com/in/jothiperiasamy
SAP BPC NW 7.5 Work Status