Transcript of Final public meeting presentation
Renderings by Michael Singer Studio
• City of Phoenix Staff• Street Transportation Department, Office of Arts & Culture, Planning & Development
and Neighborhood Services
• Arizona Forward Members
• SRP & APS Staff
• Phase I Design Team & Artist
• Phases II Design Teams
Introductions
ReinventPHX• Five transit oriented
development districts• Two districts with the Grand
Canal: Uptown and Gateway• Adopted policy plans for each
district
• Uptown TOD District• Priority Development Areas• 7th Avenue & Grand Canal
node• Central Avenue at Grand
Canal improvements suggested as a catalyst project
ReinventPHX
• Gateway TOD District• Priority Development Areas• Grand Canal Corridor
ReinventPHX
• Strategies and Action Items• Pursue funding for Grand Canal trail enhancements
• Design work for crossings conducted during ReinventPHX study/process
• Grant funding pursued using adopted policy plans as basis for award
• Implement pedestrian and bicycle improvements to Grand Canal
ReinventPHX
SRP Canals – Multiple Use
Multi-Use Trail System Status61 miles complete. 16 miles in design/construction.
Recently Completed Canal ProjectsTempe Western Canal Trail Chandler Paseo Project: Galveston – Queen Creek
SRP Guidelines within Canals
20’
20’
50’
Unlimited
Canal and Power Clearance Requirements
SRP/APS Equipment
APS Forestry & Special ProgramsJohn GauthierForestry PlannerMetro [email protected]
APS Forestry & Special ProgramsJohn GauthierForestry PlannerMetro [email protected]
• Phoenix is building a multi-use trail along the Grand Canal from Glendale to Tempe
• Design underway East Segment (I-17 and Tempe)
• Construction (Phase I) begins early 2017
• Construction (Phase II) begins early 2018
• This presentation will cover the project and some of the opportunities
Grand Canalscape Overview
Grand Canalscape Goals
• Provide continuous multi-use trail along the Grand Canal across Phoenix• Trail• Signalized street crossings• Neighborhood connections
• Re-integrate canal into neighborhood activity
Canal Bank TrailMulti-Use Trail 10 feet wide
Pedestrian Lighting
Traffic Signal HAWK Pedestrian Signal
Signalized Crossings
Neighborhood Connections
Other Features
• Integrated public art• Minimal landscaping• Maintained by Street Transportation Dept.• Patrolled by Phoenix Police• Canal serviced by SRP & APS
East Segment I-17 to Tempe (Under design)West Segment Glendale to Grand Avenue
(Under development)
Bethany Home Outfall Channel(Path completed except path specific lighting)
Grand Canalscape Master Plan
Central Segment Bridging Grand Ave and I-17
(Future Phase)
I-17SouthofIndianSchoolto15thAveNorthofGlenrosa (CD4)
Trail ends at existing bridge at 23rd Ave north of Fairmount pending decision on future I-17 Bridge
North Bank Trail New RRFB
Crossing:15th Ave s/o Roma
PhaseII- TIGER
New HAWKS:Indian School e/o 23rd Ave
19th Ave n/o Glenrosa
Future I-17 Bridge may be
on north or south bank
Existing bridge 23rd Ave north of Fairmount
15thAveNorthofGlenrosa to7thStreetNorthofRoma(CD4)
New HAWKS: 7th Ave at Minnezona | 7th St n/o Roma
PhaseI
Signal Modification: Central s/o Coolidge
Neighborhood Connections9th Ave & Hazelwood St
Alleys Neighborhood Connection
3rd Ave at Existing Bridge
7thStreetNorthofRomatoIndianSchoolat16thStreet(CD4)RRFB crossing 12th
Street at Turney
High Visibility crosswalk: Longview n/o
Roma
Enhanced crossing of Indian School and 16th St (CMAQ
Grant)
Potential Bridge at 10th St & Campbell
Neighborhood Connections9th Street and 10th Street
PhaseI
IndianSchoolat16thStreetto20thStreets/oOsborn(CD4)
PhaseII- TIGER
New HAWKs:Osborn w/o 20th St20th St s/o Osborn
20thStreets/oOsbornto24thSts/oThomas(CD4&8)
PhaseII- TIGER
New HAWK:Thomas e/o 20th St24th St s/o Thomas
24thSts/oThomasMcDowellw/o32ndSt(CD8)
New HAWK:McDowell w/o 32nd St
New RRFB:Oak e/o 24th St
PhaseII- TIGER
McDowellw/o32ndSttoGarfieldand36thSt(CD8)
PhaseII- TIGER
New HAWK:32nd St s/o McDowell
New Bridge at Garfield
PhaseI
PhaseI
PhaseII– TIGER
Signal Modifications:Van Buren and 40th St
Washington w/o 44th St
Garfieldand36thSttoWashingtonw/o44thSt(CD8)
Neighborhood Connections
Garfield St at Bike Blvd and McKinley at 36th St
Neighborhood Connection37th Street
Washingtonw/o44thSttoSR-202(CD8)|PreferredAlternative– Assumesrailcrossinggranted
PhaseII- TIGERSignal Modification:
44th St at Airport Park-n-Ride
New Bridge:Pueblo Grande Museum
New RRFB:48th St south of Washington
New Railroad crossing
Washingtonw/o44thSttoSR-202(CD8)Alternate2– AssumesRailCrossingDenied
PhaseII- TIGER
New RRFB:48th St south of Washington
Bike lanes cross tracks at existing crossing
New bike lanes on 48th St Washington to Grand Canal
Signal Modification: 48th St and Washington
Path leaves canal at existing signal west of 44th Street and
Washington and ties into existing on-street bike lanes.
SR-202toTempe(CD8)
Future Tempe Railroad crossing project
Trail Terminates at Tempe border. Coordination will be required with
Tempe on signing
PhaseII- TIGER
Project DetailsTrail Length | 10.6 milesDistrict 4 5.6 milesDistrict 8 5.0 milesSignal Modifications | 5Phase I 1 Phase II 4New HAWK Signals | 10Phase I 2 Phase II 8New RRFB Crossings | 3Phase I 2 Phase II 1New High Visibility Crossings | 1
Currently planned Phase I Neighborhood Connections (8 in Total):
Uptown:• 9th Avenue• Hazelwood
Street• 3rd Avenue• 8th Place• 9th Street• 10th Street
Gateway:• 36th Street• 37th Street
Please utilize an interactive center to assist the City in determining the best future neighborhood connections for both Phase I and Phase II!
ConstraintsOpportunities | ConstraintsHigh Levels of Public Support• Desire to improve utility & perceived safety of canal
banks
Neighborhood Connections• Eight connections included in Phase I • Potential future projects include: • Phoenix Indian Medical Center Fitness Trail at 14th Street
& Glenrosa Ave• Pocket park at 31st St & McDowell Road• Safe Routes to School project between Creighton
Elementary School and Oak St• Mountain Park Health Center connection• Pueblo Grande Museum connection
Central Avenue Signal Modifications• Requires modification to Light Rail guide-way
Union Pacific Railroad Crossing • New crossing permit needed for tracks at Pueblo
Grande Museum
• Requires closing two existing crossings for one new crossing permit
Environmental Considerations• Many archeological & historic sites located along canal
requiring archeological monitoring and recovery plans.
Phase I Typical SectionsBase Project Features:• Concrete pathway
• Lighting
• Landscaping
• Public ArtDensity/Frequency of lighting and landscaping along the canal heavily dependent on the various constraints depicted in the section view.
Phase I Typical SectionsMinimal Constraints –“Best Case Scenario” for Lighting & Landscaping:
Phase I Typical SectionsR/W Constraints – “Worst Case Scenario” for Lighting & Landscaping:
Sample Pathway Section
Landscaping – Plant List
Integrated Art – Phase I
Integrated Art – Phase I
Integrated Art – Phase I
Integrated Art – Phase I
Future Phase I/Phase II Projects
The City will seek additional funding for future projects (i.e. bridge crossings and neighborhood connections) within the Phase I and Phase II project limits. Funding sources include, but are not limited to: Community Development Block Grant (CDBG), Gila River Indian Community Grant, National Endowment for the Arts - ArtPlace Grants and many more!
Phase I Bridge Crossings
Potential future bridge crossing locations (dependent on resolution of existing site constraints):• East of Central Avenue (Brophy – Central)
• 10th Street
• 14th StreetPlease utilize an interactive center to assist the City in determining the best future bridge crossing locations for both Phase I and Phase II! Existing 3rd Avenue Bridge Crossing
East of Central Avenue – Brophy to Central Connection
Proposed “Arch to Arch” Connection
N
10th StreetN
14th StreetN
CDGB Requirements
Requirements:• Must serve low-income areas
• Must be open and available to all residents of the area
• Must be a stand-alone project
• Environmental review
• Davis Bacon and Related Acts
• Open and competitive procurement of lowest-priced qualified contractor
CDGB Ineligible Uses & Funding Availability
Ineligible Uses:• Maintenance costs
• Purchase of land
• Staff costs
• ‘Phases’ of an ongoing project
Funding Availability:• Competitive, application process
• Limited funds available
• 2017/18 funding available July 2017
• Work with assigned Neighborhood Specialist to submit an application
Sample CDBG Project Photos
Phase I & Phase II Schedule/Budget Summaries:
For more informationProject Website: http://grandcanalscape.com
Project Hotline: 623-825-3444
Kerry Wilcoxon – City of Phoenix Street Transportation Department
602-262-4613 or [email protected]