Final Bms Producion
-
Upload
sandesh-kamble -
Category
Documents
-
view
215 -
download
0
Transcript of Final Bms Producion
-
7/31/2019 Final Bms Producion
1/46
-
7/31/2019 Final Bms Producion
2/46
VISHAL
YOGESH
SEKHAR
ROHITSAGAR
VAIBHAVPRATHMAESH
-
7/31/2019 Final Bms Producion
3/46
TYPES OF PRODUCTION
LAYOUT OFMANUFACTURING COMPANY
NARSINGH HOSPITAL WASTEMANAGEMENT
-
7/31/2019 Final Bms Producion
4/46
-
7/31/2019 Final Bms Producion
5/46
TYPES OF PRODUCTION
Intermittent
JobBatch
Continuous
mass Process assembly
-
7/31/2019 Final Bms Producion
6/46
INTERMITTENT
PRODUCTION
Job
Production
Batch
Production
-
7/31/2019 Final Bms Producion
7/46
-
7/31/2019 Final Bms Producion
8/46
-
7/31/2019 Final Bms Producion
9/46
-
7/31/2019 Final Bms Producion
10/46
BATCHPRODUCTIONOF CRICKETBATS1.Receiving a lot of willow tree 2 Cutting down into logs
3.Logs are split into half. 4. Removing the barks
-
7/31/2019 Final Bms Producion
11/46
5. Logs are converted into clefts.
6. Inspection by supervisor.
7. The bat Clefts are shifted to
makers department.
-
7/31/2019 Final Bms Producion
12/46
8. FINISHINGOFBATS
9. Cutting A Wedge For The
Handle.
10.Shaping the bat handle. 11. inserting the handle.
8. Finishing of bats.
-
7/31/2019 Final Bms Producion
13/46
12. The completed bats are shipped to various companies.
.
13. bats are ready for sale.
-
7/31/2019 Final Bms Producion
14/46
CONTINUOUS
PRODUCTION
MassProduction
ProcessProduction
AssemblyProduction
-
7/31/2019 Final Bms Producion
15/46
-
7/31/2019 Final Bms Producion
16/46
-
7/31/2019 Final Bms Producion
17/46
CARCOMPUTER
-
7/31/2019 Final Bms Producion
18/46
Manufactured High Quality
Gold And Platinum Chain In
Italy .Over 25 Different Styles Of
Palladium Chain
Bassano ,Del ,Grappa, Italy.
-
7/31/2019 Final Bms Producion
19/46
1. Metals Preparation automated
rolling, forming and annealing
3. Weaving and Linking
High-powered machines
Palladium chains are
Soldered.
2. Alloys and its melding
-
7/31/2019 Final Bms Producion
20/46
4. Solderinga wide variety of different chain
styles.
One technician-12 workingmachines.
5. Annealing tube
6. Link Soldering
specially developed metallurgic
powder
-
7/31/2019 Final Bms Producion
21/46
7. talcum powder
conveyor belt
technician
8. Here bulk chain is fed intothe conveyor oven.
9. linking and laser welding.
-
7/31/2019 Final Bms Producion
22/46
10. diamond cutting procedure
11. Water freezing
Cylinder with a
chain style.
-
7/31/2019 Final Bms Producion
23/46
12. cutting
13. Cutting into pieces
14. Use ofmicro torches to
hand-solder .
-
7/31/2019 Final Bms Producion
24/46
The final produ
15. Base plating
-
7/31/2019 Final Bms Producion
25/46
LAYOUT The way in which the parts of something are
arranged or laid out. arranging & grouping of machines which are
meant to produce goods.
WHY DOES A COMPANY NEED LAYOUT Unorganized material flow?
People bumping into each other or products?
Having trouble finding your parts?
Employees spending more time moving items thanactually working on them?
Moving into a new building?
Expecting to add more equipment or work
stations?
-
7/31/2019 Final Bms Producion
26/46
TYPES OF LAYOUT
1.Process layoutIt involves grouping together likemachines in one department based upontheir operational characteristics.
2.Product layoutIt involves the arrangements of machinesin one line, depending upon sequence ofoperations. In product layout, if there is amore than one line of production, thereare as many lines of machines.
3 Fi d l
-
7/31/2019 Final Bms Producion
27/46
3.FixedlayoutFixed position layout involves the movement ofmen & machines to the product which remainsstationary. In this type of layout, the materials or
major components remains in a fixed location, &tools, machinery & men as well as other piecesofmaterial are brought to this location.
4.Combined layoutA combination of process & product layout is
known as combined layout
5. Cellular layout
Machines are grouped in to a cells &cells function somewhat like product layoutwithin a larger shop or process layout.
-
7/31/2019 Final Bms Producion
28/46
NARSINGH HOSPITAL
-
7/31/2019 Final Bms Producion
29/46
NARSINGH HOSPITAL
-
7/31/2019 Final Bms Producion
30/46
-
7/31/2019 Final Bms Producion
31/46
MOTO OF OUR PROJECT STUDY
Waste survey
Waste segregationWaste handling
Waste transportation
Scrap Control
-
7/31/2019 Final Bms Producion
32/46
WASTE SURVEY
-
7/31/2019 Final Bms Producion
33/46
Categories Of Bio Medical Waste
-
7/31/2019 Final Bms Producion
34/46
-
7/31/2019 Final Bms Producion
35/46
-
7/31/2019 Final Bms Producion
36/46
WASTE
SEGREGATION
-
7/31/2019 Final Bms Producion
37/46
WASTE HANDLING
Needle and syringes
-
7/31/2019 Final Bms Producion
38/46
-
7/31/2019 Final Bms Producion
39/46
-
7/31/2019 Final Bms Producion
40/46
Li id t
-
7/31/2019 Final Bms Producion
41/46
Liquid Waste-hospital Generate Liquid Waste-infectious Or Chemical. The Liquid Pathological
Waste Should Be Treated With A ChemicalDisinfectant. The Solution Should Be Treated With AChemical Disinfectant. The Solution Should BeTreated With A Reagent To Neutralize It. This Can Be
Flushed Into The Sewer System.
For Blood ,Serum Sample And Body Fluids Of
Laboratory Should Be Collected In Red Bags FromPenicillin Bulbs And Send It To Incinerator.
Put Empty Penicillin Bulbs Into Sodium HypochloriteSolution.
Liquid waste
-
7/31/2019 Final Bms Producion
42/46
WASTE TRANSPORTATION
-
7/31/2019 Final Bms Producion
43/46
On site transportation
Segregated waste have to be transported within the facilityfrom the point of generation to the final waste disposal site.All bags should be fastened and small trolleys can be used inlarge facilities. Trolleys and carts should be large enough sothat the waste is not piled up on them in an unsafe way. they
should be stable to minimize the risk of propping overhazardous waste even after decontamination should never betransported with general municipal waste.
Biomedical waste should collected and deposited withsanitary inspectorate 11:30 a.m and send to the incinerator.
Waste from surgery wards and hospital wards should becollected and send to the incinerator by 11:30 a.m
The biomedical waste shall be transported only in vehicleswhich may be authorized.
WASTE TRANSPORTATION
-
7/31/2019 Final Bms Producion
44/46
SCRAPOFHOSPITAL
They have two type of scrap
1. Regular scrap item
2. Engineering item
For the regular scrap item they have a ScrapRoom which is situated near the hospital itself.
A scrap note prepared by user department.
Valuation of the scrap item.Hierarchy for sanction of scrap.
Freezing the rates depending on the period of
time
-
7/31/2019 Final Bms Producion
45/46
Preparing The Scrap Sale Note, Which Include
Description Of Item, Rates , Quantity, Units,
Amount.
Finally , The Scrap Are Gate Passed; They Are
Approved By Authority To Sale.
For The Engineering Scrap Item They Have A
Godan At Sion, Where There Item Are
Accumulated Over The Period And The SameProcedure Is Followed To Sell Them.
On The Other Hand , The Wastage Are Written
Off From The Balance Sheet Of The Hospital.
-
7/31/2019 Final Bms Producion
46/46