FIDIC

• INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS • BEST KNOWN FOR RANGE OF STANDARD CONDITIONS OF

CONTRACT FOR CONSTRUCTION , PLANT AND DESIGN INDUSTRIES • FIDIC RAINBOW SUITES

• RED BOOK • YELLOW BOOK • SILVER BOOK • GREEN BOOK

Page 3: fidic , jct and nec contracts

FIDIC (CONTD)

• BASIC PRINCIPLE IS CONTRACT MUST PROVIDE A FAIR ALLOCATION OF RISK BETWEEN THE PARTIES TO A CONTRACT AND THE RSIK SHOULD BE BORNE BY A PARTY BEST ABLE TO CONTROL • CONTENTS

• GENERAL CONDITIONS • GUIDENCE FOR PREPARATION OF PARTICULAR CONDITION • FORM OF TENDER AND CONTRACT AGREEMENT • DISPUTE ADJUDICATION AGREEMENT

Page 4: fidic , jct and nec contracts

FIDIC DEFINES

• ROLES OF ENGINEER • CLAIMS• VARIATIONS• CONTRACTORS OBLIGATIONS• DELAYS AND EXTENSION OF TIME • DISPUTE RESOLUTION • RECORD KEEPING

Page 5: fidic , jct and nec contracts

JCT(JOINT CONTRACT TRIBUNAL )

• BRITISH BASED• FORMED BY 7 MEMBER COMMITTEE• JCT SUITE OF CONTRACTS -2011

SBC D&B MPINTERME

DIATE CONTRA

CTS

MINOR WORKS

FRAMEWORK

Page 6: fidic , jct and nec contracts

DESIGN & BUILD

• POPULAR FORM OF JCT SUITE• LARGE COMPLEX CONSTRUCTION PROJECTS • CONTRACTOR WILL DESIGN THE WORK BASED ON THE

REQUIREMENTS GIVEN BY EMPLOYER • THE CONTRACTOR WILL PRODUCE CONTRACTORS

PROPOSAL • CONTRACTOR WILL CARRY OUT WORK FOR LUMPSUM

Page 7: fidic , jct and nec contracts

STANDARD BUILDING CONTRACT

• TRADITIONAL CONTRACTING • CONTRACTOR WONT INVOLVE IN ANY DESIGN • WORK WILL BE DESCRIBED AS PER DRAWINGS PREPARED

AND GIVEN TO CONTRACTOR BY EMPLOYER • 3 FORMS

• SBC /Q• SBC/XQ• SBC/AQ

Page 8: fidic , jct and nec contracts

MAJOR PROJECT CONSTRUCTION

• LARGEST DESIGN & BUILD PROJECTS ALL BUILD BY ONE CONTRACT• SHORTER THAN DB ,BUT MORE FLEXIBLE • SUITABLE WHEN PARTIES ARE

• EXPERIENCED IN UNDERTAKING LARGE SCALE CONSTRUCTION WORK

• FAMILIAR WITH RISK MANAGEMENT • HAVE APPROPRIATE IN HOUSE CONTRACTUAL PROCEDURES

Page 9: fidic , jct and nec contracts

STANDARD FORMAT OF JCT

• ARTICLE OF AGREEMENT • CONTRACT PARTICULARS• CONDITIONS OF CONTRACT • SCHEDULES

Page 10: fidic , jct and nec contracts

NEC (NEW ENGINEERING CONTRACT)

• CREATED BY INSTITUTION OF CIVIL ENGINEERS • 3 EDITIONS• NEC 1- 1993• NEC 2 -1995• NEC3 - 2005

Page 11: fidic , jct and nec contracts

UNDERLYING PRICIPLES OF NEC3

• CLARITY & SIMPLICITY • STIMULUS TO GOOD MANAGEMENT • FLEXIBILITY STRUCTURE

OF NEC3

CORE CLAUSES

MAIN OPTIONS

DISPUTE RESOLUTION

SECONDARY OPTION

CONTRACT DATA Z CLAUSES

Page 12: fidic , jct and nec contracts

COMPARISON

Page 13: fidic , jct and nec contracts

COMPARISON

Page 14: fidic , jct and nec contracts

COMPARISON

Page 15: fidic , jct and nec contracts

COMPARISON

Page 16: fidic , jct and nec contracts

THANK YOU