091337118 Maricopa County Department of Transportation Final Report and Executive Summary Hidden Waters Parkway Corridor Feasibility Study 2008-046, TT005 June 2010 APPENDIX 1 TECHNICAL MEMORANDUM NO. 1 EXISTING AND FUTURE CORRIDOR FEATURES

Transcript of FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate...

Page 1: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Final Report and Executive Summary Hidden Waters Parkway Corridor Feasibility Study 2008-046, TT005 June 2010

APPENDIX 1 TECHNICAL MEMORANDUM NO. 1 – EXISTING AND FUTURE

CORRIDOR FEATURES

Page 2: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85
Page 3: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

TABLE OF CONTENTS

FINAL – EXISTING AND FUTURE CORRIDOR FEATURES

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features i February 2010

1.  INTRODUCTION .................................................................................................................................. 1 1.1  Study Background ..................................................................................................................... 1 1.2  Study Purpose and Goals .......................................................................................................... 1 1.3  Project Schedule ......................................................................................................................... 2 1.4  Project Study Area ..................................................................................................................... 3 

2.  PLANS AND STUDIES .......................................................................................................................... 5 2.1  Inventory of Plans, Studies, Reports, and Documentation .................................................... 5 2.2  Summary of Findings and Recommendations from Review of Plans and Studies .............. 5 

2.2.1  Maricopa County Old US Highway 80 Area Plan (May 2007) ........................................ 5 2.2.2  Maricopa County Tonopah/Arlington Area Plan (September 2000) ................................ 6 2.2.3  MAG Interstate 8 and Interstate 10 Hidden Valley Transportation Framework Study (October 2009) .................................................................................................................................... 6 2.2.4  MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5  ADOT SR 85 in Gila Bend Draft Final Design Concept Report (June 2009) .................. 7 2.2.6  ADOT SR 85 at Gila Bend Draft Environmental Assessment and Section 4(f) Evaluation (August 2009) ...................................................................................................................................... 8 2.2.7  MCDOT Design Guideline Recommendations for the Arizona Parkway (August 2008) . 8 2.2.8  MCDOT Arizona Parkway Intersection/Interchange Operational Analysis and Design Concepts Study (August 2009) ............................................................................................................ 9 2.2.9  MAG Updated Buildout Traffic Projections(June 2009) .................................................. 9 2.2.10  Hickman’s Egg Ranch Major Comprehensive Plan Amendment (June 2009) ............... 10 2.2.11  Hidden Waters Ranch Development Master Plan [Major Amendment #1] (October 2008) 10 2.2.12  Insignia Major Comprehensive Plan Amendment (September 2006) ............................. 10 2.2.13  Belmont Site Plan (2007) ................................................................................................ 10 2.2.14  Hassayampa Village Comprehensive Plan Amendment (July 2006) .............................. 10 2.2.15  Sonoran Trails (August 2009) ......................................................................................... 11 2.2.16  Town of Gila Bend General Plan (November 2006) ....................................................... 11 2.2.17  Town of Buckeye General Plan (2008) ........................................................................... 11 2.2.18  Old U.S. Highway 80 Bridge (Gillespie Dam Bridge) Final Design Concept Report – Volume I (September 2007) ............................................................................................................... 11 2.2.19  Old U.S. Highway 80 Bridge (Gillespie Dam Bridge) Final Value Engineering Report (May 2008) ........................................................................................................................................ 11 2.2.20  Draft of the Initial Location/Design Concept Report for SR 85, Gila Bend to I-10 (November 1999) ............................................................................................................................... 12 2.2.21  Maricopa County Transportation System Plan (February 2007) ................................... 12 2.2.22  Maricopa County Major Streets and Route Plan: Street Classification Atlas (revised September 2004) ............................................................................................................................... 12 

2.3  Summary of Programmed Roadway Improvements ............................................................ 12 

3.  EXISTING AND FUTURE CORRIDOR FEATURES ............................................................................. 13 3.1  Jurisdictional Responsibilities ................................................................................................ 13 3.2  Land Ownership ...................................................................................................................... 13 3.3  Zoning and Land Use .............................................................................................................. 13 

Page 4: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

TABLE OF CONTENTS

FINAL – EXISTING AND FUTURE CORRIDOR FEATURES

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features ii February 2010

3.3.1  Existing Zoning and Land Use ........................................................................................ 13 3.3.2  Future Land Use ............................................................................................................. 22 

3.4  Existing and Planned Developments ...................................................................................... 22 3.5  Transportation Network ......................................................................................................... 22 

3.5.1  Existing Transportation Network .................................................................................... 22 3.5.2  Future Transportation Network ...................................................................................... 26 

3.6  Utilities ...................................................................................................................................... 31 3.7  Facilities .................................................................................................................................... 31 3.8  Topography .............................................................................................................................. 34 3.9  Recreational and Wildlife Areas............................................................................................. 34 

4.  SUMMARY OF IDENTIFIED OPPORTUNITIES AND CONSTRAINTS .................................................. 38 

Page 5: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

TABLE OF CONTENTS

FINAL – EXISTING AND FUTURE CORRIDOR FEATURES

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features iii February 2010

LIST OF FIGURES Figure 1 – Project Study Area .................................................................................................................... 4 Figure 2 – Jurisdictions ............................................................................................................................ 14 Figure 3 – Land Ownership ...................................................................................................................... 15 Figure 4a – Zoning ................................................................................................................................... 16 Figure 4b – Zoning ................................................................................................................................... 17 Figure 4c – Zoning ................................................................................................................................... 18 Figure 4d – Zoning ................................................................................................................................... 19 Figure 4e – Zoning ................................................................................................................................... 20 Figure 4f – Zoning .................................................................................................................................... 21 Figure 5 – Existing Land Use ................................................................................................................... 23 Figure 6 – Future Land Use ...................................................................................................................... 24 Figure 7 – Existing and Planned Developments ....................................................................................... 25 Figure 8a – Existing Transportation Network .......................................................................................... 27 Figure 8b – Existing Transportation Network .......................................................................................... 28 Figure 9a – Proposed Buildout Transportation Network ......................................................................... 29 Figure 9b – Proposed Buildout Transportation Network ......................................................................... 30 Figure 10a – Utilities and Facilities ......................................................................................................... 32 Figure 10b – Utilities and Facilities ......................................................................................................... 33 Figure 11 – Palo Verde Nuclear Generating Station Emergency Planning .............................................. 35 Figure 12 – Slope Analysis ...................................................................................................................... 36 Figure 13 – Recreational and Wildlife Areas ........................................................................................... 37  LIST OF TABLES Table 1 – Project Schedule ......................................................................................................................... 3  LIST OF APPENDICES Appendix TM1-1. Summary Table of Documents Reviewed Appendix TM1-2. MAG Framework Study Data Appendix TM1-3. SR 85 at Gila Bend Preferred Alternative Exhibit Appendix TM1-4. Arizona Parkway Detailed Information

Page 6: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 1 February 2010

1. INTRODUCTION Technical Memorandum No. 1 (TM 1), entitled Existing and Future Corridor Features, documents existing and future corridor features for the Hidden Waters Parkway Corridor Feasibility Study. The purpose of TM 1 is to provide an overview of land uses, roadway conditions, drainage, access management, socioeconomic conditions, and environmental assessments in sufficient detail to provide a foundation for the identification of issues and constraints and preparation of base maps showing feasible corridor alignments within the study area. Additional detailed information is included in the following companion documents: Environmental Overview (TM 2), Conceptual Drainage Report (TM 3), Development and Evaluation of Candidate Alternative Alignments (TM 4), and Detailed Preferred Alignment (TM 5).

1.1 Study Background

In July 2008, the Maricopa Association of Governments (MAG) completed the Interstate 10/Hassayampa Valley Transportation Framework Study (known as the Hassayampa Framework Study), which recommended a comprehensive roadway network to meet the future traffic demands that result when the area west of the White Tank Mountains is completely developed (hereafter referred to as buildout travel demand). This long-range regional transportation network included the “Arizona Parkway” as a new facility type to supplement more traditional roadway classifications in meeting projected travel demand within the study area.

The Arizona Parkway utilizes a distinct intersection treatment that prohibits left-turns at major cross-street intersections and controls all traffic movements with simple two-phased signal control. Left-turn movements are made indirectly using directional left-turn crossovers immediately downstream of the crossroad intersection.

A north-south Arizona Parkway known as the Hidden Waters Parkway was demonstrated to be needed in the Hassayampa Framework Study that generally is offset about two miles to the west of the Hassayampa River. The northern portion of the Hidden Waters Parkway is proposed to cross Interstate 10 at 339th Avenue (where a traffic interchange already exists) and extend southward to Old U.S. Highway 80 (Old US 80).

Similar to the Hassayampa Framework Study, the Interstate 8 and Interstate 10 Hidden Valley Transportation Framework Study (known as the Hidden Valley Framework Study), completed by MAG in October 2009, indicates the need for a system of Arizona Parkways to meet the future buildout travel demand for the area southwest of Interstate 10 (I-10) and north of Interstate 8 (I-8). In the Hidden Valley Framework Study, the need was demonstrated for the Hidden Waters Parkway identified previously in the Hassayampa Framework Study to extend further south, generally following the Old US 80 alignment, to Watermelon Road in Gila Bend.

In May 2009, the Maricopa County Department of Transportation (MCDOT) retained Kimley-Horn and Associates, Inc. (KHA) to conduct a corridor feasibility study for the southern portion of the Hidden Waters Parkway between Watermelon Road and I-10.

1.2 Study Purpose and Goals

The primary purposes of the Hidden Waters Parkway Corridor Feasibility Study are to:

Page 7: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 2 February 2010

Define and assess the project study area for potential opportunities and constraints; Develop and evaluate conceptual alternative roadway alignments within the corridor study

area; Recommend a preferred roadway alignment; and Define the characteristics of the preferred alignment, including right-of-way, in greater detail.

The study goals for the Hidden Waters Parkway Corridor Feasibility Study are subsequently listed and relate specifically to the proposed Hidden Waters Parkway in the context of the existing and future transportation network in the study area. Specific objectives are listed below for each study goal.

Goal #1: Achieve roadway network continuity and connectivity Determine preferred corridor alignment from a regional transportation corridor

perspective; Provide future connectivity with primary and regional roadway facilities; and Provide crossings across alluvial fans, drainage washes, rivers, canals and the Union

Pacific Railroad. Goal #2: Enhance traffic flow (capacity) and safety

Preserve functional integrity of the Arizona Parkway by recommending unique segment-specific solutions where needed to address identified opportunities or constraints;

Identify areas that may require additional right-of-way or easements, especially at crossings with other Parkways, alluvial fans and utility corridors; and

Implement consistent design standards for enhanced traffic operation and reduced crash potential while maintaining reasonable access for developments.

Goal #3: Preserve the environment Comply with governing environmental regulations for new roadway development; Minimize adverse transportation action impacts to the study area environment,

including wildlife corridors, state wildlife areas, and archeological sites; and Use transportation actions to enhance important environmental features (e.g., habitat

areas, parks, overlooks). Goal #4: Develop consensus-driven improvement alternatives;

Work with key stakeholders in developing feasible alternatives; Develop cost-effective roadway improvement alternatives; Conduct public outreach to obtain input on alternatives and build consensus ; and Ensure consistency between the study’s transportation actions and regional and local

Plans.

This study is the first step in the roadway development process and is meant to aid the governing bodies in defining and protecting a continuous future roadway corridor that can accommodate projected future traffic demands.

1.3 Project Schedule

The project schedule spans 14 months, from May 2009 through June 2010. Throughout the duration of the project, up to five meetings will be conducted with a Technical Advisory

Page 8: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 3 February 2010

Committee consisting of representatives of state, county, and local jurisdictions along the Hidden Waters Parkway corridor along with key project stakeholders. Three public meetings will be conducted at three different times during the project: during project initiation and scoping, following the assessment of existing conditions and development of conceptual alternatives, and following the evaluation of alternatives and identification of the preferred alternative. The project schedule is displayed in Table 1.

Table 1 – Project Schedule

Milestone Anticipated

Completion Date Existing and Future Corridor Features

Environmental Overview

Drainage Overview

October 2009

Alternatives Development and Evaluation January 2010

Preferred Alignment Drawings March 2010

Final Report May 2010

1.4 Project Study Area

The project study area for the proposed Hidden Waters Parkway is approximately 38 miles in length between Watermelon Road and I-10 and is roughly two miles wide, centered on the north-south segment of Old US 80. North of the Cactus Rose Road/Old US 80 intersection, where Old US 80 diverges to the east, the study area broadens to a four-mile wide corridor, centered on the 347th Avenue section-line alignment, extending north to the Salome Highway. North of the Salome Highway, the study area width narrows back to two miles, following the 339th Avenue alignment north to I-10. The study area covers approximately 93.9 square miles. The project study area is shown in Figure 1.

Page 9: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 4 February 2010

Project Study Area

363r

d A

ve

331s

t Ave

G I L A B E N D M O U N T A I N S

MA

RI C

OP

A MO U N T A I N S

Gila River

Hassayampa R

iver

Buckeye

Gila Bend

BU

CK E

YE H

I LL S

W H I T E T A N KM O U N T A I N S

339t

h A

ve

Gila River

Old

US

80

Watermelon Rd Maricopa Rd

Salome HwyP A L O V E R D E

H I L L S

Project Study Area

Yavapai County

Maricopa County

Pinal County

Pima County

Gila County

La P

az C

ount

yYu

ma

Cou

nty

0 2.5 51.25

MilesSept. 2009

Figure 1 – Project Study Area

Page 10: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 5 February 2010

2. PLANS AND STUDIES

2.1 Inventory of Plans, Studies, Reports, and Documentation

Relevant information on existing and future corridor features was obtained from available studies, reports, and other documents. The reports and studies that were obtained and reviewed as part of the Hidden Waters Parkway Corridor Feasibility Study are listed in Appendix TM1-1. TM 2 contains a list of additional documents cited in the assessment of environmental conditions.

2.2 Summary of Findings and Recommendations from Review of Plans and Studies

This section documents the findings and recommendations from existing studies and reports that are pertinent to the general existing and future corridor features of the Hidden Waters study area. Detailed documents discussing environmental and drainage issues and features are addressed in TM 2 and TM 3, respectively.

2.2.1 Maricopa County Old US Highway 80 Area Plan (May 2007)

The area plan for 2020 was adopted in 2007 and supersedes portions of the State Route 85 and Tonopah/Arlington Area Plans;

The plan includes information on land use, transportation, environmental issues, economic development, open space, water resources, and cost of development;

Old US 80 south of Salome Highway has a future classification of Minor Arterial (four lanes in width with bike lanes). The plan later states that Old US 80’s future classification is Principal Arterial (per Table 13 in plan);

Old US 80 has an Emergency Management Overlay within a 10-mile radius of the Palo Verde Nuclear Generating Station (PVNGS);

The entire length of Old US 80 is designated as a scenic/recreational overlay; Old US 80 has a school safety overlay adjacent to Palo Verde Elementary School; Old US 80 has been identified as a component of the regional bicycle network; Stakeholder comments received during public meetings included:

Maintain current character of Old US 80 (bends and/or grades should not be eliminated);

Closing Old US 80 access to State Route (SR) 85 would cause traffic problems; and

No Bureau of Land Management (BLM) or State Land trades or sales should occur;

Agricultural exemptions have been issued for livestock grazing, dairy cattle, crops, and an egg ranch within the area;

Arlington Elementary School is located within the plan area. There is one proposed elementary school within the study area near the intersection of 335th Avenue and Buckeye Road. (Location is based on information provided by Arizona School Facilities Board and local school districts.);

There is an existing US Post Office east of the study area at 33039 W. Old US Highway 80 in Arlington; and

Page 11: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 6 February 2010

The SR 85 landfill is proposed for the southeast corner of Old US 80 and Patterson Road.

2.2.2 Maricopa County Tonopah/Arlington Area Plan (September 2000)

The area plan for 2020 was adopted in 2000; The plan includes information on land use, transportation, environmental issues, and

economic development between I-10 and Old US 80 around the Arlington Wildlife Area;

339th Avenue is shown as a Core Arterial between I-10 and Salome Highway; BLM, State Trust, and State Wildlife land are in the plan area; and Average Daily Traffic (ADT) count data is provided for the following locations:

Four locations along 339th Ave within plan area; and Four locations along Old US 80 within plan area.

Both Old US 80 and 339th Avenue have a future functional classification of Rural Collector.

2.2.3 MAG Interstate 8 and Interstate 10 Hidden Valley Transportation Framework Study (October 2009)

The proposed alignment of Hidden Waters Parkway is as follows: Northern portion runs generally east of and parallel to the proposed

Hassayampa Freeway; and Southern portion runs along the Old US 80 alignment and continues through

Gila Bend. Watermelon Road is recommended as an Arizona Parkway; Potential freight rail line parallels the west side of SR 85; Potential implementation timeframe for Hidden Waters Parkway includes the

corridor/preliminary alignment study to occur from 2010 to 2015 and right-of-way preservation from 2010 to 2020;

The facility level of development for Hidden Waters Parkway in the interim (2030) is a two-lane arterial and in the buildout is a six-lane parkway;

The Hidden Waters Parkway is designated as a low priority improvement project; Arizona wildlife fracture and linkage zones are within the study area; Cross-sections of the Arizona Parkway with sample wildlife crossings are shown for

use in linkage and fracture zones; A large prehistoric site cluster is located within the study area between Gila Bend and

Buckeye along the Gila River; The Upper Gila River is designated as a Nature Conservancy Conservation Area; The MAG Desert Spaces Plan designates a portion of the study area as a Secured Open

Space; The Maricopa County Trails Plan designates a trail along the length of the Gila River.

There are several Priority 4 trails within the study area. Priority 4 trails are conceptual corridors and the lowest priority for implementation with regards to the Maricopa County trail system plan;

Page 12: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 7 February 2010

Gas pipeline and 500kV power transmission lines cross the study area south of the Old US 80 Bridge near Gillespie Dam; and

Exhibits showing the conceptual transportation framework, the projected roadway geometry and intersection/interchange locations, and the unofficial daily traffic volume projections at buildout are provided in Appendix TM1-2.

2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008)

The study identifies a parkway traffic interchange at the existing I-10/339th Avenue interchange;

Hidden Waters Parkway is proposed to originate at the Lake Pleasant Freeway extension and run south to the proposed SR 801. Within the study area, Hidden Waters Parkway runs along 339th Avenue to Yuma Road, and then heads south along 331st Avenue through to the proposed SR 801;

Old US 80 south of the Hassayampa Parkway is designated as arterial; The Hidden Waters Parkway is shown as having medium priority for implementation; The Long-Range High Capacity Transit Scenario shows both bus rapid transit and

commuter rail lines crossing Hidden Waters Parkway near its intersection with SR 801; and

Exhibits showing the conceptual transportation framework, the projected roadway geometry and intersection/interchange locations, and the unofficial daily traffic volume projections at buildout are provided in Appendix TM1-2.

2.2.5 ADOT SR 85 in Gila Bend Draft Final Design Concept Report (June 2009)

The Design Concept Report (DCR) provides a long-range plan for a system interchange between SR 85 and I-8 to meet the anticipated capacity and operational needs through 2030;

The northern study limit is SR 85 Milepost (MP) 123.00 (the Watermelon Road alignment);

Phase 3 of the project includes a median crossing and a short section of Watermelon Road on the east side of SR 85;

The Watermelon Road traffic interchange (TI) along SR 85 is proposed as a future improvement; and

Mainline Alternative 1, the Recommended Option, includes a grade-separated interchange along SR 85 at Watermelon Road. This future Watermelon Road interchange is significantly north of the current Watermelon Road alignment. The proposed realigned Watermelon Road right-of-way is shown connecting into Old US 80 right-of-way approximately 3,000 feet north of the existing Watermelon Road/Old US 80 intersection.

Page 13: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 8 February 2010

2.2.6 ADOT SR 85 at Gila Bend Draft Environmental Assessment and Section 4(f) Evaluation (August 2009)

The Draft Environmental Assessment (EA) discusses the anticipated environmental impacts of the preferred alternative from the aforementioned SR 85 in Gila Bend Draft Final DCR;

The preferred alternative includes a future Watermelon Road traffic interchange that is proposed to be designed and constructed by others. This future Watermelon Road interchange is significantly north of the current Watermelon Road alignment. The proposed realigned Watermelon Road right-of-way is shown connecting into Old US 80 right-of-way approximately 3,000 feet north of the existing Watermelon Road/Old US 80 intersection;

An elevated signalized intersection is proposed for the Business 8/Pima Street intersection, which is just east of where Old US 80 connects to Pima Street; and

An exhibit of the preferred alternative from the EA showing the proposed SR 85/Watermelon Road interchange and Business 8/Pima Street elevated intersection is provided in Appendix TM1-3.

2.2.7 MCDOT Design Guideline Recommendations for the Arizona Parkway (August 2008)

Guidelines prepared in August 2008 for the indirect left-turn parkway design concept; 200-foot minimum right-of-way corridor recommended for both four- and six-lane

sections. Additional right-of-way and/or easements may be needed for turn lanes, bus bays, drainage structures, drainage facilities, side slopes, utilities, and landscaping;

Twelve-foot wide lanes are recommended, with four-foot wide inside paved shoulders and six-foot outside paved shoulders;

An additional eight-foot minimum width public utility easement is recommended on each side of the parkway;

Median width varies based on the number of lanes needed; Minimum design speeds for rolling terrain are 60 miles per hour (mph) in rural areas

and 50 mph in urban areas; WB-50 is the recommended design vehicle; U-turn directional crossovers are recommended to be restricted to a maximum of eight

per mile; Left turns in any direction are prohibited at all intersections; Left turns from a side-street or driveway onto the parkway are prohibited; Left turns from the parkway to a side-street or driveway are discouraged due to

conflicts between u-turns and right turns; Intersections (full median breaks) will preferably be restricted to one-mile spacing,

with a minimum spacing of one-half mile, and are only recommended where intersecting with arterial or major collector streets;

Recommended minimum driveway spacing is– 165’ for low–volume segments and 330’ for high-volume segments. The typical driveway will be limited to right-in/right-out maneuvers; and

Parkway typical cross-sections are provided in Appendix TM1-4.

Page 14: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 9 February 2010

2.2.8 MCDOT Arizona Parkway Intersection/Interchange Operational Analysis and Design Concepts Study (August 2009)

200-foot right-of-way preservation is adequate to meet the needs of at-grade parkway-to-parkway intersections of up to eight lanes on each approach;

Additional right-of-way will need to be preserved at parkway-to-parkway intersections requiring grade separations;

Parkway Grade-Separated Interchanges (PGSIs) will require approximately fifteen acres of additional right-of-way to accommodate the intersection of two eight-lane parkways. An exhibit from the study depicting a typical PGSI, including the access treatment for the legs of the PGSI, is provided in Appendix TM1-4. The fifteen-acre right-of-way requirement assumes a generally flat intersection location and typical layout conditions. Right-of-way needs may increase given the presence of special conditions;

Based on level of service thresholds for the buildout condition, Hidden Waters Parkway is anticipated to ultimately need six-lane and eight-lane segments within the project study area;

There are three parkway-to-parkway intersections within the project study area: Hidden Waters Parkway (339th Avenue)/Yuma Parkway; Hidden Waters Parkway (331st Avenue)/Southern Avenue; and Hidden Waters Parkway (Old US 80)/ Watermelon Road.

Intersection entering volumes for each of the three project area intersections are discussed in the study. The threshold-volume base intersection lane configuration for all three intersections is eight-lane to eight-lane;

The Hidden Waters Parkway/Yuma Parkway intersection is recommended to be an at-grade intersection;

The Hidden Waters Parkway/Southern Avenue intersection is recommended to be a PGSI, with Hidden Waters Parkway being the higher-volume mainline facility to remain at-grade; and

The Hidden Waters Parkway/Watermelon Road intersection is recommended to be a PGSI in the interim (through 2030) and a PGSI with an eastbound-northbound flyover ramp and a southbound-westbound direct connector ramp in the ultimate timeframe (beyond 2030). The ultimate PGSI concept design layout from the study is provided in Appendix TM1-4.

2.2.9 MAG Updated Buildout Traffic Projections(June 2009)

Updated projected daily traffic volumes for Hidden Waters Parkway range from approximately 29,000 to 85,000 vehicles per day. The buildout traffic projections are unofficial and have not been adopted by the MAG Regional Council;

The recommended lane and intersection configurations for Hidden Waters Parkway are four-, six-, and eight-lane configurations at various points in the study area; and

All proposed intersections with Hidden Waters Parkway are anticipated to be at-grade with the exception of the intersections with Watermelon Road, Salome Highway, and the Hassayampa Freeway.

Page 15: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 10 February 2010

2.2.10 Hickman’s Egg Ranch Major Comprehensive Plan Amendment (June 2009)

Hickman’s Egg Ranch is located along the east side of 331st Avenue and is bounded by Salome Highway and the Union Pacific railroad tracks;

Hickman’s Egg Ranch applied for an amendment to the Old US Hwy 80 Area Plan to change the land use to Industrial from the current Rural Residential designation; and

Hickman’s Egg Ranch was requested at its pre-application to leave a 100-foot setback from the centerline of 331st Ave when planning future onsite structures and development to preserve right-of-way for the future Hidden Waters Parkway.

2.2.11 Hidden Waters Ranch Development Master Plan [Major Amendment #1] (October 2008)

Hidden Waters Ranch is a planned 1,314-acre master planned community, bounded generally by I-10 to the north, 339th Avenue to the east, Buckeye Road to the south, and 347th Avenue to the west;

Site includes several parcels of State Land along 339th Avenue; 64 percent of the site will serve as Commercial, Industrial and Employment land use; 339th Avenue is planned to serve as the major north-south regional transportation

corridor for the area with a 200-foot parkway cross-section. Van Buren Street is proposed to be a Principal Arterial while Harrison Street is

proposed to be a Collector; and The Master Plan Development is planned to occur in several phases, starting in 2013

and ending in 2022.

2.2.12 Insignia Major Comprehensive Plan Amendment (September 2006)

Insignia is a proposed 543-acre development along the east side of Old US 80, south of the Riggs Road alignment and directly north of Hunt Highway; and

Application has been submitted and approved for amending the SR 85 Area Plan from Rural Residential land use to Small Lot, Medium and High Density Residential, and Neighborhood Commercial land uses.

2.2.13 Belmont Site Plan (2007)

Belmont is a proposed Mixed-Use development north of I-10, generally contained within the bounds of 331st Avenue, the Cactus Road alignment, 371st Avenue, and I-10.

2.2.14 Hassayampa Village Comprehensive Plan Amendment (July 2006)

Hassayampa Village is a proposed 160-acre development located north of the northwest corner of I-10 and 331st Avenue;

Application has been submitted for amending the existing land use designation from the Tonopah/Arlington Area Plan from Rural Residential land use to Mixed Use, including High Density Residential, Commercial, and Business Park land uses; and

A change in zoning designation has been proposed from Rural-43 to Mixed Use.

Page 16: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 11 February 2010

2.2.15 Sonoran Trails (August 2009)

Sonoran Trails is a proposed 2,400-acre master planned community containing Mixed-Use development, including Low- to High-Density Residential neighborhoods with several areas of Commercial uses, Community Parks, and trails commemorating the historic Butterfield Stage trailhead;

At buildout, Sonoran Trails is proposed to have 8,109 dwelling units; and Sonoran Trails is generally bounded by Old US 80, Fornes Road, SR 85, and Woods

Road.

2.2.16 Town of Gila Bend General Plan (November 2006)

Old US 80 is classified as a Local Street at and north of its intersection with Watermelon Road;

Watermelon Road is classified as a Planned Minor Arterial at its intersection with Old US 80; and

Land use within the project study area consists of Very Low Density Residential (0-1 dwelling units/acre [du/ac]), Low Density Residential (1-5 du/ac), Medium Density Residential (5-10 du/ac), Heavy Industrial, Rural, and Parks and Open Space.

2.2.17 Town of Buckeye General Plan (2008)

Land use within the project study area consists of Very Low Density Residential (0-1 du/ac), Low Density Residential (1.01-3 du/ac), Medium Density Residential (3.01-6 du/ac), Medium High Density Residential (6.01-10 du/ac), Community Commercial, Mixed Use, Business Park, Industrial, and Open Space.

2.2.18 Old U.S. Highway 80 Bridge (Gillespie Dam Bridge) Final Design Concept Report – Volume I (September 2007)

This study evaluated the location of a new bridge to supplement the existing bridge when traffic demands or other factors require a new bridge over the Gila River;

The future recommended alternative is Alternative #4, which includes a new bridge approximately 1,000 feet downstream from the existing bridge;

The proposed bridge location is south of the existing gas lines and directly north of the existing 500kV electrical lines;

The proposed bridge would be 14-span and 1,800 feet long and would utilize, AASHTO Type 6 Prestressed Concrete I-girders with a cast-in-place concrete deck slab supported on drilled shaft foundations;

The proposed right-of-way for the new bridge is a minimum of 130’, with even greater right-of-way needed at the curved approaches to the new bridge; and

The proposed six-lane bridge is assumed to be 87 feet wide, with a design speed of 55 mph.

2.2.19 Old U.S. Highway 80 Bridge (Gillespie Dam Bridge) Final Value Engineering Report (May 2008)

This document is a summary of the value engineering workshop held in May 2008;

Page 17: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 12 February 2010

The value engineering recommendation proposes to construct a new interim low-flow crossing of the Gila River along the same alignment as the ultimate bridge recommendation (Alternative #4) from the DCR;

The low-flow crossing is expected to have a capacity of 10,000 vehicles per day (projected demand for 2025 is 8,500 vehicles per day);

Acquisition of new right-of-way, 404 permitting, and environmental clearance will be required to implement the low-flow crossing; and

The low-flow crossing does not meet ultimate traffic demands and will have to be replaced by the bridge recommended in the DCR.

2.2.20 Draft of the Initial Location/Design Concept Report for SR 85, Gila Bend to I-10 (November 1999)

The recommended improvements to the SR 85 roadway are described, which are based on the findings of an alternatives evaluation, available accident information, and current and forecast traffic volumes.

2.2.21 Maricopa County Transportation System Plan (February 2007)

Old US 80 is functionally classified as a Major Collector; 339th Avenue, Salome Highway, and Baseline Road are classified as Minor Arterials; 331st Avenue and Arlington School Road are classified as Minor Collector roads; and Enterprise Road is classified as a Local Road.

2.2.22 Maricopa County Major Streets and Route Plan: Street Classification Atlas (revised September 2004)

Old US 80 is shown as having a scenic/recreational overlay over its entire length; The design guidelines of a scenic/recreational overlay call for the road to follow the

contours of the natural terrain and to have a 50-foot scenic easement added on each side of the right-of-way to provide for a wider corridor of natural habitat preservation; and

The 50-foot scenic easement does not currently exist anywhere along Old US 80.

2.3 Summary of Programmed Roadway Improvements

There are currently no programmed roadway improvements contained in the Capital Improvement Programs, Transportation Improvement Programs, and Regional Transportation Plans that pertain to the project study area.

Page 18: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 13 February 2010

3. EXISTING AND FUTURE CORRIDOR FEATURES This section summarizes the information gathered from the documents cited in the previous section into existing and future corridor feature categories. Exhibits are provided, where appropriate, to graphically display the existing and future corridor features that should be considered in determining if there are feasible alignments for the Hidden Waters Parkway.

3.1 Jurisdictional Responsibilities

The entire Hidden Waters corridor study area is located within Maricopa County. Maricopa County has jurisdiction over the majority of the land and roadways within the project study area. The Town of Buckeye and the Town of Gila Bend have jurisdiction over the land within their respective town limits adjacent to and within the study area. Portions of the project study area currently under Maricopa County jurisdiction are also within the Gila Bend Municipal Planning Area and the Buckeye Municipal Planning Area.

Jurisdictional boundaries are illustrated in Figure 2, as per the Geographic Information Systems (GIS) data provided by Public Works of Maricopa County in May 2009.

3.2 Land Ownership

The project study area contains a mix of both public and private lands. The majority of the land in the project study area is privately owned. Public land owners in the study area are the Arizona State Land Department (ASLD) and BLM. Land ownership in the project study area is shown in Figure 3, as per the GIS data provided by Public Works of Maricopa County in May 2009.

Just outside the eastern edge of the project study boundary in the central portion of the study area, the Arizona Game and Fish Department (AGFD) owns land that is part of the Powers Butte and Arlington Wildlife Areas. AGFD manages over 5,000 acres of wildlife areas along the Gila River adjacent to the Buckeye Hills that are collectively known as the Lower Gila River Wildlife Management Areas Complex (LGRWMAC). The LGRWMAC includes the Robbins Butte Wildlife Area, the Arlington Wildlife Area, the Powers Butte Wildlife Area, the Fred Weiler Greenbelt, and the PLO 1015 lands that are BLM lands withdrawn to the U.S. Fish and Wildlife Service and managed by the AGFD for wildlife management.

3.3 Zoning and Land Use

3.3.1 Existing Zoning and Land Use

Figures 4a, 4b, 4c, 4d, 4e, and 4f show the existing zoning and parcel boundaries in the project study area as of June 2009. Zoning data for the unincorporated portions of the project study area was obtained from the Maricopa County Assessor’s Office website (http://www.maricopa.gov/Assessor/GIS/map.html) while the zoning data for the portions of the project study area in Buckeye and Gila Bend was obtained from the towns’ respective General Plans.

Page 19: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 14 February 2010

Buckeye MunicipalPlanning Area

Gila BendMunicipal Planning

Area

Goo

dyea

rM

unic

ipal

Pla

nnin

gA

rea

Theba

Bosque

Liberty

Tonopah

Estrella

Arlington

Gila Bend

Perryville

Palo Verde

Hassayampa

Wintersburg

Cotton Center

Rainbow Valley

LegendTown

Project Boundary

Jurisdiction Limits

Maricopa County

City of Goodyear

Town of Buckeye

Town of Gila Bend

Municipal Planning AreasBuckeye

Gila Bend

Glendale

Goodyear

0 2.5 51.25

MilesSept. 2009

Figure 2 – Jurisdictions

Page 20: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 15 February 2010

Legend

Project BoundaryLand Ownership

Barry Goldwater Air Force Rng.Bureau of Land Mgmt.County LandArizona Game and Fish DepartmentSan Lucy District Tohono O'odhamMilitary Res.Painted Rock Wildlife AreaPrivate LandState Trust Land

0 2.5 51.25

MilesSept. 2009

Figure 3 – Land Ownership

Page 21: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 16 February 2010

R-5

C-3

RR

CC

PC

PC

RU-43

RU-190

RU-190

C-2

IND-3

IND-2

C-2

C-2

C-2

RU-43

C-3

RU-43

R-5

RU-43

R1-35

I 10

355t

h Av

e

3 39t

h A v

e

Wi n

t ers

b ur g

Rd

Salome Hwy

Van Buren St

Buckeye Rd

Indian School Rd

Lower Buckeye Rd

371s

t Av e

Dobbins Rd

351s

t Ave

Broadway Rd

343r

d A

ve

3 87t

h A v

e

Baseline Rd

331s

t Ave

359 t

h A v

e

Tonopah Salome HwyI 10 Ramp

Wickenburg Rd

Yuma Rd

Ward Rd

McDowell Rd

Wier AveRoeser Rd

Sunland Ave

Encanto Blvd

371s

t Ave

I 10

331s

t Av e

LegendProject Boundary

Parcels

County ZoningC-2 Intermediate Commercial

C-3 General Commercial

IND-2 Light Industrial

IND-3 Heavy Industrial

R-5 Limited Multiple-Family Residential

R1-35 Single-Family Residential

RU-190 Rural

RU-43 Rural

Buckeye ZoningCC Commercial Center

PC Planned Community

RR Rural Residential

6

5

3 4

2

1

0 0.5 10.25

Miles

Sept. 2009

Figure 4a – Zoning

Page 22: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 17 February 2010

C-2RU-43

RU-190

RU-43Southern Pacific Tr

Narramore Rd

Elliot Rd

Arlington Canal Rd

Cactus Rose RdA

rling

t on

S ch o

ol R

d

Old US 80

Olney Ave

RR

RU-190

IND-3

RU-43

R1-35

Dobbins Rd

351s

t Ave

Baseline Rd

Ward Rd

331s

t Ave

Old U

Compressor Rd

LegendProject Boundary

Parcels

County ZoningC-2 Intermediate Commercial

IND-3 Heavy Industrial

R1-35 Single-Family Residential

RU-190 Rural

RU-43 Rural

Buckeye ZoningRR Rural Residential

6

5

3 4

2

1

0 0.5 10.25

Miles

Sept. 2009

Figure 4b – Zoning

Page 23: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 18 February 2010

RR

RU-190

Old US 80

Ente

rpris

e R

d

Compressor Rd

LegendProject Boundary

Parcels

County ZoningRU-190 Rural

Buckeye ZoningRR Rural Residential

6

5

3 4

2

1

0 0.5 10.25

Miles

Feb. 2010

Figure 4c – Zoning

Page 24: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 19 February 2010

C-2

Komatke Rd

CG

RR

RR

PCR-1

RR

RU-43

RU-190

RU-43

R-5

RU-43

Old US 80

Komatke Rd

Enterprise Rd

283 r

d A

v ePatterson Rd

Woods Rd

LegendProject Boundary

Parcels

County ZoningC-2 Intermediate Commercial

R-5 Limited Multiple-Family Residential

RU-190 Rural

RU-43 Rural

Buckeye ZoningCG General Commerce

RR Rural Residential

Gila Bend ZoningPC Planned Community

R-1 Single Family Residential

6

5

3 4

2

1

0 0.5 10.25

Miles

Sept. 2009

Figure 4d – Zoning

Page 25: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 20 February 2010

C-2

RU-190

Pierpoint Rd

Fornes Rd

Enterprise Rd

RU-190RU-190

PCR-1

RR

PC

PC

AG

AG

AG

RU-43

R-5

Woods Rd

RU-190

Old

US 8

0

Sisson Rd

LegendProject Boundary

Parcels

County ZoningC-2 Intermediate Commercial

R-5 Limited Multiple-Family Residential

RU-190 Rural

RU-43 Rural

Buckeye ZoningRR Rural Residential

Gila Bend ZoningAG Rural Zone

I-1 Light Industrial

I-3 Basic Manufacturing, Industrial

PC Planned Community

R-1 Single Family Residential

6

5

3 4

2

1

0 0.5 10.25

Miles

Sept. 2009

Figure 4e – Zoning

Page 26: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 21 February 2010

R-3 C-2

RU-190RU-190

AG

I-3

I-1

I-2

R-1AGR-4

B-2

AGR-5R-3

AGR-3

R-1R-5

B-1R-4

R-5B-2

R-4R-5R-3AG

PC B-2

I-1

AG

RU-43

RU-190

RU-190

RU-43

IND-3

B-2

R-5

C-3

Old

US 8

0

Maricopa Rd

Watermelon Rd

Gila

Bl v

d

Cem

eter

y R

d

Indian Rd

Stou

t Rd

Main St

Sisson Rd

Hunt St

307th AveM

artin Ave

Scott AveLegend

Project Boundary

Parcels

County ZoningC-2 Intermediate Commercial

C-3 General Commercial

IND-3 Heavy Industrial

R-3 Limited Multiple-Family Residential

R-5 Limited Multiple-Family Residential

RU-190 Rural

RU-43 Rural

Gila Bend ZoningAG Rural Zone

B-1 Neighborhood Business

B-2 Community Business

I-1 Light Industrial

I-2 Heavy Industrial

I-3 Basic Manufacturing, Industrial

PC Planned Community

R-1 Single Family Residential

R-3 Manufactured Home Residential

R-4 Four-Plex Residential

R-5 Multi-Family Residential

6

5

3 4

2

1

0 0.5 10.25

Miles

Sept. 2009

Figure 4f – Zoning

Page 27: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 22 February 2010

The project study area is primarily zoned for rural agricultural activity and low-density residential uses, with some commercial and higher-density residential zoning near Gila Bend, Buckeye, and I-10. Both 339th Avenue and 331st Avenue have several segments of 80-foot full-street dedicated right-of-way within the project study area. There are also large sections of these roadway alignments that either have 40-foot or 55-foot half-street dedicated right-of-way or no existing dedicated right-of-way. Old US 80 generally has a 100-foot dedicated right-of-way throughout the project study area.

Figure 5 shows the existing land uses in the study area per the GIS data provided by Public Works of Maricopa County in May 2009. The existing land uses within the project study area are primarily agriculture, open space, and vacant land, with a few clusters of residential uses. Arlington Elementary, located near 355th Avenue and Dobbins Road, and Winters’ Well Elementary, located near 355th Avenue and Buckeye Road, are the only existing public school facilities located within the project study area.

3.3.2 Future Land Use

Figure 6 shows the anticipated future buildout land uses within the project study area per the MAG general plan GIS data provided by Public Works of Maricopa County in May 2009. This exhibit indicates that the existing agriculture and vacant land uses are anticipated to be converted to primarily low-density and medium-density land uses.

3.4 Existing and Planned Developments

Figure 7 shows the existing and active planned developments around and within the project study area. At the time the aforementioned MAG framework studies were conducted, the Phoenix metropolitan area was experiencing significant population growth over a period of several years. In the past two years, however, the rate of growth has slowed due to the economic downturn, as evidenced by the fact there are few development or rezoning requests currently being processed by Maricopa County for land within the project study area. The rate of growth within the project study area is expected to increase following a significant economic recovery, but the development timeframes for when buildout will be reached will likely be extended.

3.5 Transportation Network

3.5.1 Existing Transportation Network

Old US 80 is currently a paved two-lane Major Collector roadway that traverses the majority of the study area, running south-north from Watermelon Road in Gila Bend to the Arlington area, where Old US 80 diverges to the east. The posted speed limit along Old US 80 is primarily 50 mph. Higher-speed roads in the project study area include I-8 and I-10, along with SR 85, which is just outside of the eastern edge of the study area. Other roads of interest in the project study area include 339th Avenue and Watermelon Road, both of which are Minor Arterial roadways. There is also an existing Union Pacific railroad line that runs northeast-to-southwest through the project study area just north of Arlington.

At the northern end of the project study area, there is an existing traffic interchange along I-10 at 339th Avenue. At the southern end of the project study area, the Old US 80/Watermelon Road intersection is currently a “T” intersection, with a stop sign located on the Watermelon Road leg.

Page 28: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 23 February 2010

Theba

Bosque

Liberty

Tonopah

Estrella

Arlington

Gila Bend

Perryville

Palo Verde

Hassayampa

Wintersburg

Cotton Center

Rainbow Valley

LegendTown

Project Boundary

Municipal Planning AreaBuckeye

Gila Bend

Glendale

Goodyear

Wlderness Area

Land UseLow Density Residential

Medium Density Residential

High Density Residential

Planned Community

Commercial

Mixed Use

Industrial

Airport

Education/Schools

Public/Quasi-Public

Office/Employment

Open Space

Agriculture

Vacant Land

Water

0 2.5 51.25

MilesSept. 2009

Figure 5 – Existing Land Use

Page 29: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 24 February 2010

Theba

Bosque

Liberty

Tonopah

Estrella

Arlington

Gila Bend

Perryville

Palo Verde

Hassayampa

Wintersburg

Cotton Center

Rainbow ValleyLegendTown

Project Boundary

Municipal Planning Area

Buckeye

Gila Bend

Glendale

Goodyear

Wlderness Area

Future Land UseLow Density Residential

Medium Density Residential

High Density Residential

Planned Community

Commercial

Mixed Use

Industrial

Airport

Education/Schools

Public/Quasi-Public

Office/Employment

Open Space

Water

0 2.5 51.25

MilesSept. 2009

Figure 6 – Future Land Use

Page 30: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 25 February 2010

Arlington Farms

Butterfield Stagecoach

Dixie Park

Dos Lagos

Gila Bend

Gila Bend Estates

HassayampaVillage

Hidden Waters Ranch

Lakeside SkiVillage

North Gila Bend

Phoenix Valley West 1

Phoenix Valley West 2

Schnell Place

SonoranTrails

Spring MountainSki Ranch 1 & 2

SpringMountain SkiRanch 3 & 4

Valley ViewRanchettes

Verma Estates

BuckeyeRanch

Hickman's EggRanch

Belmont

Insignia

Theba

Bosque

Liberty

Tonopah

Estrella

Arlington

Gila Bend

Perryville

Palo Verde

Rainbow Valley

LegendProject Boundary

Developments

Town

Schools

Municipal Planning AreaBuckeye

Maricopa County

Gila Bend

Glendale

Goodyear

0 2.5 51.25

MilesOct. 2009

Figure 7 – Existing and Planned Developments

Page 31: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 26 February 2010

MCDOT utilizes the Road Management System (RMS) tool to analyze the physical attributes of roadways as well as the condition of roadway pavement and ride quality. One of the data items included in the RMS is the pavement conditions rating. The 2008 MCDOT State of the System report shows the pavement condition ratings for portions of several of the major roads within the project study area. Old US 80 is predominately rated to be in ‘excellent’ condition, with some patches rated ‘very good’. 339th Avenue and 331st Avenue both have sections of pavement rated ‘excellent’, ‘very good’, and ‘good’.

Existing 2008 daily traffic count volumes for the existing transportation network in the project study area were taken from the Traffic Counts web pages of MCDOT and ADOT.

Figure 8a and Figure 8b depict many of the features of the existing transportation network within the project study area.

3.5.2 Future Transportation Network

The existing transportation network in the project study area is anticipated to change dramatically in the future buildout condition. Most of the existing roadways are expected to change to a higher functional classification. For example, the Hidden Valley Framework Study proposes that the north-south portion of Old US 80 become the Hidden Waters Parkway and that Watermelon Road become a parkway also. According to the MAG framework studies, several new parkways, freeways, and arterial roadways are planned in the project study area as well.

As has previously been mentioned, the parkway is distinguished from other roadway types by the use of an intersection treatment known as the indirect left-turn. This intersection treatment eliminates left-turns at all cross-street intersections and utilizes a wide median to facilitate u-turns downstream from the intersections. The minimum required right-of-way for the parkway is typically 200’.

At the northern end of the project study area, the existing traffic interchange along I-10 at 339th Avenue is proposed to be reconstructed as a parkway-to-freeway interchange. At the southern end of the project study area, the Old US 80/Watermelon Road intersection is proposed to become a PGSI for the Hidden Waters and Watermelon Road parkways. Just east of this proposed PGSI is a planned Watermelon Road/SR 85 grade-separated interchange. The currently proposed design concept for this interchange on SR 85 shows Watermelon Road being realigned to the north of its existing alignment west of SR 85. It is not currently known how this shift in alignment would impact the location of the Hidden Waters/Watermelon Road PGSI.

The Hidden Valley Framework Study also proposes a new railroad line be constructed to connect the existing railroad line that runs north of Arlington to the one that runs south of Gila Bend. This new railroad line runs generally north-south parallel to SR 85 along the eastern edge of the project study area.

Future unofficial buildout daily traffic volumes for the future transportation network in the project study area were obtained from MAG framework study travel demand model outputs produced in July 2009 by MAG. The projected buildout volumes for the Hidden Waters Parkway exceed the capacity of a typical arterial roadway, indicating a long-term need for a parkway facility in the corridor. Figure 9a and Figure 9b depict many of the proposed features of the future transportation network within the project study area.

Page 32: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 27 February 2010

Union Pacific Railroad

Gila River

Hassayam

pa River

Robbins Butte Game Rd

1137

0

407

497

504

546

129

214 154

662

9591377

357

590473

380

620

672

454

462

31218

2224

4433

99

1009347

740

841

33614

28321

540

92

2105

Old US 80

Baseline Rd

355t

h Av

e

3 39t

h A v

e

Komatke Rd

Win

ter s

bur g

Rd

Salome Hwy

John

s on

Rd

Southern Ave

Elliot Rd

Indian School Rd

Hazen Rd

Ogl

esby

Rd

351s

t Ave

Sun

Vall e

y Pk

wy

387t

h A v

e

Lower Buckeye Rd

Palo

Ve r

d e R

d

3 71s

t Av e

Dobbins Rd

Yuma Rd

Bru

ner R

d

Wil s

on A

v e

Ar li

n gto

n Sc

hool

Rd

319t

h Av

e

331s

t Ave

Van Buren St

Broadway Rd

Narramore Rd

Roosevelt St

Wickenburg R

d

McDowell Rd

363r

d A

ve

309t

h Av

e

Campbell Ave

Olney Ave

Buckeye Rd

313t

h Av

e

Target Rd

Turn

e r R

d

Narramore Rd

Van Buren St

Tonopah Salome Hwy

Yuma Rd

331s

t Av e

Broadway Rd

0 1 20.5

Miles

LegendProject Boundary

Traffic Volumes

Existing Interchange

Existing Roadway

Freeway

Highway

Arterial

Major Collector

Other Roads

99

Sept. 2009

Figure 8a – Existing Transportation Network

Page 33: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 28 February 2010

Gila River

3799

4148

211 597

12

8868

482

1537

Enterprise Rd

Watermelon Rd

Citrus

Valle

y Rd

Maricopa Rd

283r

d A

ve

Gi la

Blv

d

Indian Rd

Stou

t Rd

Citrus Valley Ln

Patterson Rd

Fornes Rd

Main St

Cem

eter

y R

d

Pierpoint RdOl

d Aj

o Rd

Woods Rd

Hunt St

307t

h Av

e

Pima St

371s

t Ave

Citr

us V

alle

y R

d

0 1 20.5

Miles

LegendProject Boundary

Traffic Volumes

Existing Interchange

Existing Roadway

Freeway

Highway

Arterial

Major Collector

Other Roads

99

Sept. 2009

Figure 8b – Existing Transportation Network

Page 34: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 29 February 2010

85

9390

7692

6469

7357

76

57

52

29

38

61

16

66 82

20

73

55 80

79

48

40

91Union Pacific Railroad

Has

saya

mpa

Frw

y

Gila River

Hassayam

pa River

Hid

den

Wat

ers

Pkw

y

Southern Ave

Yuma Pkwy

Win

ters

burg

Pkw

y

Hid

den

Wat

ers

Pkw

y

McDowell Pkwy

Turn

er P

kwy

Sun

Valle

y Pk

wy

801

LegendProject Boundary

ProposedSystem Interchange

Proposed Arterial Interchange

Proposed Parkway Interchange

Proposed Freeway

Proposed Parkway

Proposed Arterial

Proposed Railroad

Unofficial BuildoutTraffic Volumes(ADT in Thousands)

99

0 1 20.5

MilesFeb. 2010

Figure 9a – Proposed Buildout Transportation Network

Page 35: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 30 February 2010

38

58

38

40

46

28

33

40

44

4624

4752

84

83

105 125 143

9

11

Hid

den

Wat

ers

Pkw

y

Gila River

Watermelon Rd

Palo

ma

Rd

Proposed de Anza

Scenic Way

LegendProject Boundary

ProposedSystem Interchange

Proposed Arterial Interchange

Proposed Parkway Interchange

Proposed Freeway

Proposed Parkway

Proposed Arterial

Proposed Railroad

Unofficial BuildoutTraffic Volumes(ADT in Thousands)

990 1 20.5

MilesFeb. 2010

Figure 9b – Proposed Buildout Transportation Network

Page 36: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 31 February 2010

3.6 Utilities

Figure 10a and Figure 10b depict the existing and planned major utilities within the project study area.

Per the Old US Highway 80 Area Plan and maps provided by Arizona Public Service (APS), 69 kV lines currently run along Old US 80 within the existing road right-of-way. An Interconnection Facilities Study published by APS in August 2009 says that APS has plans to construct a new 69kV like along the same general route as the existing 69kV line along Old US 80; however the new line will be moved into new right-of-way outside of existing Old US 80 right-of-way up to the existing APS Cotton Center substation.

There are several major power transmission corridors that run through the project study area. Three 500kV lines originate from the Palo Verde Nuclear Generating Station (PVNGS) and run diagonally through the northern end of the project study area, eventually crossing I-10. Two other 500kV lines run south from PVNGS and along the western edge of the project study area, crossing the study area about 1,100’ south of the Old US 80 bridge over the Gila River near Gillespie Dam.

Ongoing studies by APS indicate that the plans for the Solana Generating Station project include an interconnection with the existing APS Panda Substation, located at the northwest corner of Watermelon Road and Old US 80. The preferred transmission line route between the Solana Generating Station and the Panda Substation includes transmission facilities that would follow the existing 230 kV and 69 kV lines along Watermelon Road and into the Panda Substation.

There are several existing gas and petroleum pipelines that cross through the project study area. A 20-inch Kinder Morgan Energy petroleum pipeline crosses through the project study area within the Union Pacific railroad right-of-way between Baseline Road and Old US 80. El Paso Natural Gas has four major gas pipelines that cross east-west through the project study area just south of Gillespie Dam. Transwestern has a major gas pipeline that parallels the 500kV lines that run diagonally through the northern end of the project study area. The Transwestern gas pipeline also crosses east-west through the project study area just south of where the El Paso Natural Gas pipelines cross the project study area. Entegra Power Group owns a gas pipeline that laterals off of one of the aforementioned El Paso Natural Gas pipelines and runs south along the east side of Old US 80 to the Gila River Power Station north of Gila Bend.

3.7 Facilities

Figure 10a and Figure 10b show the locations of existing facilities within the project study area.

The City of Phoenix owns and operates the SR 85 Landfill located at the southeast corner of Old US 80 and Patterson Road on 2,652 acres of land. This landfill has accepted City of Phoenix municipal solid wastes since January 2, 2006. The landfill is currently accessed via SR 85 and Patterson Road and it is the only operational landfill in the project study area. The City of Phoenix is planning on constructing a solar power plant on a portion of the landfill property. The solar power plant would remain operational until the City needs that space for landfill operations.

From 1961 to 1997, Maricopa County operated the Hassayampa Landfill located at Baseline Road and Salome Highway (just outside the project study area) for municipal waste disposal. Hazardous wastes were also disposed in the northeast section of the landfill from April 1979 to October 1980. The site was added to the Superfund National Priorities List in 1987.

Page 37: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 32 February 2010

Palo Verde Nuclear Generating Station

Arizona StatePrison ComplexLewis

Jojoba Substation

Red HawkPower GeneratingStation

HassayampaSwitch Yard

MesquitePower GeneratingStation

ArlingtonSwitch Yard

3 x 50

0kV

2 x 500kV

1 x 500kV

1 x 500kV

Arlington Canal

Buckeye Canal

Roosevelt Irrigation District Canal

ArlingtonPost Office

2 x 50

0kV

Gila Bend

Canal

Enterprise

Canal

0 1 20.5

Miles

LegendProject Boundary

Airfield

Power Generating Station

Substation

Switching Yard

Power Transmission Lines69kV Existing

230kV Existing

500kV Existing

Natural Gas Line

Solar Development

Farm Facilities

Landfill

canal

Well Location

Feb. 2010

Figure 10a – Utilities and Facilities

Page 38: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 33 February 2010

GillespieSubstation

2 x

500k

V

1 x

230k

V

Cotton CenterSubstation

PandaSubstation

Gila RiverPower GeneratingStation

Gila BendPower GeneratingStation

Gila Bend Canal

Enterprise

Canal0 1 20.5

Miles

LegendProject Boundary

Airfield

Power Generating Station

Substation

Switching Yard

Power Transmission Lines69kV Existing

230kV Existing

500kV Existing

Natural Gas Line

Solar Development

Farm Facilities

Landfill

canal

Well Location

Feb. 2010

Figure 10b – Utilities and Facilities

Page 39: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 34 February 2010

There are three large canals in the project study area: the Gila Bend Canal, the Arlington Canal, and the Enterprise Canal. The Gila Bend Canal generally runs along the east side of Old US 80 between Gila Bend and Gillespie Dam. The Paloma Irrigation District has irrigation facilities along the Gila Bend Canal. The Arlington Canal generally runs along the east side of Old US 80 north of Gillespie Dam. The Enterprise Canal runs south from Gillespie Dam to the west of the project study area. Smaller irrigation canals exist throughout the project study area to provide water to the agriculture lands.

The Arlington Post Office is located along Old US 80 near Arlington.

The Gila Bend Municipal Airport is located just east of the project study area along SR 85 near Gila Bend.

There are literally hundreds of private wells located in the project study area. These wells provide water to properties because there are no municipal water lines in most of the study area.

The PVNGS is located two miles west of the project study area. A portion of Old US 80 is a planned evacuation route for PVNGS. Figure 11 shows the PVNGS planned evacuation routes, as well as the ten-mile radius Emergency Planning Zone, and the fifty-mile radius Ingestion Pathway Zone for PVNGS.

3.8 Topography

Figure 12 illustrates the topography of the region through slope analysis around and within the project study area. Most of the project study area itself is fairly flat, but there are significant topographical changes (slopes greater than five percent) just outside much of the project study area. The southern two-thirds of the project study area are flanked by the Gila Bend Mountains on the west and the Maricopa Mountains and Buckeye Hills on the east. The northern third of the project study area contains a few hills that form the eastern edge of the Palo Verde Hills.

There are three locations in the project study area where topographical constraints exist. The first and most critical topographic constraint is the narrow pass between the Gila Bend Mountains and Buckeye Hills where Gillespie Dam, the Gila River, and the Old US 80 Bridge are all located. The second topographical constraint is the large hill located approximately at the 347th Avenue alignment between Dobbins Road and Narramore Road. The third topographical constraint is the small hill located approximately at the 363rd Avenue alignment just south of Salome Highway (on the western edge of the project study area).

3.9 Recreational and Wildlife Areas

Several recreational and wildlife areas exist within or adjacent to the project study area. Figure 13 shows the various Wilderness Areas, Potential Wildlife Linkage Zones, State Wildlife Areas, and regional parks within or near the project study area.

There are several planned trails in the project study area according to the Maricopa County Trails Plan. These proposed trails are low-priority conceptual corridors that traverse the project study area along the Gila River, along a portion of Old US 80, and along the historic Butterfield Overland Stage Route near Gila Bend.

Page 40: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 35 February 2010

5 Miles

10 Miles

40 Miles

35 Miles

30 Miles

25 Miles

20 Miles

15 Miles

LegendProject Boundary

Palo Verde Nuclear Generating Station

Evacuation Route

10-mile Radius Emergency Planning Zone50-mile Radius Ingestion Pathway Zone

0 2.5 51.25

MilesSept. 2009

Figure 11 – Palo Verde Nuclear Generating Station Emergency Planning

Page 41: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 36 February 2010

G I L A B E N D M O U N T A I N S

MA

RI C

OP

A M

OU

N T AI N S

B U C K E Y E H I L L S

W H I T E T A N KM O U N T A I N S

P A L O V E R D E H I L L S

LegendProject Boundary

Slope Analysis5% or less

5 - 10%

10 - 20%

20% - More

0 2.5 51.25

MilesSept. 2009

Figure 12 – Slope Analysis

Page 42: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 37 February 2010

Woolsey Peak

SignalMountain

North MaricopaMountains

South MaricopaMountains

Sonoran DesertNational Monument

Buckeye HillsRegional Park

Gila River

Hassayam

pa River

Gila River

Powers ButteWildlife AreaArlington

Wildlife Area

LegendProject Boundary

Planned Trails

Wilderness Area

State Wildlife Area

Potential Wildlife Linkage Zone

Parks

0 2.5 51.25

MilesFeb. 2010

Figure 13 – Recreational and Wildlife Areas

Page 43: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features 38 February 2010

4. SUMMARY OF IDENTIFIED OPPORTUNITIES AND CONSTRAINTS Based on the existing and future corridor features discussed previously, the following potential opportunities/constraints have been identified (generally listed in order from south to north and east to west in the project study area) that should be considered in determining if there are feasible alignments for the Hidden Waters Parkway:

Potential Watermelon Road alignment shift near the proposed interchange with Hidden Waters Parkway;

Gila River Power Generating Station; Panda electrical substation; 69 kV power poles along Old US 80; Gila Bend Canal along east side of Old US 80; Gas pipeline along east side of Old US 80; Cotton Center electrical substation; Existing and proposed developments of Sonoran Trails, Dos Lagos, Lakeside Ski Village, Spring

Mountain Ski Ranch, and Insignia; SR 85 Landfill; Potential wildlife linkage zones; Gas pipelines south of Old US 80 Bridge; 500 kV transmission towers south of Old US 80 Bridge; BLM land near Gillespie Dam and Old US 80 Bridge; Narrow pass between Gila Bend Mountains and Buckeye Hills at Gillespie Dam and Old US 80

Bridge; LGRWMAC, including the Arlington and Powers Butte Wildlife Areas; Arlington Canal along east side of Old US 80; Arlington Post Office; Existing and proposed developments of Arlington Farms, Phoenix Valley West, Verma Estates, and

Dixie Park; Large hill near 347th Avenue/Dobbins Road; Union Pacific railroad track; Arlington Elementary School; Small hill near 363rd Avenue/Salome Highway; 500 kV transmission towers between PVNGS and I-10; Winters’ Well Elementary School; Existing and proposed developments of Butterfield Stagecoach and Hidden Waters Ranch; and Proposed reconstruction of existing I-10/339th Avenue interchange.

Page 44: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features February 2010

APPENDIX TM1-1

SUMMARY TABLE OF DOCUMENTS REVIEWED

Page 45: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

LIBRARYKHANo. Title Description Author Date Source Format/

File TypeDate

CollectedCollected

By

E1 Proposed Project Limits and Programmed Priorities State Route 85 map of SR85 mileposts and projected projects ADOT unknown ADOT pdf 06/11/09 BML

E2 Gillespie Mapping Block Delivery Schedule shows extent and delivery date of mapping for Gillespie ADMS unknown May 2009 FCDMC pdf 06/02/09 RAE

E3 Luke Wash Watershed FDS map of Floodplain Delineation Study boundary FCDMC unknown FCDMC jpg 06/11/09 BML

E4 Gila Bend Area Drainage Master Plan Floodplain Delineation Study

Hydraulics Technical Data Notebook and supporting appendices; comprised of 3 volumes eec Aug 2003 KHA pdf 06/11/09 BML

E5 Gila Bend Area Drainage Master Plan Recommended Design Report

Presents alternatives for drainage design in Gila Bend area, includes supporting calculations in separate Appendix volume

eec Apr 2002 KHA pdf 06/11/09 BML

Summary Table of Documents Reviewed - Kimley-Horn and Associates

ITEM TRACKING

Hidden Waters ParkwayCorridor Feasibility StudyData Collection Summary

ADOT = Arizona Department of TransportationUSACE = U.S. Army Corps of EngineersFEMA = Federal Emergency Management AgencyKHA = Kimley-Horn and AssociatesNRCS = Natural Resource Conservation ServiceUSGS = United States Geological SurveyMCDOT - Maricopa County Department of TransportationAZGS = Arizona Geological Survey

E6 Hydrologic Study Report for Luke Wash Zone AE Floodplain Delineation Study

Contains only the hydrology documentation (Section 4) of a larger study

Wood, Patel & Associates Sep 2008 KHA pdf 06/11/09 BML

E7 Tonopah/Arlington Area Planarea plan for 2020 - land use, transportation, environmental, economic development (adopted in 2000)

Maricopa County Sep 2000 unknown pdf 01/22/09 RAE

E8 Old U.S. Highway 80 Area Plan

area plan for 2020 - land use, transportation, environmental, economic development, open space, water resources, cost of development (adopted in 2007)

Maricopa County May 2007 unknown pdf 01/22/09 RAE

E9 Design Guideline Recommendations for the Arizona Parkway

guidelines and typical drawings for use of Arizona Parkway

DMJM Harris; AECOM Aug 2008 unknown pdf 01/30/09 RAE

E10Interstate 8 and Interstate 10 Hidden Valley Transportation Framework Study Final Report and Executive Summary

overview, existing and future conditions, evaluation framework, travel demand forecasting, alternatives, implementation, funding; GIS shapefiles

DMJM Harris; AECOM

Aug 2009 and Oct 2009

bqaz.org/MAG

pdf/GIS on CD

06/26/2009 and

02/12/2010MLG

E11Interstate 10/Hassayampa Valley Transportation Framework Study Final Report and Executive Summary

overview, existing and future conditions, evaluation framework, travel demand forecasting, alternatives, implementation, funding; GIS shapefiles

DMJM Harris; AECOM Jul 2008 bqaz.org/

MAGpdf/GIS on

CD

06/26/2009 and

02/12/2010MLG

E12 Baseline 355th Fissure screenshot of earth fissure Arizona Geological Survey Mar 2009 AZGS pdf 03/05/09 RAE

E13 SR 85 Gila Bend to Lewis Prison Draft Drainage Technical Memorandum

short text, HEC-1 output, HY-8 output, and drainage plans for general plan (30%) KHA May 2002 KHA pdf 06/22/09 ARS

E14 SR 85, MP 122.58 - MP 126.08 Final Drainage Report

text, calculation appendices, and drainage plans for widening project 8 KHA Feb 2004 KHA pdf 06/22/09 ARS

E15 SR 85, MP 126.08 - MP 130.71 Final Drainage Report text only for widening project 3 KHA Sep 2003 KHA pdf 06/16/09 ARS

KHA Project No. 091337118K:\PHX_Systems\091337118 MCDOT Hidden Waters Pkwy\Data Collection\Data Collection Summary.xls 1 of 5

Page 46: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

LIBRARYKHANo. Title Description Author Date Source Format/

File TypeDate

CollectedCollected

By

Summary Table of Documents Reviewed - Kimley-Horn and Associates

ITEM TRACKING

Hidden Waters ParkwayCorridor Feasibility StudyData Collection Summary

ADOT = Arizona Department of TransportationUSACE = U.S. Army Corps of EngineersFEMA = Federal Emergency Management AgencyKHA = Kimley-Horn and AssociatesNRCS = Natural Resource Conservation ServiceUSGS = United States Geological SurveyMCDOT - Maricopa County Department of TransportationAZGS = Arizona Geological Survey

E16 Draft Initial Location/Design Concept Report SR 85 Gila Bend to I-10

traffic and accident data, alternatives considered, major design features, cost estimate, other considerations, appendices

BRW Nov 1999 KHA pdf 06/22/09 ARS

E17 SR 85 at Gila Bend Draft Environmental Assessment and Section 4(f) Evaluation

environmental impacts of alternatives, including preferred alternative

Logan Simpson Design Inc. Aug 2009 ADOT pdf 10/05/09 MLG

E18 access.jpg SR 85 access management map -- shows land ownership ADOT unknown ADOT jpg 06/16/09 BML

E19 Regional Transportation Plan Freeway Program Major Project Status Report January 31, 2009

shows start/completion dates and costs for ADOT projects. SR 85 on page 14 or report. ADOT Jan 2009 ADOT pdf 06/16/09 BML

E20 DGM-37 Geologic Map of the Buckeye NW 7.5' AGS Nov 2004 AZGS CD 07/06/09 BMLE20 DGM-37 Quadrangle, Maricopa County, Arizona AGS Nov 2004 AZGS CD 07/06/09 BML

E21Gila Bend Area Floodplain Delineation Study Technical Data Notebook Hydraulics (Book 1 and 2)

summary of hydrologic and hydraulic results, proposed FIS tables and profiles Burgess & Niple, Inc. Mar 1992 KHA pdf 07/07/09 RAE

E22Gila Bend Area Floodplain Delineation Study Technical Data Notebook Hydrology (Book 1 and 2)

general documentation and correspondence, hydrologic mapping and analysis Burgess & Niple, Inc. Mar 1992 KHA pdf 07/14/09 BML

E23 Hydrologic Analysis of Bender and Sand Tank Washes

general documentation and correspondence, hydrologic analysis and model results FCDMC Apr 1991 KHA pdf 07/14/09 BML

E24 El Rio Watercourse Master Plan Overview Final Report

river mechanics, environmental resources, flood control alternatives, and implementation strategies

Stantec Mar 2006 KHA pdf 07/07/09 RAE

E25 El Rio Watercourse Master Plan Alternative Evaluation Report

data collection, existing conditions, flood control alternatives, recommended alternative, design guidelines, implementation planning

Stantec Apr 2006 KHA pdf 07/07/09 RAE

E26 El Rio Watercourse Master Plan Environmental Resources Report

physical and wetland resources, biological resources, anthropogenic issues, recommendations

Stantec Jul 2003 KHA pdf 07/07/09 RAE

E27 Old US 80 Bridge (Gillespie Dam Bridge) Final Design Concept Report -- Volume 1

Existing bridge evaluation, alternatives, recommended alternative, design features, and social, economic, and environmental considerations

TranSystems Sep 2007 MCDOT CD 07/08/09 GK

E28 Arizona Parkway Projected Travel Volumes and Laneage/Interchange Needs

Projected build-out traffic volumes for Hassayampa and Hidden Valley Framework areas with laneage and interchange needs on parkways; GIS shapefiles

Wilson & Company Jun 2009 MAG pdf/GIS on CD 06/26/09 MLG

KHA Project No. 091337118K:\PHX_Systems\091337118 MCDOT Hidden Waters Pkwy\Data Collection\Data Collection Summary.xls 2 of 5

Page 47: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

LIBRARYKHANo. Title Description Author Date Source Format/

File TypeDate

CollectedCollected

By

Summary Table of Documents Reviewed - Kimley-Horn and Associates

ITEM TRACKING

Hidden Waters ParkwayCorridor Feasibility StudyData Collection Summary

ADOT = Arizona Department of TransportationUSACE = U.S. Army Corps of EngineersFEMA = Federal Emergency Management AgencyKHA = Kimley-Horn and AssociatesNRCS = Natural Resource Conservation ServiceUSGS = United States Geological SurveyMCDOT - Maricopa County Department of TransportationAZGS = Arizona Geological Survey

E29 Proposed Development: Belmont Comprehensive Plan Amendment

proposed site map showing development boundaries and primary features, vicinity map showing other developments in area

United Civil Group 2007? MC pdf 06/23/09 MLG

E30 Proposed Development: Hassayampa Village Comprehensive Plan Amendment

application, citizen participation plan, proposed site plan, narrative Beus Gilbert Jun 2006 MC pdf 06/23/09 MLG

E31 Proposed Development: Hickman's Egg Ranch Comprehensive Plan Amendment

application, citizen participation plan, proposed site plan, narrative Francis Slavin Jun 2009 MC pdf 07/06/09 MLG

E32 Proposed Development: Hidden Waters Ranch Development Master Plan Major Amendment #1

regional context, site analysis, master plans, development suitability LVA Oct 2008 MC pdf 07/01/09 MLG

E33 Proposed Development: Insignia Comprehensive application proposed site plan narrative Rose Law Group Sep 2006 MC pdf 06/23/09 MLGE33 Plan Amendment application, proposed site plan, narrative Rose Law Group Sep 2006 MC pdf 06/23/09 MLG

E34 GIS shapefiles from FCDMCdrainage, floodplain, railroad, wilderness, jurisdictions, community features, subdivisions, road features, 10-ft contours, aerials

FCDMC May 2009 FCDMC GIS on CD 05/22/09 ES

E35 Town of Gila Bend General Plan land use, circulation, public facilities, housing HDR Nov 2006 Gila Bend pdf 07/08/09 MLG

E36 Town of Buckeye General Plan Figuresland use, circulation, environmental conditions, growth area land use, floodway transitional areas, master planned communities

Partners for Strategic Action May 2008 Buckeye pdf 07/08/09 MLG

E37 Town of Buckeye Zoning and Annexation History Figures zoning and annexation history Town of Buckeye May 2009 Buckeye pdf 07/08/09 MLG

E38 DGM-47 Geologic Map of the Wintersburg 7.5' Quadrangle, Maricopa County, Arizona AZGS Mar 2006 AZGS CD 07/10/09 BML

E39Bridge Scour Investigation and Design of Corrective Measures For Old U.S. 80 Highway Bridge over Hassayampa River

hydrology and hydraulics recommendations, 3 alternative countermeasures and details INCA Engineers Oct 1997 FCDMC pdf 07/14/09 BML

E40 Plan and Profile of Proposed SR85 Gila River Bridge #1274 12 11x17 sheets ADOT May 1993 FCDMC pdf 07/14/09 BML

E41 SR 85 Corridor Study Initial Alternatives Development Report

existing and future conditions, alternative concepts, evaluation of alternatives and recommendations for further study

BRW, Inc. Apr 1994 FCDMC pdf 07/14/09 BML

E42 SR 85 Gila Bend to I-10 Initial Drainage Report Vol I

report with offsite hydrology, hydraulics, subbasin, soils, and landuse maps, and proposed drainage plans

BRW, Inc. Nov 1999 ADOT pdf 07/21/09 ARS

E43 SR 85 Gila Bend to I-10 Initial Drainage Report Vol II

appendices: excerpts from floodplain studies, correspondence, model input/output BRW, Inc. Nov 1999 ADOT pdf 07/21/09 ARS

KHA Project No. 091337118K:\PHX_Systems\091337118 MCDOT Hidden Waters Pkwy\Data Collection\Data Collection Summary.xls 3 of 5

Page 48: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

LIBRARYKHANo. Title Description Author Date Source Format/

File TypeDate

CollectedCollected

By

Summary Table of Documents Reviewed - Kimley-Horn and Associates

ITEM TRACKING

Hidden Waters ParkwayCorridor Feasibility StudyData Collection Summary

ADOT = Arizona Department of TransportationUSACE = U.S. Army Corps of EngineersFEMA = Federal Emergency Management AgencyKHA = Kimley-Horn and AssociatesNRCS = Natural Resource Conservation ServiceUSGS = United States Geological SurveyMCDOT - Maricopa County Department of TransportationAZGS = Arizona Geological Survey

E44 1981 Report on Salt-Gila River Clearing Gillespie Dam Analysis

existing conditions, Gila River hydrology, dam modification concepts, cost/benefit data

John Carollo Engineers May 1981 FCDMC pdf 07/14/09 BML

E45 Gila Bend - Buckeye Highway (SR 85) Gila River Bridges Hydraulic Report

summary of hydrology, hydraulics (including HEC-2 models) for proposed replacement bridge ADOT Jan 1991 FCDMC pdf 07/14/09 BML

E46 Lower Centennial Wash Watershed Zone A Floodplain Delineation Study Phase I TDN

FEMA forms, hydrology, hydraulics, and supporting documentation RBF Consulting Jul 2005 FCDMC pdf 07/14/09 BML

E47Final Report, Lower Centennial Wash Watershed Zone A Delineation Study - Low Level Geomorphic Assessment

methodology, landform delineation (and maps), appendices contain many AZGS geologic maps

Earth Consultants International May 2005 FCDMC pdf 07/14/09 BML

Lower Centennial Wash Watershed Zone A Location drawings and photos of 18 structures A Team ProfessionalE48 Lower Centennial Wash Watershed Zone A Floodplain Delineation Study Structure Survey

Location, drawings, and photos of 18 structures along railroad south of I-10

A Team Professional Associates Jul 2005 FCDMC pdf 07/14/09 BML

E49 Hydrology Report Gila Bend Canal Floodplain Delineation Study Gillespie Dam to Gila Bend

HEC-1 hydrologic analysis and supporting documentation

Donohue & Associates Sep 1991 FCDMC pdf 07/14/09 BML

E50Hydraulic Analysis and Floodplain Delineation Report Gila Bend Canal Floodplain Delineation Study Gillespie Dam to Gila Bend

HEC-2 hydraulic analysis and supporting documentation (including hydraulic structure methodology)

Donohue & Associates Sep 1991 FCDMC pdf 07/14/09 BML

E51 Rainbow Wash Floodplain/Floodway Delineation Study TDN Hydraulics (Vol 1 and 2)

hydrology, hydraulics, mapping, and supporting documentation

Simons, Li & Associates May 1994 FCDMC pdf 07/14/09 BML

E52 Archived Projects: Gila Bend FIS, Jackrabbit Wash FIS

archive of hydrologic and hydraulic model files; does not include reports or explanations FCDMC Mar 1992 FCDMC pdf 07/14/09 BML

E53 DI-05: Geologic Data for the Phoenix South 30' x 60' Quadrangle

1:100,000 digital map of OFR93-18, in jpg and shp formats AZGS Mar 2006 AZGS CD 07/16/09 BML

E54 Old US 80 Bridge Rehabilitation (Gillespie Dam Bridge) Value Engineering Final Report value engineering alternatives RH & Associates,

Inc. May 2008 MCDOT pdf 04/20/09 MLG

E55 Maricopa County Zoning Ordinance zoning ordinance descriptions and codes Maricopa County Jul 2009 MC pdf 07/24/09 MLG

E56 SW Maricopa County Linkage Designs and Conservation Priorities

comment letter from AGFD, wildlife linkage designs, conservation priorities, environmental features and constraints

Arizona Game and Fish Department Jul 2009 KHA pdf/GIS in e-

mail 08/04/09 MLG

E57 ADWR GIS Data CD-ROMShapefiles: recharge points, industry points, depth to water and water level elev (Phoenix AMA only), irrigation polygons, hardrock

ADWR Mar 2009 ADWR CD 08/05/09 BML

E58 GWSI Database CD-ROMAccess database of Groundwater Site Inventory: well ownership, historic water levels, construction data, etc.

ADWR Jul 2009 ADWR CD 08/05/09 BML

KHA Project No. 091337118K:\PHX_Systems\091337118 MCDOT Hidden Waters Pkwy\Data Collection\Data Collection Summary.xls 4 of 5

Page 49: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

LIBRARYKHANo. Title Description Author Date Source Format/

File TypeDate

CollectedCollected

By

Summary Table of Documents Reviewed - Kimley-Horn and Associates

ITEM TRACKING

Hidden Waters ParkwayCorridor Feasibility StudyData Collection Summary

ADOT = Arizona Department of TransportationUSACE = U.S. Army Corps of EngineersFEMA = Federal Emergency Management AgencyKHA = Kimley-Horn and AssociatesNRCS = Natural Resource Conservation ServiceUSGS = United States Geological SurveyMCDOT - Maricopa County Department of TransportationAZGS = Arizona Geological Survey

E59 SR85 in Gila Bend Draft Final DCR corridor location analysis, design concept alternatives and anaylsis, major design features AMEC Jun 2009 ADOT pdf 08/18/09 MLG

E60 Gila River Bridge U.S. Route 80 as-built plans for the bridge Arizona Highway Department Nov 1925 FCDMC pdf 08/20/09 BML

E61 Old US-80 Highway Bridge Over Gila River Scour Repair

plan, pier elevations, and boring logs for scour repair MCDOT Apr 1994 FCDMC pdf 08/20/09 BML

E62 Arizona Parkway Intersection/Interchange Operational Analysis and Design Concepts Study

report with R/W requirements, traffic volumes, intersection layouts Wilson & Company Aug 2009 MCDOT pdf 08/24/09 MLG

E63 GIS and Volume Data GIS Data, buildout traffic volumes Wilson & Company Jun 2009 MAG CD 08/20/09 BPp y

E64 Sonoran Trails Information maps, project description Jokake Aug 2009 Jokake pdf 09/01/09 BCP

E65Old US 80 Bridge (Gillespie Dam Bridge) Historic Bridge Rehabilitation -- Technical Reports Volume 2a

Conditional Evaluation Report, Load Rating Report, Traffic Impact Analysis, Drainage Report, Geotech Report

TranSystems Aug 2007 MCDOT pdf 09/17/09 BML

E66Old US 80 Bridge (Gillespie Dam Bridge) Historic Bridge Rehabilitation -- Technical Reports Volume 2b

Nondestructive Testing Pile Investigation, Coating Assessment, Cultural Resources Survey, HAER Documentation, Biological Evaluation, Section 404 JD, Preliminary Structural Calculations

TranSystems Aug 2007 MCDOT pdf 09/17/09 BML

KHA Project No. 091337118K:\PHX_Systems\091337118 MCDOT Hidden Waters Pkwy\Data Collection\Data Collection Summary.xls 5 of 5

Page 50: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features February 2010

APPENDIX TM1-2

MAG FRAMEWORK STUDY DATA

Page 51: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

IA

IA

IA

IA

IA

IA

IAIA

IA

!

!

!

!

!

!

!

!

!!!

!!!!

!

!

!!!!!

!!!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!!

!! !

!

!

!

(

(

(

(

(

(

(

(

(((

((((

(

(

(((((

(((

(

(

(

((

(

(

(

(

(

(

(

(

(

(

((

(

(

((

(

(

(

(

(

(

(

(

(

(

(

(

(

(

(

(

(

(

((

(( (

(

(

(

!

!

!!

!

!

! ! ! ! !

!

!

!

!

!

!

!

!

!

(

(

((

(

(

( ( ( ( (

(

(

(

(

(

(

(

(

(

"

"

"

"

"

"

"

"

)

)

)

)

)

)

)

)

"

"

)

)

³Y

³Y

³Y

³Y³Y

³Y

³Y

³Y

Phoenix SouthMountain Park

BuckeyeHills

RecreationArea

Gila RiverIndian Community

Ak-ChinIndian

Community

Gila River

Gila River

Waterman Wash

Salt River

Union Pacific Railroad

MARI

COPA

COU

NTY

PINA

L COU

NTY

Union Pacific Railroad

Gila River

Barry M. Goldwater Air Force Range

Tohono O'odhamIndian Community

Salt River

Salt RiverPima Maricopa

Indian Community

Union Pacific Railroad

Estrella MountainRegional Park

Phoenix-Sky HarborInternational Airport

LufthansaAirlinesTrainingFacility

Arizona StatePrison Complex:

Lewis

Sonoran DesertNational Monument

Hassayampa River

Sierra EstrellaWilderness Area

Enterprise Canal

Centennial Wash

Winters Wash

Luke Wash

Vekol Wash

Santa Cruz Wash

Greene Wash

Gila Bend

Mobile

Buckeye

Maricopa

Stanfield Casa Grande

Bapchule

Chandler

Guadalupe

Sacaton

GilbertGoodyear

AvondalePhoenix

Woolsey PeakWilderness Area

Signal MountainWilderness Area

South Maricopa MountainsWilderness Area

Union Pacific Railroad

Table Top MountainWilderness Area

MesaTempe

Scottsdale

St. Johns

Eloy

T2N R5E

G I LA B E N D M O U N TA I N S

MAR I CO PA M OU N TA I NS

SAND TAN K M O U N TA I N S

S I E R R A E ST R EL LA S

Hohokam PimaNational Monument

Tolleson

Queen Creek

Nissan ProvingGrounds

VolkswagenProvingGrounds

!"a$

?Þ ?Þ?̧

Iv

!"c$

!"a$

?e

!"a$

?Ì ?ü

!"̀$?Í

?ÿ

"x801

"x802

Future VolkswagenProving Grounds

Former Tucson Cornelia& Gila Bend Railroad;

Out of Service

While every effort has been made to ensure the accuracy of this information,the Maricopa Association of Governments makes no warranty, expressed orimplied, as to its accuracy and expressly disclaims liability for the accuracythereof.Alignments for new freeway, highway, parkway, arterial, high occupancyvehicle, bridge, transit, and rail facilities will be determined following the completion of appropriate corridor planning, design and environmental studies.Locations of proposed freeway interchanges are preliminary and subject toreview and approval of the FHWA and ADOT.

NOTES:

North Maricopa MountainsWilderness Area

Watermelon Rd

Sonoran Valley Pkwy

Hassayampa Frwy

459th

Ave

403rd

Ave

355th

Ave

Johnso

n Rd

Rook

s Rd

Airpo

rt Rd

Sariva

l Ave

115th

Ave

67th

Ave

Garne

t Ave

Whit

e and

Parke

r

Indian

Valley

Rd

Burri

s Rd

Sunlan

d Gin

Rd

Eleven

Mile

Corne

r Rd

Tolte

c Hwy

Trekel

l Rd

Bianco

Rd

Murph

y Rd

John W

ayne P

kwy

Hidde

n Valle

y Rd

91st A

ve

Litchf

ield Rd

Perry

ville R

d

Wats

on Rd

Wilso

n Rd

331st

Ave

379th

Ave

427th

Ave

Hunt Rd

Pecos Rd

Baseline Rd

McDowell Rd

McCartney Rd

Selma Hwy

Battaglia Rd

Harmon Rd

Waverly Dr

Farrell Rd

Casa Blanca Rd

Storey Rd

Arica Rd

Phillips Rd

Ellis Rd

Ocotillo Rd

Warner Rd

Lower Buckeye Rd

Bella Vista Rd

Seed Farm Rd

Barre

tt Rd

Hassayampa Frwy

Proposed de Anza

Scenic W

ay

SR-85

Scenic

Way

Trekel

l Rd

Kortsen Rd

Ande

rson R

d

John W

ayne P

kwy

Ralsto

n Rd

Loop

303 S

pur

Warr

en Rd

Cotto

n Ln

Palom

a Rd

Hidde

n Wa te

rs Pk

wy

I-10/Hassayampa Valley TransportationFramework Study accepted by the MAG Regional Council on February 27, 2008

ADOT Central ArizonaFramework Study

underway

Loop 303 Extension

MAG Commuter Rail Study Phase II underway

(estimated completion 2009)

!"̀$

Mesa

Potential freight railextension to new or improved

Mexican freight container ports.

?j

Mesa FalconField

WilliamsGatewayAirport

ChandlerMuncipalAirport

Phoenix-GoodyearAirport

Gila BendMunicipalAirport

BuckeyeMunicipalAirport

MemorialAirfield

Casa GrandeMunicipalAirport

Ak-ChinCommunity

Airfield

EstrellaSailport

StellarAirpark

EloyMunicipalAirportSanta Rosa Wash

Sources: MAG, ADOT, ALRIS, Maricopa County, Pinal County, City of Casa Grande, City of Goodyear, City of Maricopa, Town of Gila Bend; 2007 October 1, 2009

I-8/I-10 Hidden Valley Transportation Framework Study

DRAFT

0 8

Miles

RecommendedFramework

Note:This proposed network is for a buildout scenario.

Legend

Freeway Transit CorridorProposed Transit Network

Local Transit ServiceArea (including serviceto support regional transit)

Study Area Boundary

Enhanced Transit CorridorProposed Commuter Rail

Park-and-RideIA

Parkway Bus Transit Corridor

ArterialArizona Parkway

Improved/Proposed Freeway

Potential Traffic Interchange!(

Existing Traffic Interchange!(

Potential Freight Railroad

Proposed Hidden Valley Network

Arizona Scenic Way

Funded System Interchange")

³YHigh Occupancy Vehicle (HOV) Lane

Potential System Interchange")

Existing Railroad

Safety and OperationalImprovements Corridor

County Boundary

Page 52: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

Jackrabbit Wash

Hassa

yamp

a Rive

r

Gila River

Bear

dsley

Can

al

Buckeye Canal

T1N R7W

T1S R7W

T2N R7W

T3N R7W

T4N R7W

T5N R7W

T6N R7W T6N R6W

T5N R6W

T4N R6W

T3N R6W

T2N R6W

T1N R6W

T1S R6W T1S R5W T1S R4W T1S R3W T1S R2W

T1N R5W T1N R4W T1N R3W T1N R2W

T2N R5WT2N R4W T2N R3W T2N R2W

T3N R5W T3N R4W T3N R3W T3N R2W

T4N R5W T4N R4W T4N R3W T4N R2W

T5N R5W T5N R4W T5N R3W T5N R2W

T6N R5W T6N R4W T6N R3W T6N R2W

White Tank MountainRegional Park

Sun Valley Pkwy

Union Pacific Railroad

Burlington Northern Santa Fe Railroad

Grand Avenue (US-60)

MC-85

CAP Canal

White TanksFRS #3

McMicke

n Dam

RID Canal

PALO VERDENUCLEAR

GENERATINGSTATION

Arlington Canal

Buckeye FRS #1BuckeyeFRS #2

BuckeyeFRS #3

White TanksFRS #4

TOYOTA TECHNICALTESTING CENTER

SurpriseGrandVista

LUKEAIR

FORCEBASE

LUKE AFBAUXILIARY

FIELD

EstrellaMountainRegional

Park

Tonopah

Wintersburg

Arlington Hassayampa

Palo Verde Liberty

Morristown

Circle City

Wittman

Beardsley

Sierra NegraRanch

TonopahVerde

SierraNegraRanch

DesertCreek

Cipriani

Silver Rock

WestwindWestpark Monte Verde

Benessere

SonoranVista

HenryPark

SouthwestRanch

CanyonTrails III

CanyonTrails

KingRanch

EstrellaMountain Ranch

PalmValley

Verrado

WatsonEstates

SundanceBlue

HorizonsRanch

SiennaHills

Sun ValleySouth

Tartesso

Tartesso

EliantoTartessoWest

EliantoHassayampaRanch

Belmont

TrilliumWest

Sun Valley

SunValley

Douglas Ranch

Whispering Ranch

SpurlockRanch

Festival RanchDel Webb

ZanjeroTrails

WhiteTank

Foothills

DoveTrails

WoolfCrossing

Cortessa

CactusLane

RanchSarah Ann

Ranch GreerRanch

SycamoreFarms

SierraMontana

SurpriseFarms

Sun CityGrandArizona

TraditionsBell WestRanch

NorthwestRanch

FoxTrail

Sun HavenRanch

AsanteNorth

Asante

DesertOasis

MarisolRanch

AustinRanch

TartessoWest

CopperFalls

SurpriseRanch

BellPointe 1, 2

Rio RanchoEstates

WhonnackEstates

SurpriseFoothills

Buena VistaRanch

PeakviewEstates

WaldenRanch

TierraVerde

SierraNorte

TierraRico

WitmanRanch

BroadstoneMountain

Ranch

Lake Pleasant Quintero

FestivalRanch

LegacyPark

MountainVistaRanch

PinnaclePeak

CountryEstates

Tartesso

JohnsonValley

MaracayWhite Tanks

RussellRanch

JackrabbitEstates

Santana

Vistoso

Valle delSol

Montiere

RiataWest

BuckeyeRanch

White Tanks(ASLD)

Westside(ASLD)

ArroyoSeco

ArroyoVerde

Sedella

LibertyPark

AbelLitchfieldFarms

HummingbirdSprings

WildernessArea

Sonoran DesertNational Monument

Northern Ave

Jackr

abbit

Trail

Turn

er Pk

wy

Cotto

n Lan

e

Hidd

en W

aters

Pkwy

Wickenburg

RainbowValley

Hassayampa Frwy

Tono

pah P

kwy

White Tanks Frwy

Wint

ersb

urg P

kwy

Wild

Rose

Pkwy

Bell Pkwy

McDowell Pkwy

Yuma Pkwy

Southern Ave

211t

h Ave

187t

h Ave

163r

d Ave

Lake Pleasant Frwy

Potential Pkwy

Extension

Vultu

re Mi

ne Rd

Camelback Rd

BuckeyeHills

RecreationArea

LewisPrison

VOLVOPROVING

GROUNDS

BNSFCommercial

Facility

SurprisePrasada

Detailed tunnel feasibilitystudy to be conducted

Hassayam

pa Frwy

Sun V

alley

Pkwy

Hidd

en W

aters

Pkwy

Turn

er Pk

wy

Box

Was

h

Coyote Wash

Phillips Wash

Winters W

ash

Luke Wash

Star

Was

h

74

85

303

Thomas RdIndian School RdCamelback RdBethany Home RdGlendale AveNorthern AveOlive AvePeoria AveCactus RdWaddell RdGreenway RdBell RdUnion Hills Dr

Deer Valley RdPinnacle Peak Rd

Jomax RdPatton Rd/Dynamite RdDixileta DrLone Mountain RdDove Valley Rd

McDowell Rd

Van Buren StYuma RdLower Buckeye RdBroadway RdSouthern AveBaseline RdBeloat RdElliot RdNarramore Rd

Ray Rd

Happy Valley Rd

Beardsley Rd

Black Mountain Rd

801

TRANSPORTATION FRAMEWORK RECOMMENDATIONLegend

Railroads

Rivers/WashesCanals

Township/Range

Topography(100' contours)

93

801

85

303

INTERSTATE 10

Arterial river crossings are conceptual to demonstrate the numberof crossing needed to support development. Final locations andnumber will be determined in engineering and water resourcestudies.Locations of proposed roadway facilities south of the study areaare subject to refinement in the I-8 and I-10/Hidden ValleyRoadway Framework Study to be completed in 2008, androadways north to be planned in the New River Roadway

Olive Avenue traffic interchange on SR-303L to be a half-diamond.

Estrel

la Pkw

ySar

ival A

veCo

tton L

n

443rd

Ave

411t

h Ave

419th

Ave

403rd

Ave

395th

Ave

387th

Ave

379t

h Ave

371st

Ave

363rd

Ave

355th

Ave

339t

h Ave

331st

Ave

Johnso

n Rd

Brun

er Rd

Palo

Verd

e Rd

Wilso

n Rd

Turne

r Rd

Rook

s Rd

Miller

RdAp

ache R

dW

atso

n Rd

Rainb

ow Rd

Dean

RdVe

rrado

Way/

Airpo

rt Rd

Jackra

bbit T

rlPe

rryvil

le Rd

Citrus

Rd

347th

Ave

Ogles

by Rd

427th

Ave

435th

Ave

451st

Ave

459th

Ave

Pecos RdGermann RdQueen Creek RdOcotillo RdChandler Heights RdRiggs RdHunt RdPatterson Rd

8

89TO

TO

60

60

60

RainbowValleyRainbow

Ranch

McRae Properties

Study Area Boundary

17TO

10

WyattLadera

Seibert

JohnFarms

Verma

Insignia

KnorrFarms

John

Micca

Carefree Hwy alignment

BuckeyeMunicipalAirport

UnincorporatedCommunities

NorthwestRegional Landfill

Noise Contours

0 5

Miles

February 22, 2008

Interstate 10/Hassayampa Valley TransportationFramework Study

C 2007, All Rights Reserved

Roads

Planned DevelopmentsBLM Raptor ProtectionZone

State Land DevelopmentMaster Plan

Land OwnershipBLMState LandRegional ParksMilitaryBureau of Reclamation

Planning AreasBuckeyeGlendaleGoodyearSurprise

While every effort has been made to ensure the accuracyof this information, the Maricopa Association of Governmentsmakes no warranty, expressed or implied, as to its accuracy

General alignments for new freeway, highway, arterial, andbridge facilities will be determined following the completion of

Locations of proposed freeway interchanges and the use ofparallel roads connecting to freeways are preliminary and subject

Notes

and expressly disclaims liability for the accuracy thereof.

appropriate design and environmental studies.

to review and approval of the FHWA and ADOT.Framework Study, schedule to be determined.

Woods Rd

New Freeway ProposalsNew Parkway Proposals

Proposed Roadway Network

New Parkway AlternativesFuture Major ArterialNetwork

Improvements toExisting FreewaysFuture RegionalTransportation Plan (RTP)Freeways (Prop 400)

Proposed ServiceTraffic InterchangesProposed ParkwayTraffic InterchangesProposed SystemInterchanges

323rd

Ave

315th

Ave

Williams Field Rd

8TO

10

National MonumentWilderness Area

7-1

Page 53: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85
Page 54: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85
Page 55: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features February 2010

APPENDIX TM1-3

SR 85 AT GILA BEND PREFERRED ALTERNATIVE EXHIBIT

Page 56: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

SR 85 at Gila Bend Draft Environmental Assessment and Section 4(f) Evaluation August 2009 NH-085-B(AOM) 39 085 MA 123 H6407 01C

Figure 11. Preferred Alternative

Page 57: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

091337118 Maricopa County Department of Transportation Technical Memorandum No. 1 Hidden Waters Parkway Corridor Feasibility Study Existing and Future Corridor Features February 2010

APPENDIX TM1-4

ARIZONA PARKWAY DETAILED INFORMATION

Page 58: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85
Page 59: FINAL TM No. 1 - HiddenWaters ExistingFutureCF 022610 1 - Existin… · 2.2.4 MAG Interstate 10/Hassayampa Valley Transportation Framework Study (July 2008) .. 7 2.2.5 ADOT SR 85

Page 4-2

Figure 4.1Parkway Grade-Separated Interchange Concept Design