ICI FINAL PROJECT/ THE PROJECT PROPOSAL
CONTENTS
1. Introduction to the site2. Site plan3. Site analysis and observation4. SWOT analysis of the existing land
5. Suggestion and proposal by Aishath hussain / 03204295.1 Mission, vision and objective of the proposed plan5.2 Description of the proposed plan 5.3 Market analysis and user characteristics5.4 The rationale benefits and impacts of your project to client and
surroundings (SWOT analysis)5.5 Sketch plan of the proposal5.6 Sketches/images of the concept5.7 Basic information of the authority procedures, plan approval5.8 Costing5.9 Conclusion
6. Suggestion and proposal by Abdullah Mamode / 0319562
6.1 The rationale benefits and impacts of your project to client and surroundings
6.2 Sketch plan of the proposal6.3 Sketches/images of the concept
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 1
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
1. Introduction to the site
1.1 Background The site is located in Subang jaya “commonly called USJ” which is a major residential township in Selangor Malaysia. It consists of sections which range from USJ 1 to 27. The construction of USJ started in 1988 and was developed by sime UEP. In recent years the town has established plenty of new commercial developments to cater the high population of middle class and upper-class residents.
1.2 Landmarks/ LocationThe summit hotel and local hypermarkets such as giant and mydin are located just beside the site. Summit is the oldest hotel in the township which can be seen from a long distance and hence it is an easy landmark to recognize the site. Moreover the site been located in the middle of the hypermarkets on Persiaran subang permai road is an advantage making it easy to identify.
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 2
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
2. Site plan2.1 Bubble diagram
2.2 Site location and content
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 3
Maxis
Myd
in m
all
Gia
nt
mall
Pro
posa
l si
te
Site located here
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
3. Site Analysis and observation
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 4
30 M*30 M Empty land
Sun Rise
Wind direction
Good views
Bad views
Existing trees and fences
Topography; the land is on a flat area.
Vegetation; soft scape existing vegetation in the area
Drainage; connected to the road
Sun set
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 5
FRONT VIEW
Good views (mydin,gaint and residential building)
Wide entrance no congestion Accessible from the main road
SIDE VIEW
Can view the empty land Sunlight during midafternoon Can spot from long distant,
famous land mark Bit high traffic in the evening
FRONT VIEW
Residential and commercial shops
Have a culinary school Many office buildings Different aesthetics available
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
PROPOSAL (A) BY;
AISHATH HUSSAIN 0320429
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 6
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
5.1 Mission, vision and objectives of the proposed plan.
Mission; is to enhance the quality of life through outdoor recreation, leisure and experiences.
Vision; provide sustainable well maintained outdoor recreational experiences through biking, walking and inspiration towards arts from the outdoor gallery.
Objectives1. Preservation of nature2. Inspire people towards mother nature and green spaces 3. Attract and innovate people to use open public spaces
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 7
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
5.2 Description of the proposed plan
In an urbanized area, open green spaces and recreational facilities are important inoder to make communities desirable places to live. Moreover it emphasis people to develop healthy lifestyles, strong minds and fit bodies.
The proposed empty land is located in the middle of commercial, residential and tourism zone along with other facilities. There are no affordable, safe open spaces to satisfy the needs of the people living nearby. Hence with all the research, I have decided to propose a recreational area to meet the value of the citizens. First of all what is a recreational area? It is a public private land for rest, relaxation and satisfaction including a variety of sports and other activities.
The proposed plan will include open green spaces along with seating area and an ecofriendly open art gallery. The concept is designed in a way to attract both citizens and tourists providing great aesthetics and satisfaction. The outdoor art gallery is made of solar powered frame beds which inspired the shape and name from the bluebonnet flower and it generate energy and is followed by a unique shadow walkway. Moreover the interior will be white which will give neutral backdrop to the artistic works. The ecofriendly structure harnesses power from the sun, and the generated electricity is utilized to power the displays during night. Furthermore the structure will be constructed from recycled steel frames. This concept mainly focuses on the tourists interests. While on the other hand the seating area consists of an artificial water fall that flows throughout the day giving a relaxing sound inspiring you towards nature.
Since my proposal is based on landscaping, landscape architectures are involved in designing, planning and managing the land form. They design areas that are not functional and works closely with landscape contractors, planners
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 8
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
and land surveyors. Moreover they go through different construction phases from the inception to the final stage of the proposal.
5.3 Market analysis and user characteristics
Current demand is primarily focused on resting areas for customers from hyper markets which is giant and Mydin. Furthermore a concept to attract tourists who are staying in summit hotel.
The following table shows the users or the target markets located nearby the neighborhood of the proposed land.
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 9
Place Customer Description Activities
Residents ,non-residents and travellers
Hyper super market/commercial zone
Shopping, food courts
Segi college Students, lecturers
Education center Education
Travellers, tourists
Oldest hotel, tourism and commercial
Hospitality, services and facilities
Giant mall Tourists, residents
Super market Shopping ,restaurants
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
5.4 The rationale benefits and impacts of your project to client and surroundings
The proposed landscape project is a combination of a recreational and commercial unit giving it special feature and uniqueness. This concept mainly focuses on providing open green space for the citizens and a tourist attraction, increasing the level of economic benefits to the surrounding area.
The proposal offers numerous social, economic, environmental, physical and personal benefits to the client and the surrounding area. Open spaces such as recreational areas can have a positive effect on nearby residential property values. Resulting in higher property tax revenues for local governments. Parks and open spaces tend to increase the value and sale price of homes nearby,
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 10
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
having the advantage of renting the place at higher price. This gives enhanced marketability and faster sales or income. In addition evidence shows that when people have excess to parks, they exercise more. The proposal itself will increase the frequency of exercise throughout the neighborhood making people fit and healthy. Moreover the space will be available encouraging people to exercise daily.
It communicates leisure and assists tourist industry. The outdoor art gallery will inspire people to use renewable source of energy and encourage adaptation to green features. Moreover it will increase the country’s economy and reduce pollution and crime rate by building a strong community among people.
On the other hand there are a few impacts towards the proposal which includes poor air quality due to high traffic in the area. This might lead to spread diseases and also the area might be noisy due to traffic which needs to be set into consideration.
SWOT ANALYS
Strengths
Famous landmarks Located on a high way and easy
to access Attractive Frequency of exercise
Weaknesses
Limited space Might be loud since located next
to high way
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 11
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
Increase property values Neighborhood with strong
community Eco friendly
Opportunities
Protect and preserve natural environment
Tourism benefits Reduce pollution Reduce crime Practice sports and outdoor
recreation Present historical, cultural and
modern art
Threats
Poor air quality in the area High traffic
5.5 sketch plan of the proposal
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 12
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
5.6 concept of the proposal
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 13
Outdoor art gallery
Park WaterfallSeating area
Shadow walk way
Entrance from road
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
The seating area
Shadow walk way to the art gallery
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 14
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
Solar blossom outdoor Art gallery
Turf grass along with stepping stone in the park
Decking for seating area
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 15
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
5.7 Basic information of the authority procedures, plan approval
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 16
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
Malaysian public work department (PWD) is the federal government department in malaysia under government of works.This department is responsible for construction and maintanance of public infrastructure and building plan.
During a construction project there are several stages which implies from the inception to the completion of the project.The first stage is the plaining or the pre development stage where all the data will be collected. The conversion of land usage and plaining permission will be approved at this stage.when all required approvals have been obtained it dhen goes to the second stage the construction phase.once it gets approved then it goes to post construction stage,that is the third stage where a certificate of complition (CCC) will be awarded and approved by the Authourity. MPSJ in suban jaya is the local authority responsible for the approval of building projects. They check all the specifications and then approves the drawings.
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 17
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
5.8 costing
During every construction project a budgeted cost is estimated in order for smooth cash flow. A bill of quantity (BOQ) is made during the tendering of the project.
5.9 Conclusion
The Proposal provides sustainable living space with quality facilities and good aesthetics. It gives the empty land livable and green scenery to the neighborhood. More over this plan will be benefited and used by all age group of people increasing the demand for recreational areas. And there is no better option than to promote sustainable designs, in order to inspire people and preserve nature.
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 18
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
PROPOSAL (B) BY;
ABDHULLA MAMODE 0319562
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 19
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
The rationale, benefits and impacts of the project to the client and
surroundings / end user
This project is to make a recreation area in Persiaran Subang Permai, where
there are much of roads, buildings like the hypermarket, malls, condominium,
offices, hotel, shops, and restaurants but there is not a single place for people to
relax, spend time to take some fresh air or any place for children to play or spend
time.
Since the land in between the two Hypermarkets MyDin and Giant which is no
more being used as a parking area since a very long time and is actually closed. So
I decided to plan a recreation area like a Pocket Park on that land so as to introduce
a place for the people coming for shopping at MyDin or Giant Hypermarket, they
can go to the park and spend time to relax before driving home, or take an ice
cream eating with family or also let their children play around for sometimes so as
to get a bit distracted. Or it can be also for the people working around, they are
assured to be having a safe, calm, beautiful place to spend their lunch time
enjoying the view of the street, the people moving around.
As this will be the only place in Persiaran Subang Permai that will have a
Pocket Park, it will attract many people that are around and also those that pass
around there very rarely. And it will also be a very crowded place from time to time.
This is the place that I chose to construct a Pocket Park. The
door in the middle was the entrance of the parking which is now
always closed since very long time.
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 20
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
Chosen site for a Recreation Area
This is the right side of the plan where you can see MyDin
Hypermarket and the road that continues to other places
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 21
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
This is the left side of the site where you can see the Giant
Hypermarket and where the road continues, there are some
construction behind.
This is the opposite side of the chosen site for the Recreation
Area which shows a building somehow like an office.
This is my proposal plan for the Pocket Park in between the
two Hypermarket MyDin and Giant.
Covered Swing Bench Walking Space Children Playground
Fountain
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 22
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
Trees Benches Tables with attach
sitting
Main Entrance and Exit 2 other entrance
and exit
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 23
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
Main Entrance and Exit
In the Main Entrance and Exit there will be a Gate
which is well designed and beautiful as it is the front of
the Pocket Park. Here is an example of how the gate will
look like.
These are examples of the main gate, but will be in smaller
size which will fit in the Pocket Park which will be around 3 metres
wide. And the other two entrance also will have the same type of
door but more simple.
The walking space will be made of concrete and rocks. Here
are some examples of the walking spaces.
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 24
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
These are the different types of garden paths that I suggest
to put in the entrance path of the Park.
Pathways in front of the benches.
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 25
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
Pathways in front the
benches
These types of pathways are to show a difference in between
both the entrance and the sitting area.
Trees around all around the Park
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 26
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
Trees around the Park
Different types of trees can be planted all around the park to
have different kind of appearance, looks and design. And also it’s
beautiful for the eyes to see either when you are sitting inside or
passing by from outside in the car or walking.
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 27
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
These kind of colourful and beautiful trees will enhance the
park and the area in whole which will attract more people to come
and take pictures and so on.
Benches in the Garden
Benches around the
Park
Different kinds of Benches that can be considered to be
placed in the Pocket Park.
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 28
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
One kind of bench only can be used in the whole garden, but
can be using two different kind and design of bench also, so as to
give a different look and a change to the Park.
Covered Swing Bench
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 29
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
Covered Swing Bench
Different kind and models of Covered Swing Bench.
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 30
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
For the four corners of the Park I choose one in these 4
suggested Swing Bench and another single and unique for the
one in the middle just opposite the Main Entrance.
Tables with attached Benches
Round Kiosk and Oval
Tables
Different models of the Kiosk and Tables with attached
Benches.
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 31
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
These are suggested idea of tables and kiosk for people to
enjoy their times. They can eat during their lunch time.
Children’s Playground
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 32
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
Children
Playground
Includes various types of things that normally have in a
children playground.
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 33
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
These are some designs and new kind of children playing
grounds. Which all four can be integrated in the park.
Fountain in the middle
Fountains
Different Models of Fountains
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 34
ICI FINAL PROJECT/ THE PROJECT PROPOSAL
The bottom one on the left seems more appropriate to me to
be placed in the Parks, as it is very beautiful and very nice as
well.
So this is my proposal to the site chosen in Subang Jaya at
Persiaran Subang Persian which will be the most appropriate one
to be constructed there as this is the only missing thing that is
missing in this area.
FNBE AUGUST INTAKE 2014/TAYLORS UNIVERSITY 35