Final Demonstration Team 2A The Charles Machine Works Downhole Generator Project.
-
Upload
gwendolyn-rodgers -
Category
Documents
-
view
215 -
download
0
Transcript of Final Demonstration Team 2A The Charles Machine Works Downhole Generator Project.
![Page 1: Final Demonstration Team 2A The Charles Machine Works Downhole Generator Project.](https://reader036.fdocuments.in/reader036/viewer/2022072017/56649f0c5503460f94c1f823/html5/thumbnails/1.jpg)
Final DemonstrationFinal Demonstration
Team 2ATeam 2A
The Charles Machine WorksThe Charles Machine Works
Downhole Generator ProjectDownhole Generator Project
![Page 2: Final Demonstration Team 2A The Charles Machine Works Downhole Generator Project.](https://reader036.fdocuments.in/reader036/viewer/2022072017/56649f0c5503460f94c1f823/html5/thumbnails/2.jpg)
RequirementsRequirements
750 mW minimum power output at 750 mW minimum power output at 800rpm800rpm
1.2 V minimum output at 800rpm1.2 V minimum output at 800rpm 10 minutes of power with no rotation10 minutes of power with no rotation
![Page 3: Final Demonstration Team 2A The Charles Machine Works Downhole Generator Project.](https://reader036.fdocuments.in/reader036/viewer/2022072017/56649f0c5503460f94c1f823/html5/thumbnails/3.jpg)
Block DiagramBlock Diagram
![Page 4: Final Demonstration Team 2A The Charles Machine Works Downhole Generator Project.](https://reader036.fdocuments.in/reader036/viewer/2022072017/56649f0c5503460f94c1f823/html5/thumbnails/4.jpg)
Design – MechanicalDesign – Mechanical
8-motor configuration8-motor configuration Aluminum mounting bracketsAluminum mounting brackets Rubber wheels for contact with shaftRubber wheels for contact with shaft Epoxy mountingEpoxy mounting
![Page 5: Final Demonstration Team 2A The Charles Machine Works Downhole Generator Project.](https://reader036.fdocuments.in/reader036/viewer/2022072017/56649f0c5503460f94c1f823/html5/thumbnails/5.jpg)
Design - ElectricalDesign - Electrical
Power Management CircuitPower Management Circuit Battery ChargingBattery Charging NiCd BatteriesNiCd Batteries
![Page 6: Final Demonstration Team 2A The Charles Machine Works Downhole Generator Project.](https://reader036.fdocuments.in/reader036/viewer/2022072017/56649f0c5503460f94c1f823/html5/thumbnails/6.jpg)
LogisticsLogistics
Schedule:Schedule:– 16 Weeks16 Weeks– 4 Milestones4 Milestones
PDR – Present design ideasPDR – Present design ideas CDR – Review designCDR – Review design DDD – Design Description DocumentDDD – Design Description Document Demo – Display projectDemo – Display project
![Page 7: Final Demonstration Team 2A The Charles Machine Works Downhole Generator Project.](https://reader036.fdocuments.in/reader036/viewer/2022072017/56649f0c5503460f94c1f823/html5/thumbnails/7.jpg)
BudgetBudget
Parts cost: Parts cost: – Total parts cost:Total parts cost: $230 $230
Labor cost:Labor cost:– Total hours:Total hours: 543 hrs543 hrs– Effective cost:Effective cost: $44.00 per hr$44.00 per hr– Labor cost:Labor cost: $23,892$23,892
Total budget:Total budget: $24,122$24,122
![Page 8: Final Demonstration Team 2A The Charles Machine Works Downhole Generator Project.](https://reader036.fdocuments.in/reader036/viewer/2022072017/56649f0c5503460f94c1f823/html5/thumbnails/8.jpg)
Budget Cost Vs. Actual Cost
0
5000
10000
15000
20000
25000
30000
1
Do
llars Budget Cost
Actual Cost
![Page 9: Final Demonstration Team 2A The Charles Machine Works Downhole Generator Project.](https://reader036.fdocuments.in/reader036/viewer/2022072017/56649f0c5503460f94c1f823/html5/thumbnails/9.jpg)
RecommendationsRecommendations