Fi ldField titrip to RSPO Tripa Resolution

42
Fi ld t i t Ti Field trip t o T ripa RSPO & Tripa Resolution RSPO & Tripa Resolution PT Surya Panen Subur 2 45 August 2009

Transcript of Fi ldField titrip to RSPO Tripa Resolution

Page 1: Fi ldField titrip to RSPO Tripa Resolution

Fi ld t i t T iField trip to TripaRSPO & Tripa ResolutionRSPO & Tripa Resolution

PT Surya Panen Subur 2

4‐5 August 2009

Page 2: Fi ldField titrip to RSPO Tripa Resolution

NGOs Coalition calls on Astra (19 June 2008) to prevent further destruction in Tripa

k i• Yayasan Ekosistem Leuser• PanEco• Oxfam• Sawit WatchSawit Watch• Wetlands InternationalE A h• Eye on Aceh

• Greenpeace• Flora Fauna International • Leuser International Foundation

Page 3: Fi ldField titrip to RSPO Tripa Resolution

Why?Obj ti b NGO liti th dObjections by NGOs coalition on the grounds:

1. Concession of SPS is located in primary peat swamp forest and there are 3 meters in depth at several places;

2. Because the location is on shore, SPS is also a coastal area that has a function as buffer zone for tsunami;

3. SPS is located inside protected Leuser Eco‐system Area because this area has an extremely bio‐diversity and also as a habitat for orang utan;

4. Land procuring activities in SPS is presumed against the valid and required laws and regulations in Indonesia as followslaws and regulations in Indonesia as follows :1. The Presidential Decree Number 32/1990 pertaining to Conservation Area;2. Government Regulation Number 47/1997 pertaining to National Layout Plan;3 Post Tsunami Master Plan to Rehabilitate and Reconstruct Aceh and Nias3. Post‐Tsunami Master Plan to Rehabilitate and Reconstruct Aceh and Nias

Islands;4. Act Number 17/2007 pertaining to Kyoto Protocol on Climate Change;5. Government Regulation Number 48/1991 pertaining to Convension on5. Government Regulation Number 48/1991 pertaining to Convension on 

Wetland that assumes from International Interests;6. Act Number 5/1994 pertaining to United Nations Convention on Bio‐Diversity;7. Instruction of Governor of Nanggroe Aceh Darussalam Province Number 

5/2007 t i i t hibiti f Ill l L i5/2007 pertaining to prohibition of Illegal Logging.

Page 4: Fi ldField titrip to RSPO Tripa Resolution

Responses from Astraa. Legal status of SPS’s concession is HGU (Cultivation Right);

b. SPS has carried out HCVF Assessment and becoming a proposed part of AMDAL (Analysis on Environmental Impacts) processes. HCVF Assessment 6,000 hectares including HCVF with peat area above 3 meters depth;above 3 meters depth;

c. The Presidential Decree 32/1990 on Conservation Area, whereas it stipulates on article 10 that peat areal with 3 meters in depth shall be conserved. HCV proposal already conforms with the decree;

d. Government Regulation Number 47/1997 on National Spatial Plan, it states criteria of conservationd. Government Regulation Number 47/1997 on National Spatial Plan, it states criteria of conservation area article 33 paragraph 2, primary peat with 3 meters depth  is conservation area. 

e. Act Number 17/2007 on the ratification of the Kyoto Protocol is discussing generally on “Indonesia needs to enhance lands and forests capability in order to absorb Greenhouse Gasses is less relevant;

f. Government Regulation Number 48/1991 on Convention on Wetlands when it assumes on international interests is also too general and with clause of “to wish the prevention of disturbances and loss of wetland areas both for current and future era”;

g Act Number 5/1994 on the ratification of the United Nations Convention on biodiversity is also lessg. Act Number 5/1994 on the ratification of the United Nations Convention on biodiversity is also less relevant and too general. Moreover, HCVF proposal is already accommodated it.

h. Instruction of Governor No. 5/1997 is to stop any illegal logging activities. SPS activities are not an illegal logging activity, however, this is a land clearing at HGU area that has been deforested.g gg g y, , g

i. One other thing that mentioned in the letter of NGOs coalition is about Leuser ecosystem area. Its legal base is according to Decree of Minister of Forestry Affairs No. 90/KPTS‐II/2001 re Leuser Eco‐system. On third decision point b of this Decree stated that right/permit to forest usage and or permit 

i id L E h h b d di i d d lid lto use area inside Leuser Ecosystem area that has been passed according to required and valid laws and regulations before the stipulation of this decree is valid until the maturity of its permit.

Page 5: Fi ldField titrip to RSPO Tripa Resolution

Trip to Tripa/PT SPS 2• Astra group

1 Joko S pri ono (HO Jakarta)1. Joko Supriyono (HO, Jakarta)

2. Muhamad Khoiri (Aceh, Manager Area)

3. Basyir (Community relation)

4. Djoniady (PT SPS 2, Project Operator)j y ( , j p )

5. Some field staff

S it W t h (N Ji H d f• Sawit Watch (Norman Jiwan, Head of Department, Social and Environmental Mitigation Initiatives)

• WALHI NAD (M Oki Friends of the EarthWALHI NAD (M Oki, Friends of the Earth Indonesia Nanggroe Aceh Darussalam chapter)

Page 6: Fi ldField titrip to RSPO Tripa Resolution

Trip to SPS 2: 4 August 2009

Page 7: Fi ldField titrip to RSPO Tripa Resolution

Burnt location in PT SPS 2 areasBurnt location in PT SPS 2 areas

Page 8: Fi ldField titrip to RSPO Tripa Resolution

Land planted with oil palm in PT SPS 2 (is it occupation?)

Page 9: Fi ldField titrip to RSPO Tripa Resolution

2 Rangkok birds: protected species(too far for a digital camera) 

Protected Rangkok bird

(Rangkok(Rangkok, local name)

Page 10: Fi ldField titrip to RSPO Tripa Resolution

Replanted palm trees conditionReplanted palm trees condition

Page 11: Fi ldField titrip to RSPO Tripa Resolution

Fire towerFire tower 

Page 12: Fi ldField titrip to RSPO Tripa Resolution

Photo from fire tower (flat peat landscape/ecosystem?)

Page 13: Fi ldField titrip to RSPO Tripa Resolution

Closed worker housing (date of moratorium effective into force)

Page 14: Fi ldField titrip to RSPO Tripa Resolution

Water gate controls water‐table/surface water streams

Page 15: Fi ldField titrip to RSPO Tripa Resolution

Water table regulates at 55 cmWater table regulates at 55 cm

Page 16: Fi ldField titrip to RSPO Tripa Resolution

Water gate built on 6 May 2009Water gate built on 6 May 2009

Page 17: Fi ldField titrip to RSPO Tripa Resolution

5 August 2009di l ith it l ddialog with community leaders

Page 18: Fi ldField titrip to RSPO Tripa Resolution

HCV 4 1 SignboardHCV 4.1 Signboard

Page 19: Fi ldField titrip to RSPO Tripa Resolution

Small stream of HCV (river buffer and riparian)riparian) 

Page 20: Fi ldField titrip to RSPO Tripa Resolution

Krueng Muling (Muling river)b i d li lih d i i isubsistent and livelihood activities; 

traditional boat transports mother and son

Page 21: Fi ldField titrip to RSPO Tripa Resolution

Sacred site/grave (Kuburan Keramat) in PT SPS 2 areas

Page 22: Fi ldField titrip to RSPO Tripa Resolution

Broken HCV signboard

Page 23: Fi ldField titrip to RSPO Tripa Resolution

young mangrove (tsunami natural greenbelt/buffer)

Page 24: Fi ldField titrip to RSPO Tripa Resolution

The coast of Indonesian sea approximate 300 to 500 meters to sacred site/grave

Page 25: Fi ldField titrip to RSPO Tripa Resolution

2 orang Utan: at the opposite side of grave sacred site (no HCV signboard)

Page 26: Fi ldField titrip to RSPO Tripa Resolution

Hutan Malu Tua & Malu Tua Mudaf h d lfar view with draining canaldying vs growing greendying vs. growing green

Page 27: Fi ldField titrip to RSPO Tripa Resolution

Hutan Malu Tua & Malu Tua Mudaclose view of 

dying vs growing greendying vs. growing green

Page 28: Fi ldField titrip to RSPO Tripa Resolution

Hutan Malu Tua & Malu Tua Mudacloser view of dying trees

i d i i ???ongoing draining???  

Page 29: Fi ldField titrip to RSPO Tripa Resolution

Findings 4 August 2009• Oil palm estate of SPS 2 located in peat soils/peatland 

ecosystem both planted and planned future planting areasecosystem both planted and planned future planting areas

• PT SPS 2 border with PT Kalista Alam (ongoing land clearing and expanding activities in Tripa peatland ecosystem)and expanding activities in Tripa peatland ecosystem)

• No activities since November 2008 (according to Astra)

• PT SPS 2 has stopped operation (vacuum) and somePT SPS 2 has stopped operation (vacuum) and some community leaders expect the company re‐activate its operations soon (local leader doesn’t know when and why the company stopped operation/moratorium)

• The company built water gates to control water table at 55 cm(according to M Khoiri, Director Area, Astra Aceh)

• Some areas in PT SPS 2 location already planted with oil palm b l l l ( id tifi d h d f h ???)by local people (unidentified who and from where???); 

Page 30: Fi ldField titrip to RSPO Tripa Resolution

Field findings: 5 August 2009

• PT SPS 2 concession in some areas are located l d din peatland ecosystem and HCV areas 

including:– Coastal buffer zones

– Krueng Semayam (river) buffer/riparian– Krueng Semayam (river) buffer/riparian

– Orang utan habitat

– Crocodile and big lizard (biawak)

– Sacred site (graveyard)

– Cultivated land of local communities’ gardens

Page 31: Fi ldField titrip to RSPO Tripa Resolution

Notes from dialog with local l d ( tt d li t)leaders (see attendance list)

• Indigenous population living in the areas are Aceh people and g p p g p ptransmigrant from Java;

• There are 9 villages in operational sites PT SPS2 including transmigration settlement built in 1994/1995;

• The concession of PT SPS 1 and SPS 2 areas is the territory of kingdom customary land given to official government village administration (village head);

Wi hi T i i il l l i• Within Tripa areas are operating some oil palm plantation companies and mills of PT Socfindo, PT Kalista, PT GSM, and local people small palm plantations;local people small palm plantations;

• Means of living, source of livelihoods and subsistent agriculture are rice farming, fishing, crop gardens, trades,agriculture are rice farming, fishing, crop gardens, trades, cacao, oil palm, work with company;

Page 32: Fi ldField titrip to RSPO Tripa Resolution

Positive impacts• The presence of company brings impact on economic 

improvement;

• Open road access and better connecting village to village;

• The company provides aids for orphans and poorer people (Imam – spiritual leader/Alim Ulama); the company provide to mosque (Imam – spiritual leader/Alim Ulama);

C t l t f i i it iti ( t th t• Create employment for vicinity communities (at the moment around 600 still working at daily maintenance);

• Salary payment on time (compare to previous company• Salary payment on time (compare to previous company owner/PT Citra often times delays salary payment late up to three month time););

• Improved business incomes in partner with PT SPS 2; 600 kgper month to 7 tons per month sold to PT SPS (rice supplier to PTSPS 1 and PT SPS 2);

Page 33: Fi ldField titrip to RSPO Tripa Resolution

Complaints of local people• Weather is hot compare to before oil palm plantation companies 

converted Tripa’s peat and forest

• Consequently, fish in river died; the latest case was in January 2009 (village head);

• Difficult to catch fish; water body decrease or cannot be used for water transportation because drained by oil palm plantation (hed of village);village);

• River badly covered with Enceng Gondok  (water hyacinth plant) disturbed water body (pak Ridwan);

• Dirty rivers (people want clear and clean water; compare to before);

• Crocodile has never come to river; crocodile used as symbol that ll driver ecosystem is still good; 

• Religious leader – spiritual alim ulama given no honor; PT Citra gave honor Rp 200 000 per month mosque spritual leader; no honorhonor Rp. 200,000 per month mosque spritual leader; no honor since take over (pak Maksum)

Page 34: Fi ldField titrip to RSPO Tripa Resolution

Other issues• Conservation of Tripa as an integral ecosystem prioritises the 

entire area where there also are PT Kalista, PT Socfindo, PT GSM, SPS1 & SPS2 d l l l il l l tSPS1 & SPS2 and local people oil palm plots;

• Conservation and ecosystem interests vs. economic development should go along altogether? How and by whom?development should go along altogether? How and by whom?

• Is AMDAL, legality & permits and supports from communtiesacceptable and legitimate?p g

• Controversy remain on hutan malu tua (myth ‘old’ dying and death) whether due to draining ground water and water table drastically?

• How is identification of rights, recognition, and resolution over t t l d d i ht f b l l iti ?status over lands and rights of nearby local communities?

• The previous company opened land used fires. Now fires still occur in the areas of PT SPS how and who is responsible? Referoccur in the areas of PT SPS,  how and who is responsible? Refer to 2005, 2007 including zero burning...

Page 35: Fi ldField titrip to RSPO Tripa Resolution

Dialog: Astra & NAD NGOs, 7 August

Present:

• Joko Supriyono (HO Astra)Joko Supriyono (HO Astra)

• Khoiri (Director, Astra Aceh Area)

• Djoniady (head of PT SPS project)

• Basyir Hasan (CD Area Manager)Basyir Hasan (CD Area Manager)

Page 36: Fi ldField titrip to RSPO Tripa Resolution

PARTICIPANTS IN DIALOG

Page 37: Fi ldField titrip to RSPO Tripa Resolution
Page 38: Fi ldField titrip to RSPO Tripa Resolution

Introductory presentationsIntroductory presentations

1. Astra, by Djoniady (head of project PT SPS) 

2. Field findings of Tripa, Norman Jiwan (Sawit2. Field findings of Tripa, Norman Jiwan (Sawit Watch)

3 NGO li i S T i E3. NGO coalition: Save Tripa Ecosystem, Bambang Antariksa (WALHI NAD)

4. Dialog: clarification and question remarks 

Page 39: Fi ldField titrip to RSPO Tripa Resolution

Position of coalition to save Tripa (Bambang Antariksa WALHI NAD)Antariksa, WALHI NAD)

T i di t l T i A h NGO• To immediately save Tripa, Aceh NGO Coalition recommends:

– Moratorium on further land clearing all plantation oplerations in Tripa ecosystem areas;R l i ll i l d di i h l l– Resolution over all ongoing land disputes with local communities of all companies operating in Tripa peatland and restitution of rights and land takenpeatland, and restitution of rights and land taken over from local communities in the areas

– To immediately review security management To immediately review security managementsystems with organisations, of plantation company and/or government in Tripa peatland areas in line i h li bl lwith applicable laws.

Page 40: Fi ldField titrip to RSPO Tripa Resolution

Issues and expectations of NGOs• NGO coalition to rescue Tripa:

NGO i t A t f it l ti d t– NGO appreciates Astra for its explanation and transparency with regard to Tripa and in line policy of the company

NGO enquires hard copy of HCV assessment results and map– NGO enquires hard copy of HCV assessment results, and map of locations of identified HCVs, and management proposal/efforts of the identified HCV areas in PT SPS proposal/efforts of the identified HCV areas in PT SPSconcession (whereby NGO can help to provide substantial inputs)

– There must be joint‐study (Astra, NGO coalition, government) on the status and existence of Tripa ecosystem to seek 

h i d bl l ifi i d l icomprehensive and acceptable clarification and solutions

– There must be follow up dialog which must involve government and all operating companies in Tripa areasgovernment and all operating companies in Tripa areas.

Page 41: Fi ldField titrip to RSPO Tripa Resolution

Responses from AstraResponses from Astra• Astra takes moratorium call of the NGOs coalition since November 2008

• Legality of SPS is HGU• Legality of SPS is HGU

• HCV assessment  6000 identified and proposed to be conserved

• Environmental impact assessment (AMDAL)Environmental impact assessment (AMDAL)  recommends 5000 ha should not be opened d h ld b dand should be conserved

• Tripa concerns related to PT SPS 2 oil palm p pplantation can be solved as soon as possible.

Page 42: Fi ldField titrip to RSPO Tripa Resolution

Concluding remarksT i i f L ( ffi i ll d )• Tripa area is part of Leuser ecosystem (officially protected areas)

• There are some oil palm plantation companies operating in Tripaincluding PT SPS/Astraincluding PT SPS/Astra

• NGO coalition calls on all companies to take moratorium on new land clearing of any new oil palm plantations to prevent furtherland clearing of any new oil palm plantations to prevent further destruction in Tripa areas

• Astra/PT SPS 2 has taken moratorium since November 2008; stillAstra/PT SPS 2 has taken moratorium since November 2008; still maintenance activities still take place

• Astra provides copies of AMDAL, HCV assessment, and HCV p p , ,management document; 

• Astra and NGO coalition agree to have follow up dialog (to be decided soon);

• NGO coalition asks Sawit Watch to facilitate and coordinate relevant follow up communication between Astra and NGO coalition