FIMS/Real Estate WorkshopPalm Springs, CA
June 2-6, 2008
DOE Oak Ridge OfficeRebecca Whitehead
204/21/23
Responsibilities of Oak Ridge Office
Multi-Program Multi-Contractor DOE ORO:
Science Environmental Cleanup Nuclear Energy
304/21/23
DOE Oak Ridge - Science UT-Battelle (Oak Ridge National Laboratory) Oak Ridge Associated Universities (Oak Ridge Institute for Science and Education) Jefferson Science Associates, LLC. (Thomas Jefferson National Accelerator Facility; Newport News,
VA) Battelle Memorial Institute
(Pacific Northwest National Laboratory; Richland, WA) Stanford University (Stanford Linear Accelerator Center; Menlo Park, CA) Federal Direct Operations
Office of Scientific and Technical Information (OSTI) DOE-ORO
404/21/23
DOE Oak Ridge -Environmental Cleanup
Bechtel Jacobs East Tennessee Technology Park Oak Ridge National Laboratory
Isotek Oak Ridge National Laboratory – 3019 Complex
EnergX Oak Ridge National Laboratory – TRU Waste
Processing Facility
504/21/23
DOE Oak Ridge - Other Missions
Nuclear Energy Nuclear Fuel Supply United States Enrichment Corporation (Paducah
and Portsmouth Gaseous Diffusion Plants, and East Tennessee Technology Park)
Asset Utilization
Oak Ridge Office Sites
704/21/23
Oak Ridge - Status
ETTP Population of FIMS to include 240 Bldgs.,
344 OSFs, and 5,639 acres of land. Accounts for 10% of DOE’s Real Property
Inventory.
PNNL and SLAC Fully implemented and maintained FIMS.
804/21/23
Status, Con’t.
Federal Direct Operations OSTI
Fully implemented, validated, and maintained
FIMS.
DOE-OR Cataloged and entered OSFs into FIMS.
Remaining data fields are populated as source documentation is obtained.
Developed and implemented FIMS QA/QC program.
904/21/23
Status, Con’t. ORISE
Preparation continues for additional buildings to be demolished over the next few years.
Transfer of several buildings and land to the Department of Commerce was delayed but now back on track to be completed over the next 6-9 months.
USEC
Assigned federal staff to manage FIMS. Developed corrective action plan (CAP) for March 2008
Validation to populate FIMS with all DOE ownded/USEC leased facilities.
Executing CAP.
1004/21/23
Status, Con’t.
TJNAF Population of FIMS and contractor expectation of meeting
all required deadlines.
ORNL Fully implemented and maintained FIMS. Data recording and collection from facility operations have
been reviewed and are continuously being improved.
1104/21/23
Oak Ridge - FIMS Validation StatusSite/Contractor Validation Date Overall Score
ORO Federal (SC) January 2008 Green
ETTP (BJC-EM) February 2008 Green
TJNAF (JSA-SC) February 2008 Green
USEC Pad & Ports GDP (NE)
March 2008 Red
PNNL (BMI- EM & SC)
January and March 2008
Green
OSTI (SC) March 2008 Green
SLAC (Stanford-SC) April 2008 Green
ORNL EM and SC (UT-B, Isotek, EnergX, and BJC)
May 2008 Green
ORISE (ORAU) May 2008 Green
1204/21/23
Oak Ridge Success Stories ETTP
ETTP Closure Project – “…dismantling and preparing the massive (~4.8M gsf) K-25 building for demolition is our biggest challenge.” Quote by Gerald Boyd
Safety of our employees is our primary concern. K-25 is one of the largest D&D projects in the DOE
complex. Project re-baseline stretches closure to 2016. Demolished 12 buildings (~558K gsf) and 11 OSFs. K-31 and K-33 (~4.5M gsf) are available for reuse. Transferred 6 buildings (~ 289K gsf) to CROET; 3 of those
have been acquired by the private sector. Four more buildings and 6 OSFs will transfer to the City of
Oak Ridge in 2008 (~35K gsf).
Oak Ridge Success Stories: K-1401 D&D
1404/21/23
Oak Ridge Success Stories - Cont.
ORISE Cleared out the storage contents of one building to set the
stage for its removal, so we can expand a recently built Shipping and Receiving Facility.
ORNL (EM Isotek and EnergX work) Completion of Isotek’s and EnergX’s first FIMS validation
in May ’08. Submission of Isotek’s first asset management plan to DOE
for approval which includes real estate. Submission of CD-1 in May for the D&D of 292 buildings
at ORNL.
Oak Ridge Success Stories ORNL (EM BJC Work)
Completed fuel removal at Molten Salt Reactor. Obtained Bethel Valley Groundwater Engineering Study on soil
and surface water samples. Installed monitoring wells to further identify existing
contamination. Installed Melton Valley Pickett Wells to monitor potential exit
pathway from Melton Valley disposal area. Performed Tank W-1A TRU Soil Sampling to obtain detailed
analytical data on the TRU soil and identify the TRU and LLW boundary.
Disposed of 5 m3 of newly generated MLLW through the end of April 2008 for FY ’08.
1604/21/23
Oak Ridge Success Stories - Cont.
SLAC
Approval by DOE of High Value/Low Maintenance RPV’s for unique facilities.
1704/21/23
Oak Ridge FIMS Issues
None to report