CAMPUS SQUARE HARRISBURG,PENNSYLVANIA ANDREW MARTIN |CONSTRUCTION MANAGEMENT |APRIL 12, 2010

Transcript of Final Thesis Presentation - engr.psu.edu Thesis... · Presentation Outline Project Overview Pfbi...

Page 1: Final Thesis Presentation - engr.psu.edu Thesis... · Presentation Outline Project Overview Pfbi tdEt iWllPl 46‐well, closed loop hybrid geothermal system 220 panel, 47kW photovoltaic

CAMPUS SQUAREHARRISBURG, PENNSYLVANIA

ANDREWMARTIN | CONSTRUCTION MANAGEMENT | APRIL 12, 2010

Page 2: Final Thesis Presentation - engr.psu.edu Thesis... · Presentation Outline Project Overview Pfbi tdEt iWllPl 46‐well, closed loop hybrid geothermal system 220 panel, 47kW photovoltaic

CAMPUS SQUAREPresentation OutlineProject Overview

Prefabricated Exterior Wall Panels: Construction Sequence, Cost, and Schedule Impacts(Construction Management Depth) 

Thermal Performance of Exterior Wall Systems(Mechanical Breadth) 

Structural Redesign of Exterior Wall Panel Connections(St t l B dth)

ANDREWMARTIN | CONSTRUCTION MANAGEMENT | APRIL 12, 2010

(Structural Breadth) 

Conclusions and Recommendations

Questions and Acknowledgements

Page 3: Final Thesis Presentation - engr.psu.edu Thesis... · Presentation Outline Project Overview Pfbi tdEt iWllPl 46‐well, closed loop hybrid geothermal system 220 panel, 47kW photovoltaic

CAMPUS SQUAREPresentation OutlineProject Overview

P f b i t d E t i W ll P l

Project Overview

Function Type:Mixed Use – Retail/Office/EducationalPrefabricated Exterior Wall Panels(Construction Management Depth) 

Thermal Performance of Exterior Wall Systems(Mechanical Breadth) 

Structural Redesign of Exterior Wall Panel Connections(Structural Breadth) 

Size: 75,000 square feet

Height: 65’ (4 above grade, with mechanical basement space)

Dates of Construction: Core & Shell: June 26, 2008 – August 14, 2009

ANDREWMARTIN | CONSTRUCTION MANAGEMENT | APRIL 12, 2010

( )

Conclusions and Recommendations

Questions and Acknowledgements

Project Cost: Core and shell ‐ $9 million (GMP)

Project Delivery Method: Design‐Build

Page 4: Final Thesis Presentation - engr.psu.edu Thesis... · Presentation Outline Project Overview Pfbi tdEt iWllPl 46‐well, closed loop hybrid geothermal system 220 panel, 47kW photovoltaic

CAMPUS SQUAREProject Overview

Structural steel moment resisting frame

Presentation OutlineProject Overview

P f b i t d E t i W ll P l

46‐well, closed loop hybrid geothermal system

220 panel, 47kW photovoltaic solar system

High performance brick veneer façade, low‐E windows and curtain wall

Prefabricated Exterior Wall Panels(Construction Management Depth) 

Thermal Performance of Exterior Wall Systems(Mechanical Breadth) 

Structural Redesign of Exterior Wall Panel Connections(Structural Breadth) 

ANDREWMARTIN | CONSTRUCTION MANAGEMENT | APRIL 12, 2010

LEED® Gold certification (LEED‐CS v2.0)

( )

Conclusions and Recommendations

Questions and Acknowledgements

Page 5: Final Thesis Presentation - engr.psu.edu Thesis... · Presentation Outline Project Overview Pfbi tdEt iWllPl 46‐well, closed loop hybrid geothermal system 220 panel, 47kW photovoltaic

CAMPUS SQUAREPresentation OutlineProject Overview

P f b i t d E t i W ll P l

Prefabricated Exterior Wall Panels (CM Depth)

Goals:Prefabricated Exterior Wall Panels(Construction Management Depth) 

Thermal Performance of Exterior Wall Systems(Mechanical Breadth) 

Structural Redesign of Exterior Wall Panel Connections(Structural Breadth) 

Determine building shell construction sequence

Reduce overall construction schedule duration

Formulate cost impacts of a prefabrication

ANDREWMARTIN | CONSTRUCTION MANAGEMENT | APRIL 12, 2010

( )

Conclusions and Recommendations

Questions and Acknowledgements

Page 6: Final Thesis Presentation - engr.psu.edu Thesis... · Presentation Outline Project Overview Pfbi tdEt iWllPl 46‐well, closed loop hybrid geothermal system 220 panel, 47kW photovoltaic

CAMPUS SQUAREPresentation OutlineProject Overview

P f b i t d E t i W ll P l

Original Exterior Wall Sequence

77 day building shell durationPrefabricated Exterior Wall Panels(Construction Management Depth) 

Thermal Performance of Exterior Wall Systems(Mechanical Breadth) 

Structural Redesign of Exterior Wall Panel Connections(Structural Breadth) 

50  days spent on exterior brick installation‐(exceeded original schedule)

Adjustable scaffolding, material/man lifts needed throughout 

ANDREWMARTIN | CONSTRUCTION MANAGEMENT | APRIL 12, 2010

( )

Conclusions and Recommendations

Questions and Acknowledgements

Page 7: Final Thesis Presentation - engr.psu.edu Thesis... · Presentation Outline Project Overview Pfbi tdEt iWllPl 46‐well, closed loop hybrid geothermal system 220 panel, 47kW photovoltaic

CAMPUS SQUAREPresentation OutlineProject Overview

P f b i t d E t i W ll P l

Proposed Exterior Wall Sequence

45 day building shell duration (6+ week schedule reduction)Prefabricated Exterior Wall Panels(Construction Management Depth) 

Thermal Performance of Exterior Wall Systems(Mechanical Breadth) 

Structural Redesign of Exterior Wall Panel Connections(Structural Breadth) 

3 week panel installation duration

No scaffolding needed

Addition of crane throughout panel installation

ANDREWMARTIN | CONSTRUCTION MANAGEMENT | APRIL 12, 2010

( )

Conclusions and Recommendations

Questions and Acknowledgements

Page 8: Final Thesis Presentation - engr.psu.edu Thesis... · Presentation Outline Project Overview Pfbi tdEt iWllPl 46‐well, closed loop hybrid geothermal system 220 panel, 47kW photovoltaic

CAMPUS SQUAREPresentation OutlineProject Overview

P f b i t d E t i W ll P l

Proposed Exterior Wall Panels:  Sequence 1 – NW Corner 

Prefabricated Exterior Wall Panels(Construction Management Depth) 

Thermal Performance of Exterior Wall Systems(Mechanical Breadth) 

Structural Redesign of Exterior Wall Panel Connections(Structural Breadth) 

ANDREWMARTIN | CONSTRUCTION MANAGEMENT | APRIL 12, 2010

( )

Conclusions and Recommendations

Questions and Acknowledgements

Page 9: Final Thesis Presentation - engr.psu.edu Thesis... · Presentation Outline Project Overview Pfbi tdEt iWllPl 46‐well, closed loop hybrid geothermal system 220 panel, 47kW photovoltaic

CAMPUS SQUAREPresentation OutlineProject Overview

P f b i t d E t i W ll P l

Proposed Exterior Wall Panels:  Sequence 2 – SW Corner 

Prefabricated Exterior Wall Panels(Construction Management Depth) 

Thermal Performance of Exterior Wall Systems(Mechanical Breadth) 

Structural Redesign of Exterior Wall Panel Connections(Structural Breadth) 

ANDREWMARTIN | CONSTRUCTION MANAGEMENT | APRIL 12, 2010

( )

Conclusions and Recommendations

Questions and Acknowledgements

Page 10: Final Thesis Presentation - engr.psu.edu Thesis... · Presentation Outline Project Overview Pfbi tdEt iWllPl 46‐well, closed loop hybrid geothermal system 220 panel, 47kW photovoltaic

CAMPUS SQUAREPresentation OutlineProject Overview

P f b i t d E t i W ll P l

Proposed Exterior Wall Panels:  Sequence 3 – SE Corner 

Prefabricated Exterior Wall Panels(Construction Management Depth) 

Thermal Performance of Exterior Wall Systems(Mechanical Breadth) 

Structural Redesign of Exterior Wall Panel Connections(Structural Breadth) 

ANDREWMARTIN | CONSTRUCTION MANAGEMENT | APRIL 12, 2010

( )

Conclusions and Recommendations

Questions and Acknowledgements

Page 11: Final Thesis Presentation - engr.psu.edu Thesis... · Presentation Outline Project Overview Pfbi tdEt iWllPl 46‐well, closed loop hybrid geothermal system 220 panel, 47kW photovoltaic

CAMPUS SQUAREProposed Exterior Wall Panels:  Sequence 4 – NE Corner Presentation Outline

Project Overview

P f b i t d E t i W ll P lPrefabricated Exterior Wall Panels(Construction Management Depth) 

Thermal Performance of Exterior Wall Systems(Mechanical Breadth) 

Structural Redesign of Exterior Wall Panel Connections(Structural Breadth) 

ANDREWMARTIN | CONSTRUCTION MANAGEMENT | APRIL 12, 2010

( )

Conclusions and Recommendations

Questions and Acknowledgements

Page 12: Final Thesis Presentation - engr.psu.edu Thesis... · Presentation Outline Project Overview Pfbi tdEt iWllPl 46‐well, closed loop hybrid geothermal system 220 panel, 47kW photovoltaic

CAMPUS SQUAREPresentation OutlineProject Overview

P f b i t d E t i W ll P l

Cost Impacts

$154,691 GC savings due to 9 week reduction in construction schedule

$585,200 direct cost increase of prefabricated panels

$430,500 total scope increase of exterior facadePrefabricated Exterior Wall Panels(Construction Management Depth) 

Thermal Performance of Exterior Wall Systems(Mechanical Breadth) 

Structural Redesign of Exterior Wall Panel Connections(Structural Breadth) 

ANDREWMARTIN | CONSTRUCTION MANAGEMENT | APRIL 12, 2010

( )

Conclusions and Recommendations

Questions and Acknowledgements

Page 13: Final Thesis Presentation - engr.psu.edu Thesis... · Presentation Outline Project Overview Pfbi tdEt iWllPl 46‐well, closed loop hybrid geothermal system 220 panel, 47kW photovoltaic

CAMPUS SQUAREPresentation OutlineProject Overview

P f b i t d E t i W ll P l

Thermal Performance of Exterior Wall Systems (Mech. Breadth)

Goals:Calculate heat loss through and as built and prefabricated wallPrefabricated Exterior Wall Panels

(Construction Management Depth) 

Thermal Performance of Exterior Wall Systems(Mechanical Breadth) 

Structural Redesign of Exterior Wall Panel Connections(Structural Breadth) 

Calculate heat loss through and as‐built and prefabricated wall assemblies

Demonstrate the thermal advantages of the proposed wall assembly over the as‐built condition

ANDREWMARTIN | CONSTRUCTION MANAGEMENT | APRIL 12, 2010

( )

Conclusions and Recommendations

Questions and Acknowledgements

Page 14: Final Thesis Presentation - engr.psu.edu Thesis... · Presentation Outline Project Overview Pfbi tdEt iWllPl 46‐well, closed loop hybrid geothermal system 220 panel, 47kW photovoltaic

CAMPUS SQUAREPresentation OutlineProject Overview

P f b i t d E t i W ll P l

As‐Built Masonry Veneer Assembly

4” masonry brick with 7/16” DensGlass® sheathingPrefabricated Exterior Wall Panels(Construction Management Depth) 

Thermal Performance of Exterior Wall Systems(Mechanical Breadth) 

Structural Redesign of Exterior Wall Panel Connections(Structural Breadth) 

6” 16‐gauge steel studs @ 16” o.c.

6” batt. insulation with foil backing

½” gypsum board

R‐Value Analysis

ANDREWMARTIN | CONSTRUCTION MANAGEMENT | APRIL 12, 2010

( )

Conclusions and Recommendations

Questions and Acknowledgements

Insulated Wall Sections:  20.51

Uninsulated Wall Sections:  3.86 

Page 15: Final Thesis Presentation - engr.psu.edu Thesis... · Presentation Outline Project Overview Pfbi tdEt iWllPl 46‐well, closed loop hybrid geothermal system 220 panel, 47kW photovoltaic

CAMPUS SQUAREPresentation OutlineProject Overview

P f b i t d E t i W ll P l

Prefabricated Panel Wall Assembly

4” EIFS and simulated brick stucco facePrefabricated Exterior Wall Panels(Construction Management Depth) 

Thermal Performance of Exterior Wall Systems(Mechanical Breadth) 

Structural Redesign of Exterior Wall Panel Connections(Structural Breadth) 

7/16” DensGlass® sheathing 

6” 16‐gauge steel studs @ 16” o.c.

½” gypsum board

R‐Value Analysis

ANDREWMARTIN | CONSTRUCTION MANAGEMENT | APRIL 12, 2010

( )

Conclusions and Recommendations

Questions and Acknowledgements

Insulated Wall Sections:  20.66

Uninsulated Wall Sections:  19.79

Page 16: Final Thesis Presentation - engr.psu.edu Thesis... · Presentation Outline Project Overview Pfbi tdEt iWllPl 46‐well, closed loop hybrid geothermal system 220 panel, 47kW photovoltaic

CAMPUS SQUAREPresentation OutlineProject Overview

P f b i t d E t i W ll P l

Heat Loss AnalysisQ=(U)(A)(Δt) for each element

Prefabricated Exterior Wall Panels(Construction Management Depth) 

Thermal Performance of Exterior Wall Systems(Mechanical Breadth) 

Structural Redesign of Exterior Wall Panel Connections(Structural Breadth) 

U= U‐factor for a given envelope componentA= Surface area of the envelope componentΔt = The design temperature difference between inside and outside air

ANDREWMARTIN | CONSTRUCTION MANAGEMENT | APRIL 12, 2010

( )

Conclusions and Recommendations

Questions and Acknowledgements

Page 17: Final Thesis Presentation - engr.psu.edu Thesis... · Presentation Outline Project Overview Pfbi tdEt iWllPl 46‐well, closed loop hybrid geothermal system 220 panel, 47kW photovoltaic

CAMPUS SQUAREPresentation OutlineProject Overview

P f b i t d E t i W ll P l

Redesign of Exterior Wall Panel Connections (Struct. Breadth)

Goal:Prefabricated Exterior Wall Panels(Construction Management Depth) 

Thermal Performance of Exterior Wall Systems(Mechanical Breadth) 

Structural Redesign of Exterior Wall Panel Connections(Structural Breadth) 

Redesign the connections of the prefabricated wall system to the superstructure of the building

ANDREWMARTIN | CONSTRUCTION MANAGEMENT | APRIL 12, 2010

( )

Conclusions and Recommendations

Questions and Acknowledgements

Page 18: Final Thesis Presentation - engr.psu.edu Thesis... · Presentation Outline Project Overview Pfbi tdEt iWllPl 46‐well, closed loop hybrid geothermal system 220 panel, 47kW photovoltaic

CAMPUS SQUAREPresentation OutlineProject Overview

P f b i t d E t i W ll P l

QuickClip™ (QC‐Series ™) 10 gauge, 33 ksi

Prefabricated Exterior Wall Panels(Construction Management Depth) 

Thermal Performance of Exterior Wall Systems(Mechanical Breadth) 

Structural Redesign of Exterior Wall Panel Connections(Structural Breadth) 

ASCE 7‐05, Section 2.4: Combining Nominal Loading Using Allowable 

Stress Design

Allowable Load of connection: 476lbs

Wall Assembly (per tributary area of): 233lbs

ANDREWMARTIN | CONSTRUCTION MANAGEMENT | APRIL 12, 2010

( )

Conclusions and Recommendations

Questions and Acknowledgements

Allowable Shear (concrete): 335 lbs (1 ½ screw embed)

Design Shear: 264lbs

Page 19: Final Thesis Presentation - engr.psu.edu Thesis... · Presentation Outline Project Overview Pfbi tdEt iWllPl 46‐well, closed loop hybrid geothermal system 220 panel, 47kW photovoltaic

CAMPUS SQUAREPresentation OutlineProject Overview

P f b i t d E t i W ll P l

Hilti™ Powder Driven Fasteners

Allowable Shear (concrete): 335 lbs (1 ½ screw embed)Prefabricated Exterior Wall Panels(Construction Management Depth) 

Thermal Performance of Exterior Wall Systems(Mechanical Breadth) 

Structural Redesign of Exterior Wall Panel Connections(Structural Breadth) 

Design Shear (concrete): 264lbs

Allowable Tension (steel): 800 lbs

Design Tension (steel): 233 lbs

Fill t W ld t t d ( i h) ll bl l d 606lb

ANDREWMARTIN | CONSTRUCTION MANAGEMENT | APRIL 12, 2010

( )

Conclusions and Recommendations

Questions and Acknowledgements

Fillet Weld at stud (per inch) allowable load: 606lbs 

16 gauge, 33 ksi steel studs

Page 20: Final Thesis Presentation - engr.psu.edu Thesis... · Presentation Outline Project Overview Pfbi tdEt iWllPl 46‐well, closed loop hybrid geothermal system 220 panel, 47kW photovoltaic

CAMPUS SQUAREPresentation OutlineProject Overview

P f b i t d E t i W ll P l

Conclusions

Prefabrication will reduce the construction duration by 9 weeks

Recommendations

All three analysis topics should be used on Prefabricated Exterior Wall Panels(Construction Management Depth) 

Thermal Performance of Exterior Wall Systems(Mechanical Breadth) 

Structural Redesign of Exterior Wall Panel Connections(Structural Breadth) 

Repetitive bay sizing / floor height 

Increase of building shell cost: $430,500

Increased thermal performance during peak loading by 13%

Decrease in operational costs will further mitigate scope increase

P f b i ti d i id ti

Campus Square

ANDREWMARTIN | CONSTRUCTION MANAGEMENT | APRIL 12, 2010

( )

Conclusions and Recommendations

Questions and Acknowledgements

Prefabrication design considerations 

Implementation of a construction quality assurance program

Page 21: Final Thesis Presentation - engr.psu.edu Thesis... · Presentation Outline Project Overview Pfbi tdEt iWllPl 46‐well, closed loop hybrid geothermal system 220 panel, 47kW photovoltaic

CAMPUS SQUAREPresentation OutlineProject Overview

P f b i t d E t i W ll P l

Acknowledgements

Penn State Architectural Engineering FacultyW hl C i CPrefabricated Exterior Wall Panels

(Construction Management Depth) 

Thermal Performance of Exterior Wall Systems(Mechanical Breadth) 

Structural Redesign of Exterior Wall Panel Connections(Structural Breadth) 

Questions?Wohlsen Construction Company

Daryl EvansWilliam Sutton II

GreenWorks DevelopmentBobbie L. Van Buskirk

TEAM Panels InternationalCraig Fleischmann

KERR Interior Systems Ltd. & Composite Building Systems Inc.

ANDREWMARTIN | CONSTRUCTION MANAGEMENT | APRIL 12, 2010

( )

Conclusions and Recommendations

Questions and Acknowledgements

te o Syste s td & Co pos te u d g Syste s cDarryl Wiebe

Family and Friends