Fiji PacWave2011

download Fiji PacWave2011

of 11

Transcript of Fiji PacWave2011

  • 8/12/2019 Fiji PacWave2011

    1/11

    STANDARD OPERATING PROCEDURE (SOP)

    AND

    PACWAVE2011 EXERCISE FOR FIJI

    Sefanaia.Seru

    a/Senior Scientific Officer

    Seismology Section

    Ministry of Lands &Mineral Resources

  • 8/12/2019 Fiji PacWave2011

    2/11

    OUTLINE

    Current Operating System

    Propose SOP base from current one

    PacWave2011 Exercise

    oObjective of the PacWave2011 Exercise for Fiji

    oPreparedness Phases ( Plan, Coordinate, Organize)

    o

    Execution StageoEvaluation and Summary Report

    Way Forward

  • 8/12/2019 Fiji PacWave2011

    3/11

    Current Operating System

    Tsunami Warning System

    Fiji

    100% Rely to PTWCfor tsunami warning

    50:50 % manual and automated systemfor seismic analysis and dissemination

    No local Tsunami Warning System

  • 8/12/2019 Fiji PacWave2011

    4/11

  • 8/12/2019 Fiji PacWave2011

    5/11

    FIJI THRESHOLD TABLE

    Parameters Tsunami Threat Levels Template to Use

    5.0Mw/ML 6.9kmNo threat Standard Text Message, only insert Eq Parameters, 1 message only

    0 Depth 50.0km

    7.0Mw/ML 7.4km Potential Threat

    (Advisory)

    Information Bulletin Issued, several messages

    30.0 Depth 50.0km

    Standby for evacuation, must be followed up until Cancellation

    7.0Mw/ML 7.4km

    Threat ( Warning)

    Warning Bulletin Issued, several messages

    All coastal low lying areas under threat

    0 Depth 30.0km

    Mw/ML 7.5Must be followed up until Cancellation

    0 Depth 50.0km

  • 8/12/2019 Fiji PacWave2011

    6/11

    TIDE GAUGE MONITORING FOR DISTANT TSUNAMI THREAT FOR NORTH

    PACIFIC AND SOUTH EAST PACIFIC BASIN

    Fiji Is.

  • 8/12/2019 Fiji PacWave2011

    7/11

    Areas of Responsibilities

  • 8/12/2019 Fiji PacWave2011

    8/11

    ETA ~14.0hrs

    ETA ~ 11hrs

    ETA ~11 hrs

    ETA~2hr

    ETA ~ 9 hrs

    ETA ~ 8hrs

    ETA ~1 hr

  • 8/12/2019 Fiji PacWave2011

    9/11

    PACWAVE2011EXERCISE

    Objective:

    i. To ensure fluent, efficient dissemination of tsunami information and effective coordination

    at national, provincial and down to district level

    ii. Ensure key agency understands its responsibilities and whom, when, where they should

    be accordingly

    Sept

    Meeting for:

    PacWave2011 Ex

    presentation to all

    key agencies

    SOP Presentation

    Materials Print and

    delivered to all

    www.pacwave.info

    Oct1stPhase 2ndPhase

    Meeting to decide:

    Controller

    Evaluation Team

    Evaluator for each checklistTo Provide:

    Evaluation Checklist

    Contact of each agencies involved

    [Fax,Email,Phone]

    Nov

    Meeting:

    Ex programme

    [Duration,Bulletins]

    Review of ongoingpreparation

    Miscellaneous

    3ndPhase

    Briefing1 wk before

    09/11Tsunami

    Drill

    Debriefing

    Summary Report

    Comments

    Suggestions

    Amendments

    Soon after drill

    Execution, Evaluation process detail will befurther discussed

  • 8/12/2019 Fiji PacWave2011

    10/11

    WAY FORWARD

    Practice Makes Perfect

    Internal Exercise(People Centered Warning System) -once/month

    Building Capacities[Long Term Training in Tsunami Modeling]

    Educational Awareness be strengthen

  • 8/12/2019 Fiji PacWave2011

    11/11

    ???

    I am done..enough lectures