CLAM HATCHERIES FEED SHOP 7 SOUTH AQUA GREEN HOUSE H2, H3, H4 A.C.T.E.D. ADMINISTRATION BLDG. SEA DIVER HOUSE BIOPHOTONICS LAB SHED 9 SOUTH AQUA GREEN HOUSE H5, H6 SHED 14 SHEDS 14A to 14H LEGEND: SCHENKEL SHULTZ A R C H I T E C T U R E NORTH COMPREHENSIVE MASTER PLAN SUPPORTING DOCUMENTS SOURCE: FIGURE 9.1.1 AQUACULTURE SCALE FEET 0 225 450 ADOPTED MARCH 15, 2012

Transcript of Final GOP element 9 031512 WORKING FILE figures 9.1.1-9.4.10 · 2014. 3. 10. · ffe=10.86 o op a...

Page 1: Final GOP element 9 031512 WORKING FILE figures 9.1.1-9.4.10 · 2014. 3. 10. · ffe=10.86 o op a lab ii legend: schenkelshultz a r c h i t e c t u r e north comprehensive master

CLAMHATCHERIES

FEED

SHOP 7SOUTHAQUA

GREENHOUSE

H2, H3, H4A.C.T.E.D.ADMINISTRATION

BLDG.

SEA DIVERHOUSE

BIOPHOTONICSLAB

SHED 9

SOUTHAQUA

GREENHOUSEH5, H6

SHED 14 SHEDS

14A to 14H

LEGEND:

SCHENKELSHULTZA R C H I T E C T U R E

NORTH

COMPREHENSIVE MASTER PLAN

SUPPORTING DOCUMENTS

FINAL DRAFT: NOVEMBER 6, 2009

SOURCE:

FIGURE 9.1.1

AQUACULTURE

SCALE FEET

0 225 450

ADOPTED MARCH 15, 2012

Page 2: Final GOP element 9 031512 WORKING FILE figures 9.1.1-9.4.10 · 2014. 3. 10. · ffe=10.86 o op a lab ii legend: schenkelshultz a r c h i t e c t u r e north comprehensive master

HBOI/FAU MARINESCIENCE

PARTNERSHIP

POST DOCTORATEHOUSING DUPLEX

POST DOCTORATEHOUSING 6 PLEX

LINK ENGINEERINGBUILDING AND HIGH BAY

UTILITY BLDG/WTP BARROWS MARINE

OPERATIONS BLDG

DTAWEST

DTAEAST

FIRE POND

VISIT ORCENTER

F FE=24.14

CA

NOP

Y

T WO STORYLINK ENGINEERING BUILDING

F FE=10.86

OAAOAAPO

LAB II

LEGEND:

SCHENKELSHULTZA R C H I T E C T U R E

NORTH

COMPREHENSIVE MASTER PLAN

SUPPORTING DOCUMENTS

FINAL DRAFT: NOVEMBER 6, 2009

SOURCE:

FIGURE 9.1.2

WEST CHANNEL

SCALE FEET

0 225 450

ADOPTED MARCH 15, 2012

Page 3: Final GOP element 9 031512 WORKING FILE figures 9.1.1-9.4.10 · 2014. 3. 10. · ffe=10.86 o op a lab ii legend: schenkelshultz a r c h i t e c t u r e north comprehensive master

JOHNSON EDUCATIONCENTER ANDCONFERENCE

BIOMEDICALMARINE

RESEARCHEAST

JOHNSON HOUSE

STORAGE SHED

POOL

NECROPSYLAB

JOHNSON HOUSEUTILITY BUILDING

LEGEND:

SCHENKELSHULTZA R C H I T E C T U R E

NORTH

COMPREHENSIVE MASTER PLAN

SUPPORTING DOCUMENTS

FINAL DRAFT: NOVEMBER 6, 2009

SOURCE:

FIGURE 9.1.3

EAST CHANNEL

SCALE FEET

0 225 450

ADOPTED MARCH 15, 2012

Page 4: Final GOP element 9 031512 WORKING FILE figures 9.1.1-9.4.10 · 2014. 3. 10. · ffe=10.86 o op a lab ii legend: schenkelshultz a r c h i t e c t u r e north comprehensive master

HURRICANESHELTER

HBOI/FAU MARINESCIENCE

PARTNERSHIP

SEWERTREATMENT

LEGEND:

SCHENKELSHULTZA R C H I T E C T U R E

NORTH

COMPREHENSIVE MASTER PLAN

SUPPORTING DOCUMENTS

FINAL DRAFT: NOVEMBER 6, 2009

SOURCE:

FIGURE 9.1.4

NORTH CAMPUS

SCALE FEET

0 225 450

ADOPTED MARCH 15, 2012

Page 5: Final GOP element 9 031512 WORKING FILE figures 9.1.1-9.4.10 · 2014. 3. 10. · ffe=10.86 o op a lab ii legend: schenkelshultz a r c h i t e c t u r e north comprehensive master

HURRICANESHELT ER

HBOI/FAU MARINESCIENCE

PARTNERSHIP

POST DOCT ORATEHOUSING DUPLEX

POST DOCT ORATEHOUSING 6 PLEX

LINK ENGINEERINGBUILDING AND HIGH BAY

UTILITY BLDG/WTP BARROWS M ARINE

OPERATIONS BLDG

DTAWEST

DTAEAST

JOHNSON EDUCATIONCENTER AND

CONF ERENCE

CLAMHAT CHERIES

F EED

SHOP 7SOUTHAQUA

GREENHOUSE

H2, H3, H4A.C.T.E .D.ADM INISTRATION

BLDG.

SEA DIVERHOUSE

BIOMEDICALM ARINE

RESEARCHEAST

NECROPSYLAB

BIOPHOTONICSLAB

SHED 9

SOUTHAQUA

GREENHOUSEH5, H6

SHED 14 SHEDS

14A to 14H

F IRE POND

SEWERT REAT MENT

LITLILITTWTWTWTWWWWTWTWWWWW

YWTTTWTWTWWWWWTWWW//W/W////WWWWWWWWTYTYTYTW

YYYTYTYWWWWWW

U

P

LAB II

SCALE FEET

0 400 800

FIGURE 9.1.5

ADOPTED MARCH 15, 2012

Page 6: Final GOP element 9 031512 WORKING FILE figures 9.1.1-9.4.10 · 2014. 3. 10. · ffe=10.86 o op a lab ii legend: schenkelshultz a r c h i t e c t u r e north comprehensive master

CLAMHATCHERIES

FEED

SHOP 7SOUTHAQUA

GREENHOUSE

H2, H3, H4A.C.T.E.D.ADMINISTRATION

BLDG.

SEA DIVERHOUSE

BIOPHOTONICSLAB

SHED 9

SOUTHAQUA

GREENHOUSEH5, H6

SHED 14 SHEDS

14A to 14HS

T

LEGEND:

SCHENKELSHULTZA R C H I T E C T U R E

NORTH

COMPREHENSIVE MASTER PLAN

SUPPORTING DOCUMENTS

FINAL DRAFT: NOVEMBER 6, 2009

SOURCE:

FIGURE 9.2.2

AQUACULTURE

SCALE FEET

0 225 450

ADOPTED MARCH 15, 2012

Page 7: Final GOP element 9 031512 WORKING FILE figures 9.1.1-9.4.10 · 2014. 3. 10. · ffe=10.86 o op a lab ii legend: schenkelshultz a r c h i t e c t u r e north comprehensive master

HBOI/FAU MARINESCIENCE

PARTNERSHIP

POST DOCTORATEHOUSING DUPLEX

POST DOCTORATEHOUSING 6 PLEX

LINK ENGINEERINGBUILDING AND HIGH BAY

UTILITY BLDG/WTP BARROWS MARINE

OPERATIONS BLDG

DTAWEST

DTAEAST

FIRE POND

VISIT ORCENTER

F FE=24.14

CA

NOP

Y

T WO STORYLINK ENGINEERING BUILDING

F FE=10.86

/ITWWWWWWWWWWWWTWWWTY///////////

LLIT GLDY B/WW/WWW////

YYYWTWWWWWTWWWWWWWWWW

LAB II

LEGEND:

SCHENKELSHULTZA R C H I T E C T U R E

NORTH

COMPREHENSIVE MASTER PLAN

SUPPORTING DOCUMENTS

FINAL DRAFT: NOVEMBER 6, 2009

SOURCE:

FIGURE 9.2.3

WEST CHANNEL

SCALE FEET

0 225 450

ADOPTED MARCH 15, 2012

Page 8: Final GOP element 9 031512 WORKING FILE figures 9.1.1-9.4.10 · 2014. 3. 10. · ffe=10.86 o op a lab ii legend: schenkelshultz a r c h i t e c t u r e north comprehensive master

JOHNSON EDUCATIONCENTER ANDCONFERENCE

BIOMEDICALMARINE

RESEARCHEAST

JOHNSON HOUSE

STORAGE SHED

POOL

NECROPSYLAB

JOHNSON HOUSEUTILITY BUILDING

LEGEND:

SCHENKELSHULTZA R C H I T E C T U R E

NORTH

COMPREHENSIVE MASTER PLAN

SUPPORTING DOCUMENTS

FINAL DRAFT: NOVEMBER 6, 2009

SOURCE:

FIGURE 9.2.4

EAST CHANNEL

SCALE FEET

0 225 450

ADOPTED MARCH 15, 2012

Page 9: Final GOP element 9 031512 WORKING FILE figures 9.1.1-9.4.10 · 2014. 3. 10. · ffe=10.86 o op a lab ii legend: schenkelshultz a r c h i t e c t u r e north comprehensive master

HURRICANESHELTER

HBOI/FAU MARINESCIENCE

PARTNERSHIP

SEWERTREATMENT

LEGEND:

SCHENKELSHULTZA R C H I T E C T U R E

NORTH

COMPREHENSIVE MASTER PLAN

SUPPORTING DOCUMENTS

FINAL DRAFT: NOVEMBER 6, 2009

SOURCE:

FIGURE 9.2.5

NORTH CAMPUS

SCALE FEET

0 225 450

ADOPTED MARCH 15, 2012

Page 10: Final GOP element 9 031512 WORKING FILE figures 9.1.1-9.4.10 · 2014. 3. 10. · ffe=10.86 o op a lab ii legend: schenkelshultz a r c h i t e c t u r e north comprehensive master

CLAMHATCHERIES

FEED

SHOP 7SOUTHAQUA

GREENHOUSE

H2, H3, H4A.C.T.E.D.ADMINISTRATION

BLDG.

SEA DIVERHOUSE

BIOPHOTONICSLAB

SHED 9

SOUTHAQUA

GREENHOUSEH5, H6

SHED 14 SHEDS

14A to 14H

LEGEND:

SCHENKELSHULTZA R C H I T E C T U R E

NORTH

COMPREHENSIVE MASTER PLAN

SUPPORTING DOCUMENTS

FINAL DRAFT: NOVEMBER 6, 2009

SOURCE:

FIGURE 9.3.1

AQUACULTURE

SCALE FEET

0 225 450

ADOPTED MARCH 15, 2012

Page 11: Final GOP element 9 031512 WORKING FILE figures 9.1.1-9.4.10 · 2014. 3. 10. · ffe=10.86 o op a lab ii legend: schenkelshultz a r c h i t e c t u r e north comprehensive master

HBOI/FAU MARINESCIENCE

PARTNERSHIP

POST DOCTORATEHOUSING DUPLEX

POST DOCTORATEHOUSING 6 PLEX

LINK ENGINEERINGBUILDING AND HIGH BAY

UTILITY BLDG/WTP BARROWS MARINE

OPERATIONS BLDG

DTAWEST

DTAEAST

FIRE POND

VISIT ORCENTER

F FE=24.14

CA

NOP

Y

T WO STORYLINK ENGINEERING BUILDING

F FE=10.86

/TY DGBLLITYTYY

LAB II

LEGEND:

SCHENKELSHULTZA R C H I T E C T U R E

NORTH

COMPREHENSIVE MASTER PLAN

SUPPORTING DOCUMENTS

FINAL DRAFT: NOVEMBER 6, 2009

SOURCE:

FIGURE 9.3.2

WEST CHANNEL

SCALE FEET

0 225 450

ADOPTED MARCH 15, 2012

Page 12: Final GOP element 9 031512 WORKING FILE figures 9.1.1-9.4.10 · 2014. 3. 10. · ffe=10.86 o op a lab ii legend: schenkelshultz a r c h i t e c t u r e north comprehensive master

JOHNSON EDUCATIONCENTER ANDCONFERENCE

BIOMEDICALMARINE

RESEARCHEAST

JOHNSON HOUSE

STORAGE SHED

POOL

NECROPSYLAB

JOHNSON HOUSEUTILITY BUILDING

LEGEND:

SCHENKELSHULTZA R C H I T E C T U R E

NORTH

COMPREHENSIVE MASTER PLAN

SUPPORTING DOCUMENTS

FINAL DRAFT: NOVEMBER 6, 2009

SOURCE:

FIGURE 9.3.3

EAST CHANNEL

SCALE FEET

0 225 450

ADOPTED MARCH 15, 2012

Page 13: Final GOP element 9 031512 WORKING FILE figures 9.1.1-9.4.10 · 2014. 3. 10. · ffe=10.86 o op a lab ii legend: schenkelshultz a r c h i t e c t u r e north comprehensive master

HURRICANESHELTER

HBOI/FAU MARINESCIENCE

PARTNERSHIP

SEWERTREATMENT

LEGEND:

SCHENKELSHULTZA R C H I T E C T U R E

NORTH

COMPREHENSIVE MASTER PLAN

SUPPORTING DOCUMENTS

FINAL DRAFT: NOVEMBER 6, 2009

SOURCE:

FIGURE 9.3.4

NORTH CAMPUS

SCALE FEET

0 225 450

ADOPTED MARCH 15, 2012

Page 14: Final GOP element 9 031512 WORKING FILE figures 9.1.1-9.4.10 · 2014. 3. 10. · ffe=10.86 o op a lab ii legend: schenkelshultz a r c h i t e c t u r e north comprehensive master

CLAMHATCHERIES

FEED

SHOP 7SOUTHAQUA

GREENHOUSE

H2, H3, H4A.C.T.E.D.ADMINISTRATION

BLDG.

SEA DIVERHOUSE

BIOPHOTONICSLAB

SHED 9

SOUTHAQUA

GREENHOUSEH5, H6

SHED 14 SHEDS

14A to 14H

L S

L S

RA

PH

LEGEND:

SCHENKELSHULTZA R C H I T E C T U R E

NORTH

COMPREHENSIVE MASTER PLAN

SUPPORTING DOCUMENTS

FINAL DRAFT: NOVEMBER 6, 2009

SOURCE:

FIGURE 9.4.1

AQUACULTURE

SCALE FEET

0 225 450

ADOPTED MARCH 15, 2012

Page 15: Final GOP element 9 031512 WORKING FILE figures 9.1.1-9.4.10 · 2014. 3. 10. · ffe=10.86 o op a lab ii legend: schenkelshultz a r c h i t e c t u r e north comprehensive master

HBOI/FAU MARINESCIENCE

PARTNERSHIP

POST DOCTORATEHOUSING DUPLEX

POST DOCTORATEHOUSING 6 PLEX

LINK ENGINEERINGBUILDING AND HIGH BAY

UTILITY BLDG/WTP BARROWS MARINE

OPERATIONS BLDG

DTAWEST

DTAEAST

FIRE POND

VISIT ORCENTER

F FE=24.14

CA

NOP

Y

T WO STORYLINK ENGINEERING BUILDING

F FE=10.86L S

L S

L S

LS

LS

LS

/WITWWWWWWWWWWWWTWWWTY///////////

L S

YYWTWWWWWTWWWWWWWWWW

UU

LAB II

LEGEND:

SCHENKELSHULTZA R C H I T E C T U R E

NORTH

COMPREHENSIVE MASTER PLAN

SUPPORTING DOCUMENTS

FINAL DRAFT: NOVEMBER 6, 2009

SOURCE:

FIGURE 9.4.2

WEST CHANNEL

SCALE FEET

0 225 450

ADOPTED MARCH 15, 2012

Page 16: Final GOP element 9 031512 WORKING FILE figures 9.1.1-9.4.10 · 2014. 3. 10. · ffe=10.86 o op a lab ii legend: schenkelshultz a r c h i t e c t u r e north comprehensive master

JOHNSON EDUCATIONCENTER ANDCONFERENCE

BIOMEDICALMARINE

RESEARCHEAST

JOHNSON HOUSE

STORAGE SHED

POOL

NECROPSYLAB

JOHNSON HOUSEUTILITY BUILDING

L S

LS

L S

L S

LS

BUIOU

LS

LS

LEGEND:

SCHENKELSHULTZA R C H I T E C T U R E

NORTH

COMPREHENSIVE MASTER PLAN

SUPPORTING DOCUMENTS

FINAL DRAFT: NOVEMBER 6, 2009

SOURCE:

FIGURE 9.4.3

EAST CHANNEL

SCALE FEET

0 225 450

ADOPTED MARCH 15, 2012

Page 17: Final GOP element 9 031512 WORKING FILE figures 9.1.1-9.4.10 · 2014. 3. 10. · ffe=10.86 o op a lab ii legend: schenkelshultz a r c h i t e c t u r e north comprehensive master

HURRICANESHELTER

HBOI/FAU MARINESCIENCE

PARTNERSHIP

SEWERTREATMENT

LS

LS

L S

LEGEND:

SCHENKELSHULTZA R C H I T E C T U R E

NORTH

COMPREHENSIVE MASTER PLAN

SUPPORTING DOCUMENTS

FINAL DRAFT: NOVEMBER 6, 2009

SOURCE:

FIGURE 9.4.4

NORTH CAMPUS

SCALE FEET

0 225 450

ADOPTED MARCH 15, 2012

Page 18: Final GOP element 9 031512 WORKING FILE figures 9.1.1-9.4.10 · 2014. 3. 10. · ffe=10.86 o op a lab ii legend: schenkelshultz a r c h i t e c t u r e north comprehensive master

POST DOC LS #1DUPLEXBARNES

FLOW 65 GPM2HP 1Ø 240V MOTOR

GENERATOR RECEPTACLE6' DIAMETER CONCRETE

WETWELLFAIR CONDITION

TOP SLAB EL.= 29.17'TOP PUMP EL.= 22.42'INV. EL.= 25.00' (E) 8"

LS #14, CRYOGENIC BUILDINGDUPLEX

ABS C4331FLOW - 47 GPM

2HP 1Ø 230V MOTORGENERATOR RECEPTACLE4' DIAMETER FIBERGLASS

WETWELLGOOD CONDITION

TOP SLAB EL.= 15.65'TOP PUMP EL.= 9.65'INV. EL.= UNKNOWN

LS #13, MARINE SCIENCEBUILDINGDUPLEX

BARNES MODEL SGV3FLOW - 35 GPM

2HP 3Ø 208V MOTORGENERATOR RECEPTACLE

4' DIAMETER CONCRETEWETWELL

GOOD CONDITIONTOP SLAB EL.= 14.91'TOP PUMP EL.= 3.41'INV. EL.= 6.91' (E) 8"

LS #9, AQUACULTUREDUPLEX

ABSFLOW - 30 GPM

2HP 3Ø 208V MOTORGENERATOR RECEPTACLE

4' DIAMETER FIBERGLASS WETWELLGOOD CONDITION

TOP SLAB EL.= 4.80'TOP PUMP EL.= -5.41'

INV. EL.= (-)3.41' (N) 10"

LS #6, PUMP HOUSEDUPLEX

BARNES 4SE2894LFLOW - 137 GPM

3HP 3Ø 230V MOTORNO GENERATOR RECEPTACLE

4'X10'CONCRETE WETWELL

POOR CONDITIONTOP SLAB EL.= 7.93'

TOP PUMP EL.= -0.65'INV. EL.= 2.68' (N) 2-4"INV. EL.= 3.93' (E) 4"INV. EL.= 4.53' (E) 2"

INV. EL.= 1.35' (SW) 6"

LS #5, SCIENCE LABDUPLEX

ENPO/CORNELLFLOW - 168 GPM

5HP 3Ø 208V MOTORGENERATOR RECEPTACLE

4'X10'CONCRETE WETWELL

POOR CONDITIONTOP SLAB EL.= 6.69'

TOP PUMP EL.= -1.98'INV. EL.= 3.60' (S) 4"INV. EL.= 0.00' (S) 4"INV. EL.= 3.60' (W) 4"INV. EL.= 0.00' (E) 2"

LS #3, ENGINEERINGDUPLEX DRYWELL

CRANE/DEMINGFLOW - 135 GPM

MODEL 71635HP 3Ø 208V MOTOR

BACK-UP POWER PROVIDED4'X6'

CONCRETE WETWELLFAIR CONDITION

TOP SLAB EL.= 10.91'TOP PUMP EL.= 2.41'INV. EL.= 4.41' (W) 8"INV. EL.= 8.91' (S) 8"

LS #4, DOCKSIDEDUPLEX

PEABODY/BARNESFLOW - UNKNOWN

1HP 3Ø 460V MOTORGENERATOR RECEPTACLE

4' DIAMETERCONCRETE WETWELL

FAIR CONDITIONTOP SLAB EL.= 6.58'TOP PUMP EL.=0.58'

INV. EL.= UNKNOWN (S) 4"

NEW VISITORS CENTERLIFT STATION

ELIMINATE SEPTIC TANKAND DRAIN FIELD

GRAVITY SEWER TO SMALL BOATS MARINA

(700'±)ELIMINATE SEPTIC TANK,

DRAINFIELD AND EXISTINGPACKAGE LIFT STATION

PHASE 1

PHASE 2

NEW LIFT STATIONWITH GENERATOR

FROM NEW BLDG.

PHASE 3

PHASE 4

CONNECT TO EXISTINGGRAVITY SEWER

LS #2, B.M.R.DUPLEX

ABS MODEL AF22-4-4FLOW - 24 GPM

3HP 3Ø 230V MOTORGENERATOR RECEPTACLE

6' DIAMETERCONCRETE WETWELL

FAIR CONDITIONTOP SLAB EL.= 7.03'

TOP PUMP EL.= -1.10'INV. EL.= 3.20' (N) 4"

INV. EL.= UNKNOWN (W) 4" (CAPPED)INV. EL.= 0.91' (E) 4" (CAPPED)

LS #8 JOHNSON HOUSEDUPLEX

BARNES MODEL SGV3FLOW UNKNOWN

2HP 3Ø 208V MOTORGENERATOR RECEPTACLE3' DIAMETER FIBERGLASS

WETWELLGOOD CONDITIONPOOR LOCATION

TOP SLAB EL.= 7.75TOP PUMP EL.= 1.75'

INV. EL.= 2.90 (E)INV. EL. = 2.90 (W)

6" PVC FM

6" PVC FM

RELOCATE LIFT STATION 7AND CONSTRUCT NEW GRAVITY

SEWER

REFURBISH LIFT STATION 5BY:

CLEAN AND COAT WET WELLNEW COVER

NEW ELECTRICAL PANEL3Ø 230V MOTOR

NEW ELECTRICAL PANEL AND MOTOR

NEW ELECTRICAL PANEL AND MOTOR

NEW ELECTRICAL PANEL AND MOTOR

NEW ELECTRICAL PANEL AND MOTOR

NEW ELECTRICAL PANEL AND MOTOR

CLEAN, COAT WET WELLNEW COVER

LEGEND:

SCHENKELSHULTZA R C H I T E C T U R E

NORTH

COMPREHENSIVE MASTER PLAN

SUPPORTING DOCUMENTS

FINAL DRAFT: NOVEMBER 6, 2009

SOURCE:

FIGURE 9.4.10