FIELD PERIOD ASSY Aug 13, 2003 M. Cole and FPA Team 20030811-Field-Period_Assy-r2
description
Transcript of FIELD PERIOD ASSY Aug 13, 2003 M. Cole and FPA Team 20030811-Field-Period_Assy-r2
![Page 1: FIELD PERIOD ASSY Aug 13, 2003 M. Cole and FPA Team 20030811-Field-Period_Assy-r2](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814fcb550346895dbd8c9b/html5/thumbnails/1.jpg)
FIELD PERIOD ASSY
Aug 13, 2003
M. Cole and FPA Team
20030811-Field-Period_Assy-r2.ppt
![Page 2: FIELD PERIOD ASSY Aug 13, 2003 M. Cole and FPA Team 20030811-Field-Period_Assy-r2](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814fcb550346895dbd8c9b/html5/thumbnails/2.jpg)
• Assembly Procedure 10 min
• Fixtures Required 05 min
• Fixture Concepts 20 min
• Field Period Assy Area
• Work Plan 10 min
•Questions 10 min
AGENDA
![Page 3: FIELD PERIOD ASSY Aug 13, 2003 M. Cole and FPA Team 20030811-Field-Period_Assy-r2](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814fcb550346895dbd8c9b/html5/thumbnails/3.jpg)
Assembly Procedure
• Prepare Field Period assembly area• Includes any initial fixture or area setup required prior to starting the assy activities
• Receive, Inspect and Prepare VV•Receive and inspect vacuum vessel segment
•Attach diagnostics, cooling tubes & insulation to VV period
•Mount Vacuum vessel to assy Fixture
•Install diagnostics (approx. 30)
•Install cooling tubes
•Install insulation
• Sub-assembly of Modular Coils
•Task involves the mounting and aligning of (3) modular coils to form a coil set [M1, M2,
M3].
![Page 4: FIELD PERIOD ASSY Aug 13, 2003 M. Cole and FPA Team 20030811-Field-Period_Assy-r2](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814fcb550346895dbd8c9b/html5/thumbnails/4.jpg)
Assembly Procedure cont’d
• Sub-assembly of TF Coils •Task involves assembling together (3) TF coils and structure to form a TF coil set
• Assemble Modular Coils to Field Period Assembly•Assemble and align right side modular coils to vacuum vessel
•Assemble and align left side modular coils to vacuum vessel
• Assemble TF Coils to Field Period Assembly•Assemble and align right side TF coils over shell
•Assemble and align left side TF coils over shell
• Position and Weld Port Assemblies•Eight ports will be welded to the vacuum vessel
![Page 5: FIELD PERIOD ASSY Aug 13, 2003 M. Cole and FPA Team 20030811-Field-Period_Assy-r2](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814fcb550346895dbd8c9b/html5/thumbnails/5.jpg)
Assembly Procedure cont’d
• Assemble Trim Coils to Field Period Assembly•Install [3] Upper coils
•Install [2] Mid coils
•Install [3] Lower coils
Shipping positionAssembly position
Add cooling lines
![Page 6: FIELD PERIOD ASSY Aug 13, 2003 M. Cole and FPA Team 20030811-Field-Period_Assy-r2](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814fcb550346895dbd8c9b/html5/thumbnails/6.jpg)
FIXTURES REQUIRED
•Fixture to orient vv from shipping position ?
•Fixture for supporting VV Dave Conner
•Fixture for assembly of M1, M2, and M3 coils Dave Conner
•Fixture for assy of mod coils to Field Period Assy Dave Conner
•Fixture for assy TF coils together Tom Brown
•Fixture to assy TF coil set to Field Period Assy Dave Conner
•Fixture for welding ports to vv Dave Conner
![Page 7: FIELD PERIOD ASSY Aug 13, 2003 M. Cole and FPA Team 20030811-Field-Period_Assy-r2](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814fcb550346895dbd8c9b/html5/thumbnails/7.jpg)
Mod Coil to Field Period Assembly Fixture Concepts
![Page 8: FIELD PERIOD ASSY Aug 13, 2003 M. Cole and FPA Team 20030811-Field-Period_Assy-r2](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814fcb550346895dbd8c9b/html5/thumbnails/8.jpg)
Mod Coil to Field Period Assembly Fixture Concepts
![Page 9: FIELD PERIOD ASSY Aug 13, 2003 M. Cole and FPA Team 20030811-Field-Period_Assy-r2](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814fcb550346895dbd8c9b/html5/thumbnails/9.jpg)
Mod Coil to Field Period Assembly Fixture Concepts
![Page 10: FIELD PERIOD ASSY Aug 13, 2003 M. Cole and FPA Team 20030811-Field-Period_Assy-r2](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814fcb550346895dbd8c9b/html5/thumbnails/10.jpg)
Mod Coil to Field Period Assembly Fixture Concepts
![Page 11: FIELD PERIOD ASSY Aug 13, 2003 M. Cole and FPA Team 20030811-Field-Period_Assy-r2](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814fcb550346895dbd8c9b/html5/thumbnails/11.jpg)
Mod Coil to Field Period Assembly Fixture Concepts
![Page 12: FIELD PERIOD ASSY Aug 13, 2003 M. Cole and FPA Team 20030811-Field-Period_Assy-r2](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814fcb550346895dbd8c9b/html5/thumbnails/12.jpg)
Mod Coil to Field Period Assembly Fixture Concepts
![Page 13: FIELD PERIOD ASSY Aug 13, 2003 M. Cole and FPA Team 20030811-Field-Period_Assy-r2](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814fcb550346895dbd8c9b/html5/thumbnails/13.jpg)
Mod Coil to Field Period Assembly Fixture Concepts
Cost:
200P $47,350
250P $52500
![Page 14: FIELD PERIOD ASSY Aug 13, 2003 M. Cole and FPA Team 20030811-Field-Period_Assy-r2](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814fcb550346895dbd8c9b/html5/thumbnails/14.jpg)
Work Plan
![Page 15: FIELD PERIOD ASSY Aug 13, 2003 M. Cole and FPA Team 20030811-Field-Period_Assy-r2](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814fcb550346895dbd8c9b/html5/thumbnails/15.jpg)
Field Period Assy Area
![Page 16: FIELD PERIOD ASSY Aug 13, 2003 M. Cole and FPA Team 20030811-Field-Period_Assy-r2](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814fcb550346895dbd8c9b/html5/thumbnails/16.jpg)
Questions
•Where will the Field Period Assy be performed?
•What is the capacity of the crane?
•What is the hook height?
•How much area will be available?
•What concepts are existing that you would like us to incorporate?
•Manual or Automatic fixtures?
•Floor loading? Concrete?
![Page 17: FIELD PERIOD ASSY Aug 13, 2003 M. Cole and FPA Team 20030811-Field-Period_Assy-r2](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814fcb550346895dbd8c9b/html5/thumbnails/17.jpg)
![Page 18: FIELD PERIOD ASSY Aug 13, 2003 M. Cole and FPA Team 20030811-Field-Period_Assy-r2](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814fcb550346895dbd8c9b/html5/thumbnails/18.jpg)