11
TRAFFIC STUDY OF AUBURN RD & LOWER RIDGE DRIVE Humna Anjum Wayne State University

Transcript of Final Project (Anjum)

Page 1: Final Project (Anjum)

TRAFFIC STUDY OF AUBURN RD & LOWER

RIDGE DRIVE

Humna AnjumWayne State University

Page 2: Final Project (Anjum)

SummaryLocation

Crash History

Warrant Analysis

Conclusions

Questions

Page 3: Final Project (Anjum)

Why this Location?

Page 4: Final Project (Anjum)

Why this Location?

Page 5: Final Project (Anjum)

Level Of Service D• Data Collected on two Fridays in November from

12:30 to 1:30• Heavy Vehicle (HV) percentage • PHF calculated to be 0.87• HCS2000

Page 6: Final Project (Anjum)

Crash History

5 Year Crash Data

Accident Year Total Crash

es2014 2013 2012 2011 2009

Crash Type

Single Motor

Vehicle2 2 0 2 0 6

Angle 2 0 0 0 0 2

Rear-end 0 0 1 3 0 4

Total Crashes 4 2 1 5 0 12

Page 7: Final Project (Anjum)

Warrant Analysis Warrant 1 Eight-Hour Vehicular VolumeWarrant 2 Four-Hour Vehicular VolumeWarrant 3 Peak HourWarrant 4 Pedestrian VolumeWarrant 5 School CrossingWarrant 6 Coordinated Signal SystemWarrant 7 Crash ExperienceWarrant 8 Roadway NetworkWarrant 9 Intersection near a Grade Crossing

Page 8: Final Project (Anjum)

WarrantsPeak Hour Warrant■ Total Entering Volume■ Volume on Minor StreetSchool Crossing Warrant■  Two school in the area the Avondale Meadows School and the

Rochester Hills Christian School are both 0.4 miles away from IAGD. ■ Nearest signal is 600 feet away from the intersectionCrash Experience Warrant■ 12 month period there were 4 crashes at this location■ 2 out of the 4 crashes from 2014 were rear end crashes but the

other 2 were single motor vehicle crashes

Page 9: Final Project (Anjum)

Basic 2 Phase SignalSignal Timing:

Cycle Length 30 sec

All Red 2 secYellow 5 secGreen (NS) 5 secGreen (EW) 18 sec

Page 10: Final Project (Anjum)

Conclusions24 hour Vehicle Counts

School crossing Warrant

2 Way left turn lane