FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT...

25
C a ndl a g a n C r e ek C a bba ge T r e e C r e e k Du nns C r e e k M o go Cree k Jer e m adra Cre ek L yn ch C r ee k T o maga R i ver Mogo Broulee Tomakin Mossy Point Catchment Area Creeks ´ FIGURE 1 STUDY AREA J:\Jobs\114088\ArcView\ArcMaps\Figure01_Study_Area.mxd 0 5 10 2.5 km Bega Congo Brogo Cooma Cowra Monga Moruya Tathra Sutton Brooman Bimbaya Bemboka Cobargo Chakola Canberra Rock Flat Michelago Queanbeyan Charleyong Mystery Bay Maclaughlin Batemans Bay Burrill Lake Majors Creek Captains Flat Belowra Valley Mogo Broulee Tomakin

Transcript of FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT...

Page 1: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

Candlagan Creek

Cabbage Tree Creek

Dunns C

reek

Mogo C

reek

Jeremadra C

reek

Lynch Creek

Tomaga River

Mogo

Broulee

Tomakin

Mossy Point

Catchment Area

Creeks

´

FIGURE 1

STUDY AREA

J:\

Jo

bs\1

14

08

8\A

rcV

iew

\Arc

Ma

ps\F

igu

re0

1_

Stu

dy_

Are

a.m

xd

0 5 102.5

km

Bega

Congo

Brogo

Cooma

Cowra

Monga

Moruya

Tathra

Sutton

Brooman

Bimbaya

Bemboka

Cobargo

Chakola

Canberra

Rock Flat

Michelago

Queanbeyan

Charleyong

Mystery Bay

Maclaughlin

Batemans Bay

Burrill Lake

Majors CreekCaptains Flat

Belowra Valley

Mogo

BrouleeTomakin

Page 2: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

Old Mossy Point Rd

Tomakin Rd

Prin

ce

s H

ighw

ay

George Bass Dr

Prince

s Hig

hway

Tomaga River

Cabbage Tree Creek

Dunn

s C

reek

Jeremadra Creek

Lynch Creek

Mogo

Broulee

Tomakin

Mossy Point

´

FIGURE 2

DIGITAL ELEVATION MODELTERRAIN DATA

J:\

Jo

bs\1

14

08

8\A

rcV

iew

\Arc

Ma

ps\F

igu

re0

2_

AL

S_

Hyd

rosu

rve

y.m

xd

0 2 4 61

km

Catchment Area

Available Survey Data

Available Cross-sectional Data

Elevation (mAHD)

High : 479.613

Low : -3.819

Page 3: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

Vei tch S

t

Church St

Prin

ces

Hig

hway

Tomakin Rd

Jam

es S

t

Buckenboura Rd

George Bass Dr

Tom

akin

Rd

Candlagan Creek

Tomaga River

Jeremadra Creek

Dunn

s C

reek

Lynch Creek

Mogo

Tomakin

Mossy Point

Coro

na

t io

n D

r

Sunpa

tch P

de

Bridge Locations

BRIDGE STRUCTURESFIGURE 3

Tomakin Rd, Terry Connell Bridge

Tomakin Rd, Wooden Bridge

Dunns Creek Bridge

Dunns Creek Rd, Bridge

George Bass Dr, Candlagan Ck

George Bass Dr, Tomaga RiverBeach Rd, Candlagan Ck

Princes Hwy, Lynch Creek

´

Princes Hwy, Jeremadra Creek

Princes Hwy, Mogo Creek

J:\

Jo

bs\1

14

08

8\A

rcV

iew

\Arc

Ma

ps\F

igu

re0

3_

Bri

dg

eS

tru

ctu

res.m

xd

0 0.5 1 1.5 20.25

km

Note: Additional structures not shown have also been included in the model.

Page 4: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

$+$+

$+

$+$+$+$+$+$+$+

$+$+

$+$+$+$+$+$+

$+$+

$+$+$+$+$+$+$+$+$+$+$+$+

$+$+$+ $+$+$+$+$+

$+$+$+$+$+$+

$+$+

$+$+$+$+

$+$+$+$+$+$+$+

$+$+$+$+$+$+$+$+$+

$+$+$+$+$+$+$+

$+$+$+$+$+

$+$+$+$+

$+$+$+

$+$+$+$+

$+$+$+$+$+$+$+$+$+$+

$+$+

$+$+$+

$+$+$+$+$+$+

$+$+$+$+$+$+$+$+$+

$+

$+$+$+$+$+$+$+$+$+$+

$+$+

$+$+$+$+

$+

$+$+$+

$+$+$+$+$+

$+$+$+

$+$+$+$+$+

$+$+$+

$+$+$+$+$+$+$+$+

$+$+

$+

$+$+$+$+

$+$+

$+$+$+$+$+$+$+$+$+$+$+

$+$+$+$+$+$+

$+

$+$+$+$+

$+$+

$+$+

$+$+$+$+$+$+$+$+$+

$+$+$+

$+$+

$+$+

$+$+

$+$+$+$+$+$+$+$+$+$+$+$+$+$+$+

$+$+$+

$+$+

$+$+$+$+$+

$+$+$+$+$+$+$+$+

$+$+$+$+$+$+$+$+$+$+$+$+$+$+ $+

$+

$+

$+$+$+$+

$+$+

$+$+

$+$+

$+$+

$+$+

$+$+

$+$+

$+$+

$+$+

$+$+

$+$+$+$+

$+$+

$+$+$+$+$+$+

$+$+

$+$+$+$+$+$+$+$+

$+$+$+$+$+

$+$+$+

$+

$+$+$+$+$+$+$+$+$+$+

$+$+$+$+$+$+$+

$+$+$+$+$+$+$+$+$+$+

$+$+$+$+$+$+$+$+$+$+

$+$+$+$+$+$+$+$+

$+$+$+$+

$+$+$+

$+

$+$+$+$+$+$+$+

$+$+$+$+

$+$+$+$+$+ $+$+$+$+

$+$+$+$+$+

$+$+$+$+

$+$+$+$+$+$+

$+$+$+$+$+$+

$+

$+$+$+$+

$+$+

$+$+$+$+$+$+

$+$+$+ $+$+

$+$+$+$+$+$+

$+$+$+$+$+$+$+$+ $+$+$+

$+$+$+$+$+$+

$+

$+$+$+$+

$+$+$+$+$+$+$+$+$+

$+$+$+$+$+$+

$+$+$+

$+$+

$+$+$+$+

$+$+$+$+$+

$+$+$+$+

$+$+$+$+

$+$+$+$+$+$+$+$+$+$+

$+

$+$+

$+$+$+

$+

$+

$+

$+

$+ $+

$+

$+

$+

$+

$+

$+

$+

$+

$+

$+

$+

$+$+$+

$+

$+$+

$+ $+$+

$+

$+

$+

$+$+$+$+$+$+

$+$+$+$+$+$+$+$+

$+$+$+

$+$+$+$+$+$+$+

$+$+$+

$+$+$+$+

$+$+$+$+$+$+$+

$+$+

$+$+$+

$+$+$+$+$+$+

$+

$+$+$+$+$+$+

$+

$+$+$+$+$+$+$+

$+$+$+$+$+$+$+$+$+$+$+$+$+$+$+

$+$+$+$+

$+$+$+$+$+$+

$+

$+$+$+

$+$+$+$+$+$+$+

$+$+

$+

$+$+$+$+$+$+$+

$+$+$+$+$+$+

Candlagan Creek

Tomaga River

Cabbage Tree Creek

Dunn

s C

reek

Mogo

Cre

ek

Jeremadra Creek

Lynch Creek

Mogo

Broulee

Tomakin

Mossy Point

Hydraulic Model Extent

Bridges

Culverts

Pipes

$+ Pits

Roads

Creeks

´

FIGURE 4

HYDRAULIC MODEL STRUCTURES

J:\Job

s\1

14

08

8\A

rcV

iew

\Arc

Ma

ps\F

igu

re0

4_

Hyd

raulic

Mo

de

lStr

uctu

res.m

xd

0 2 4 61

km

$+$+

$+$+$+

$+$+$+$+

$+$+

$+$+$+$+$+$+$+$+

$+

$+

$+

$+

$+

$+$+$+$+$+$+

$+$+$+$+

$+$+$+$+

$+$+

$+

$+$+$+$+$+$+$+

$+ $+ $+ $+$+$+

$+

$+

$+$+

$+$+$+$+$+

$+$+

$+$+

$+$+$+$+

$+$+$+$+

$+$+$+$+$+

$+ $+ $+ $+$+$+

$+$+$+$+$+$+

$+$+

$+$+

$+$+$+$+$+$+$+ $+

$+$+$+$+

$+

$+$+

$+$+

$+$+

$+

$+$+$+$+

$+$+$+

$+$+$+$+

$+$+$+$+$+

$+

$+

$+$+

$+$+$+$+

$+ $+$+

$+$+$+ $+$+$+

$+$+$+$+

$+

$+

$+$+

$+

$+$+

$+$+$+

Tomakin

$+$+

$+$+$+$+$+$+$+

$+$+$+

$+$+$+$+$+

$+$+$+

$+$+$+$+$+$+

$+$+$+

$+$+$+

$+

$+$+$+

$+$+$+$+$+

$+$+$+$+

$+$+$+$+

$+$+

$+$+$+$+$+$+$+

$+$+

$+

$+$+$+

$+$+$+$+$+$+$+

$+$+

$+$+$+$+$+

$+

$+$+$+$+

$+$+$+

$+$+$+$+

$+$+

$+$+

$+$+$+$+

$+$+$+$+

$+

$+$+$+ $+$+$+$+$+$+$+

$+$+$+

$+$+$+$+

$+$+$+$+$+$+$+$+$+$+

$+$+

$+$+$+$+

$+$+$+$+

$+$+$+$+$+$+$+$+

$+$+$+$+

$+$+$+

$+$+$+$+$+

$+$+$+

$+

$+$+$+$+$+$+

$+

$+$+$+$+

$+$+

$+

$+$+$+$+

$+$+$+

$+$+ $+

$+

$+$+$+$+$+

$+

$+$+$+$+

$+$+

$+ $+$+$+

$+$+

$+$+

$+$+

$+

$+$+$+

$+$+

$+ $+$+ $+

$+$+$+$+

$+$+$+$+$+$+

$+

$+$+$+

$+

$+

$+

$+

$+

$+

$+

$+$+

$+

$+

$+

$+

$+

$+

$+

$+

$+

$+

$+

$+

$+$+

$+ $+$+

$+

$+

$+

$+$+$+$+$+ $+

$+$+$+

$+$+$+$+$+$+

$+$+

$+$+$+

$+$+

$+$+

$+$+$+

$+$+

$+$+

$+$+$+$+$+$+

$+

$+$+

$+$+$+

$+$+

$+$+$+$+

$+

$+$+$+$+$+$+

$+

$+$+

$+$+$+$+$+

$+$+$+$+$+$+$+$+$+$+$+$+$+$+$+

$+$+$+$+

$+$+

$+$+$+$+

$+

$+$+$+

$+$+$+$+$+

$+$+

$+$+

$+

$+$+$+

$+$+$+$+

$+$+

$+

$+$+$+

Broulee

Mossy Point

Mogo

Page 5: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

Moruya (Kiora)

Moruya (The Lagoon)

Nelligen (Thule Rd)

Moruya (Burra Creek)

Bettowynd (Nobbys Hill)

Batemans Bay - Buckenbowra

Moruya Heads Pilot Station

Batemans Bay (Catalina Country Club)

69142

69134

69052

69042

69035

69033

69023

69018

216455

Deep Creek Dam

Moruya Airport AWS

Araluen Lower (Araluen Rd)

69127

69148

Mogo

Broulee

TomakinMossy Point

FIGURE 5

GAUGE LOCATIONS

Catchment Area

Pluviometer Gauges

Daily Rainfall Gauges

Deep Creek Dam Tipping Bucket

George Bass Drive Water Level

´

0 5 102.5

km

J:\Job

s\1

14

088

\Arc

Vie

w\A

rcM

aps\F

igure

05

_G

au

geL

ocations.m

xd

Page 6: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

Sm

ith

St

Eliz

abe

th D

r Coro

na

tio

n D

r

Train S

t

Clarke S

t

Ge

org

e B

ass

Dr

Adams Way

Broulee

HISTORICAL FLOOD MARKS

ELIZABETH DRIVE 1974 EVENT

FIGURE 6

90 Elizabeth Drive

36 Elizabeth Drive

28 Elizabeth Drive

18 Elizabeth Drive

34 Elizabeth Drive

86 Elizabeth Drive

72 Elizabeth Drive 62 Elizabeth Drive

56 Elizabeth Drive

52 Elizabeth Drive

Flood Marks

Properties Floodmarked

´

J:\

Jo

bs\1

14

08

8\A

rcV

iew

\Arc

Ma

ps\F

igu

re0

6_

Eliz

ab

eth

Dr_

19

74

Flo

od

Ma

rks.m

xd

0 100 200 300 40050

m

Note: Floodmarks shown are approximately0.3m above the actual flood level

Page 7: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

Candlagan Creek

Cabbage Tree Creek

Dunns C

reek

Mogo C

reek

Jeremadra C

reek

Lynch Creek

Tomaga River

Mogo

Broulee

Tomakin

Mossy Point

Catchment Area

Hydraulic Model Inflow Locations

Subcatchments

´

FIGURE 7

HYDROLOGIC MODEL LAYOUT

J:\

Jo

bs\1

14

08

8\A

rcV

iew

\Arc

Ma

ps\F

igu

re0

7_

Hyd

rolo

gic

Mo

de

lLa

yo

ut.

mxd

0 2 4 61

km

Page 8: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

Candlagan Creek

Tomaga River

Cabbage Tree Creek

Dunn

s C

reek

Mogo

Cre

ek

Jeremadra Creek

Lynch Creek

Mogo

Broulee

Tomakin

Mossy PointCatchment Area

Hydraulic Roughness

Dense Trees: n=0.12

Medium Trees: n=0.07

Swamp: n=0.06

Grass/Clearing: n=0.04

Dirt Areas: n=0.03

Waterways: n=0.03

Roads: n=0.02

´

FIGURE 8

HYDRAULIC MODEL ROUGHNESS

J:\

Jo

bs\1

14

08

8\A

rcV

iew

\Arc

Ma

ps\F

igu

re0

8_

Hyd

rau

licM

od

elR

ou

gh

ne

ss.m

xd

0 2 4 61

km

Page 9: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

Old Mossy Point Rd

Tomakin Rd

Prin

ce

s H

ighw

ay

George Bass Dr

Prince

s Hig

hway

Candlagan Creek

Cabbage Tree Creek

Dunns C

reek

Jeremadra C

reek

Lynch Creek

Tomaga River

Mogo

Broulee

Tomakin

Mossy Point

Creeks

Downstream Tailwater

Hydraulic Model Inflow Locations

Hydraulic Routed Inflows

TUFLOW 2.5m Nested Grid Extent

TUFLOW 10m Grid Extent

Hydrologic Model Extent

Ground Level (mAHD)High : 225.227

Low : -6

´

FIGURE 9

HYDRAULIC (TUFLOW) MODEL LAYOUT

J:\

Jo

bs\1

14

08

8\A

rcV

iew

\Arc

Ma

ps\F

igu

re0

9_

Hyd

rau

licM

od

elL

ayo

ut.

mxd

0 2 4 61

km

Page 10: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

1.2

22/12/1998 0:00 22/12/1998 12:00 23/12/1998 0:00 23/12/1998 12:00 24/12/1998 0:00 24/12/1998 12:00 25/12/1998 0:00 25/12/1998 12:00

Wate

r L

ev

el (m

AH

D)

Date and Time

Tide Level - Jervis Bay (216470)

Water Level - George Bass Dr (216455)

TUFLOW Modelled Level - George Bass Dr

FIGURE 10

HYDRAULIC MODEL CALIBRATION TIDAL - DECEMBER 1998 EVENT

STAGE HYDROGRAPH J:\Jobs\114088\TUFLOW\results\B_Hist\Tables\Calibration_Tide_1998.xlsx

Page 11: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

-1

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

1.2

6/05/2012 0:00 6/05/2012 12:00 7/05/2012 0:00 7/05/2012 12:00 8/05/2012 0:00 8/05/2012 12:00 9/05/2012 0:00

Wate

r L

ev

el (m

AH

D)

Date and Time

Tide Level - Jervis Bay (216470)

Water Level - George Bass Dr (216455)

TUFLOW Modelled Level - George Bass Dr

FIGURE 11

HYDRAULIC MODEL CALIBRATION TIDAL - MAY 2012 EVENT

STAGE HYDROGRAPH J:\Jobs\114088\TUFLOW\results\B_Hist\Tables\Calibration_Tide_2012.xlsx

Page 12: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

Moruya (Kiora)

Moruya (The Lagoon)

Nelligen (Thule Rd)

Moruya (Burra Creek)

Bettowynd (Nobbys Hill)

Batemans Bay - Buckenbowra

Moruya Heads Pilot Station

Batemans Bay (Catalina Country Club)

69142

69134

69052

69042

69035

69033

69023

69018

216455

Deep Creek Dam

Moruya Airport AWS

Araluen Lower (Araluen Rd)

69127

69148

Mogo

Broulee

TomakinMossy Point

FIGURE 12

HYDRAULIC MODEL CALIBRATIONFEBRUARY 2010 EVENT

RAINFALL DISTRIBUTION

Catchment Area

Pluviometer Gauges

Daily Rainfall Gauges

Deep Creek Dam Tipping Bucket

George Bass Drive Water Level

Temporal Pattern Applied to Subcatchments

Moruya Airport AWS

Deep Creek Dam

Rainfall Depth in mm (48hrs to 9am)

113 - 140

140 - 160

160 - 180

180 - 200

200 - 220

220 - 232

´

0 5 102.5

km

J:\

Jo

bs\1

14

08

8\A

rcV

iew

\Arc

Ma

ps\F

igu

re1

2_

Ca

libra

tio

n_

Ra

infa

ll_2

01

0_

Dis

trib

utio

n.m

xd

Page 13: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

14/02/2010 0:00 14/02/2010 12:00 15/02/2010 0:00 15/02/2010 12:00 16/02/2010 0:00 16/02/2010 12:00 17/02/2010 0:00

-0.8

-0.6

-0.4

-0.2

0

0.2

0.4

0.6

0.8

1

1.2

0

5

10

15

20

25

30

35

40

45

50 14/0

2/2

010 0

:00

14/0

2/2

010 1

:00

14/0

2/2

010 2

:00

14/0

2/2

010 3

:00

14/0

2/2

010 4

:00

14/0

2/2

010 5

:00

14/0

2/2

010 6

:00

14/0

2/2

010 7

:00

14/0

2/2

010 8

:00

14/0

2/2

010 9

:00

14/0

2/2

010 1

0:0

0

14/0

2/2

010 1

1:0

0

14/0

2/2

010 1

2:0

0

14/0

2/2

010 1

3:0

0

14/0

2/2

010 1

4:0

0

14/0

2/2

010 1

5:0

0

14/0

2/2

010 1

6:0

0

14/0

2/2

010 1

7:0

0

14/0

2/2

010 1

8:0

0

14/0

2/2

010 1

9:0

0

14/0

2/2

010 2

0:0

0

14/0

2/2

010 2

1:0

0

14/0

2/2

010 2

2:0

0

14/0

2/2

010 2

3:0

0

15/0

2/2

010 0

:00

15/0

2/2

010 1

:00

15/0

2/2

010 2

:00

15/0

2/2

010 3

:00

15/0

2/2

010 4

:00

15/0

2/2

010 5

:00

15/0

2/2

010 6

:00

15/0

2/2

010 7

:00

15/0

2/2

010 8

:00

15/0

2/2

010 9

:00

15/0

2/2

010 1

0:0

0

15/0

2/2

010 1

1:0

0

15/0

2/2

010 1

2:0

0

15/0

2/2

010 1

3:0

0

15/0

2/2

010 1

4:0

0

15/0

2/2

010 1

5:0

0

15/0

2/2

010 1

6:0

0

15/0

2/2

010 1

7:0

0

15/0

2/2

010 1

8:0

0

15/0

2/2

010 1

9:0

0

15/0

2/2

010 2

0:0

0

15/0

2/2

010 2

1:0

0

15/0

2/2

010 2

2:0

0

15/0

2/2

010 2

3:0

0

16/0

2/2

010 0

:00

16/0

2/2

010 1

:00

16/0

2/2

010 2

:00

16/0

2/2

010 3

:00

16/0

2/2

010 4

:00

16/0

2/2

010 5

:00

16/0

2/2

010 6

:00

16/0

2/2

010 7

:00

16/0

2/2

010 8

:00

16/0

2/2

010 9

:00

16/0

2/2

010 1

0:0

0

16/0

2/2

010 1

1:0

0

16/0

2/2

010 1

2:0

0

16/0

2/2

010 1

3:0

0

16/0

2/2

010 1

4:0

0

16/0

2/2

010 1

5:0

0

16/0

2/2

010 1

6:0

0

16/0

2/2

010 1

7:0

0

16/0

2/2

010 1

8:0

0

16/0

2/2

010 1

9:0

0

16/0

2/2

010 2

0:0

0

16/0

2/2

010 2

1:0

0

16/0

2/2

010 2

2:0

0

16/0

2/2

010 2

3:0

0

17/0

2/2

010 0

:00

Wate

r L

ev

el (m

AH

D)

Rain

fall (

mm

per

15m

in)

Date and Time

Pluviometer - Araluen Lower (69127)

Pluviometer - Moruya Airport AWS (69148)

Pluviometer - Deep Creek Dam

Tide Level - Jervis Bay (216470)

Water Level - George Bass Dr (216455)

TUFLOW Modelled Level - George Bass Dr

FIGURE 13

HYDRAULIC MODEL CALIBRATION RAINFALL - FEBRUARY 2010 EVENT

STAGE HYDROGRAPH J:\Jobs\114088\TUFLOW\results\B_Hist\Tables\Calibration_Rainfall_2010.xlsx

Page 14: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

5

10

20

15

25

10

10

5

10

5

5

5

5

5

15

10

5

20

10

5

525

10

5

5

5

5

25

20

5

5

20

25

5

5

5

10

10

15

10

5

5

15

10

15

Mogo

Broulee

Tomakin

Mossy Point

Flooding Experiences

Model Extent

Flood Level Contours

Major Contours (5m interval)

Minor Contours (1m interval)

Depth (m)

0 - 1.0

1.0 - 2.0

2.0 - 3.0

3.0 - 4.0

4.0 - 5.0

> 5.0

´

FIGURE 14

VERIFICATION1% AEP EVENT

PEAK FLOOD DEPTH AND LEVEL CONTOURS

J:\

Jo

bs\1

14

08

8\A

rcV

iew

\Arc

Ma

ps\F

igu

re1

4_

Pe

ak_

Flo

od

_D

ep

th_

Le

ve

l_1

00

yA

RI_

Eve

nt.

mxd

0 2 4 61

km

5

10

5

10

55

5

10

5

10

10

10

5

5

10

5

10

15

20

2530

20

5

25

5

10

2015

15

15 10

5

5

20

10

5

15

10

5

5

15

Page 15: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

!

!!

!

!

Mogo

Broulee

Mossy Point

Tomago River

Candlagan Creek

Old Mossy Point Rd

Tomakin Rd

Prin

ce

s H

ighw

ay

Prince

s Hig

hway

Tomaga River

Cabbage Tree Creek

Dunn

s C

reek

Jeremadra Creek

Lynch Creek

Mogo

Broulee

Tomakin

Mossy Point

´

J:\

Jo

bs\1

14

08

8\A

rcV

iew

\Arc

Ma

ps\F

igu

re1

5_

Re

su

lts_

La

yo

ut.

mxd

0 2 4 61

km

Catchment Area

Profiles

Candlagan Creek

Dunns Creek

Jeremadra Creek

Mogo Creek

Tomago River

! Hydrographs

1% AEP Extent

FIGURE 15

RESULTS LAYOUT

Page 16: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

-1

0

1

2

3

4

5

6

7

8

0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000

Peak F

loo

d L

ev

el (m

AH

D)

Chainage (m from Downstream Ocean Confluence)

Ground Elevation

0.2 EY Event

10% AEP Event

5% AEP Event

2% AEP Event

1% AEP Event

0.5% AEP Event

PMF Event

FIGURE 16A

PEAK FLOOD LEVEL PROFILES CANDLAGAN CREEK J:\Jobs\114088\TUFLOW\results\D_Design\Profiles\Profiles_022.xlsx

Page 17: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

-5

-4

-3

-2

-1

0

1

2

3

4

5

6

7

8

0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000

Peak F

loo

d L

ev

el (m

AH

D)

Chainage (m from Downstream Ocean Confluence)

Ground Elevation

0.2 EY Event

10% AEP Event

5% AEP Event

2% AEP Event

1% AEP Event

0.5% AEP Event

PMF Event

FIGURE 16B

PEAK FLOOD LEVEL PROFILES TOMAGO RIVER J:\Jobs\114088\TUFLOW\results\D_Design\Profiles\Profiles_022.xlsx

Page 18: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

-4

-3

-2

-1

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

8300 8800 9300 9800 10300 10800 11300 11800 12300 12800 13300

Peak F

loo

d L

ev

el (m

AH

D)

Chainage (m from Downstream Ocean Confluence)

Ground Elevation

0.2 EY Event

10% AEP Event

5% AEP Event

2% AEP Event

1% AEP Event

0.5% AEP Event

PMF Event

FIGURE 16C

PEAK FLOOD LEVEL PROFILES JEREMADRA CREEK J:\Jobs\114088\TUFLOW\results\D_Design\Profiles\Profiles_022.xlsx

Page 19: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

-2

-1

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

10000 10500 11000 11500 12000 12500 13000 13500 14000

Peak F

loo

d L

ev

el (m

AH

D)

Chainage (m from Downstream Ocean Confluence)

Ground Elevation

0.2 EY Event

10% AEP Event

5% AEP Event

2% AEP Event

1% AEP Event

0.5% AEP Event

PMF Event

FIGURE 16D

PEAK FLOOD LEVEL PROFILES MOGO CREEK J:\Jobs\114088\TUFLOW\results\D_Design\Profiles\Profiles_022.xlsx

Page 20: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

-2

-1

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

10000 10500 11000 11500 12000 12500 13000

Peak F

loo

d L

ev

el (m

AH

D)

Chainage (m from Downstream Ocean Confluence)

Ground Elevation

0.2 EY Event

10% AEP Event

5% AEP Event

2% AEP Event

1% AEP Event

0.5% AEP Event

PMF Event

FIGURE 16E

PEAK FLOOD LEVEL PROFILES DUNNS CREEK J:\Jobs\114088\TUFLOW\results\D_Design\Profiles\Profiles_022.xlsx

Page 21: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

-1

0

1

2

3

4

5

6

0 5 10 15 20 25 30 35 40

Flo

od

Lev

el (m

AH

D)

Time (hrs)

0.2 EY Event

10% AEP Event

5% AEP Event

2% AEP Event

1% AEP Event

0.5% AEP Event

PMF Event

FIGURE 17A

PEAK FLOOD LEVEL PROFILES TOMAGO RIVER - GEORGE BASS DRIVE GAUGE J:\Jobs\114088\TUFLOW\results\D_Design\Hydrographs\Hydrographs_022.xlsx

Page 22: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

0

1

2

3

4

5

6

0 5 10 15 20 25 30 35 40

Flo

od

Lev

el (m

AH

D)

Time (hrs)

0.2 EY Event

10% AEP Event

5% AEP Event

2% AEP Event

1% AEP Event

0.5% AEP Event

PMF Event

FIGURE 17B

PEAK FLOOD LEVEL PROFILES CANDLAGAN CREEK - GEORGE BASS DRIVE J:\Jobs\114088\TUFLOW\results\D_Design\Hydrographs\Hydrographs_022.xlsx

Page 23: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

3

4

5

6

0 5 10 15 20 25 30 35 40

Flo

od

Lev

el (m

AH

D)

Time (hrs)

0.2 EY Event

10% AEP Event

5% AEP Event

2% AEP Event

1% AEP Event

0.5% AEP Event

PMF Event

FIGURE 17C

PEAK FLOOD LEVEL PROFILES BROULEE - CRN OF ANGLE ST AND ELIZABETH DR J:\Jobs\114088\TUFLOW\results\D_Design\Hydrographs\Hydrographs_022.xlsx

Page 24: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

0

1

2

3

4

5

6

0 5 10 15 20 25 30 35 40

Flo

od

Lev

el (m

AH

D)

Time (hrs)

0.2 EY Event

10% AEP Event

5% AEP Event

2% AEP Event

1% AEP Event

0.5% AEP Event

PMF Event

FIGURE 17D

PEAK FLOOD LEVEL PROFILES MOSSY POINT - CONNELLS CL J:\Jobs\114088\TUFLOW\results\D_Design\Hydrographs\Hydrographs_022.xlsx

Page 25: FIGURE 1 STUDY AREA · 2020. 12. 11. · FIGURE 12 HYDRAULIC MODEL CALIBRATION FEBRUARY 2010 EVENT RAINFALL DISTRIBUTION Catchment Area Pluviometer Gauges Daily Rainfall Gauges Deep

3

4

5

6

7

8

9

10

11

0 5 10 15 20 25 30 35 40

Flo

od

Lev

el (m

AH

D)

Time (hrs)

0.2 EY Event

10% AEP Event

5% AEP Event

2% AEP Event

1% AEP Event

0.5% AEP Event

PMF Event

FIGURE 17E

PEAK FLOOD LEVEL PROFILES MOGO CREEK - UPSTREAM OF PRINCES HWY J:\Jobs\114088\TUFLOW\results\D_Design\Hydrographs\Hydrographs_022.xlsx