1 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015 JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR FINAL PROJECT: DEVELOPMENT PROPOSAL Introduction to the Construction Industry [QSB30105] JIJI NG | 0904Y72861 LEONG LI JING|0323628 FNBE MARCH 2015

Transcript of Final Project - Development Proposal

Page 1: Final Project - Development Proposal

1 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

FINAL PROJECT: DEVELOPMENT

PROPOSAL

Introduction to the Construction Industry [QSB30105]

JIJI NG | 0904Y72861

LEONG LI JING|0323628

FNBE MARCH 2015

Page 2: Final Project - Development Proposal

2 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

CONTENT

1. Introduction to the Site

2. Location, Key Plan and Site Plan

3. Existing Condition

4. Site Context

5. Site Analysis, Site Inventory and Site Observation

6. Development Proposal (Jiji Ng)

7. Development Proposal (Leong Li Jing)

Page 3: Final Project - Development Proposal

3 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Introduction to the Site

The site for this development is along Jalan Yap Kwan Seng. It is

currently a landmark for sale and temporarily managed by an authority

available for its tertiary services - car parking. We find the functionality of

this landmark covers a very high potential of being designed due to its

surrounding commercial development. We claimed to propose a

beneficial landscape planning for the advanced city line.

Page 4: Final Project - Development Proposal

4 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Location and Key Plan

Location: Jalan Yap Kwan Seng,

KLCC, 50450, Kuala

Lumpur, Wilayah

Persekutuan.

Page 5: Final Project - Development Proposal

5 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Site Plan

B

C

A

View A

View B

View C

Page 6: Final Project - Development Proposal

6 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Existing Condition

→ The subject land is located along

the bustling Jalan Yap Kwan Seng.

↓ It is surrounded by a commercial building,

AmBank Tower and Ampang Elevated Highway.

→ There are a few types of

development projects being

carry out opposite of

and beside this landmark.

Page 7: Final Project - Development Proposal

7 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Site Context

Page 8: Final Project - Development Proposal

8 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Site Analysis, Site Inventory and

Site Observation

Page 9: Final Project - Development Proposal

9 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Circulation

Circulation 1

→ The entrance and exit of the site as

seen from internal of the site.

The site can be easily accessed from the main road – Jalan Yap Kwan

Seng. The specific circulation of peoples are mainly the employees of the

commercial areas, bank towers and business buildings near the site.

There is only one entrance and exit on the site. People can enter to the

site through circulation 1 as figured in the plan.

Page 10: Final Project - Development Proposal

10 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Microclimate

SUNSET SUNRISE

The site is moderately hot because the site is exposed to maximum sunlight

throughout the entire year. It is cooler in the early morning (6-8am) and late

evening (6-8pm), warmer at afternoon (12-2pm).

Wind flow from two direction which is north-east and south-east.

Page 11: Final Project - Development Proposal

11 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Drainage

There is only one drainage is

identified along the site.

Page 12: Final Project - Development Proposal

12 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Site Analysis

Site Context Images Distance Time

KL Tower

2.4 km 8 mins

Shopping Mall

Suria KLCC

0.65 km 2 mins

Pavillion

3.1 km 7 mins

Berjaya Times Square

5.9 km 13 mins

Page 13: Final Project - Development Proposal

13 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Ampang Point

Shopping Mall

5.8 km 10 mins

Education

Aquaria KLCC

2.1 km 6 mins

Raffles Laselle

International Design School

1.5 km 5 mins

Raffles Design School

1.6 km 5 mins

Page 14: Final Project - Development Proposal

14 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Primrose Hill Nursery

1.1 km 4 mins

UTM

0.8 km 2 mins

Sayfol International

School

2.1 km 6 mins

Petrosains, The

Discovery Centre

0.8 km 3 mins

Page 15: Final Project - Development Proposal

15 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Hospital

Gleneagles Intan

Medical Centre

3.6 km 7 mins

Hospital Pakar

Ampang Puteri

5.9 km 11 mins

Kuala Lumpur General Hospital

4.1 km 11 mins

National Heart

Institute

3.7 km 7 mins

Page 16: Final Project - Development Proposal

16 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Prince Court Medical Centre

2.3 km 9 mins

Sports and Recreation

Royal Selangor Golf Club

3.4 km 8 mins

Merdeka Square

3.7 km 11 mins

Stadium Merdeka

6.7 km 10 mins

Page 17: Final Project - Development Proposal

17 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

The Royal Selangor

Polo Club

3.7 km 10 mins

Cemetery

Ampang Road Islam Cemetery

3.5 km 6 mins

Kwong Tong Cemetery

8.8 km 16 mins

National and International Institution

Embassy of Republic of

Poland

1.9 km 6 mins

Page 18: Final Project - Development Proposal

18 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Embassy of Romania

2.3 km 6 mins

Royal Thai Embassy

1.8 km 6 mins

FELDA

1.6 km 4 mins

Department of Fisheries

Malaysia

6.6 km 9 mins

Page 19: Final Project - Development Proposal

19 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Green Landscapes

KL City Park

0.9 km 4 mins

Titiwangsa Lake Garden

3.3 km 7 mins

Hotel

Shangri-La Hotel

3.8 km 10 mins

The Ritz-Carlton Kuala

Lumpur

3.5 km 12 mins

Page 20: Final Project - Development Proposal

20 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Final Project:

A Mini Theme Park Development Proposal

Name: Jiji Ng

Student ID: 0904Y72861

Tutor: Pn. Hasmanira Mokhtar

Course: Foundation in Natural and Built Environment

(FNBE)

Module: Introduction to the Constructed Industry

(QSB30105)

Intake: March 2015

Page 21: Final Project - Development Proposal

21 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

CONTENT

1. Introduction and Objective of the Construction

2. Conceptual Studies

3. Concept and Ideas Sketches

4. Sketch Plan of Proposal

5. Rationale, Benefits and Impacts

6. Professions and Tasks

Page 22: Final Project - Development Proposal

22 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Introduction

I have decided to develop a recreational area on the designated land,

2601 square meter downgraded site along Jalan Yap Kwan Seng, KLCC,

50450, Kuala Lumpur, Wilayah Persekutuan. I plan to build a mini theme

park because it’s surrounded by significant landmarks from the commercial

area, educational area and tourism area.

The diversity of people in the centre of the city makes the landscape

design to be embraced, appreciated, formulated and publicised in a

harmonization of old-culture patterns – a new make-up for the

modernization and globalization of the world.

Nowadays, people in the bustling city should came across an

extraordinary atmosphere that increase the productivity of revolutionized

world by means of cultural diversity. People need to have confidence about

the history of cultural formation which brought forward the cultural

differences into the global mechanism that changes the world. The

communication of this concept starts from the mini theme park that

concerns on the blend-culture of a multi-racial country.

Objective of the Construction

- To entertain the nearby employee with new approach of coping the

growth of multi-culture in the working field.

- To nurture the morals of respect towards the cultural art among

young art generations.

- To raise awareness of the importance of culture harmonization

among professionals in the working field.

- To increase public interests on using national art culture as an

implementation on communication, risk and global management,

and professional training.

Page 23: Final Project - Development Proposal

23 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Conceptual Studies

The mini them park reflect the culture and tradition of Malaysian

culture.

As it located near the national institutions, the park symbolize the

culture preferences and nationality of Malaysia.

As it situated near the worldwide education centres, international

institutions and hotels, the park promote the distinctiveness of national

identity to the international hospitality and tourism in Malaysia.

As it located near the cemeteries, the park upright the ancestor’s

traditional spirit and designed a memorial for their patriotism.

As it situated near the other national-class green landscapes, the park

serves as an elaboration for the greeneries, establishing a fresh significance

– the modernized cultural and traditional signature of the green spaces in

Kuala Lumpur.

As it located near the hospitals and medical institutions, the park

functions as an extra circulation which communicates patients to the nature

of authenticity that lies within this symbolical landscape of Malaysia.

Page 24: Final Project - Development Proposal

24 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Concept and Ideas Sketches

Sketch Plan of Proposal

Page 25: Final Project - Development Proposal

25 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Sketch Plan of Proposal

Page 26: Final Project - Development Proposal

26 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Rationale

According to my research and experience living in Malaysia, I aware

that in the working field, there are a great deal of graduates who are

compassionate about the national art culture or with high spirit of

patriotism nurtured by schools. The spirit of this group of people

diminishes along with the era of politics and cultures in the working

field. The mini theme park could stimulated the thoughts and awareness

on these people to take the importance of preserving their own interests

towards the uniqueness of national culture.

Benefits

The green landscape of the city is mostly covered with greeneries and

the diversity of nature. To create a new generation’s park, I used the

essence of culture harmonization to initiate the new trend in teenagers.

They will be attracted to share with, inspire and impress the

unconcerned groups. This bring forth the modernization in the way that

can bring harmony, and enlightening and effective changes to the world

that perishing in each second.

I also use this culture in teenagers to tackle the outdated thoughts

among adults, as to create new potential to adjust themselves to the new

trend of culture in everyday life of the world.

Impacts

The building of this mini theme park creates a networking rest place

that can diffuses the tension, conflicts and anguishes in employees

caused by the hectic environment of the working field. This leisure

networking brings different way of living to the surrounding areas, as it

increases the prospective of divergent thinking among the professionals.

Page 27: Final Project - Development Proposal

27 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Professions and Their Tasks

1. Structural Engineer: Draw plans, examine and plan the structures

of rigid features in the park.

2. Landscape architect: Design and coordinate the natural and built

environment in the park to create an atmosphere that fulfil the

green drive of city.

3. Traditional carpenters: Assist landscape architect in the design of

park. Fabricated the rigid features involving beams, columns and

wooden trims.

4. Construction manager: Oversee the construction project and

supervise the construction team. Took responsibility in keeping

schedules, delegating jobs and prioritizing.

5. Material Engineer: Choose and identify the kind of materials that

highlighted the quality of the cultural features in Malaysia.

6. Interior Designer: Design and associate the space of interior with

new trend of cultural attributes depicted in the exterior design of

the park.

7. Quantity Surveyor: Responsible for the cost management

meanwhile create a budget balance that maintains the standards

and quality of the park.

8. Contractor: Perform multiple fields’ duties in construction sites,

hire and coordinate subcontractors such as excavation manager,

cement and brick masons, construction labourers, glaziers et

cetera.

9. Local authorities: Ensure the objectives of this landscape design as such is beneficial to the nearby community; ensure this planning and construction are based on the set of building standard.

Page 28: Final Project - Development Proposal

28 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Final Project:

Fitness Recreation Centre and Commercial Block

Development Proposal

Name: Leong Li Jing

Student ID: 0323628

Tutor: Pn. Hasmanira Mokhtar

Course: Foundation in Natural and Built Environment

(FNBE)

Module: Introduction to the Constructed Industry

(QSB30105)

Intake: March 2015

Page 29: Final Project - Development Proposal

29 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

CONTENT

1. Introduction

2. Concept and ideas

3. Sketch plan of proposal

4. Rationale, benefits and impacts

5. Professions involved and tasks

6. Reference list

Page 30: Final Project - Development Proposal

30 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

INTRODUCTION

In this final project, we are given a task to find a specific empty land with a maximum size of 3500m2 to initiate a small construction project on it in a group of two people. For our group, we came out with an outcome to use the empty land located along Jalan Yap Kwan Seng. After surveying, I found that there is no any other place nearer provided for the public to exercise in this area and are forced to take different means of transportation to travel to another places. Thus, I decided to propose a fitness centre on this empty land, which accommodate with commercial block to provide public to enjoy exercising under a complete equipped environment.

The land is a waste of space as it was originally a parking area because public seldom use it. Hence, it is good to have a fitness centre and commercial block to put this empty land in a good use.

This fitness centre is a one stop place for people that are into sports and fitness. The Fitness Centre is a health, recreational, and social facility geared towards exercise, sports, and other physical activities. This is where people can work out and relax and also they can find all types of sports accessories and facilities. This commercial block is a building consists of grocery shops and convenience store. This is much easier and convenience for people to get the needed stuff quickly.

Objective of construction

- To put the empty land in a good use

- To provide a recreation and leisure venue

- To provide a standard and high quality sports environment

- To provide a comfortable and convenient place which is equipped with complete

facilities for exercise

- To raise awareness about importance of exercise for health

- To improve public interests in sports

- To solve the problem of car park

Page 31: Final Project - Development Proposal

31 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

CONCEPT AND IDEAS

The land of site will be fully used for parking area, fitness centre and commercial block.

The land outside the fitness centre and commercial block will be remained as car park as the

building occupies more spaces.

The fitness centre consists of three floors which is basement, ground floor and first floor. The

basement is car park because there are not enough land to provide spaces for car park outside

the building as it was originally a car park area. Ground floor consists of fitness area, shower and

washroom area, office room and waiting area. For the first floor, it consists of gym area, first aid

room area and some convenience store.

The commercial block consists of basement car park and ground floor. Ground floor consists of

convenience stores for commercial purpose.

Page 32: Final Project - Development Proposal

32 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

SKETCH PLAN OF PROPOSAL

Diagram above shows the plan view of the site.

The land is occupied with parking area, fitness centre and commercial block.

As the original circulation in and out the site is narrow, it changed into bigger entrance and exits for

vehicles to avoid traffic congestion.

Page 33: Final Project - Development Proposal

33 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Diagram above shows the plan view of basement car park.

Example of the view of basement car park with entrance and exits.

Page 34: Final Project - Development Proposal

34 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Diagram above shows the plan view of ground floor.

Potential Fitness Centre spaces are numerous and varied. Small facilities may have little more than a

fitness area with group exercise room, locker rooms, and a small support/administrative area.

Group exercise

room/studio. These

rooms accommodate

organized fitness class

activities.

Locker rooms and associated functions. These spaces are typically

separated by gender and accommodate the basic functions of

changing, storing clothes, patron showers, and toilets.

Page 35: Final Project - Development Proposal

35 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Administrative and support

spaces. These staff spaces

accommodate the operation and

administration of the facility and

include Reception/control counter

and equipment issue and offices.

Lobby entrance.

A commercial area is real estate intended for use by for-profit businesses. The building itself consists of

convenience store and food court.

Food court.

Convenience store.

Page 36: Final Project - Development Proposal

36 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

Diagram above shows the plan view of first floor.

Large facilities may add food service and retail spaces, washroom, first aid room, gender-specific gym

area, public gym area and child care spaces.

Washroom.

Juice bar and food service.

Sport retail stores.

Page 37: Final Project - Development Proposal

37 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

First aid room.

Fitness spaces. Provide

proper impact flooring

for each space for fall

attenuation and

appropriate cushioning

for bone and joint

health.

Visual access for

all fitness and

gym spaces.

Ensure good

indoor air quality

and natural light.

Page 38: Final Project - Development Proposal

38 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

RATIONALE, BENEFITS AND IMPACTS

Rationale - Distance with other sport and recreation centre is far - Population increased within that area - People surrounding can have a place to work out for stress relief - Awareness of the importance of health raised nowadays - Car park slots need to be added as the circulation will be increased

Benefits

- Increase aggregate demand of the economy, creating new jobs, thus increasing employment.

- Empty land can be functional - Raise awareness about importance of exercise for health - Public interests in sports improved - Provide a nearer fitness centre for public - Stress can be relieved through work out - Have a comfortable fitness centre for people to work out - Completed sport equipment and other facilities - 24 hours operation which allow people exercise in a quiet condition - Car park problem solved with the addition of basement car park - People can get the needed stuff from convenience store easily - First aid area in building increase the safety of the people who work out

Impacts - Causes traffic congestion as the road in front of the site is narrow - Rate of pollution may increase - Safety of the area may be decreased as the location is surrounded by commercial

buildings such as bank - Direction of wind flow are blocked - Air is not fresh for people who work out because it is located beside highway

Page 39: Final Project - Development Proposal

39 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

PROFESSIONS INVOLVED AND TASKS

1. Architect - Ascertaining, interpreting and formulating requirements - Coordinate necessary environmental and engineering service to building design - Prepare probable costs and the project timeline - Awarding tenders, contract administration and in helping to obtain Certificate of

Fitness for Occupation (CFO) - Administrating building contract – mediating between clients and contractor

2. Client - Co-operative and participative - Understand the construction process

3. Project manager - Ensure maximum efficiency of the construction project

- Ability to adapt to the various internal procedures of the contracting party

- Ensuring the key issues of cost, time, quality and above all, client satisfaction can be realized.

- Plan, organize, evaluate, direct, control and lead project

- Produce the end product within the cost schedule, specifications and technical limitations

- Fully aware with the ethnical cost and the schedule objectives will be met

4. Contractor - Responsible for the supplying of all materials, labours, equipment and tools necessary

- Responsible for the construction execution in accordance with the contract documents

5. Interior designer

- Developing initial ideas and acquiring key information about potential projects

- Setting project schedules

- Considering materials and costs

- Sourcing products

- Preparing detailed working drawings, designs, plans, models and schemes

6. Quantity surveyor - Conducting feasibility studies to estimate materials, time and labor costs

- Preparing, negotiating and analyzing costs for tenders and contracts

- Advising on a range of legal and contractual issues

- Valuing completed work and arranging for payments

7. Engineers - Assess its suitability for construction - Develop a brief for the building - Detailed design of the system - Monitor the progress at site and ensure compliant to the design - Manage the maintenance of the services

Page 40: Final Project - Development Proposal

40 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR

8. Civil engineer - Analyse survey reports, maps, drawings, blueprints, aerial photography, and other

topographical or geologic data to plan projects

- Plan and design transportation or hydraulic systems and structures, following construction and government standards

- Test soil and materials to determine the adequacy and strength of foundations, concrete, asphalt or steel

- Conduct studies of traffic patterns or environmental condition to identify engineering problems and assess the potential impact of projects

- Provide technical advice regarding design, construction, or program modifications and structural repairs to industrial and managerial personnel

- Direct or participate in surveying to lay out installations and establish reference points, grades, and elevations to guide construction

- Inspect project sites to monitor progress and ensure conformance to design specification and safety or sanitation standards

- Direct construction, operations and maintenance activities at project site

9. Structural engineer - Dealing with the analysis and design of structures that support or resist loads - May design the individual structural elements if a structure - Identifying the loads with act upon structure and the forces and stresses - Advise employer and the architect of the most efficient, economical and practical

method of providing their specialist service - Prepare design calculations and material specifications - Prepare detailed drawings within the architect’s design

10. Building engineer (mechanical & electrical) - Read and interpret blueprints, technical drawings, schematics and computer-

generated reports - Research and analyse design proposals, specifications, manuals, and other data - Confer with engineers and other personnel to implement operating procedures,

resolve system malfunctions and provide technical information - Specify system components or direct modification of products to ensure

conformance with engineering design and performance specifications - Perform detailed calculations to compute and establish manufacturing, construction

and installation in accordance with standards and specifications

11. Authorities - approve and ensure professions are licensed such as first aider - ensure facilities are completed and safe for public

Page 41: Final Project - Development Proposal

41 ICI FINAL PROJECT | DEVELOPMENT PROPOSAL | FNBE MARCH 2015

JIJI NG – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR