Transcript of Final Construction Project Sl 2009
8/14/2019 Final Construction Project Sl 2009
http://slidepdf.com/reader/full/final-construction-project-sl-2009 1/21
The Netherlands Toermalijn 7 [T] +31 (0) 84 39667 76
3643 AA MIJDRECHT [F] +31 (0) 84 39667 76
[W]www.mindtochange.nl
Sierra Leone 14, Bojon Street [T] +232 (0) 33 7358 20
8/14/2019 Final Construction Project Sl 2009
http://slidepdf.com/reader/full/final-construction-project-sl-2009 2/21
MIND TO CHANGE – Sierra
Leone
PROJECT OUTLINE | one
SUMMARY
A community based construction and training called “Capacity Building and
Construction (CBC)’’. The project will focus on building trust, hope and capacity
between the community people and ex-child combatants that have had some basic
skills training from the National Commission for Disarmament Demobilization and
Reintegration (NCDDR). These ex-child combatants are staying in the various
communities, but are finding difficult to reintegrate into the society.
The Construction project comprises of a group of ex-child combatants that are in a
socio-economic difficult position because of lack of trust in their various
communities they are staying. Construction Group (CG) project will provide
occupational training, construction skills, as well as basic educational services and
leadership development.
The project is multifaceted, comprehensive and innovative. It provides aid not only
to the ex-combatants that are in need of assistance in various communities, but also
to the community people who suffered during the course of war. We anticipate that
25 percent of the program will be set aside for capacity building between the ex-
child combatants and the community people through providing them with free minor
construction services. This will especially involve people that are victims of the war
like the amputees, the war wounded, and the war widows.
After the disarmament, these ex-child soldiers went through various skill training
such as carpentry, masonry, tailoring, gara tying dying, driving plumbing, electrical
8/14/2019 Final Construction Project Sl 2009
http://slidepdf.com/reader/full/final-construction-project-sl-2009 3/21
wiring. Most of these trainings lasted for only three months, and were followed by
handing out tool kits as a start up for the various careers. Based on the limited time
for the various trainings they received from NCDDR, most of the ex-combatants
ended up selling their tool kits. Yet some are still continuing with the trade, but
people do not trust them enough to be giving assignment or contract and this
especially counts for the carpentry, masonry, plumbing, and electrical wiring due to
lack of proper training and trust. As a result of lack of job, contract and assignment
for this category of people from the community where they are staying, Mind to
Change (MTC), as a humanitarian organization, sees it as a possible threat to the
fragile peace the country is presently enjoying.
GOALS AND OBJECTIVES
There are two major goals for the "CBC" Project and objectives within each of the
goals:
Goal 1 - To reduce the degree of marginalization among ex-combatants and child
soldiers.
Objective 1.1 - To provide community people in eastern Kono and southern Bo
province of Sierra Leone with relevant information regarding trust, forgiveness andacceptability for the ex- child soldiers.
Objective 1.2 - To assist communities with minor construction services in Kono and
Bo, especially the war victims.
Objective 1.3 - To teach communities in Kono and Bo how to evaluate changes in the
ex-child soldiers of their community.
Goal 2 - To effectively train the ex-child soldiers with various construction skills in
order to help them solve their socio-economic problems, and gain hope and trust fortheir reintegration.
Objective 2.1 - To recruit a group of ex-child soldiers (30 at provincial level each
year) and help them to reintegrate in society and to become independent and
trustworthy in their various careers.
Objective 2.2 - To provide a one (1) year construction and job training program for
the ex-child soldiers.
Objective 2.3 - To place the ex-child soldiers in a position in which they are able tohelp the community they are staying in with minor construction services.
8/14/2019 Final Construction Project Sl 2009
http://slidepdf.com/reader/full/final-construction-project-sl-2009 4/21
TARGET GROUP
The target population for the CBC is the group of most socio-economically,
occupationally, and educationally disadvantaged ex-child soldiers in the various
communities. The project administrators will utilize the resources of the community,the community people, along with those of experts in construction companies,
educational planning, administration, and civil engineers to implement the program.
It is essential that the project administrators research, select, and recruit those ex-
child soldiers in the various communities that are most in need of the resources
offered. The following will be utilized by the project planners and administrators to
research, select, and recruit project participants:
• community newspapers and radio stations, using both community service
announcements and advertisements;
• community agencies (such as the Police ghettoes, poyo bars, and Boys and
Girls Clubs) to identify ex-child soldiers who are currently in difficult situations
or have nothing to do on daily basis;
• court officers and probation officers who can identify participants who have
recently been discharged from youth cities or state prisons;
• local religious institutions and their affiliated youth groups;
• local agencies that work with those recovering from alcohol or other
substance abuse problems who might be able to utilize the services of the
program;
• community offices of local political leaders, ranging from district leaders, to
members of the City Council, State Legislature, or Congress;
• individuals who refer to themselves or others;
• The ex-child soldiers themselves as they still know their colleagues that are in
difficult position in the community.
All recruitment efforts are to be conducted without consideration of a participant's
race, ethnicity, sex, disability, or sexual orientation, and a statement to this effect
will accompany all public service announcements, advertisements, and locally-
placed flyers or posters.
As part of the effort to recruit and retain participants with dependent children, it will
be necessary for the program planners to study the feasibility of providing child care
services for those hours during which program participants are on job sites and in
the classroom. CBC participants will be selected according to the following criteria:
• Participants must be between the ages of 16-30;
8/14/2019 Final Construction Project Sl 2009
http://slidepdf.com/reader/full/final-construction-project-sl-2009 5/21
• They must be ex-child soldiers that at least have gone through basic
skill training in the following areas: carpentry, masonry, plumbing,
electricity painting, or be in serious risk of dropping out of high school.
75% of the program participants must have gone through the past
NCDDR program.
• They must be very disadvantaged or have no hope of making a living in
the community they are staying in.
• They should express an interest in learning about the construction
trades and in completing at least one of the above skill training options.
Twenty-five participants will be selected on the basis of recommendations of localcommunity people, agencies and leaders, and on the basis of an interview
discussion with the project administrators. Participants should be counselled prior to
their acceptance into the program regarding its length (1 year) and the daily time
commitment (9am-6pm, Monday to Friday) involved.
TARGETS AND PROJECT ACTIVITIES | two
REASONABLE COSTS
The planning process has taken into account all reasonable and legitimate expenses
related to the implementation of the CBC project. MTC and Instructors have had
extensive experience in managing, implementing and administering training and
counselling programs and this knowledge will be put to use to devise both the
project and the budget.
Cost estimates have been based on a detailed project design which takes into
account all of the criteria, and other aspects of the project, which include staffing,
wages, stipends, educational costs, workshops, travelling cost, communication cost,
implementation cost, and uniforms, tools and equipment. Other costs that will be
incurred will include counselling and support services, leadership development and
job placement.
The project is based on a year long schedule which takes into account the difficulty,
hazard and liability that training young people for the construction trades entail.
Safety will be emphasized and all progress through the project will be based on
capability, ability, attentiveness, and responsibility.
The instruction for each of the trades that is covered (carpentry, electrical,
plumbing, electrical wiring, and masonry) will be conducted by trainers who have
8/14/2019 Final Construction Project Sl 2009
http://slidepdf.com/reader/full/final-construction-project-sl-2009 6/21
practiced the trade that they will teach for a long time. In this way the participants
will learn a great deal more than just how to perform the tasks that each of the
trades requires. They will also be involved in the actual practice of construction as
labourers on the site, and will acquire necessary understanding of the actual process
of construction that governs behaviour at construction sites.Each of the participants will be paid a small stipend for any completed construction
work. We have figured this stipend on the basis of the 10 months that the
participant will be in the actual group of the project. The remaining period will be
spent in job placement activities. Each of the trainees will likewise be provided
appropriate safety equipment, tools and clothing such as work boots, work gloves,
hammers, etc. Classroom supplies will also be provided in whatever manner is
deemed advisable by the instructors.
We have estimated this cost as follows:Selection activities will be extensive and the pool of applicants will be large. Those
not selected will be placed on a waiting list for other selection activities.
Educational and job training services will require one fulltime supervisor/counsellor,
4 part-time classroom instructors and 4 fulltime trade instructors. The cost of
staffing will be € 10.080 per annum.
Supplies and materials for each of the trainees, which will enable them to pursue
instant outside employment once the program is over will be € 22.950 per trainee.
All other costs of the program are reasonable and customary and are illustrated in
the budget worksheets.
METHOD | three
PROJECT PLANNING
The CBC project described comprises of workshops for the community people,research, selection, recruitment, training, education, professional and peer
counselling, leadership development, and job placement for ex-child soldiers who
have had basic knowledge in the above various skill trainings, but are not finished,
because of the short training they had from the NCDDR program, and have very
limited training, educational, or job placement resources available to them. This
project will include feasibility studies on recruiting participants into the project;
utilizing and supporting existing community counselling, child care, health care, and
job counselling services and developing new services where these do not already
exist; retaining participant in the program once they have begun their on-sitetraining and educational activities; providing basic English as a Second Language
8/14/2019 Final Construction Project Sl 2009
http://slidepdf.com/reader/full/final-construction-project-sl-2009 7/21
training and instruction toward successful completion of construction training under
the supervision of MTC until they start to work in their various communities.
Wherever possible, community resources will be put to effective use through CBC in
their operation for the benefit of the community as a whole. In all instances, we will
work with educational consultants to develop the comprehensive educationalcomponent of the project. The participants will be involved into the planning of the
various skill trainings of their choice and program development in order to
implement the project successfully. Careful planning at the early stage of the project
will enable the participants to address the diverse problems they are facing.
POTENTIAL PROBLEMS AND SOLUTIONS
The planning process will be focused on the research, selection, and recruitment of the participants in to the CBC project. The planners will need to study the available
knowledge and tools for recruiting participants: community people, community
newspapers, local popular radio stations, community centres, police community,
local Boys and Girls Clubs, the Society, and religious institutions and their related
youth groups, alcohol and drug centres, such as ghettos and poyo bars, and
guidance counsellors (to identify participants (ex-combatants/child soldiers) at risk
in the communities who may be appropriate participants), community service
agencies that work with young people, and individual referrals will be useful sources
for locating potential project’s participants. The program planners and
administrators need to make connections with these sources and establish working
relationships with them in order to complement existing community problems, while
providing a unique skill training, educational and job training opportunity for the
target population. Specifically, the planning process will be targeted at working
closely with the community to establish the project as a viable community project.
During the implementation stage, it will be necessary to work closely with
participants before they begin their on-site construction training or classroom
education. We want to provide intensive and extensive pre-program counselling that
will help participants to understand the scope of the project; the education,counselling, and training opportunities it provides; the importance of personal
commitment to changing earlier patterns of attendance, punctuality, and
responsibility in a job or school setting; and the potential to use the training to make
significant changes in the life of participants.
All ex-child soldiers who wish to take advantage of the project will be allowed to do
so because of the need to care for their dependents. As part of the effort to recruit
and retain these program participants, project planners will study the feasibility of
providing child care for those hours during which program participants are on the job
as well as the time when they are in class. It will be necessary to consider issues
8/14/2019 Final Construction Project Sl 2009
http://slidepdf.com/reader/full/final-construction-project-sl-2009 8/21
such as on-site day care for their children in their homes. In addition, it is critical
that project planners take into account the licensing, and the health care, and
educational requirements of all participants. All of these issues need to be studied
and specific provisions for child care will have to be formulated.
STAFF TRAINING
Staff members recruited for the CBC project will be required to work effectively as a
team. Many will work with participants in more than one content area and all will be
expected to assume counselling and leadership-building tasks with the group as well
as a traditional classroom teaching roles. All staff members will need to spend
considerable individual time developing lessons and curricular materials outside of
required class time. In order to facilitate the team-building process, all the project
staff members will participate in a three days retreat after every two months,comprised of workshops and discussions focused on the community, the
construction trades, the program's population, and the mission and goals of the
project. The three days retreat will be held at the project site and will consist of the
following activities:
Monday Morning: Team- Building Workshop (outside consultant), role-playing,
discussions, and exercises to help staff members develop a closer acquaintance with
each other's individual expertise.
Monday Afternoon: The project goals and objectives presentations by programadministrators and a discussion.
Tuesday Morning: Introduction to Construction I field trip to a construction site that
will help staff members to become more familiar with the environment in which the
project participants will be spending an important part of their working day.
Tuesday Afternoon: Introduction to Construction II lectures by representatives of the
construction trades to help staff members understand basic terminology and work
processes on the job.
Friday Morning: Discussion of community and the project resources to assist
participants with problems related to health, child care, and family or legal
emergencies.
Friday Afternoon: Counselling II workshop on recognition and assistance with
learning disabilities; drug, alcohol, or other substance abuse; physical abuse in a
family or relationship; or personal psychological difficulties.
RECIPROCITY/ PAY BACK
8/14/2019 Final Construction Project Sl 2009
http://slidepdf.com/reader/full/final-construction-project-sl-2009 9/21
The site of both the construction program and the training activities will be
conducted simultaneously. The work will take place in concert with the training
activities. The participants will be actively engaged in learning the relevant
construction trades on the site. The construction items identified in the program’s
funds will be used to construct public infrastructures such as community centres,market schools that were damaged or completely destroyed during the course of
the war in the form of harmonizing the relationship between the community
members and the ex-child soldiers.
The participants of CBC (ex-child soldiers) will provide free minor construction
service for the community people in the form of capacity building to harmonize their
reintegration. For example, if there is any damage done to the existing structure of
any community member, especially the war victims, the project will mobilize its
participants to repair the structure. In addition, if any community member wants to
reconstruct his or her structure that was destroyed during the course of war, uponhiring the project participants will have price reduction in labour fees in the form of
community solidarity to fully welcome the ex-child soldiers in their various
communities.
The costs for private construction will purely be the responsibility of the person
hiring the project participants, but the rehabilitation of any public structure will be
the responsibility of the community members and the participants of the project in
the form of pay back.
IMPLEMENTATION | four
a. The CBC project will be ongoing relationships with the community members at
various levels, other social service agencies, and construction companies in their
area of operation. It is anticipated that several of those completing the program will
continue their skill at one of the towns, cities or any community they found
themselves. MTC will run the project in the target area for one year and choose
other areas in the future. The expectation is that more community members would
be ready to accept the ex-child soldiers and obtain services from them the CBC
project after one year in the construction project. MTC itself will offer assistance to
the community in paying school fees for ex-child soldiers that are staying with some
of the community people. All participating in the project would, of course, be able to
use those services. Currently, MTC has on its staff a social worker who provides or
refers ex-child soldiers to the project.
b. In the past MTC has served as an organization to give scholarship to ex-child
soldiers in the form of a reintegration program. The staff of that program is currently
employed to MTC and has extensive contacts with those in the program as well asthe various categories of ex-combatants. These contacts and skills will be further
8/14/2019 Final Construction Project Sl 2009
http://slidepdf.com/reader/full/final-construction-project-sl-2009 10/21
developed and provided to the staff of the project both in the planning and
implementing phase, as well as during the training period of the program.
c. During the planning phase of the project, all of the Joint Boards as well as the ex-
child soldiers, and the construction industry will be contacted for exact information
concerning their contribution for the programs. MTC's contacts with the variousstake holders as well as the community members, personal contacts with the
educational directors, instructors of the project should provide program with the
contacts necessary to facilitate the transition between the incoming and the
outgoing participants in the construction industry.
COUNSELLING, LEADERSHIP DEVELOPMENT, AND SOCIAL SERVICES
Although the Counselling and Leadership Development class component is integral
to MTC and the project’s success, it is also the case that every class, group activity,and on-the-job experience presents an opportunity for leadership development. Staff
members will be trained in essential team building skills not only to form a cohesive
cooperative learning group but also to work closely with the project participants to
facilitate and encourage the development of both individual and group skills.
Speaking in large and small groups; presenting an argument; negotiating; and
mediating among conflicting points of view will all be developed through solving real
problems presented to the group; role playing; and simulation games.
Participants may come to MTC with personal and social problems for which they mayneed advice and counselling. The program plans a feasibility study of child care as
part of the grant or funding process; participants who require counselling for
substance abuse, marital, legal, or other family problems will be referred to MTC.
EDUCATIONAL AND JOB TRAINING SERVICES
Activities:
The schedule below indicates the various educational and job training activities of the project.
Monday, Tuesday, Wednesday, Thursday, Friday
10am Construction Skills and On-the-Job Training
11am Construction Skills and On-the-Job Training
12pm -------- LUNCH -------
1pm
8/14/2019 Final Construction Project Sl 2009
http://slidepdf.com/reader/full/final-construction-project-sl-2009 11/21
2pm Construction Skills and On-the-Job Training
3pm Construction Skills and On-the-Job Training
4pm Analytical Thinking, Math, , Leadership Counselling.
CONSTRUCTION SKILLS AND ON-THE-JOB TRAINING
This component of the participants' training will be developed with the advice of an
expert in apprenticeship training from one or more of the construction companies.
The consultant will be employed mainly to provide assistance in developing specific
program modules to teach specific job-related skills. The project participants will
work on construction and rehabilitation projects in their communities.
COURSE DESCRIPTIONS
Construction Skills: this course consists of closely-supervised on-the-job work
experience at a local construction site. Participants will become familiar with
construction terminology; common work procedures in different construction trades;
the importance of teamwork; and safety procedures. Supervisors will be men and
women who have achieved journeyman status in their respective trades, and the
ratio of participants to supervisors will be no more than 7:1.
English as a Second Language I: this course will provide English language instruction
to those of the project participants who require rudimentary instruction in English. It
will meet at the same time and will share the same cultural events such as field trips
and guest speakers. Topics to be studied include basic grammar; simple sentence
structure; speaking; reading comprehension; and writing.
English speaking training is a critical component of the project, as many participants
will not have sufficient proficiency in English to allow them to compete successfully
in the job market, perform complex tasks on a construction site, or earn their State
General Education Diploma. The twenty-five students in the program will be grouped
according to their English proficiency, with class size ranging from 10 to 15 students. The program will employ two English instructors, each on a part-time basis. They will
work together to coordinate classroom instruction. Reading, writing, and speech will
also be taught by the English instructors in order to maintain a focus on language
learning. Examples of culture-focused lectures and trips that can form the basis of
classroom assignments in English, Reading, and Writing. (what do you mean by this
last sentence? Examples? What are the examples? I don’t get it..)
The instructors who teach English, Reading, and Writing should make every effort to
coordinate as much as possible into language and basic skill teaching.
8/14/2019 Final Construction Project Sl 2009
http://slidepdf.com/reader/full/final-construction-project-sl-2009 12/21
READING AND WRITING
Reading: this course provides practice in reading comprehension, fluency, and
speed. Materials used in the course range from instructions for operating
construction equipment to advertisements, stories, newspaper articles, construction
education booklets, and compositions written by students. The course will alsoinclude practice in reading aloud.
Writing: Students in this course will improve their writing fluency, skill, and speed.
Subject matter can range from job experiences and personal entries in a journal to
current events.
As described above, these courses are closely connected to the teaching of English
as a Second Language. They should also be focused on teaching the skills necessary
to work successfully in construction. During the last quarter of the one-year
program, instructors will develop and use test-taking exercises to help studentsbecome familiar with taking standardized tests. Two hours each week will be
dedicated to instruction in Reading and another two in Writing. Points of grammar,
spelling, punctuation, sentence structure, and the formulation of a logical argument
will all receive attention in these sessions that will dovetail with the participants'
study of English language and structure in their classes.
SPEECH
This course will provide practice in a variety of forms of oral communication; readinga prepared text, conversation, group discussion, argumentation, and
extemporaneous speaking. Participants will be encouraged to share their own
written work with colleagues as they improve their fluency and diction.
The project’s participants will receive one hour each week in Speech instruction. This
will consist of prepared and improvised conversations, reading aloud,
extemporaneous discussions of topics important to the participants, job interviewing
practice, and informal group discussions. The Speech component of the curriculum is
closely tied to the Reading, Writing, and Leadership Counselling components in that
it seeks to improve the participants' self-image and self-confidence as well as
specific cognitive skills.
MATHEMATICS
Participants will become familiar with basic arithmetic, mathematical operations
such as addition, subtraction, multiplication, division, number placement, and basic
algebra. They will also become familiar with basic geometry. Learning materials
introduce mathematical skills required in construction as well as everyday activities
such as shopping or reading a chart or graph in a newspaper.
8/14/2019 Final Construction Project Sl 2009
http://slidepdf.com/reader/full/final-construction-project-sl-2009 13/21
Practical mathematics in occupational and consumer settings will form an important
component of the Mathematics curriculum. However, it will be necessary to insure
that participants had a solid grounding in basic mathematical concepts. The
following topics will be among those covered in the Mathematics curriculum:
Basic operations: addition, subtraction, multiplication, division; Number placement,reading simple and complex numbers; Reading simple charts and graphs; Fractions;
Decimals; Percents; Measurement; Geometry; Introduction to Statistics.
LEADERSHIP COUNSELLING
This aspect of the project will transcend its Leadership Counselling by being a
classroom and job site experience. Participants will work together to solve problems,
negotiate solutions, and present divergent points of view. They will discuss issues of
personal development, of their experiences in the project, and encourage each otherto seek solutions for such problems as substance abuse, marital difficulties, or legal
problems.
Leadership Counselling offers the project’s participants an opportunity to learn how
to find the resources to address personal, family, and community problems. During
the course of the year, participants will discuss their progress on the job site and in
the classroom. The program counsellor will integrate class activities, including
teaching and job experiences, into the weekly discussions. Participants will also
become familiar with job interviewing techniques and strategies throughinformational films, discussions, role-playing of interview situations. The Leadership
Counselling component of the program will also serve as a job referral service with
connection to those local communities that lent their support in recruiting
participants for the project.
COSTS AND BENEFIT | five
The bulk of the CBC grant, funds will be used for the buying of tools to be used bythe ex-child soldiers, MTC as an organization identified to use during any
construction assignment that would be giving to them, and the total amount needed
to implement this project € 45.140. Also MTC will use the fund to pay teachers to
teach them with basic education for them to able do estimate and sign contract with
any future client. Mind to Change will use the fund to conduct workshops in the
communities they are staying in, in the form of capacity building, for the
communities to see them as people to be recon with for them to start giving them
construction assignment that will remedy their socio-economic position. (I think you
should rewrite these sentences, I don’t get what you mean exactly) MTC will use thefund to facilitate the minor construction services for the war victims in the project
8/14/2019 Final Construction Project Sl 2009
http://slidepdf.com/reader/full/final-construction-project-sl-2009 14/21
operational areas. We estimate that 30 ex-combatants/child soldiers will be served
in the beginning face of the year long program. The program's Administrative cost
will be about 15 percent of the grant/funding budget.
The CBC grant/fund cost breakdown is as follows:
• Buying of tools (€ 22.950);
• Administrative costs (€ 2.450) ;
• The project will benefit both the community people and ex-child
soldiers.
• The community people will benefit minor construction services
especially the war victims, and the ex-child soldiers will benefiteffective training to be able to properly reintegrate and to solve their
socio-economic situation.
• The outputs of the project (?) are: capacity building between the
community and the ex-child soldiers. This means that at the end of the
project the community members and the ex-child soldiers will be able
to understand each other, that there will be proper reintegration of the
ex-child soldiers, that at the end of this project the communitymembers will accept the ex-child soldiers, there will be socio-economic
independency. This means that after the project, the ex-child soldiers
will be able take care of their social and economic situations.
• Average total cost per beneficiary is € 250.
• For this project, the value of benefits and costs of inputs are in the form
of vice versa.
The CBC costs include salaries, staff, workshops, transportation, communication,
medication, recruitment, and tools and materials for training and education and
construction work.
Administrative costs include all of the appropriate financial and program reporting
requirements, accounting and auditing costs, payroll and secretarial work and other
standard administrative costs.
The CBC costs will be funded through other sources including but not limited to
International Construction Companies’ Fund, State Fund for youth activities,
8/14/2019 Final Construction Project Sl 2009
http://slidepdf.com/reader/full/final-construction-project-sl-2009 15/21
conventional lending, public and private matching funds, and International
Organizations.
MONITORING | six
MONITORING SHOULD BE DONE BY:
• the affected community, represented by the local committee;
• MTC organization (through the Operational Manager); and
The various donors such as: International Construction Companies, Private Sectors,
International organizations, to name but few that are going to fund this project.
MEASUREMENT AND EVALUATION OF THE PROJECT
Achievements will be measured through questionnaires.
Achievement will be verified by the project administrators.
Monitoring and follow-up have to be part of the project activities. Part should be
continuous self evaluation by MTC as an implementing agency.
The monitoring and reports from the project will be available on three months bases,
starting from the day the project will come to an effect. The monthly report will be
available from the starting of the project.
PROJECT RESULTS | seven
Job Placement and Completion Follow-Up
The one-year project will offer participants a basic cognitive, developmental, and
experiential foundation for future life and work. However, training and educationrequire substantive follow-up in the form of job placement and continuing
counselling services for program graduates.
During the last month of the project, participants will focus on interviewing and oral
and written skills (development of a resume) in their area of trade they will become
familiar with.
Those who wish to explore the possibility of attending poly-tech will be referred to
Higher Vocational Institute at the community Vocational Institutes.
8/14/2019 Final Construction Project Sl 2009
http://slidepdf.com/reader/full/final-construction-project-sl-2009 16/21
Measurable objectives will be achieved by the number of ex-child soldiers who are
trained and who will successfully complete the Capacity Building and Construction
project. In addition for each class and the job training sessions, attendance will be
taken, and attendance will be used to measure the degree of program success. No
participants will be permitted to graduate without attending 90% of the sessions/jobtraining in each of their area of trade.
Job and Leadership Development will be recorded with follow-up during one year of
the program of the individual participants. Follow-Up counselling will be made
available by (MTC).
BUDGET | eight
PROJECT BUDGET (30 TRAINEES)
Project CostsComponent Amount
Materials/ToolsSpecification Trainees
Amount
€ 13.325
Carpentry10 € 475 €
4.750
Masonry 10 - 335 - 3.350Electrical Wiring 6 - 220 - 1.320Plumbing 4 - 235 - 940Reciprocity/Pay back - 765
8/14/2019 Final Construction Project Sl 2009
http://slidepdf.com/reader/full/final-construction-project-sl-2009 17/21
Printing of Learning materials - 500Uniform - 1.000
Teaching and Learning Materials - 700
Workshops Specification € 1.510
Community based capacitybuilding
Days Participants
Region 1: Koidu Town, Kono 3 50 € 550Region 2: Bo Town 3 50 - 550Region 3: MTC 2 50 - 410
Training SpecificationMont
hsSalaryp.m.
€ 10.330
Full time on the job
trainingsupervisor/counsellor (1)
12 € 140 € 1.680
Part time classroomInstructor (4)(€ 35 per instructor per month)
12 - 140 - 1.680
Full time trade instructor(4)(€ 140 per instructor per month)
12 - 560 - 6.720
Travel & Lodging € 150Food budget - 100
Project totals € 25.165
Transport is needed for the project instructors to be able to travel to the implementation
site, because the two places are not close to each other. If the project instructors are
travelling to these places they will need money for food and lodging, and the estimated
budget is for twelve months.
IMPLEMENTATION COST
MATERIALS AMOUNT Transportation MTC Project coordinator € 800Lodging MTC Project coordinator - 800Communication MTC Project coordinator - 550Printing office - 300Total € 2.450
Transport is needed for the project coordinator to be able to travel to the implementation site,
because the two places are not close to each other. If the project coordinator is travelling to
these places he will need money for food and lodging, and the estimated budget is for twelve
months.
8/14/2019 Final Construction Project Sl 2009
http://slidepdf.com/reader/full/final-construction-project-sl-2009 18/21
PROJECT TOTALS
Project totals (direct & indirect costs) AMOUNTProject costs € 25.165Implementation costs - 2.450Total € 27.615
Transport is needed for the project coordinator to be able to travel to the implementation site,
because the two places are not close to each other. If the project coordinator is travelling to
these places he will need money for food and lodging, and estimated budget is for twelve
months.
THE ORGANIZATION’S PROFILE | nine
GOAL
Our main goal is to bring members of vulnerable groups back to mainstream society
and to actively involve them in their communities, raise their awareness of their
rights and duties as citizens of the community and the necessity of their contributionto society, and finally, to enable them to take responsibility over their own lives.
OBJECTIVES
Mind to Change will focus its projects and programs on empowering and
capacitating individual members of vulnerable groups to enable them to develop
their own lives in the post-war society through education, capacity building, and
skills training.
Mind to Change will:
• Stimulate durable peace,
• Protect and promote the rights of members of vulnerable groups,
• Stimulate societal reintegration and (re)building of the post-war society,
• Educate donor countries about the effects and challenges of war and
living in a post-war society, as well as educate donor countries about
life in a developing country.
Through;• the implementation of programs and projects in post-war societies
8/14/2019 Final Construction Project Sl 2009
http://slidepdf.com/reader/full/final-construction-project-sl-2009 19/21
• educational campaigns in post-war societies and donor countries to
raise awareness
• scientific research for the development of effective programs and the
general good• Participation and involvement in the political debate and policy making.
BACKGROUND/JUSTIFICATION | ten
The CBC, is a project that comprises of a group of ex-combatants and child soldiers
that are in socio-economic difficult position because of lack of trust in the various
communities they are staying in. The Construction and Training (CT) project willprovide occupational training, construction skills, as well as basic educational
services and leadership development.
Mind to Change is a non profit organization working with ex- combatants and child
soldiers who have lost hope and trust in the various communities they are staying
for their role in the past war. The Capacity Building and Construction Training Project
is designed by MTC and the ex-combatants and child soldiers in order to build hope
and trust between the ex-combatants/child soldiers and the community through
construction group. Because of lack of hope and trust from the community for the
ex-combatants/child soldiers, it is difficult for them to properly reintegrate especiallyfor those that went through a skill training program with the National Commission
for Disarmament Demobilization and Reintegration (NCDDR) program.
After the disarmament, these people (ex-combatants/child soldiers) went through
various skill training such as carpentry, masonry, tailoring, gara tying dying, driving
plumbing, electrical wiring, to name but few for three months, which followed by tool
kits as start up for their various career. Based on the limited time for the various
training they received from NCDDR, most of them ended up selling their tool kits,
and some are still continuing with the trade, but people do not trust them enough to
be giving assignment or contract, especially the carpentry, masonry, plumbing, and
electrical wiring due to lack of proper training and trust. As a result of lack of job,
contract and assignment for this category of people from the community where they
are staying, MTC as a humanitarian organization sees it as a possible threat to the
fragile peace the country is presently enjoying.
This proposal requests attention from the various National and International
Construction Companies, Donor Communities, Institutions as well as private sectors
for their help in order for MTC to be able to change the negative image of this
category of people in post war Sierra Leone, by forming groups of them in wherethey can start to exploit the training they have acquired.
8/14/2019 Final Construction Project Sl 2009
http://slidepdf.com/reader/full/final-construction-project-sl-2009 20/21
We anticipate that whatever support, assistance, funds or grant giving to MTC, will
be an essential and primary part of our program and will help MTC to provide them
with occupational training, construction skills, as well as basic educational services
and leadership development, counselling to community people, in conjunction with
the rehabilitation of some of the public and private structures that was damaged orcompletely destroyed by the ex-combatants and child soldiers during the course of
the war.
The project MTC has proposed is multifaceted, comprehensive and innovative. The
CBCTG will provide aid not only to the ex-combatants and child soldiers that are in
dying need of assistance in the various communities but also to the community
people who suffered during the course of the war. We anticipate that 25 percent of
the program will be set aside for capacity building between the ex-combatants and
the community people through providing them with free minor construction service
especially people that are victims of the war like the amputees, the war wounded,and the war widows.
The ex-combatants and child soldiers are particularly vulnerable and dependent on
the community people for job/employment opportunities for both economic and
social reasons. Economically, the ex-combatants, and child soldiers’ population is far
more lack behind, because in this country the extended families can play a basic
role if they are staying together to sustain themselves in difficult times. Furthermore
the ex-combatants population and child soldiers are confined in a particular area
and are unable to search for opportunities elsewhere. If you go to the cities and
towns in Sierra Leone, you can find the ex-combatants and child soldiers in slum
areas, and remote parts of the towns. They are always grouped together, and
sometimes they engage in illegal activities for their living. Demographically, the
population of the ex-combatant/child soldiers is usually youthful. More than one third
of the population is under 28 years of age with the majority under 21.
The poverty rate is overwhelming. The population of ex-combatants and child
soldiers has the highest poverty rates in all of The Cities and Towns in Sierra Leone.
Over one third of their population is below the poverty line. Over 50% of them is still
staying in strange places instead of its places of origin, and has great difficulties interms of coping with its economic situation. The unemployment rate is over 25%
among the ex-combatants and child soldiers according to our findings in working
with them. And this does not account for the hidden unemployment and
underemployment that is pervasive in the local areas in Sierra Leone.
From the figures available at the present time the future looks no better, and that
will serve as a possible threat to the fragile peace in the country. Below half of the
ex-combatants and child soldiers’ population is in the labour force. Much of this can
be traced to the lack of available employable skills, lack of trust, or a mismatch
between the skills of the ex-combatants and those required by local or regionalindustries or companies. Most of the members of the local community who are
8/14/2019 Final Construction Project Sl 2009
http://slidepdf.com/reader/full/final-construction-project-sl-2009 21/21
employed work in informal sector such as farming, mining diamond petty trading,
clerical support, service work, sales and general labour. With the emerging young
population entering the work force, the ex-combatants are drastically in need for a
Program that will provide occupational training, construction skills, as well as basic
educational services and leadership development, counselling for them to gain newand better employment possibilities.
The ex-combatants and child soldiers are facing an inevitable crisis involving the
continuing marginalization from the communities they are staying in. Without a
significant change in the current trends of the younger people, whose majority is ex-
combatant and child soldier, will be forced to leave elsewhere to find employment
they have had the training for, such as armed robbery. They will be going to other
areas where there is conflict in order to support their families, since most of them
are married and are having children. One of the ex-combatants told us that at any
time he is in difficult financial problems, he thinks of robbing someone to getmoney, because he has had basic training but cannot make any money out of it.
One of the potential areas of economic growth in the next decade is likely to be
infrastructure, because most of the structures were damaged, and some were
completely destroyed during war. The infrastructure is a major problem in most
parts of the country, since the end of war six years ago.
In these circumstances training for the construction trades has the potential to have
a major impact on the local labour force especially among the ex-combatants/child
soldiers. The likelihood of both union and non-union employment in construction forbuilding both housing and the resulting infrastructure improvements is likely to be a
growth industry in the near future.