    TL CVL Comparative

    Technical comparison

    SCL

    (2X15MW)

    SCL(2X18

    MW)

    SCL Present

    36 MW plant

    CVL (2x15

    MW) OLD

    CVL (2x15

    MW)

    Revised

    CVL (2x18

    MW) OLD

    CVL (2x18

    MW)

    REVISED

    TL (2x15

    MW) OLD

    TL (2x15

    MW)

    REVISED

    TL (2x18

    MW) OLD

    TL (2x18

    MW)

    REVISED

    INDURE

    (2x15)

    Performance Parameters

    based upon

    Sept'05

    performance

    Gross Heat Rate Kcal /

    KWH

    Min Min 3700 3086 3180 3086 3180 3305 3170 3297 3165

    3075

    (based on

    70%

    petcoake+3

    0%coalAuxilliary Power

    Consumption in KWH Min Min 3521 3000 3000 3600 3600 3365 3165 4035 3780 3950 KW/hr.

    Effluent Water KL Per DayMin Min 112 120 120 141.6 141.6 205.68 74.4 240 87.6 288

    Water Requirement KL

    Per DayMin Min 2568 396 396 427.2 427.2 480 253.5 552 316.8

    Steam generating units

    Particulars

    General Description AFBC AFBC AFBC AFBC AFBC AFBC AFBC AFBC AFBC AFBC

    Bi-drum watertube boiler

    Single drumwater tube

    boiler

    Singledrum water

    tube boiler

    Singledrum water

    tube boiler

    Single drumwater tube

    boiler

    Single

    drumwater tube

    boiler

    Single

    drumwater tube

    boiler

    Singledrum water

    tube boiler

    Singledrum water

    tube boiler

    Singledrum water

    tube boiler

    Under bed

    feeding

    Under bed

    feeding

    Under bed

    feeding

    Under bed

    feeding

    Under bed

    feeding

    Under bed

    feeding

    Under bed

    feeding

    Under bed

    feeding

    Under bed

    feeding

    Under bed

    feeding

    Natural

    circulation

    Natural

    circulation

    Natural

    circulation

    Natural

    circulation

    Natural

    circulation

    natural

    circulation

    natural

    circulation

    natural

    circulation

    natural

    circulation

    natural

    circulation

    Design pressure 78 107 ata 107 ata 107 ata 107 ata 107 ata 107 ata 107 ata 107 ata

    Max. drum working

    pressure 66 107 ata 107 107 ata 107 ata 107 ata 107 ata 107 ata 107 ata

    Steam flow 75 TPH 80 75 TPH 75 85 TPH 85 TPH 68 TPH 70 TPH 84 TPH 85 TPH 65 TPH

    Steam pressure at S/H

    outlet89 ata 89 ata 66 89 ata 89 89 ata 89 ata 89 ata 89 ata 89 ata 89 ata 89 ata

    Steam temp. at S/H outlet5155 C 5155 C 490 5155 C 5205 C 5155 C 5205 C 5155 C 5155 C 5155 C 5155 C 525C

    Feed water temp.at

    ecomomiser inlet210 210 196 210 C 210 210 C 210 C 195 C 210 195 C 210 `

    Feed water temp.at

    ecomomiser outlet

    260 260 235 250-260 250-260 250-260

  • 8/12/2019 Final TL _ CVL Comparative.xls

    2/6

    TL CVL Comparative

    Technical comparison

    SCL

    (2X15MW)

    SCL(2X18

    MW)

    SCL Present

    36 MW plant

    CVL (2x15

    MW) OLD

    CVL (2x15

    MW)

    Revised

    CVL (2x18

    MW) OLD

    CVL (2x18

    MW)

    REVISED

    TL (2x15

    MW) OLD

    TL (2x15

    MW)

    REVISED

    TL (2x18

    MW) OLD

    TL (2x18

    MW)

    REVISED

    INDURE

    (2x15)Flue gas temp. at APH

    outlet

    - 100 % Indian coal140 140 140 140

    -100% Petcoke160 160 -- 160

    50 % indian +50%Imp coal140 140 140 140

    -85%Petcoke+15%Indian

    coal

    min

    consideringsafety of

    boiler

    min

    consideringsafety of

    boiler

    124 160 160 160 160

    -50% Lignite+50% Indian

    coal160 160 160 160

    SH steam temp. control

    range

    60 to 100%

    MCR

    60 to 100%

    MCR

    60 to 100%

    MCR

    60 to 100%

    MCR

    60 to 100%

    MCR

    60 to

    100%

    MCR

    60 to

    100%

    MCR

    60 to 100%

    MCR

    60 to

    100%

    MCR

    60 to 100%

    MCR

    Air temp. at inlet of air

    heater40 40 40 40 40 na na na na

    Air temp. at outlet of airheater

    150 150-160 150-160 150-160 150-160 na na na na

    FD Fan

    1x100%,

    Regulating

    power

    cylinder

    damper

    1x100%,

    Regulating

    power

    cylinder

    damper

    1x100%,

    Regulating

    power cylinder

    damper

    2x60%,

    Regulating

    power

    cylinder

    damper

    1x100%,

    Regulating

    power

    cylinder

    damper

    2x60%,

    Regulating

    power

    cylinder

    damper

    1x100%,

    Regulating

    power

    cylinder

    damper

    1x100 %,

    with IGV

    control&

    constant

    speed

    motor

    1x100 %,

    with IGV

    control&

    constant

    speed

    motor

    1x100 %,

    with IGV

    control&

    constant

    speed

    motor

    1x100 %,

    with IGV

    control&

    constant

    speed

    motor

    2x60%,

    Reglatingp

    ower

    cylinder

    damper

    ID Fan

    1x100%,Regulating

    power

    cylinder

    damper

    1x100%,Regulating

    power

    cylinder

    damper

    1x100%,

    Regulating

    power cylinder

    damper

    2x60%,Regulating

    power

    cylinder

    damper

    1x100%,Regulating

    power

    cylinder

    damper

    2x60%,Regulating

    power

    cylinder

    damper

    1x100%,Regulating

    power

    cylinder

    damper

    1x100 %,

    withoutlouver

    control

    damper%

    const.

    speed

    motor

    1x100 %,

    with VFD

    1x100 %,

    with VFD

    1x100 %,

    with VFD2x60%

  • 8/12/2019 Final TL _ CVL Comparative.xls

    3/6

    TL CVL Comparative

    Technical comparison

    SCL

    (2X15MW)

    SCL(2X18

    MW)

    SCL Present

    36 MW plant

    CVL (2x15

    MW) OLD

    CVL (2x15

    MW)

    Revised

    CVL (2x18

    MW) OLD

    CVL (2x18

    MW)

    REVISED

    TL (2x15

    MW) OLD

    TL (2x15

    MW)

    REVISED

    TL (2x18

    MW) OLD

    TL (2x18

    MW)

    REVISED

    INDURE

    (2x15)

    PA Fan

    1x100%,

    Regulating

    power

    cylinder

    damper

    1x100%,

    Regulating

    power

    cylinder

    damper

    1x100%,

    Regulating

    power cylinder

    damper

    1x100 %,

    Solenoid

    operated

    power

    cylinder,

    damper

    control

    1x100%,

    Regulating

    power

    cylinder

    damper

    1x100 %,

    Solenoid

    operated

    power

    cylinder,

    damper

    control

    1x100%,

    Regulating

    power

    cylinder

    damper

    1x100 %,

    with IGV

    control&

    constant

    speed

    motor

    1x100 %,

    with IGV

    control&

    constant

    speed

    motor

    1x100 %,

    with IGV

    control&

    constant

    speed

    motor

    1x100 %,

    with IGV

    control&

    constant

    speed

    motor

    Gas velocity

    Fluidisation velocity2.3 -2.5m/sec 2.3 -2.5m/sec 2.3 -2.5m/sec 2.3 -2.5m/sec

    Furnace

    1.8-2.0

    m/sec

    1.8-2.0

    m/sec

    1.8-2.0

    m/sec

    1.8-2.0

    m/sec

    Convection S/H6-8 m/sec 6-8 m/sec 6-8 m/sec 6-8 m/sec

    Economiser8-10 m/sec 8-10 m/sec 8-10 m/sec 8-10 m/sec

    Air heater6-8 m/sec 6-8 m/sec 6-10 m/sec 6-8 m/sec

    Deaerator Capacity

    1,50,000

    kg/hr

    1,50,000

    kg/hr

    1,70,00

    kg/hr

    1,70,00

    kg/hrDeaerator storage tank

    capacity60 m 60m 50 m 50 m 56.67m3 56.67m3 na na na na na

    STEAM TURBINE

    GENERATOR

    Inlet steam pressure 84 ata 84 ata 62 84 ata 84 ata 84 ata 84 ata

    K /cm286 Kg/cm2 86 Kg/cm2 86 Kg/cm2

    Inlet steam temperature 515 C 515 C 485 5105 C 515 5105 C 515 C 5105 C 5105 C 5105 C 5105 C

    Power factor 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8

    Gross power generation

    terminal volatge6.6 KV 11 6.6 KV 6.6 6.6 KV 6.6 KV 6.6 KV 6.6 KV 6.6 KV 6.6 KV 6.6 KV

    Governor

    505-

    woodward,

    Electro

    hyadraulic

    505-

    woodward,

    Electro

    hyadraulic

    505-

    woodward,

    Electro

    hyadraulic

    505-

    woodward,

    Electro

    hyadraulic

    505-

    woodward,

    Electro

    hyadraulic

    505-

    woodward

    , Electro

    hyadraulic

    505-

    woodward,

    Electro

    hyadraulic

    505-

    woodward,

    Electro

    hyadraulic

    505-

    woodward,

    Electro

    hyadraulic

    Bleed connectionThree Three Three Three Three Three Three Three Three Three Three

  • 8/12/2019 Final TL _ CVL Comparative.xls

    4/6

    TL CVL Comparative

    Technical comparison

    SCL

    (2X15MW)

    SCL(2X18

    MW)

    SCL Present

    36 MW plant

    CVL (2x15

    MW) OLD

    CVL (2x15

    MW)

    Revised

    CVL (2x18

    MW) OLD

    CVL (2x18

    MW)

    REVISED

    TL (2x15

    MW) OLD

    TL (2x15

    MW)

    REVISED

    TL (2x18

    MW) OLD

    TL (2x18

    MW)

    REVISED

    INDURE

    (2x15)

    Barring gear

    auto engage

    and auto

    disengage

    na na na na

    Manual

    engage

    and Auto

    disengage

    Autol

    engage

    and Auto

    disengage

    Manual

    engage

    and Auto

    disengage

    Auto

    engage

    and Auto

    disengage

    AIR COOLED

    CONDENSER

    Design temp. 42 42 na 42 C 42 C 42 C 42 C 40 C 42 C 42 C 42 C 40C

    Exhaust pressure 0.22 0.22 na 0.20 0.22 0.20 0.22 0.20 0.22 0.22 0.22 0.2

    Fan Motor

    VFD

    operated

    VFD

    operatedna ---

    VFD

    optional---

    VFD

    optional

    Two

    speed

    motors

    Two speed

    motors

    Two speed

    motors

    Two speed

    motors

    DM plant

    Designed capacity (net

    output each stream)6 m/hr 2x10 m3/hr 5 m3/hr 5 m3/hr 5.60 m3/hr 5.60 m3/hr 5 M3/hr 5 M3/hr 5 M3/hr 5 M3/hr 6 M3/hr

    OBR 100 100 m3 100 m3 120 m3 112 m 100 M3 100 M3 100 M3 100 M3

    Operation mode

    semi

    automatic

    semi

    automatic

    semi

    automatic

    Semiauto

    metic

    Semiauto

    metic

    Semiautom

    etic

    Semiauto

    metic

    Manually

    operated

    Treated water quality

    parameters

    - Reactive silica

  • 8/12/2019 Final TL _ CVL Comparative.xls

    5/6

    TL CVL Comparative

    Technical comparison

    SCL

    (2X15MW)

    SCL(2X18

    MW)

    SCL Present

    36 MW plant

    CVL (2x15

    MW) OLD

    CVL (2x15

    MW)

    Revised

    CVL (2x18

    MW) OLD

    CVL (2x18

    MW)

    REVISED

    TL (2x15

    MW) OLD

    TL (2x15

    MW)

    REVISED

    TL (2x18

    MW) OLD

    TL (2x18

    MW)

    REVISED

    INDURE

    (2x15)

    Combined

    with main

    cooling tower

    One aux.

    cooling

    tower with

    one cell

    One aux.

    cooling

    tower with

    one cell

    One aux.

    cooling

    tower with

    one cell

    One aux.

    cooling

    tower with

    one cell

    One aux.

    cooling

    tower with

    two

    cells(both

    working)

    One aux.

    cooling

    tower with

    two

    cells(both

    working)

    One aux.

    cooling

    tower with

    two

    cells(both

    working)

    One aux.

    cooling

    tower with

    two

    cells(both

    working)

    Range of temp.33-42 32-42 deg 32-42 deg 32-42 deg 32-42 deg

    34 - 42

    deg

    32 - 42

    deg34 - 42 deg

    32 - 42

    deg34 - 43 deg

    Make-up water Flow rate

    Chimney height 95 m 109 m 109 m 113 m 113 m 83.5 m 107m 106.5 m 115 m

    Crane & Hoist 40/05 Ton 40/5 Ton 40/5 Ton 40/5 Ton 40/5 Ton 35/5 Ton 35/5 Ton 35/5 Ton 35/5 Ton 40/05 Ton

    Material Handling

    Fly ash handling

    Mechanical

    conveying

    Mechanical

    conveying

    Pneumatic

    conveying

    Pneumatic

    conveying

    Mechanical

    conveying

    Pneumatic

    conveying

    Mechanical

    conveying

    Pneumatic

    conveying

    Pneumatic

    conveying

    Pneumatic

    conveying

    Capacity12 TPH 2*7.5 TPH 6.78*2 TPH 6.82*2 TPH 7.7 x 2 TPH

    7.70 x 2

    TPh--- 12 TPH 12 TPH 12 TPH ---

    Silo capacity

    20 Hr.

    Storage (60

    m)

    85 m3 2*125 m3 2*125 m3 ---

    12 hours

    storage for

    each

    boiler

    12 hours

    storage for

    each boiler

    12 hours

    storage for

    each boiler

    16 hours

    storage for

    each boiler

    (common

    for both bed

    ash+fly ash

    Bed ash handling

    Capacity 5 TPH 2*2.5 TPH 0.75X2 TPH 0.76*2 TPH0.85X2

    TPH

    0.85X2

    TPH--- 5 TPH 5 TPH 5 TPH ---

    Silo capacity

    20 Hr.

    Storage

    (Each 125

    m)

    55 TPH 1*60 m3 1*60 m3 ---

    12 hours

    storage for

    each

    boiler

    12 hours

    storage for

    each boiler

    12 hours

    storage for

    each boiler

    ---

    Coal crusher

  • 8/12/2019 Final TL _ CVL Comparative.xls

    6/6

    TL CVL Comparative

    Technical comparison

    SCL

    (2X15MW)

    SCL(2X18

    MW)

    SCL Present

    36 MW plant

    CVL (2x15

    MW) OLD

    CVL (2x15

    MW)

    Revised

    CVL (2x18

    MW) OLD

    CVL (2x18

    MW)

    REVISED

    TL (2x15

    MW) OLD

    TL (2x15

    MW)

    REVISED

    TL (2x18

    MW) OLD

    TL (2x18

    MW)

    REVISED

    INDURE

    (2x15)

    Coal/Petcock/Lignite

    Capacity 60 TPH 70 TPH 70 TPH 73 TPH 73 TPH 50 TPH 80 TPH 80 TPH 80 TPH 70 TPH

    Hrs of operation/day12 hrs 10 Hrs 11 Hrs 12 Hrs 12 Hrs --- -- --

    Lime crusher

    Capacity 20 TPH 43 TPH 43 TPH 48 TPH 48 TPH 50 TPH 30 TPH 30 TPH 30 TPH 5 TPH

    Hrs of operation/day 12 hrs 8 Hrs 8 Hrs 8 Hrs 8 Hrs --- --- ---

    LDO storage capacity 25KL 25KL 25KL Not considered