FINAL CONSTRUCTION REPORT ROUTING AND DISTRIBUTION SHEET Project Name: Arpt Way PM - Stage II, NR Signal Interconnect
Arpt/Peger, NR Pedestrian Improvements Project Number:
0610(007)/63278,0002(334)/60520&0002(286)/62489
I. ROUTING Initials/Date A. Project Engineer to Concurrent Review .. _____/______ B. Concurrent Review to Project Manager .. _____/______ C. Project Manager to Quality Assurance Engineer _____/______ D. QA Engineer to QA Concurrent Review for Distribution (email notification to Proj Eng & Proj Mgr) _____/______ E. To Contractor: (CERTIFIED MAIL - RETURN RECEIPT REQUESTED) _____/______ 1. Originals of: Certificate of Final Estimate (25D-116) & Contractor's Release (25D-117*) 2. Copy of Summary of Quantities & Previous Payments. (25D-025) F. When returned from Contractor: 1. To QA Concurrent Review for verification of Contractor Signature Compliance _____/______ G. Final Acceptance Letter: to Regional Construction Engineer for initials & then Director’s Office for signature _____/______ II. IMMEDIATE DISTRIBUTION (AFTER CONST. CHIEF'S SIGNATURE) A. ORIGINALS: Originals - (Make cc's to keep in Final Packet).� 1. Contractor: Send Original Final Acceptance Letter (usually done by Director’s Secretary) ���� 2. Finance:� a. Final Estimate Review Report (25D-031) ���� b. Certification of Final Estimate (25D-116) ���� c. All Summary of Quantities Sheets (25D-025) ���� d. Contractor's Release (25D-117*) ���� e. Completion Report Cover Sheet ���� 3. Right-of-Way: a. Proof of Const. R.O.W. (25D-173) ONLY IF APPLICABLE ���� b. Proof of Use Material. Source (25D-174) ONLY IF APPLICABLE ���� c. Materials Site Records and Drawings ONLY IF APPLICABLE ���� III. ELECTRONIC DISTRIBUTION A. Final Scanned into Computer & saved in Adobe Acrobat format (as PDF) _____/______ B. Final PDF placed on servers: 1. Local Server: (Fileshare on 'Fai_dot1'/Current Final Packets) : _____/______
2. FTP site: http://www.dot.state.ak.us/nreg/Construction_Finals_PDF/ C. E-Mail sent to “Distribution List” informing them of new final being placed on server _____/______
i ORIGINAL Final Assembly Packet forwarded to Contracts Section. _____/______ i COPY w/Regional Files to QA for archiving OR Electronic file uploaded to project by SiteManger Administrator_____/______
DISTRIBUTION LIST
1.Project Control, Fbks Shelley Dykema:([email protected]) Final Acceptance Letter & Final FAA Construction Report�
8.H.Q. Finance, Fed Aid Sect., Anch Mona Lisa Denia :([email protected]) (Fed Project only) Final Acceptance Letter
2.Contracts, Fbks Barbara Tanner:([email protected]) Final Acceptance Letter & Final FAA Construction Report
9.FHWA, Juneau: Michael Cain ([email protected]) Complete Final Packet
3.Planning, Fbks Judy Chapman ([email protected]) Final Estimate Review Report (25D-031) & Project History
10.Bridge Design, Juneau Richard Pratt ([email protected]) Complete Final Packet
4.Finance, Fbks Edward Deal:([email protected]) Final Acceptance Letter
11.Dept. of Labor, Andrea Quintyne ([email protected]) � Final Acceptance Letter
5.E&O, Juneau Roger Healy:([email protected]) Final Acceptance Letter & Final FAA Construction Report�
12.Statewide Materials, Anch Michael San Angelo: ([email protected])
6.Civil Rights Office, Anch. Dennis Good:([email protected]) Final Acceptance Letter, Summary of Disadvantaged Business Enterprise (25A-335), & DBE Adjustments Worksheet, if applicable)�
13. Environmental, Fbks Brett Nelson ([email protected])
7.Regional Pre-Const. Engineer, Fbks Ryan Anderson ([email protected])
14. Regional SiteManager Administrator: Jaclyn Elmes ([email protected])
LS 4/25/17
Project Number Contractor
Project NameDescription of Work
Required Project Completion Date / Calendar DaysDate Contract Time Stopped / Calendar DaysProject Manager Project EngineerDays Overrun Liquidated Damages Assessed n/aFinal Amount Bid AmountMaterials Certification Date Federal Document Date 6/9/2016Dept of Labor (W&H) Clearance Date Right of Way Clearance Date 2/17/2017Dept of Labor (Tax) Clearance Date Dept of Revenue Clearance Date 2/17/2017
**************************************************CLASSIFICATION OF COSTS -- FINAL PROJECT AMOUNTS
Total Activity Phase$99,850.00 153P TC4000
$3,157,100.32 153P TC4000$5,041,715.20 153P TC4000
$86,500.00 173P TC4000
Total $8,385,165.52
Remarks:
Z605200000
I certify that my review of this project, in accordance with State policy, indicates that all work has been completed within the terms on the contract and authorized change documents; and it also indicates that State and Federal Aid funds have been properly classified unless otherwise noted above.
Funding Source Code Z632780000Liquidated Damages
Signature of Reviewer Date Submitted
0610(007)/Z63278000, 0002(334)/Z605200000, 0002(286)/Z624890000
Program
Brian Herning, PE
$8,240,476.20
Road. Work includes replacing signs and fencing and upgrades to signalized intersections. Project 60520 consists of improving
Funding Source CodeFunding Source Code
Z624890000
4/11/20172/17/2017
Project 63278 consists of resurfacing Airport Way and adjoining frontage roads from Peger Road to Hoselton
Z632780000
Airport Way Preventative Maintenance - Stage II, Northern Region Signal Interconnect - Airport Way/Peger Road & Northern Region Pedestrian Improvements
Funding Source Code
Travis Donovan
$8,385,165.5212/5/2016
n/a
consists of removing existing crosswalk lines and installing with inlaid methyl methacrylate crosswalk lines at multiple intersections. Arectangular flashing beacon system will be installed at the intersection of the frontage road along Airport Way and Cowles Street.
STATE OF ALASKA
AND PUBLIC FACILITIES
Northern RegionFINAL ESTIMATE REVIEW REPORT
6/8/2016
DEPARTMENT OF TRANSPORTATION
HC Contractors
6/8/2016
connectivity and upgrading the communication bandwidth between traffic signals located on Airport Way and Peger Road. Project 62489
25D-031 (NR - 4/08)
4/25/2017
FAA & FHWA PROJECT CLOSEOUT PACKAGE CHECKLISTProject Manager: Brian Herning Project Number: Project Engineer: Travis Donovan
Contractor: HC Contractors
Ref No. Initial when complete
FAA & FHWA1 Auto Completed LS2 TAD Final Estimate, Estimate Summary by Funding Report, Contract Funding Final Report DO NOT 3-HOLE PUNCH THIS FORM LS3 Auto Completed Contractor’s Release w / Certificate (2 sided) (25D-117) DO NOT 3-HOLE PUNCH THIS FORM LS4 N/A For projects with Bid Escrow 103-1.11 prepare a letter releasing documents. Not to be sent until #3 comes back. N/A5 Auto Completed Final Construction Report Summary Sheet w/copy of Project Completion Letter attached & 670 MMA Manufacturer Warranty (if applicable) LS6 TAD Explanation of Over / Under-run (major pay items (≥5% original contract; varying more than 25%) / Summary of Change Documents LS7 TAD Copy of email (only) to QA Engineer transmitting two before and after photos LS8 TAD DBE Clearance from Contract Compliance Officer LS9 Auto Completed Project Materials Certification LS10 N/A Memo of Exception (if required) LS
Tax Clearance for Contract Closure 11 TAD 1. Dept. of Revenue, Income & Excise Audit Compliance Division / email: [email protected] LS TAD 2. Dept of Labor: Fbks Field Tax Office (Nor. Region Contractors) / email: [email protected] LS
Anch Field Tax Office (Central Region Contractors) / email: [email protected] Field Tax Office (Contractors: Glenn Hwy South, Valdez & Cordova) / email: [email protected]
Juneau Field Tax Office (Other Contractors) / Email: [email protected], phone 465-59003. Dept. of Labor (Wage & Hour) Approved Notice of Completion Form from Contractor LSOther Deliverables
12 As-Built Drawings (Electrical As-Builts if applicable) Submit to Concurrent Review Engineer for review and transmittal to Contracts. LS13 TAD ROW Clearance Forms: Proof of Use of ROW 25D-173 & Materials/Encroachment Cert. 25D-174 LS
Copy of Email from DNR transmitting Material Sales Contractor clearance / email: [email protected] N/A14 TAD Land Survey Monument Record (Transmittal Letter to Dave Ciampa, ROW) LS15 N/A Permit Clearance Forms: 1. Copy of COE NWP Permit 'Enclosure' (included in your contract appendix if applicable) N/A
N/A 2. Contractor's & DOT's N.O.T. and Acknowlegement letter from ADEC N/AN/A 3. N.O.V. proof of payment if any (copy of Email from Stormwater Engineer transmitting SWPPP clearance) N/A
16 TAD Catalog Cuts (Transmittal Letter to M&O Northern Region or M&O Nome), if applicable. LSFHWA
17 Auto Completed FHWA 1446C Form (Regional Construction Engineer Signature for Director) LS18 Auto Completed Project History for FHWA projects and printout of the Lessons Learned from the database LS19 N/A Alaska Railroad Release (only for projects in railroad right-of-way) Release Letter by Certified Mail N/A20 N/A Copy of Piledriving Logs to: (if applicable) N/A N/A 1. Bridge Design, Juneau and 2. Foundation Engineer, Statewide Materials
FAA21 N/A Sponsor Certification for Construction Project Final Acceptance22 N/A 5010 Transmittal Letter to Aviation Design Group Chief 23 N/A Compilation of Bids24 N/A Project Subcontract Summary (From Contract Compliance Officer)25 N/A Project History for FAA projects and printout from Lessons Learned database
Ref No.
1/13/2016
Completed By Project Engineer
Certification of Final Estimate (25D-116)
0610(007)/63278,0002(334)/60520&0002(286)/62489
Arpt Way PM - Stage II, NR Signal Interconnect Arpt/Peger, NR Pedestrian Improvements
DO NOT 3-HOLE PUNCH THIS FORM
Approved by QA (Initials)Project Name:
EXPLANATION OF POSSIBLE DELAYS
1 I:\Construction Forms\Final Package Forms\00Closeure Checklist.xls Rev. 1/15/14 JA
Region:Progress Estimate Recapitulation
Estimate Number: 0016
For Period: Thru:
Project Name:
Airport Way PM ‐ Stg II, NR Signal Intercon, & NR Ped ImprAmended Contract Amount:
$9,127,970.10
Original Contract Amount:
$8,240,476.20
Project Number/Program Code Phase/Activity Code Amount Earned This Estimate
12/01/ 2016 03/13/2017
FA Code
Northern
0610(007)/Z632780000 TC4000 / 153P $25,481.1006‐4R (63278)0610(007)/Z632780000 TC4000 / 173P $0.0017 (CF) (63278)0610(007)/Z632780000 TC4000 / 153P $0.0042 (63278)0002(334)/Z605200000 TC4000 / 153P $4,240.0043 (60520)0002(286)/Z624890000 TC4000 / 153P $0.0028 (62489)
TC4000 / 153P $0.0028 (62489)
Page 1 of 2
Ln Itm
Progress Estimate - Original
Estimate No: For Period: Thru:
Project No: Address:
Contractor:
Project:
Original Contract/Participating
Item No Description Unit Qty Amount Qty Amount Qty Amount Qty AmountUnit Price
Plan Previous This Estimate Totals to Date
0002(334)/60520
HC Contractors, Inc.
PO Box 80688
Fairbanks AK
Northern Region Signal Interconnect ‐ Airport Way/Peger Road 0016 12/01/ 2016 03/13/2017
Supl DescFAPrj No
Region: Northern
101 1 ,984 .500 .001 ,984 .501 ,998 .00S Y $49 ,950 .00 $49 ,612 .50 $0 .00 $49 ,612 .50202(002 )
R e m o v a l o f P a v e m e n t $25 .00
60520
43 (60520 )
102 114 .900 .00114 .90141 .00S Y $9 ,870 .00 $8 ,043 .00 $0 .00 $8 ,043 .00202(003 )
R e m o v a l o f S id e w a lk $70 .00
60520
43 (60520 )
103 243 .800 .00243 .80399 .00L F $9 ,975 .00 $6 ,095 .00 $0 .00 $6 ,095 .00202(009 )
R e m o v a l o f C u rb a n d G u tte r
$25 .00
60520
43 (60520 )
104 0 .000 .000 .000 .00T O N $0 .00 $0 .00 $0 .00 $0 .00301(001D )
A gg r e g a t e B a s e C o u rs e , G ra d in g D -1
$60 .00D e le te d C O #0460520
43 (60520 )
105 0 .000 .000 .000 .00S Y $0 .00 $0 .00 $0 .00 $0 .00401(006 E )
H M A , T yp e II; C la s s B $45 .00D e le te d C O #0460520
43 (60520 )
106 64 .008 .0056 .0083 .00L F $2 ,490 .00 $1 ,680 .00 $240 .00 $1 ,920 .00607(004 )
R e c o n s tru c te d F e n c e $30 .00
60520
43 (60520 )
107 123 .500 .00123 .50141 .00S Y $8 ,460 .00 $7 ,410 .00 $0 .00 $7 ,410 .00608(001 a )
C o n c re t e S id e w a lk , 4 in c h e s th ic k
$60 .00
60520
43 (60520 )
108 0 .000 .000 .001 .00E A C H $1 ,500 .00 $0 .00 $0 .00 $0 .00608(006 )
C u rb R a m p $1 ,500 .00
60520
43 (60520 )
109 243 .800 .00243 .80389 .00L F $15 ,560 .00 $9 ,752 .00 $0 .00 $9 ,752 .00609(002A )
C u rb a n d G u tte r , T yp e 1 $40 .00
60520
43 (60520 )
110 1 .180 .001 .180 .32A C R E $1 ,280 .00 $4 ,728 .00 $0 .00 $4 ,728 .00618(001 )
S e e d in g $4 ,000 .00 60520
43 (60520 )
111 100%0%100%100%L S $527 ,000 .00 $527 ,000 .00 $0 .00 $527 ,000 .00640(001 )
M o b i l iz a t ion a n d D e m o b il iz a t io n
$527 ,000 .00
60520
43 (60520 )
112 100%0%100%100%L S $2 ,000 .00 $2 ,000 .00 $0 .00 $2 ,000 .00641(108 )
P o l lu t io n C o n tro l $2 ,000 .00
60520
43 (60520 )
113 100%0%100%100%L S $12 ,000 .00 $12 ,000 .00 $0 .00 $12 ,000 .00642(001 )
C o ns tru c t io n S u rv e y in g $12 ,000 .00
60520
43 (60520 )
114 0 .000 .000 .0035 .00H R $12 ,950 .00 $0 .00 $0 .00 $0 .00642(003 )
T h re e P e rs o n S u rv e y P a r ty
$370 .00
60520
43 (60520 )
115 100%0%100%100%L S $70 ,000 .00 $70 ,000 .00 $0 .00 $70 ,000 .00643(002 )
T ra ff ic M a in te n a n c e $70 ,000 .00
60520
43 (60520 )
116 0%0%0%0%L S $0 .00 $0 .00 $0 .00 $0 .00643(003 )
P e rm a n e n t C o n s tru c t io n S ig ns
$4 ,000 .00D e le te d C O #0560520
43 (60520 )
117 0 .004 ,000 .00-4 ,000 .000 .00C S UM
$0 .00 ($4 ,000 .00 ) $4 ,000 .00 $0 .00643(023 )
T ra ff ic P r ic e A d ju s tm e n t $1 .00
60520
43 (60520 )
Page 1 of 6
Ln Itm
Progress Estimate - Original
Estimate No: For Period: Thru:
Project No: Address:
Contractor:
Project:
Original Contract/Participating
Item No Description Unit Qty Amount Qty Amount Qty Amount Qty AmountUnit Price
Plan Previous This Estimate Totals to Date
0002(334)/60520
HC Contractors, Inc.
PO Box 80688
Fairbanks AK
Northern Region Signal Interconnect ‐ Airport Way/Peger Road 0016 12/01/ 2016 03/13/2017
Supl DescFAPrj No
Region: Northern
118 16 ,036 .920 .0016 ,036 .9254 ,000 .00C S UM
$54 ,000 .00 $16 ,036 .92 $0 .00 $16 ,036 .92643(025 )
T ra ff ic C on tro l $1 .00
60520
43 (60520 )
119 100%0%100%100%L S $2 ,000 .00 $2 ,000 .00 $0 .00 $2 ,000 .00643(117 )
P ub l ic In fo rm a t io n $2 ,000 .00
60520
43 (60520 )
120 100%0%100%100%L S $14 ,000 .00 $14 ,000 .00 $0 .00 $14 ,000 .00660(001A )
T ra ff ic S ign a l S ys te m C o m p le te , _ _ _ _ _ _ _
$14 ,000 .00A irp o rt/S p o rts m a n W a y
60520
43 (60520 )
121 100%0%100%100%L S $32 ,000 .00 $32 ,000 .00 $0 .00 $32 ,000 .00660(001B )
T ra ff ic S ign a l S ys te m C o m p le te , _ _ _ _ _ _ _
$32 ,000 .00A irp o rt/U n iv e rs ity60520
43 (60520 )
122 100%0%100%100%L S $13 ,000 .00 $13 ,000 .00 $0 .00 $13 ,000 .00660(001 C )
T ra ff ic S ign a l S ys te m C o m p le te , _ _ _ _ _ _ _
$13 ,000 .00A irp o rt/W a s h in g to n60520
43 (60520 )
123 100%0%100%100%L S $6 ,000 .00 $6 ,000 .00 $0 .00 $6 ,000 .00660(001D )
T ra ff ic S ign a l S ys te m C o m p le te , _ _ _ _ _ _ _
$6 ,000 .00A irp o rt/M a rk e t60520
43 (60520 )
124 100%0%100%100%L S $25 ,000 .00 $25 ,000 .00 $0 .00 $25 ,000 .00660(001 E )
T ra ff ic S ign a l S ys te m C o m p le te , _ _ _ _ _ _ _
$25 ,000 .00A irp o rt/P e g e r60520
43 (60520 )
125 100%0%100%100%L S $18 ,000 .00 $18 ,000 .00 $0 .00 $18 ,000 .00660(001 F )
T ra ff ic S ign a l S ys te m C o m p le te , _ _ _ _ _ _ _
$18 ,000 .00A irp o rt/W i lb u r60520
43 (60520 )
126 100%0%100%100%L S $2 ,000 .00 $2 ,000 .00 $0 .00 $2 ,000 .00660(001 G )
T ra ff ic S ign a l S ys te m C o m p le te , _ _ _ _ _ _ _
$2 ,000 .00A irp o rt/L a th ro p60520
43 (60520 )
127 100%0%100%100%L S $25 ,000 .00 $25 ,000 .00 $0 .00 $25 ,000 .00660(001H )
T ra ff ic S ign a l S ys te m C o m p le te , _ _ _ _ _ _ _
$25 ,000 .00A irp o rt/C o w le s60520
43 (60520 )
128 100%0%100%100%L S $25 ,000 .00 $25 ,000 .00 $0 .00 $25 ,000 .00660(001 I)
T ra ff ic S ign a l S ys te m C o m p le te , _ _ _ _ _ _ _
$25 ,000 .00A irp o rt/B a rn e tt e60520
43 (60520 )
129 100%0%100%100%L S $37 ,000 .00 $37 ,000 .00 $0 .00 $37 ,000 .00660(001J )
T ra ff ic S ign a l S ys te m C o m p le te , _ _ _ _ _ _ _
$37 ,000 .00A irp o rt/C u s h m a n60520
43 (60520 )
130 100%0%100%100%L S $13 ,000 .00 $13 ,000 .00 $0 .00 $13 ,000 .00660(001K )
T ra ff ic S ign a l S ys te m C o m p le te , _ _ _ _ _ _ _
$13 ,000 .00A irp o rt/N o b le60520
43 (60520 )
131 100%0%100%100%L S $18 ,000 .00 $18 ,000 .00 $0 .00 $18 ,000 .00660(001L )
T ra ff ic S ign a l S ys te m C o m p le te , _ _ _ _ _ _ _
$18 ,000 .00A irp o rt/S te e s e60520
43 (60520 )
132 100%0%100%100%L S $18 ,000 .00 $18 ,000 .00 $0 .00 $18 ,000 .00660(001M )
T ra ff ic S ign a l S ys te m C o m p le te , _ _ _ _ _ _ _
$18 ,000 .00P e g e r/D a v is60520
43 (60520 )
133 14 ,221 .680 .0014 ,221 .6814 ,512 .00L F $362 ,800 .00 $355 ,542 .00 $0 .00 $355 ,542 .00662(109A )
F ib e r O p tic In te rc o n n e c t ,E x is t in g C o nd u it
$25 .00
60520
43 (60520 )
134 8 ,441 .790 .008 ,441 .797 ,934 .00L F $396 ,700 .00 $422 ,089 .50 $0 .00 $422 ,089 .50662(109B )
F ib e r O p tic In te rc o n n e c t , N e w C o n d u it
$50 .00
60520
43 (60520 )
Page 2 of 6
Ln Itm
Progress Estimate - Original
Estimate No: For Period: Thru:
Project No: Address:
Contractor:
Project:
Original Contract/Participating
Item No Description Unit Qty Amount Qty Amount Qty Amount Qty AmountUnit Price
Plan Previous This Estimate Totals to Date
0002(334)/60520
HC Contractors, Inc.
PO Box 80688
Fairbanks AK
Northern Region Signal Interconnect ‐ Airport Way/Peger Road 0016 12/01/ 2016 03/13/2017
Supl DescFAPrj No
Region: Northern
135 10 .000 .0010 .0010 .00E A C H $70 ,000 .00 $70 ,000 .00 $0 .00 $70 ,000 .00662(110A )
F ib e r O p tic V a u lt , T yp e 1 $7 ,000 .00
60520
43 (60520 )
136 13 .000 .0013 .0013 .00E A C H $195 ,000 .00 $195 ,000 .00 $0 .00 $195 ,000 .00662(110B )
F ib e r O p tic V a u lt , T yp e 2 $15 ,000 .00
60520
43 (60520 )
137 43 .000 .0043 .0043 .00E A C H $25 ,800 .00 $25 ,800 .00 $0 .00 $25 ,800 .00662(111 )
R e m o v a l o f J u n c t io n B o x $600 .00
60520
43 (60520 )
138 11 .000 .0011 .0011 .00E A C H $110 ,000 .00 $110 ,000 .00 $0 .00 $110 ,000 .00662(112 )
F ib e r O p tic M a n h o le $10 ,000 .00
60520
43 (60520 )
139 100%0%100%100%L S $40 ,000 .00 $40 ,000 .00 $0 .00 $40 ,000 .00662(113 )
F ib e r O p tic T ra in in g $40 ,000 .00
60520
43 (60520 )
140 100%0%100%100%L S $42 ,000 .00 $42 ,000 .00 $0 .00 $42 ,000 .00670(108 )
M M A P a v e m e n t M a rk in g s In la id
$42 ,000 .00
60520
43 (60520 )
201 67 .500 .0067 .5067 .50S F $6 ,750 .00 $6 ,750 .00 $0 .00 $6 ,750 .00615(001 )
S ta n d a rd S ig n $100 .00
62489
28 (62489 )
202 1 .000 .001 .001 .00L B S $100 .00 $100 .00 $0 .00 $100 .00618(002 )
S e e d in g $100 .00
62489
28 (62489 )
203 100%0%100%100%L S $1 ,000 .00 $1 ,000 .00 $0 .00 $1 ,000 .00640(001 )
M o b i l iz a t ion a n d D e m o b il iz a t io n
$1 ,000 .00
62489
28 (62489 )
204 100%0%100%100%L S $1 ,000 .00 $1 ,000 .00 $0 .00 $1 ,000 .00641(108 )
P o l lu t io n C o n tro l $1 ,000 .00
62489
28 (62489 )
205 100%0%100%100%L S $2 ,000 .00 $2 ,000 .00 $0 .00 $2 ,000 .00642(001 )
C o ns tru c t io n S u rv e y in g $2 ,000 .00
62489
28 (62489 )
206 100%0%100%100%L S $10 ,000 .00 $10 ,000 .00 $0 .00 $10 ,000 .00643(002 )
T ra ff ic M a in te n a n c e $10 ,000 .00
62489
28 (62489 )
207 0 .000 .000 .000 .00C S UM
$0 .00 $0 .00 $0 .00 $0 .00643(023 )
T ra ff ic P r ic e A d ju s tm e n t $1 .00
62489
28 (62489 )
208 100%0%100%100%L S $79 ,000 .00 $79 ,000 .00 $0 .00 $79 ,000 .00660(128 )
R e c t a n g u la r R a p id F la s h ing B e a c o n C m p lt
$79 ,000 .00
62489
28 (62489 )
001 100%0%100%100%L S $37 ,000 .00 $37 ,000 .00 $0 .00 $37 ,000 .00201(001B )
C le a rin g $37 ,000 .00
63278
06 -4R (6327
002 100%0%100%100%L S $35 ,000 .00 $35 ,000 .00 $0 .00 $35 ,000 .00201(002B )
G rub b in g $35 ,000 .00
63278
06 -4R (6327
003 2 ,808 .000 .002 ,808 .00439 .00S Y $1 ,756 .00 $11 ,232 .00 $0 .00 $11 ,232 .00202(002 )
R e m o v a l o f P a v e m e n t $4 .00
63278
06 -4R (6327
Page 3 of 6
Ln Itm
Progress Estimate - Original
Estimate No: For Period: Thru:
Project No: Address:
Contractor:
Project:
Original Contract/Participating
Item No Description Unit Qty Amount Qty Amount Qty Amount Qty AmountUnit Price
Plan Previous This Estimate Totals to Date
0002(334)/60520
HC Contractors, Inc.
PO Box 80688
Fairbanks AK
Northern Region Signal Interconnect ‐ Airport Way/Peger Road 0016 12/01/ 2016 03/13/2017
Supl DescFAPrj No
Region: Northern
004 149 ,156 .000 .00149 ,156 .00159 ,863 .00S Y $383 ,671 .20 $357 ,974 .40 $0 .00 $357 ,974 .40202(113 )
P a v e m e n t P la n in g $2 .40
63278
06 -4R (6327
005 0 .000 .000 .000 .00T O N $0 .00 $0 .00 $0 .00 $0 .00301(001D )
A gg r e g a t e B a s e C o u rs e , G ra d in g D -1
$60 .00Ite m D e le te d C O #0463278
06 -4R (6327
006 18 ,074 .050 .0018 ,074 .0517 ,876 .00T O N $893 ,800 .00 $903 ,702 .50 $0 .00 $903 ,702 .50401(001 E )
H M A , T yp e II; C la s s B $50 .00
63278
06 -4R (6327
007 971 .00-1 .50972 .50984 .80T O N $1 ,378 ,720 .00 $1 ,361 ,500 .00 ($2 ,100 .00 ) $1 ,359 ,400 .00401(004 C )
A s p h a lt B in d e r , G ra d e P G 52 -40
$1 ,400 .00
63278
06 -4R (6327
008 56 ,428 .770 .0056 ,428 .77120 ,094 .00C S UM
$120 ,094 .00 $56 ,428 .77 $0 .00 $56 ,428 .77401(008 E )
H M A P r ic e A d ju s tm e n t , T yp e II; C la s s B
$1 .00
63278
06 -4R (6327
009 0 .000 .000 .0079 ,281 .00C S UM
$79 ,281 .00 $0 .00 $0 .00 $0 .00401(009 )
L o ng itu d in a l J o in t D e ns ity P r ic e A d js tm n t
$1 .00
63278
06 -4R (6327
010 59 ,986 .310 .0059 ,986 .31120 ,094 .00C S UM
$120 ,094 .00 $59 ,986 .31 $0 .00 $59 ,986 .31401(010B )
P v m n t S m oo th n e s s P r ic e A d js tm n t , M th d 2
$1 .00
63278
06 -4R (6327
011 0 .000 .000 .0010 ,000 .00C S UM
$10 ,000 .00 $0 .00 $0 .00 $0 .00401(015 )
A s p h a lt M a te r ia l P r ic e A d jus tm e n t
$1 .00
63278
06 -4R (6327
012 40 .950 .0040 .9566 .00T O N $66 ,000 .00 $40 ,950 .00 $0 .00 $40 ,950 .00402(001 )
S T E -1 A s ph a lt fo r T a c k C o a t
$1 ,000 .00
63278
06 -4R (6327
013 141 .000 .00141 .00160 .00L F $11 ,200 .00 $9 ,870 .00 $0 .00 $9 ,870 .00603(001 )-012
C S P 12 In c h $70 .00
63278
06 -4R (6327
014 7 .000 .007 .008 .00E A C H $6 ,400 .00 $5 ,600 .00 $0 .00 $5 ,600 .00604(004 )
A d jus t E x is t in g M a n h o le $800 .00
63278
06 -4R (6327
015 2 .000 .002 .002 .00E A C H $8 ,000 .00 $8 ,000 .00 $0 .00 $8 ,000 .00604(005 )
In le t, T yp e _ _ _ $4 ,000 .00T yp e A63278
06 -4R (6327
016 200 .000 .00200 .00187 .50L F $9 ,375 .00 $10 ,000 .00 $0 .00 $10 ,000 .00606(001 )
W -B e a m G u a rd ra i l $50 .00
63278
06 -4R (6327
017 2 .000 .002 .002 .00E A C H $10 ,000 .00 $10 ,000 .00 $0 .00 $10 ,000 .00606(013 )
P a r a l le l G u a rd ra i l T e rm in a l
$5 ,000 .00
63278
06 -4R (6327
018 2 .000 .002 .002 .00E A C H $7 ,000 .00 $7 ,000 .00 $0 .00 $7 ,000 .00606(016 )
T ra n s it io n R a i l $3 ,500 .00
63278
06 -4R (6327
019 527 .300 .00527 .30524 .00L F $26 ,200 .00 $26 ,365 .00 $0 .00 $26 ,365 .00607(003 )
C h a in L in k F e n c e $50 .00
63278
06 -4R (6327
020 16 .400 .0016 .4036 .00S Y $2 ,160 .00 $984 .00 $0 .00 $984 .00608(001 a )
C o n c re t e S id e w a lk , 4 in c h e s th ic k
$60 .00
63278
06 -4R (6327
Page 4 of 6
Ln Itm
Progress Estimate - Original
Estimate No: For Period: Thru:
Project No: Address:
Contractor:
Project:
Original Contract/Participating
Item No Description Unit Qty Amount Qty Amount Qty Amount Qty AmountUnit Price
Plan Previous This Estimate Totals to Date
0002(334)/60520
HC Contractors, Inc.
PO Box 80688
Fairbanks AK
Northern Region Signal Interconnect ‐ Airport Way/Peger Road 0016 12/01/ 2016 03/13/2017
Supl DescFAPrj No
Region: Northern
021 125 .200 .00125 .20250 .00L F $8 ,500 .00 $4 ,256 .80 $0 .00 $4 ,256 .80609(002A )
C u rb a n d G u tte r , T yp e 1 $34 .00
63278
06 -4R (6327
022 2 ,523 .237 .272 ,515 .962 ,496 .21S F $224 ,658 .90 $226 ,436 .40 $654 .30 $227 ,090 .70615(001 )
S ta n d a rd S ig n $90 .00
63278
06 -4R (6327
023 11 .000 .0011 .0044 .00L B S $6 ,600 .00 $1 ,650 .00 $0 .00 $1 ,650 .00618(002 )
S e e d in g $150 .00
63278
06 -4R (6327
024 2 .000 .002 .002 .00E A C H $5 ,000 .00 $5 ,000 .00 $0 .00 $5 ,000 .00639(002 )
C o m m e rc ia l D r iv e w a y $2 ,500 .00
63278
06 -4R (6327
025 100%0%100%100%L S $200 ,000 .00 $200 ,000 .00 $0 .00 $200 ,000 .00640(001 )
M o b i l iz a t ion a n d D e m o b il iz a t io n
$200 ,000 .00
63278
06 -4R (6327
026 100%0%100%100%L S $2 ,000 .00 $2 ,000 .00 $0 .00 $2 ,000 .00641(108 )
P o l lu t io n C o n tro l $2 ,000 .00
63278
06 -4R (6327
027 100%0%100%100%L S $70 ,000 .00 $70 ,000 .00 $0 .00 $70 ,000 .00642(001 )
C o ns tru c t io n S u rv e y in g $70 ,000 .00
63278
06 -4R (6327
028 5 .610 .005 .61136 .00H R $50 ,320 .00 $2 ,075 .70 $0 .00 $2 ,075 .70642(003 )
T h re e P e rs o n S u rv e y P a r ty
$370 .00
63278
06 -4R (6327
029 3 .000 .003 .0011 .00E A C H $13 ,750 .00 $3 ,750 .00 $0 .00 $3 ,750 .00642(006 )
R e p l a c e E x is t in g w ith P r im a ry M o n u m e n t
$1 ,250 .00
63278
06 -4R (6327
030 8 .000 .008 .0011 .00E A C H $6 ,600 .00 $4 ,800 .00 $0 .00 $4 ,800 .00642(009 )
R e fe re n c e E x is t in g M o nu m e n t
$600 .00
63278
06 -4R (6327
031 8 .000 .008 .0011 .00E A C H $7 ,700 .00 $5 ,600 .00 $0 .00 $5 ,600 .00642(010 )
M o nu m e n t C a s e $700 .00
63278
06 -4R (6327
032 100%0%100%100%L S $260 ,000 .00 $260 ,000 .00 $0 .00 $260 ,000 .00643(002 )
T ra ff ic M a in te n a n c e $260 ,000 .00
63278
06 -4R (6327
033 0 .0013 ,096 .00-13 ,096 .000 .00C S UM
$0 .00 ($13 ,096 .00 ) $13 ,096 .00 $0 .00643(023 )
T ra ff ic P r ic e A d ju s tm e n t $1 .00
63278
06 -4R (6327
034 142 ,092 .730 .00142 ,092 .73500 ,000 .00C S UM
$500 ,000 .00 $142 ,092 .73 $0 .00 $142 ,092 .73643(025 )
T ra ff ic C on tro l $1 .00
63278
06 -4R (6327
036 100%0%100%100%L S $42 ,000 .00 $42 ,000 .00 $0 .00 $42 ,000 .00643(108 )
In te r im P a v e m e n t M a rk in g
$42 ,000 .00
63278
06 -4R (6327
035 100%0%100%100%L S $5 ,000 .00 $5 ,000 .00 $0 .00 $5 ,000 .00643(117 )
P ub l ic In fo rm a t io n $5 ,000 .00
63278
06 -4R (6327
037 100%0%100%100%L S $20 ,000 .00 $20 ,000 .00 $0 .00 $20 ,000 .00644(001 )
F ie ld O f fic e $20 ,000 .00
63278
17 (C F ) (6327
Page 5 of 6
Ln Itm
Progress Estimate - Original
Estimate No: For Period: Thru:
Project No: Address:
Contractor:
Project:
Original Contract/Participating
Item No Description Unit Qty Amount Qty Amount Qty Amount Qty AmountUnit Price
Plan Previous This Estimate Totals to Date
0002(334)/60520
HC Contractors, Inc.
PO Box 80688
Fairbanks AK
Northern Region Signal Interconnect ‐ Airport Way/Peger Road 0016 12/01/ 2016 03/13/2017
Supl DescFAPrj No
Region: Northern
038 500 .000 .00500 .00500 .00L H $500 .00 $500 .00 $0 .00 $500 .00645(001 )
T ra in in g P ro g ra m ,_ _ _ T ra in e e s /A pp re n tic e s
$1 .00O n e T ra in e e /A p p re n t ic e
63278
42 (63278 )
039 100%0%100%100%L S $2 ,000 .00 $2 ,000 .00 $0 .00 $2 ,000 .00646(001 )
C P M S c h e d u l in g $2 ,000 .00
63278
06 -4R (6327
040 100%0%100%100%L S $100 ,000 .00 $100 ,000 .00 $0 .00 $100 ,000 .00660(001A )
T ra ff ic S ign a l S ys te m C o m p le te , _ _ _ _ _ _ _
$100 ,000 .00A irp o rt/S p o rts m a n W a y
63278
06 -4R (6327
041 100%0%100%100%L S $90 ,000 .00 $90 ,000 .00 $0 .00 $90 ,000 .00660(001B )
T ra ff ic S ign a l S ys te m C o m p le te , _ _ _ _ _ _ _
$90 ,000 .00A irp o rt/U n iv e rs ity63278
06 -4R (6327
042 100%0%100%100%L S $6 ,000 .00 $6 ,000 .00 $0 .00 $6 ,000 .00660(001 C )
T ra ff ic S ign a l S ys te m C o m p le te , _ _ _ _ _ _ _
$6 ,000 .00A irp o rt/W a s h in g to n63278
06 -4R (6327
043 100%0%100%100%L S $185 ,000 .00 $185 ,000 .00 $0 .00 $185 ,000 .00660(001D )
T ra ff ic S ign a l S ys te m C o m p le te , _ _ _ _ _ _ _
$185 ,000 .00A irp o rt/M a rk e t63278
06 -4R (6327
044 7 .000 .007 .007 .00E A C H $10 ,500 .00 $10 ,500 .00 $0 .00 $10 ,500 .00660(108 )
J un c tio n B o x , T yp e I $1 ,500 .00T yp e -1A63278
06 -4R (6327
045 129 .000 .00129 .00129 .00E A C H $90 ,300 .00 $90 ,300 .00 $0 .00 $90 ,300 .00660(121 )
R e p l a c e L u m in a ire P a rt , _ _ __ _ _ _ _
$700 .00B u lb63278
06 -4R (6327
046 100%0%100%100%L S $80 ,000 .00 $80 ,000 .00 $0 .00 $80 ,000 .00669(102 )
A u to m a te d T ra ff ic R e c o rd e r L o o p s
$80 ,000 .00
63278
06 -4R (6327
047 69 ,154 .003 ,457 .7065 ,696 .3068 ,338 .00L F $273 ,352 .00 $262 ,785 .20 $13 ,830 .80 $276 ,616 .00670(104 )
M M A P v m n t M rk n g s L o ng itu d in a l In la id
$4 .00
63278
06 -4R (6327
048 5 ,189 .500 .005 ,189 .505 ,249 .00S F $73 ,486 .00 $72 ,653 .00 $0 .00 $72 ,653 .00670(107 )
M M A T r a n s v e rs e M a rk in g s In la id
$14 .00
63278
06 -4R (6327
049 74 .000 .0074 .0078 .00E A C H $31 ,200 .00 $29 ,600 .00 $0 .00 $29 ,600 .00670(109 )
M M A P a v e m e n t M a rk in g s A rro w In la id
$400 .00
63278
06 -4R (6327
$7,200,856.83$29,721.10$7,171,135.73$7,937,403.10Total
Page 6 of 6
FA
Progress Estimate - New
Estimate No: For Period: Thru:
Project No: Address:
Contractor:
Project:
New Items/Participating
Item No Description Unit Qty Amount Qty Amount Qty Amount Qty AmountUnit Price
Plan Previous This Estimate Totals to Date
0002(334)/60520
HC Contractors, Inc.
PO Box 80688
Fairbanks AK
Northern Region Signal Interconnect ‐ Airport Way/Peger Road 0016 12/01/ 2016 03/13/2017
Supl DescPrj No
Region: Northern
Ln Itm
322 .710 .00322 .71333 .00C Y $39 ,960 .00 $38 ,725 .20 $0 .00 $38 ,725 .20301(002D )
A gg r e g a t e B a s e C o u rs e , G ra d in g D -1
$120 .00C O #04 #6052060520
43 (60520 )
142
486 .240 .00486 .24517 .00T O N $93 ,060 .00 $87 ,523 .20 $0 .00 $87 ,523 .20401(001 E )
H M A , T yp e II; C la s s B $180 .00C O #04 #6052060520
43 (60520 )
143
100%0%100%100%L S $3 ,183 .00 $3 ,183 .00 $0 .00 $3 ,183 .00662(900 )
U t il itie s C h a n g e s $3 ,183 .00C O #10 -E x te n d 18" C S P @ V a u lt 32
60520
43 (60520 )
145
100%0%100%100%L S $2 ,400 .00 $2 ,400 .00 $0 .00 $2 ,400 .00660(900 )
S ig n a ls a n d L ig h t in g C h a n g e s
$2 ,400 .00C O #15 - R e p la c e C o n d u le ts
60520
43 (60520 )
146
100%0%100%100%L S $3 ,440 .00 $3 ,440 .00 $0 .00 $3 ,440 .00662(900 )
U t il itie s C h a n g e s $3 ,440 .00C O #15 - V a u lt 3 T o U n iv S ig n a l C o n tro l le r
60520
43 (60520 )
147
100%0%100%100%L S ($1 ,200 .00 ) ($1 ,200 .00 ) $0 .00 ($1 ,200 .00 )662(900 )
U t il itie s C h a n g e s ($1 ,200 .00 )C O #17 -P e g e r & D a v is C a b le D e le t io n C re d it
60520
43 (60520 )
148
100%0%100%100%L S $800 ,000 .00 $800 ,000 .00 $0 .00 $800 ,000 .00105(002 )
D is pu t e R e s o lu t io n $800 ,000 .00105 (002 ) D is p u te R e s o lu t io n
60520
43 (60520 )
149
100%0%100%100%L S $66 ,500 .00 $66 ,500 .00 $0 .00 $66 ,500 .00644(006 )
V e h ic le s $66 ,500 .00C O #01 - C o n tra c to r S u p p l ie d V e h ic l e s - 63278
63278
17 (C F )
050
834 .350 .00834 .35600 .00T O N $61 ,500 .00 $85 ,520 .88 $0 .00 $85 ,520 .88401(902 )
H M A P a v e m e n t C h a n g e s $102 .50C O #02 -M in o r P a v e m e n t
63278
06 -4R (632
051
117 .330 .00117 .33232 .00C Y $27 ,840 .00 $14 ,079 .60 $0 .00 $14 ,079 .60301(002D )
A gg r e g a t e B a s e C o u rs e , G ra d in g D -1
$120 .00C O #04 #6327863278
06 -4R (632
053
100%0%100%100%L S $10 ,990 .00 $10 ,990 .00 $0 .00 $10 ,990 .00660(900 )
S ig n a ls a n d L ig h t in g C h a n g e s
$10 ,990 .00C O #07 -S W U n iv /A rp t S ig n a l C o n d u it R o u t in g
63278
06 -4R (632
054
100%0%100%100%L S $7 ,957 .00 $7 ,957 .00 $0 .00 $7 ,957 .00615(900 )
S ta n d a rd S ig n C h a n g e s $7 ,957 .00C O #11 -F o ld in g T ru c k C ro s s in g S ig n s & P o s t/M o u n t
63278
06 -4R (632
055
100%0%100%100%L S $9 ,290 .00 $9 ,290 .00 $0 .00 $9 ,290 .00615(900 )
S ta n d a rd S ig n C h a n g e s $9 ,290 .00C O #12 -R e p la c e C h e v ro n W 1 -8R S ig n P a n e ls
63278
06 -4R (632
056
18 ,144 .000 .0018 ,144 .0021 ,190 .00L F $67 ,808 .00 $58 ,060 .80 $0 .00 $58 ,060 .80301(100D )
A gg B a s e C o u rs e , G ra d in g D -1 (S h ld rn g )
$3 .20C O #1363278
06 -4R (632
057
100%0%100%100%L S ($3 ,682 .00 ) ($3 ,682 .00 ) $0 .00 ($3 ,682 .00 )670(900 )
T ra ff ic M a rk in g s C h a n g e s ($3 ,682 .00 )C O #19 -M M A In c o m p le te P u n c h l is t C re d i t
63278
06 -4R (632
058
100%0%100%100%L S $1 ,521 .00 $1 ,521 .00 $0 .00 $1 ,521 .00660(900 )
S ig n a ls a n d L ig h t in g C h a n g e s
$1 ,521 .00C O #20 -R a is e T yp e 2 J B o x M a rk e t S t .
63278
06 -4R (632
059
$1,184,308.68$0.00$1,184,308.68$1,190,567.00Total
Page 1 of 1
Project No: 0610(007)/63278, 60520, 62489
Contractor:
HC Contractors, Inc.
Address:PO Box 80688
Fairbanks AK
Region: Northern
99708
Project: Airport Way PM ‐ Stg II, NR Signal Intercon, & NR Ped Estimate No: 0016 For Pay Period Ending: 3/13/2017
Progress Estimate - Stockpiled Materials
Description Supplemental DescriptionItem CodeLine ItemAmountAdj TypeEst #
Page 1 of 1*STMI: Stockpile Initial Payment, STMA: Stockpile Adjustment, STMC: Stockpile Closure
Project No: 0610(007)/63278, 60520, 62489
Contractor:
HC Contractors, Inc.
Address:PO Box 80688
Fairbanks AK
Region: Northern
99708
Project: Airport Way PM ‐ Stg II, NR Signal Intercon, & NR Ped Estimate No: 0016 For Pay Period Ending: 3/13/2017
Progress Estimate - Adjustments
Contract AdjustmentsAdj Type Est # Amount
Interim Work Authorization
Progress Withholding
Liquidated Damages
$0.00
$0.00
$0.00
Line Item Adjustments
Adj Type Est # Amount
Item Specific
Item CodeLine Item Item Description
0001 ($35,235.64)646(001) 039 CPM Scheduling
0003 $35,235.64646(001) 039 CPM Scheduling
0005 $23,594.81646(001) 039 CPM Scheduling
0006 ($23,594.81)646(001) 039 CPM Scheduling
Subtotal: $0.00
Grant Total Adj: $0.00
Page 1 of 1
Alaska Date:
User: tadonova Page 1 of 5Dept of Trans Public Facilities
Estimate Summary By Funding
Rpt-ID: RCPESSUM
0610(007) Contract ID:
03/13/2017
Date Let:Date Awarded:Date Contract Executed:Date Notice to Proceed:Date Work Began:
Date Time Stopped:Date Accepted:Original Amount:Current Amount:
Surety CoVendor C00015
HC Contractors, Inc.
SUR0006
Western Surety Company
00/00/0000
05/19/2015
05/19/2015
06/14/2015
00/00/0000
00/00/0000
00/00/0000
$8,240,476.20
$9,127,970.10
Estimate Number: 0001 Estimate Date: 06/30/15 Accounting Date: 07/20/15
ProjectNumber
TotalEarnings
TotalAdjustments Retainage
Liquid Dam/Incent/
Disincent Payable60520 $44,562.68$44,562.68 $0.00 $0.00$0.0062489 $0.00$0.00 $0.00 $0.00$0.0063278 $624,914.55$660,150.19 $0.00 $0.00($35,235.64)
Total For Estimate $704,712.87 ($35,235.64) $0.00 $0.00 $669,477.23
Estimate Number: 0002 Estimate Date: 07/15/15 Accounting Date: 08/03/15
ProjectNumber
TotalEarnings
TotalAdjustments Retainage
Liquid Dam/Incent/
Disincent Payable60520 $203,862.46$203,862.46 $0.00 $0.00$0.0062489 $0.00$0.00 $0.00 $0.00$0.0063278 $1,603,782.53$1,603,782.53 $0.00 $0.00$0.00
Total For Estimate $1,807,644.99 $0.00 $0.00 $0.00 $1,807,644.99
Estimate Number: 0003 Estimate Date: 07/31/15 Accounting Date: 08/25/15
ProjectNumber
TotalEarnings
TotalAdjustments Retainage
Liquid Dam/Incent/
Disincent Payable60520 $569,329.38$569,329.38 $0.00 $0.00$0.0062489 $800.00$800.00 $0.00 $0.00$0.0063278 $1,139,332.19$1,104,096.55 $0.00 $0.00$35,235.64
Total For Estimate $1,674,225.93 $35,235.64 $0.00 $0.00 $1,709,461.57
Estimate Number: 0004 Estimate Date: 08/15/15 Accounting Date: 09/11/15
ProjectNumber
TotalEarnings
TotalAdjustments Retainage
Liquid Dam/Incent/
Disincent Payable60520 $179,345.89$179,345.89 $0.00 $0.00$0.0062489 $18,287.00$18,287.00 $0.00 $0.00$0.0063278 $153,888.04$153,888.04 $0.00 $0.00$0.00
Total For Estimate $351,520.93 $0.00 $0.00 $0.00 $351,520.93
Projects: Northern Region Signal Interconnect - Airport Way/Peger Road60520 Northern Region Pedestrian Improvements62489 Airport Way Preventative Maintenance - Stage II63278
Alaska Date:
User: tadonova Page 2 of 5Dept of Trans Public Facilities
Estimate Summary By Funding
Rpt-ID: RCPESSUM
0610(007) Contract ID:
03/13/2017
Estimate Number: 0005 Estimate Date: 08/31/15 Accounting Date: 10/05/15
ProjectNumber
TotalEarnings
TotalAdjustments Retainage
Liquid Dam/Incent/
Disincent Payable60520 $97,128.88$97,128.88 $0.00 $0.00$0.0062489 $2,171.00$2,171.00 $0.00 $0.00$0.0063278 $396,191.03$372,596.22 $0.00 $0.00$23,594.81
Total For Estimate $471,896.10 $23,594.81 $0.00 $0.00 $495,490.91
Estimate Number: 0006 Estimate Date: 09/15/15 Accounting Date: 10/12/15
ProjectNumber
TotalEarnings
TotalAdjustments Retainage
Liquid Dam/Incent/
Disincent Payable60520 $119,056.46$119,056.46 $0.00 $0.00$0.0062489 $2,171.00$2,171.00 $0.00 $0.00$0.0063278 $110,189.93$133,784.74 $0.00 $0.00($23,594.81)
Total For Estimate $255,012.20 ($23,594.81) $0.00 $0.00 $231,417.39
Estimate Number: 0007 Estimate Date: 09/30/15 Accounting Date: 10/27/15
ProjectNumber
TotalEarnings
TotalAdjustments Retainage
Liquid Dam/Incent/
Disincent Payable60520 $184,826.10$184,826.10 $0.00 $0.00$0.0062489 $15,285.00$15,285.00 $0.00 $0.00$0.0063278 $240,378.70$240,378.70 $0.00 $0.00$0.00
Total For Estimate $440,489.80 $0.00 $0.00 $0.00 $440,489.80
Estimate Number: 0008 Estimate Date: 10/15/15 Accounting Date: 11/16/15
ProjectNumber
TotalEarnings
TotalAdjustments Retainage
Liquid Dam/Incent/
Disincent Payable60520 $139,888.90$139,888.90 $0.00 $0.00$0.0062489 $2,271.00$2,271.00 $0.00 $0.00$0.0063278 $235,330.85$235,330.85 $0.00 $0.00$0.00
Total For Estimate $377,490.75 $0.00 $0.00 $0.00 $377,490.75
Estimate Number: 0009 Estimate Date: 10/31/15 Accounting Date: 12/02/15
ProjectNumber
TotalEarnings
TotalAdjustments Retainage
Liquid Dam/Incent/
Disincent Payable60520 $374,085.03$374,085.03 $0.00 $0.00$0.0062489 $26,005.00$26,005.00 $0.00 $0.00$0.0063278 $245,178.42$245,178.42 $0.00 $0.00$0.00
Total For Estimate $645,268.45 $0.00 $0.00 $0.00 $645,268.45
Estimate Number: 0010 Estimate Date: 11/15/15 Accounting Date: 12/30/15
ProjectNumber
TotalEarnings
TotalAdjustments Retainage
Liquid Dam/Incent/
Disincent Payable60520 $92,532.84$92,532.84 $0.00 $0.00$0.0062489 $29,430.00$29,430.00 $0.00 $0.00$0.00
Alaska Date:
User: tadonova Page 3 of 5Dept of Trans Public Facilities
Estimate Summary By Funding
Rpt-ID: RCPESSUM
0610(007) Contract ID:
03/13/2017
Estimate Number: 0010 Estimate Date: 11/15/15 Accounting Date: 12/30/15
ProjectNumber
TotalEarnings
TotalAdjustments Retainage
Liquid Dam/Incent/
Disincent Payable63278 $181,943.56$181,943.56 $0.00 $0.00$0.00
Total For Estimate $303,906.40 $0.00 $0.00 $0.00 $303,906.40
Estimate Number: 0011 Estimate Date: 12/15/15 Accounting Date: 01/12/16
ProjectNumber
TotalEarnings
TotalAdjustments Retainage
Liquid Dam/Incent/
Disincent Payable60520 $193,216.70$193,216.70 $0.00 $0.00$0.0062489 $1,650.00$1,650.00 $0.00 $0.00$0.0063278 $47,131.80$47,131.80 $0.00 $0.00$0.00
Total For Estimate $241,998.50 $0.00 $0.00 $0.00 $241,998.50
Estimate Number: 0012 Estimate Date: 05/15/16 Accounting Date: 06/23/16
ProjectNumber
TotalEarnings
TotalAdjustments Retainage
Liquid Dam/Incent/
Disincent Payable60520 $7,306.00$7,306.00 $0.00 $0.00$0.0062489 $0.00$0.00 $0.00 $0.00$0.0063278 $8,186.50$8,186.50 $0.00 $0.00$0.00
Total For Estimate $15,492.50 $0.00 $0.00 $0.00 $15,492.50
Estimate Number: 0013 Estimate Date: 07/15/16 Accounting Date: 07/28/16
ProjectNumber
TotalEarnings
TotalAdjustments Retainage
Liquid Dam/Incent/
Disincent Payable60520 $33,889.00$33,889.00 $0.00 $0.00$0.0062489 $0.00$0.00 $0.00 $0.00$0.0063278 $63,246.00$63,246.00 $0.00 $0.00$0.00
Total For Estimate $97,135.00 $0.00 $0.00 $0.00 $97,135.00
Estimate Number: 0014 Estimate Date: 10/11/16 Accounting Date: 10/12/16
ProjectNumber
TotalEarnings
TotalAdjustments Retainage
Liquid Dam/Incent/
Disincent Payable60520 $113,830.00$113,830.00 $0.00 $0.00$0.0062489 $1,780.00$1,780.00 $0.00 $0.00$0.0063278 $53,040.00$53,040.00 $0.00 $0.00$0.00
Total For Estimate $168,650.00 $0.00 $0.00 $0.00 $168,650.00
Estimate Number: 0015 Estimate Date: 11/30/16 Accounting Date: 01/13/17
ProjectNumber
TotalEarnings
TotalAdjustments Retainage
Liquid Dam/Incent/
Disincent Payable60520 $800,000.00$800,000.00 $0.00 $0.00$0.0062489 $0.00$0.00 $0.00 $0.00$0.0063278 $0.00$0.00 $0.00 $0.00$0.00
Total For Estimate $800,000.00 $0.00 $0.00 $0.00 $800,000.00
Alaska Date:
User: tadonova Page 4 of 5Dept of Trans Public Facilities
Estimate Summary By Funding
Rpt-ID: RCPESSUM
0610(007) Contract ID:
03/13/2017
Estimate Number: 0016 Estimate Date: 03/13/17 Accounting Date: 00/00/00
ProjectNumber
TotalEarnings
TotalAdjustments Retainage
Liquid Dam/Incent/
Disincent Payable60520 $4,240.00$4,240.00 $0.00 $0.00$0.0062489 $0.00$0.00 $0.00 $0.00$0.0063278 $25,481.10$25,481.10 $0.00 $0.00$0.00
Total For Estimate $29,721.10 $0.00 $0.00 $0.00 $29,721.10
Total For Contract $8,385,165.52 $0.00 $0.00 $0.00 $8,385,165.52
Alaska Date:
User: tadonova Page 5 of 5Dept of Trans Public Facilities
Estimate Summary By Funding
Rpt-ID: RCPESSUM
0610(007) Contract ID:
03/13/2017
Project Number: 60520 State Project Number: 0002(334)/60520
Federal Project Number
FundingSource
% FromFundingSource
State AcctgCode
State FundCode
LocalAgreement
Number
FundingSource
CapUsage
Amount
Current Contract Amount:% Of Total Contract:
9127970.1035.15
FS001 100.00 0002(334)/Z605200000 $.00 $3,157,100.32
TC4000 153P
Project Number: 62489 State Project Number: 0002(286)/62489
Federal Project Number
FundingSource
% FromFundingSource
State AcctgCode
State FundCode
LocalAgreement
Number
FundingSource
CapUsage
Amount
Current Contract Amount:% Of Total Contract:
9127970.101.09
FS001 100.00 0002(286)/Z624890000 $.00 $99,850.00
TC4000 153P
Project Number: 63278 State Project Number: 0610(007)/63278
Federal Project Number
FundingSource
% FromFundingSource
State AcctgCode
State FundCode
LocalAgreement
Number
FundingSource
CapUsage
Amount
Current Contract Amount:% Of Total Contract:
9127970.1063.76
FS001 100.00 0610(007)/Z632780000 $.00 $86,500.00
TC4000 173P
FS001 100.00 0610(007)/Z632780000 $.00 $500.00
TC4000 153P
FS001 100.00 0610(007)/Z632780000 $.00 $5,041,215.20
TC4000 153P
From: Dutra, Monica L (DOT)To: Staft, Lauren A (DOT)Cc: Donovan, Travis A (DOT)Subject: RE: Payments to Date for Airport Way PM Stage II , NR Signal Interconnect, and NR Pedestrian ImprovementsDate: Tuesday, March 28, 2017 11:39:40 AMAttachments: Z605200000 153P.xls
Z632780000 153P.xlsZ632780000 173P.xlsZ642890000 153P.xlsFinal Calculations.xlsximage001.png
Sorry for the delay, Here it is
From: Staft, Lauren A (DOT) Sent: Friday, March 17, 2017 4:20 PMTo: Dutra, Monica L (DOT) <[email protected]>Cc: Donovan, Travis A (DOT) <[email protected]>Subject: Payments to Date for Airport Way PM Stage II, NR Signal Interconnect, and NR PedestrianImprovements Hi Monica,Can you please provide the payments to date and coding breakdown for:Project: Airport Way PM Stage II, NR Signal Interconnect, and NR Pedestrian ImprovementsNumber: Z632780000, Z605200000, Z624890000Contractor: HC Contractors, Inc. Thanks!
Final Contract Funding Report
Contract Name Contract ID
0610(007)/63278, 60520, 62489 Airport Way PM Stg II, NR Signal Interc
FA Cod CCLC PCFederal/State PJ Number Previous Payments Final Payment Total Paid
28 (624 0TC4000 153P 0002(286)/Z624890000 $99,850.00 $0.00 $99,850.00
43 (605 0TC4000 153P 0002(334)/Z605200000 $3,152,860.32 $4,240.00 $3,157,100.32
42 (632 0TC4000 153P 0610(007)/Z632780000 $500.00 $0.00 $500.00
17 (CF) 0TC4000 173P 0610(007)/Z632780000 $86,500.00 $0.00 $86,500.00
06‐4R ( 0TC4000 153P 0610(007)/Z632780000 $5,015,734.10 $25,481.10 $5,041,215.20
Monday, March 13, 2017 Page 1 of 1
STATE OF ALASKA DEPARTMENT OF TRANSPORTATION
AND PUBLIC FACILITIES
F R S S PROJECT NAME: Arpt Way PM - Stage II, NR Signal Interconnect Arpt/Peger, NR Pedestrian Improvements PROJECT NO.: 0610(007)/63278,0002(334)/60520&0002(286)/62489 DESCRIPTION:
Project 63278 consists of resurfacing Airport Way and adjoining frontage roads from Peger Road to Hoselton Road. Work includes replacing signs and fencing and upgrades to signalized intersections. Project 60520 consists of improving connectivity and upgrading the communication bandwidth between traffic signals located on Airport Way and Peger Road. Project 62489 consists of removing existing crosswalk lines and installing with inlaid methyl methacrylate crosswalk lines at multiple intersections. A rectangular rapid flashing beacon system will be installed at the intersection of the frontage road along Airport Way and Cowles Street.
PROJECT EN INEER(s): Travis A Donovan - Project Engineer, Andy Pagel - Assistant Project Engineer CONTRACTOR: HC CONTRACTORS, INC. DATE OF AWARD: 05/19/2015 NOTICE TO PROCEED DATE: Limited 06/12/15, Full 06/24/15 START OF WORK DATE: 06/14/2015 ORI INAL CONTRACT COMPLETION DATE: 10/31/2015 TIME E TENSION B CHAN E DOCUMENT: 06/08/2016 PROJECT ACCEPTANCE DATE: 06/08/2016 O ERRUN TIME: 0 Engineer s Estimate $7,122,545.80 Original Contract Amount: $8,240,476.20 Change Order Amount: $127,593.32 Overruns/Underruns: $17,096.00 Less liquidated Damages: 0 Final Contract Amount $8,385,165.52
Department of Transportation and Public Facilities
NORTHERN REGION
Construction
2301 Pe g e r Ro a d F a irb a nks, A l a sk a 99709-5399
M a in: 907.451.5466 TD D: 907.451.2363 F a x: 907.451.5487
d ot.st a t e . a k.us June 9, 2016 Abdel Abouhaib Superintendent HC Contractors P.O. Box 80688 Fairbanks, Alaska 99708 Re: No. 0610(007)/63278, No. 0002(334)/60520, No. 0002(286)/62489 Airport Way Preventive Maintenance - Stage II, Northern Region Signal Interconnect-Airport Way/Peger Road, Northern Region Pedestrian Improvements Letter of Project Completion Dear Mr. Abouhaib, In accordance with Subsection 105-1.15, a final inspection of this project was held June 9, 2016. The following people were in attendance:
Brian Herning ADOT&PF, Construction Travis Donovan ADOT&PF, Construction This is to advise you that all physical work and cleanup provided for under the contract was found to be complete. The Department will take acceptance and resume maintenance on all items of work on the contract. You are relieved from further maintenance responsibilities. Contract time stopped as of June 8, 2016. Please note that this does not relieve you of any other obligations remaining under the contract. Sincerely, James Allen, P.E. Construction Group Chief TAD/ere cc: Erin Anderson, Construction Michael Cain, FHWA Regional Engineer Mona Denia, Administrative Services, Headquarters Travis Donovan, Project Engineer Shelley Dykema, Project Control Chief, Northern Region Frank Ganley, P.E., Regional Construction Engineer Gail Gardner, P.E., Utilities Engineer, Northern Region Dennis Good, Civil Rights Office Manager Brian Herning, P.E., Construction Manager
Adam Marks, Civil Rights Research Analyst Sheryl Post, Right of Way Agent, Pre-Audit Andrea Quintyne, Alaska Department of Labor & Workforce Development Megan Sawtelle, Civil Rights Administrative Officer Dan Schacher, Area Manager, M&O Augustine Schaefer, Construction QA Lauren Staft, P.E., Senior Concurrent Review Engineer, Construction Regional File, Construction
“Keep Alaska Moving through service and infrastructure.”
MAJOR Contract Overruns (for closeout)Contract ID: 0610(007)
Contract Description: Airport Way PM Stg II, NR Signal Intercon, & NR Ped Impr
AKSAS (Project Number): 63278
Line Item Code Description Supp Desc Bid Qty Bid Amt Final Qty Amt Paid % +/ $ +/
034 643(025) Traffic Control 500000 $500,000.00 142092.73 $142,092.73 ‐71.6% ($357,907.27)
Friday, February 17, 2017 Page 1 of 1red: overruns green: underruns
Change Order Summary
Contract ID: 0610(007) Contract: Airport Way PM ‐ Stg II, NR Signal Intercon, &
Adjusted Completion Date: 20160608
CO# Change Order Description Status Approval Date CO Amount
Project # Line # Item Code Item Description UnitCO Quantity Unit Price CO Item TotalSupplemental Description
Adj Compl DateCO Type
001 CO#01 Sign Summary Revisions & Vehicles APPR 20150605 $31,954.40CMO
63278 022 615(001) Standard Sign SF ‐383.84 $90.00 ($34,545.60)
63278 050 644(006) Vehicles LS 1 $66,500.00 $66,500.00CO#01‐ Contractor Supplied Vehicles ‐ 63278
002 CO#02 HMA for Ditch, Bikepath, Medians & Density Testing Mod APPR 20150626 ($12,180.00)CMO
63278 006 401(001E) HMA, Type II; Class B TON ‐600 $50.00 ($30,000.00)
63278 007 401(004C) Asphalt Binder, Grade PG 52‐40 TON ‐31.2 $1,400.00 ($43,680.00)
63278 051 401(902) HMA Pavement Changes TON 600 $102.50 $61,500.00CO#02‐Minor Pavement
004 CO#04 D 1 & HMA Unit Changes APPR 20150708 $3,150.00CMO
60520 104 301(001D) Aggregate Base Course, Grading D‐1
TON ‐666 $60.00 ($39,960.00)Deleted CO#04
60520 105 401(006E) HMA, Type II; Class B SY ‐1998 $45.00 ($89,910.00)Deleted CO#04
60520 142 301(002D) Aggregate Base Course, Grading D‐1
CY 333 $120.00 $39,960.00CO#04 #60520
60520 143 401(001E) HMA, Type II; Class B TON 517 $180.00 $93,060.00CO#04 #60520
63278 005 301(001D) Aggregate Base Course, Grading D‐1
TON ‐464 $60.00 ($27,840.00)Item Deleted CO#04
63278 053 301(002D) Aggregate Base Course, Grading D‐1
CY 232 $120.00 $27,840.00CO#04 #63278
Friday, February 17, 2017 Page 1 of 4
CO# Change Order Description Status Approval Date CO Amount
Project # Line # Item Code Item Description UnitCO Quantity Unit Price CO Item TotalSupplemental Description
Adj Compl DateCO Type
005 CO#05 Delete Perm Construction Signs APPR 20150827 ($4,000.00)CMO
60520 116 643(003) Permanent Construction Signs LS ‐1 $4,000.00 ($4,000.00)Deleted CO#05
006 CO#06 Change specification 740 2.16 APPR 20151020 $0.00CMO
007 CO#07 SW Univ/Arpt Signal Conduit Routing Changes APPR 20160201 $10,990.00CMO
63278 054 660(900) Signals and Lighting Changes LS 1 $10,990.00 $10,990.00CO#07‐SW Univ/Arpt Signal Conduit Routing Changes
009 CO#09 Additional W Beam Guardrail APPR 20160201 $3,125.00CMO
63278 016 606(001) W‐Beam Guardrail LF 62.5 $50.00 $3,125.00
010 CO#10 Extend 18"CSP at Vault 32 APPR 20151005 $3,183.00CMO
60520 145 662(900) Utilities Changes LS 1 $3,183.00 $3,183.00CO#10‐Extend 18" CSP @ Vault 32
011 CO#11 Folding Truck Crossing Signs & Post/Mount Changes APPR 20151020 $9,194.50CMO
63278 022 615(001) Standard Sign SF 13.75 $90.00 $1,237.50
63278 055 615(900) Standard Sign Changes LS 1 $7,957.00 $7,957.00CO#11‐Folding Truck Crossing Signs & Post/Mount Changes
012 CO#12 Replace Chevron W1 8R Sign Panels APPR 20151020 $9,290.00CMO
63278 056 615(900) Standard Sign Changes LS 1 $9,290.00 $9,290.00CO#12‐Replace Chevron W1‐8R Sign Panels
Friday, February 17, 2017 Page 2 of 4
CO# Change Order Description Status Approval Date CO Amount
Project # Line # Item Code Item Description UnitCO Quantity Unit Price CO Item TotalSupplemental Description
Adj Compl DateCO Type
013 CO#13 Shouldering & Jbox removal reduction APPR 20151102 $30,308.00CMO
63278 044 660(108) Junction Box, Type I EACH‐25 $1,500.00 ($37,500.00)Type ‐1A
63278 057 301(100D) Aggregate Base Course, Grading D‐1(Shouldering)
LF 21190 $3.20 $67,808.00CO#13
014 CO#14 Cushman St Fiber Optic Deletion APPR 20160119 $0.00CMO
015 CO#15 Repair damaged condulets APPR 20160201 $2,400.00CMO
60520 146 660(900) Signals and Lighting Changes LS 1 $2,400.00 $2,400.00CO#15 ‐ Replace Condulets
016 CO#16 FO vault 3 to Univ Ave Signal Controller APPR 20160128 $3,440.00CMO
60520 147 662(900) Utilities Changes LS 1 $3,440.00 $3,440.00CO#15 ‐ Vault 3 To Univ Signal Controller
017 CO#17 Peger & Davis Cable Deletion APPR 20160224 ($1,200.00)CMO
60520 148 662(900) Utilities Changes LS 1 ($1,200.00) ($1,200.00)CO#17‐Peger & Davis Cable Deletion Credit
018 CO#18 Sportsman Demo Deletion APPR 20160120 $0.00CMO
019 CO#19 MMA Incomplete Punchlist Credit APPR 20160224 ($3,682.00)CMO
63278 058 670(900) Traffic Markings Changes LS 1 ($3,682.00) ($3,682.00)CO#19‐MMA Incomplete Punchlist Credit
020 CO#20 Market St. Junction Box APPR 20160606 $1,521.00CMO
63278 059 660(900) Signals and Lighting Changes LS 1 $1,521.00 $1,521.00CO#20‐Raise Type 2 JBox Market St.
Friday, February 17, 2017 Page 3 of 4
CO# Change Order Description Status Approval Date CO Amount
Project # Line # Item Code Item Description UnitCO Quantity Unit Price CO Item TotalSupplemental Description
Adj Compl DateCO Type
021 CO#21 Utility Conflicts Dispute Resolution APPR 20161129 $800,000.00 20160608CMO
60520 149 105(002) Dispute Resolution LS 1 $800,000.00 $800,000.00105(002) Dispute Resolution
Sum of Change Orders: $887,493.90
Friday, February 17, 2017 Page 4 of 4
PROJECT NUMBER: 0610(007)/63278 002(334)/60520 002(286)/62489PROJECT NAME: Airport Way Preventative Maintenance Stage II & Northern Region Signal Interconnect Airport Way/Peger Rd & Northern Region Pedestrian Improvements
IWA #
Issue Date Description Remarks
1 6/22/15 Establish new item 401(902) HMA pavements changes, minor pavement, medians, sidewalk, and ditch. New paving item on SiteManager for minor paving quantities
2 8/10/15 Perform the changes to the work at the Cushman St/Airport Way intersection Changes specified in revised Plan Sheets H15, H27, & H31. Paid with T&M summary sheet
3 8/13/15 Removal of J-box at approximate station ~A 105+85 project left Remove any conduit elbows and/or t-drains present. Install conduit and coupling to provide a straight connection. Backfill and repave per plan detail H2
4 8/14/15 Removal of J-box & phone pedistal A 145+70Remove existing inteconnect junction box and existing pedestal at approxiamte Station 145+70 proj. Lt. on the north side of fencing. Remove existing 3-2" RMCs between J-box and phone pedestal. Quantity of 2 Ea will be added to existing item 662(111) Removal of Junction Box
5 8/21/15 Install new condulets to replace older eroded conduletsDuring wiring repairs of the four Traffic Count Loops damaged by the contractor between Lathrop and Wilber Westbound, it was discovered that the condulets in these loops have correded beyond re-useability. Tracked T&M. Waiting on Material invoices.
6 9/16/15 Intercept existing conduit out of signal controller at Univ/Apt and tie into FO Vault 3.
Unit prices paid for this work as directed in the IWA. T&M was also tracked for this work in case of a disagreement.
7 10/5/15 Investigate damage & repair 2" RMC to facilitate HDPE install (Dir 36) Tracked per T&M.
IWA SUMMARY
All IWA's have been addressed with existing contract items or via Change Order.
1
Donovan, Travis A (DOT)
From: Donovan, Travis A (DOT)Sent: Friday, February 17, 2017 12:59 PMTo: Schultz, Andrew M (DOT)Subject: Airport Way PM Stage II - Before and After PhotosAttachments: apt before.JPG; AW AFTER.jpg; AW Ditch After.jpg; AW Ditch before.JPG
Mr.Schultz,Pleaseseeattachedbeforeandafterphotosforsaidproject.Thankyou,Travis A. Donovan | Project Engineer | Northern Region Construction 2301 Peger Rd, Fairbanks, Ak 99709 |�PH: 907-451-2652 |�CELL: 907-590-4355| �FAX: 907-451-5487 | [email protected]
1
Donovan, Travis A (DOT)
From: Anderson, Erin (DOT)Sent: Tuesday, March 07, 2017 7:26 AMTo: Donovan, Travis A (DOT)Subject: FW: 60520 Airport Way Peger Road DBE Clearance
Please see below for DBE clearance from the CRO. Erin Anderson| State of Alaska | DOT & PF Northern Region Construction | 2301 Peger Road Fairbanks, AK 99709 | �: 907.451.3055 | �: 907.451.5487 | : [email protected] From: Marks, Adam J (DOT) Sent: Monday, March 06, 2017 1:17 PM To: Anderson, Erin (DOT) Cc: DOT Civil Rights (DOT sponsored) Subject: 60520 Airport Way Peger Road DBE Clearance Hey Erin, This project had an original DBE goal of 27.50% ($2,266,131), and was awarded with a DBE commitment of 32.27% ($2,658,982). The actual DBE utilization on the project was 31.72% ($2,613,898), and met the DBE goal. This project is DBE cleared. Thanks, Adam Marks Research Analyst II ADOT&PF Civil Rights Office 2200 E. 42nd Ave. Anchorage, Alaska 99508 (907) 269‐0846 [email protected] “Keep Alaska Moving through Service and Infrastructure.”
1
Donovan, Travis A (DOT)
From: Garcia, Kelli J (DOR)Sent: Friday, February 17, 2017 2:32 PMTo: Donovan, Travis A (DOT)Subject: RE: Tax Clearance Request - Arpt Way PM - Stage II, NR Signal Interconnect
Arpt/Peger, NR Pedestrian Improvements - 0610(007)/63278,0002(334)/60520&0002(286)/62489
Hi Travis, The tax clearance for HC Contractors is approved. Thank you, Kelli
From: Donovan, Travis A (DOT) Sent: Friday, February 17, 2017 2:30 PM To: Garcia, Kelli J (DOR) <[email protected]> Subject: Tax Clearance Request ‐ Arpt Way PM ‐ Stage II, NR Signal Interconnect Arpt/Peger, NR Pedestrian Improvements ‐ 0610(007)/63278,0002(334)/60520&0002(286)/62489 reetin s elli,
ta clearanceisre uestedforthefollo in notedcontractor project.Ta clearanceisre uestedfro
throu h .ontractor a e ontractorsontractor ddress P o airbanks, Project a e rpt ayPM Sta e , Si nal nterconnect rpt Pe er, Pedestrian pro e entsProject o. , ederal . . o.
Thankyou,Travis A. Donovan | Project Engineer | Northern Region Construction 2301 Peger Rd, Fairbanks, Ak 99709 |�PH: 907-451-2652 |�CELL: 907-590-4355| �FAX: 907-451-5487 | [email protected]
Labor Standards and Safety675 7th Avenue, Station J-1Fairbanks, AK 99701-4596Phone: (907) 451-2886Fax: (907) 451-2885
Notice of Completion 1. Contractor
HC Contractors, Inc. PO Box 80688 Phone: 9074885983 Fairbanks, AK 99708
2. Project InformationDOL Project Number 15/05-50477F Agency Project Number 63278&60520&62 Federal Project Number 0610007
Name AIRPORT WAY PREVENTIVE MAINTENANCE - STAGE II, NORTHERN REGION SIGNAL INTERCONNECT - AIRPORT WAY/PEG
Description
Project 63278 consists of resurfacing Airport Way & adjoining frontage rds from Peger to Hoselton Rd. Replace signs, fencing, & upgrades to signalized intersections. Project 60520 consists of improving connectivity & upgrading communication bandwidth betw
Contracting Awarding Agency (DOT/PF) Dept. of Transportation & Public Facilities Agency Contact Pam Lord Agency Contact Phone Number 9074512247 Agency Address 2200 E. 42ND Ave. City, State, Zip Anchorage, AK 99507 Location REGIONWIDE Date Work Start 06/02/2015 Completion Date 06/08/2016 Final Contract Amount $8,385,165.52
3. Contractors and SubcontractorsPrime Contractor Name HC Contractors, Inc. Prime Contractor Owner/Operator? No Prime T/M? No Prime Contractor Amount $4,739,984.01
Contractor Name O/O Type of Work T/M AmountArctic Surveys No Survey No $83,722.90 Dimond Fence Co No Guardrail, fencing No $49,474.42 Emulsion Products No Distributor truck No $25,730.00
FW Scott Enterprises No Clearing, hydroseeding, seeding
No $28,495.00
Hot Wire Electric No Traffic signal system No $2,460,042.49 Jolt Construction & Traffic Maint. No Signs No $259,193.35 KJ Enterprises No Pavement markings No $53,800.00
Pacific Asphalt No MMA inlaid. MMA transverse inlaid, MMA symbols
No $380,726.15
Rady Concrete Construction No Concrete No $17,995.05 PFK Enterprises No Hauling No $261,959.00 Voorhees No Sawcut No $24,043.15 Contract Total
Page 1 of 2Print Notice of Completion
4/11/2017https://certpay.dol.alaska.gov/NoticeOfWork/NoWNoCPrint.aspx
The Notice of Completion for this project has been APPROVED.
4. FeesFee Amount $5,000.00 Fees Paid $5,000.00 Fees Due $0.00
Quintyne, Andrea N
DOLWD Signature
04/11/2017
Date
Page 2 of 2Print Notice of Completion
4/11/2017https://certpay.dol.alaska.gov/NoticeOfWork/NoWNoCPrint.aspx
I:\Construction Forms\Forms\Project Closeout\All closeout forms\13- ROW Clearance (25D-174).doc
STATE OF ALASKA DEPARTMENT OF TRANSPORTATION
AND PUBLIC FACILITIES I, __Travis Donovan____, state that I am a Project Engineer for the State of Alaska, Department of Transportation and Public Facilities; that Project(s) Arpt Way PM - Stage II, NR Signal Interconnect Arpt/Peger, NR Pedestrian Improvements 0610(007)/63278,0002(334)/60520&0002(286)/62489 has/have been constructed under my supervision; that construction commenced on 6/14/2015 and was completed on 6/08/2016.
1) PROOF OF USE FOR MATERIAL SOURCES, MAINTENANCE & STOCKPILE SITES, & ROADSIDE & LANDSCAPE DEVELOPMENT AREAS (Form 25D –174 (rev.9/05 NR) MS#/BLML/ADL# _______N/A__________ has been utilized under my supervision as a ________N/A___________ on this project. The pit use conforms to the plat which the (agency) APPROVED on ______N/A________. The attached map of the Materials Source shows the amount(s) and type(s) of material used. Note to Project Engineer: This form is required on project involving Department-furnished materials sources, whether the source was used or not. Complete the form and include a plan view for each source. Plan View should include the following: x Condition of the source at the end of the project. x Tabulation of quantities of materials removed. x Did the materials perform adequately? x Were there any problems during excavation? x Is boundary expansion necessary? x Anything else pertinent to future use that should be noted? 2) PAYMENT VERIFICATION I certify that the contractor has provided copies of royalty agreements, if any, and that the contractor has provided verification of payments made in accordance with agreements and/or contract provisions. Attach copy of proof of payment to this form. 3) PROJECT APPROACH PERMIT CERTIFICATION I certify that 2 Each Commercial approaches were reconstructed within the project right of way limits according to the as-built plans of record on file with the Contracts Section. The approaches are noted on the attached Approach Summary that has been forwarded to the Chief, Right of Way section on 2/17/17. __________________________________ ____________________________________ Signature of Project Engineer Date
2/17/2017
N/A TAD
1
Donovan, Travis A (DOT)
From: Donovan, Travis A (DOT)Sent: Friday, February 17, 2017 3:56 PMTo: Wilson, Kahlil A (DOT)Subject: Airport Way PM Stage II - Approach summary and form 27D-174Attachments: 13- ROW Clearance (25D-174).pdf
reetin s ahil,Pleasefindattachedfor forreferenceproject.Thankyou,Travis A. Donovan | Project Engineer | Northern Region Construction 2301 Peger Rd, Fairbanks, Ak 99709 |�PH: 907-451-2652 |�CELL: 907-590-4355| �FAX: 907-451-5487 | [email protected]
1
Donovan, Travis A (DOT)
From: Donovan, Travis A (DOT)Sent: Friday, February 17, 2017 3:22 PMTo: Ciampa, David N (DOT)Subject: Monument Records - Arpt Way PM - Stage II, NR Signal Interconnect Arpt/Peger, NR
Pedestrian ImprovementsAttachments: Land Survey Monument Record Transmittal.pdf; Apt Way PM II - Monument
Records.pdf
Mr. ia pa,
Pleasefindattached onu entrecordtrans ittal e oand onu entrecordsforsaidproject.
Thanks,
Travis A. Donovan | Project Engineer | Northern Region Construction2301 Peger Rd, Fairbanks, Ak 99709 |�PH: 907-451-2652 |�CELL: 907-590-4355| �FAX: 907-451-5487 | [email protected]
MEMORANDUM State of Alaska Department of Transportation & Public Facilities
TO: Dave Ciampa Right of Way Northern Region FROM: Travis Donovan Project Engineer Northern Region
DATE: 2/17/2017 FILE NO: TELEPHONE NO: 907-451-2652 SUBJECT: Arpt Way PM - Stage II, NR Signal Interconnect Arpt/Peger, NR Pedestrian Improvements 0610(007)/63278,0002(334)/60520&0002(286)/62489 Monument Records
Attached please find for your review and recording, monument records for the subject project. Please call with any questions or changes required. Thank you. Travis Donovan
HomeHome InboxInbox OutboxOutbox LogoutLogout
From:
Travis Donovan ([email protected]) NR DOT Construction from 10.10.75.130 on 17 Feb 2017 02:51:57 PM
To:
Filename Type Size DescriptionApt PM II - Submittals.zip application/x-zip-compressed 58.2 MB
NR Interconnect Apt-Peger Submittals.zip application/x-zip-compressed 45.4 MB
NR Ped Improvements - Submittals.zip application/x-zip-compressed 18.9 MB
3 files
Comments:
Please find attached submittals for all Traffic and Signals related materials incorporated into the following projects: Arpt Way PM - Stage II, NR Signal Interconnect Arpt/Peger, NR Pedestrian
To send the file to someone else, simply send them this Claim ID and Passcode:
Alaska ZendTo https://drop.state.ak.us/drop/dropoff.php
1 of 2 2/17/2017 2:59 PM
U.S. DEPARTMENT OF TRANSPORTATIONFEDERAL HIGHWAY ADMINISTRATION
FINAL INSPECTION OF FEDERAL-AID PROJECT CONSTRUCTED UNDER 23 U.S.C. 117
1. PROJECT NAME AND NUMBER Arpt Way PM - Stage II, NR Signal Interconnect Arpt/Peger,
NR Pedestrian Improvements 0610(007)/63278,0002(334)/60520&0002(286)/62489
2. BOROUGH/CITY FNSB/Fairbanks
3. STATE Alaska
4. DESCRIPTION OF IMPROVEMENT AS PROGRAMMED: Project 63278 consists of resurfacing Airport Way and adjoining frontage roads from Peger Road to Hoselton Road. Work includes replacing signs and fencing and upgrades to signalized intersections. Project 60520 consists of improving connectivity and upgrading the communication bandwidth between traffic signals located on Airport Way and Peger Road. Project 62489 consists of removing existing crosswalk lines and installing with inlaid methyl methacrylate crosswalk lines at multiple intersections. A rectangular rapid flashing beacon system will be installed at the intersection of the frontage road along Airport Way and Cowles Street. 5. CONTRACTOR’S NAME: HC CONTRACTORS, INC.
6. CONTRACT AMOUNT $8,385,165.52
7. NOTICE OF COMPLETION: The above listed project has been completed.
A final inspection by ADOT&PF has found this project to be in reasonable conformance with the PS&E.
SIGNATURE _____________________________________ (SHA OFFICIAL) Frank Ganley, P.E. TITLE Regional Construction Engineer 8. ADOT&PF INSPECTION MADE BY: Travis A Donovan
9. DATE OF INSPECTION 06/09/2016
10. IN COMPANY WITH: Brian Herning, Travis Donovan cc: ADOT&PF Regional Construction Engineer (e) ADOT&PF Headquarters Director, Statewide Design & Engineering Services Division (e) ADOT&PF Headquarters Director, Administrative Services Division (e) FHWA Engineer (e)
Form FHWA-1446C-AKDO (5/99ge)
PROJECT HISTORY
PROJECT NAME: Arpt Way PM - Stage II, NR Signal Interconnect Arpt/Peger, NR Pedestrian Improvements
PROJECT NUMBER: 0610(007)/63278,0002(334)/60520&0002(286)/62489 ADVERTISING DATE: 04/14/2015DATE CONTRACT SIGNED: 05/19/2015DATE OF LETTER OF AWARD: 05/19/2015NOTICE TO PROCEED DATE: Limited 06/12/15, Full 06/24/15ORIGINAL CONTRACT COMPLETION DATE:
10/31/2015
CONTRACT COMPLETION DATE EXTENSIONS:
06/08/2016
FINAL INSPECTION DATE: 06/09/2016ACTUAL COMPLETION DATE: 06/08/2016LIQUIDATED DAMAGES with explanation: 0
PRIME CONTRACTOR: HC CONTRACTORS, INC.SUBCONTRACTORS: Arctic Surveys, Rady Concrete Construction, Diamond Fence Company,
Emulsion Products, FW Scott Enterprises, KJ Enterprises, Hot Wire Electric, Voorhees, PFK Enterprises, Jolt Construction & Traffic Maint., Pacific Asphalt, Bighorn Enterprises, EC Haulin, Roger's Trucking, Middle Fork, Hot Wire Communications
DESCRIPTION OF PROJECT: Project 63278 consists of resurfacing Airport Way and adjoining frontage roads from Peger Road to Hoselton Road. Work includes replacing signs and fencing and upgrades to signalized intersections. Project 60520 consists of improving connectivity and upgrading the communication bandwidth between traffic signals located on Airport Way and Peger Road. Project 62489 consists of removing existing crosswalk lines and installing with inlaid methyl methacrylate crosswalk lines at multiple intersections. A rectangular rapid flashing beacon system will be installed at the intersection of the frontage road along Airport Way and Cowles Street. BRIEF NARRATIVE Construction Activities:
The Project Commenced on 6/14/15. Hotwire, the Electrical subcontractor, began work on 6/22/15 at the Intersection of University Avenue. HC Contractors began milling and paving work between Pikes and Sportsmans Way as there was no electrical trenching work in this segment. The milling and paving schedule was dependant on the electricians getting the fiber optic conduit installed. The milling and paving followed the fiber optic and electrical work. Trenching of the fiber optic conduit proved to be a slow difficult task, with many unidentified underground utilities effecting the final locations and routing of the new conduit, vaults, jboxes, etc. The short duration of the construction season and the late bid advertise/award dates also made it difficult for long lead time electrical materials to arrive to project ie. precast concrete fiberoptic vaults and steel manhole tops. Much of the exisiting interconnect RMC was to be utilized to run a new HDPE innerduct and fiber optic cable. Much of the existing RMC was damaged from interim projects moving it out of the way by improper bending radii, separations, and clogged conduit. These damaged areas had to be investigated and repaired prior to installation of the new innerduct. The work continued into early December with the finishing fiber optic work happening in cold weather conditions.The project was delayed into the following season for minor work and punchlist items. The contract was complete on June 8th,2016. Claim Activity:
Conflicts with existing underground utilities not shown on the plans caused delays to the 2015 season pushing work late into the season and ultimately delaying Project completion until the following season. HC Contractors submitted requests for equitable adjustments (REAs) totaling ~$1,400,000.00. After a review of project records and HC Contractor’s REAs, the Department countered with an offer of ~$550,000.00. The total amount of $800,000.00 was agreed upon as full resolution of the dispute. Contract time was extended to June 8th, 2016 to complete the remaining Contract and punch list work.
LESSONS LEARNED
DESIGN MANAGER:DESIGNER NAME: DONOVAN, TRAVIS A
SCHACHER, SARAH E
DURFEE, LARRY
63278 AIRPORT WAY PREVENTIVE MAINTENANCE - STAGE II
HERNING, BRIAN WCONSTRUCTION MANAGER:
RESIDENT ENGINEER:
SECTIONNUMBER ISSUE
1 When utilizing existing conduit to facilitate new installation, Make a note in the plans/specs or an itemfor repairing existing conduit. Approximately 6 areas of damaged existing conduit were found and hadto be dug up and repaired prior to installation of the innerduct.
Put all existing utilities on the plan sheets. Including State Owned Utilities.
The Department, by definition in the specifications IS considered a UTILITY. And needs to abide bythe 105 Utility Specification. Our M&O signal forces are not equipped with the man power nor theequipment to facilitate providing locates for all the State owned Utilities. The contract needs toredefine the States roll as a utility owner, or make the Contractor responsible for providing locates toexisting State owned Utilities.
105
2 Specify and detail what is required (sizes and method) as far as proving the existing conduit in the 662fiber spec
662
3 Add language to specification 106-1.08 for 660 submittals. Each traffic signal system complete will besubmitted as one complete submittal package.
106
4 Add specs to the 660 requiring certifications for the workers that are modifying signals. Talk to JasonJacobs about the recommended certifications
660
5 If plans call for signs to be braced and mounted on opposite sides a PST post, if necessary they cansometimes be mounted back to back with bracing offset vertically.If a designated framed sign is toonarrow to mount per LIGHT/SIGNAL POLE SIGN FRAMING & MOUNTING DETAILS in plan set, useStandard Drawing S-23.00 POPPLE . OR use Steel Saddle for MAST ARM MOUNTING FOR RSERIES SIGN detail in plan set.Sign notes conflict with the signal mast arm plan sheet drawing - offsetof the sign from the signal pole for mast arm signs should it be 2' from the CL of the pole or the edgeof the pole?
615