Ff system sdlc presentation_v0.6
-
date post
19-Oct-2014 -
Category
Education
-
view
1.373 -
download
0
description
Transcript of Ff system sdlc presentation_v0.6
![Page 1: Ff system sdlc presentation_v0.6](https://reader033.fdocuments.in/reader033/viewer/2022061106/54449befafaf9fa4098b4a0d/html5/thumbnails/1.jpg)
SDLC PresentationJanuary 2011
![Page 2: Ff system sdlc presentation_v0.6](https://reader033.fdocuments.in/reader033/viewer/2022061106/54449befafaf9fa4098b4a0d/html5/thumbnails/2.jpg)
Page 2
Agenda
• Introduction
• End to end review of SDLC process
• Detail review of Prototype design stage
• Review prototype design stage deliverables list
• Additional SDLC documentation
![Page 3: Ff system sdlc presentation_v0.6](https://reader033.fdocuments.in/reader033/viewer/2022061106/54449befafaf9fa4098b4a0d/html5/thumbnails/3.jpg)
Page 3
Introduction
• Key features of SDLC
– UTi SDLC process is collection of Agile, Iterative, prototyping methodologies and best practices from HCL, Infosys.
– Uses Continuous Integration and Testing(Automated) methodologies that helps in identifying integration issues early.
– Uses Time boxing(Sprints) for early realization of high value features
– Helps with faster realization of prioritized requirements
– Uses parallel cross functional teams concept to achieve Time to Market goal for meeting the FF System Development timelines.
![Page 4: Ff system sdlc presentation_v0.6](https://reader033.fdocuments.in/reader033/viewer/2022061106/54449befafaf9fa4098b4a0d/html5/thumbnails/4.jpg)
Page 4
Introduction
• Items still need to be done as part of SDLC
– MDM(CIM tool) implementation approach for SDLC
– Need to expand on QA activities and engagement process with UST Global.
– Expand on Continuous Integration, Configuration management, Change management processes.
![Page 5: Ff system sdlc presentation_v0.6](https://reader033.fdocuments.in/reader033/viewer/2022061106/54449befafaf9fa4098b4a0d/html5/thumbnails/5.jpg)
Page 5
Introduction
• Key Success factors– Team work with cross functional teams
– Identifying issues early
– Pro-activeness
– Technical skills
– Working on right things; meeting deliverable expectations
– Stable technology platform, environments
– Continuous improvements
![Page 6: Ff system sdlc presentation_v0.6](https://reader033.fdocuments.in/reader033/viewer/2022061106/54449befafaf9fa4098b4a0d/html5/thumbnails/6.jpg)
Page 6
SDLC (Level 1)
![Page 7: Ff system sdlc presentation_v0.6](https://reader033.fdocuments.in/reader033/viewer/2022061106/54449befafaf9fa4098b4a0d/html5/thumbnails/7.jpg)
Page 7
Stage 1 – Foundation work
![Page 8: Ff system sdlc presentation_v0.6](https://reader033.fdocuments.in/reader033/viewer/2022061106/54449befafaf9fa4098b4a0d/html5/thumbnails/8.jpg)
Page 8
Stage 2 – Prototype team assignment
![Page 9: Ff system sdlc presentation_v0.6](https://reader033.fdocuments.in/reader033/viewer/2022061106/54449befafaf9fa4098b4a0d/html5/thumbnails/9.jpg)
Page 9
Stage 3 – Prototype Design
![Page 10: Ff system sdlc presentation_v0.6](https://reader033.fdocuments.in/reader033/viewer/2022061106/54449befafaf9fa4098b4a0d/html5/thumbnails/10.jpg)
Page 10
Stage 4 – SOW Sign off
![Page 11: Ff system sdlc presentation_v0.6](https://reader033.fdocuments.in/reader033/viewer/2022061106/54449befafaf9fa4098b4a0d/html5/thumbnails/11.jpg)
Page 11
Stage 5 – Development, QA
![Page 12: Ff system sdlc presentation_v0.6](https://reader033.fdocuments.in/reader033/viewer/2022061106/54449befafaf9fa4098b4a0d/html5/thumbnails/12.jpg)
Page 12
Stage 6 – Validation of Code
![Page 13: Ff system sdlc presentation_v0.6](https://reader033.fdocuments.in/reader033/viewer/2022061106/54449befafaf9fa4098b4a0d/html5/thumbnails/13.jpg)
Page 13
Stage 7 – Integration testing
![Page 14: Ff system sdlc presentation_v0.6](https://reader033.fdocuments.in/reader033/viewer/2022061106/54449befafaf9fa4098b4a0d/html5/thumbnails/14.jpg)
Page 14
Stage 8 – Quarterly UAT
![Page 15: Ff system sdlc presentation_v0.6](https://reader033.fdocuments.in/reader033/viewer/2022061106/54449befafaf9fa4098b4a0d/html5/thumbnails/15.jpg)
Page 15
Prototype design Stage
Objectives
Primary Objective within prototype stage is to elaborate requirements, produce detailed design artifacts that include outputs from tools like TIBCO Business Studio, Business works, Blaze etc. There will be some code skeletons produced as needed.
Ready for offshore to code quickly.
“Proof of concepts” are identified and conducted to reduce any architectural risks if necessary.
![Page 16: Ff system sdlc presentation_v0.6](https://reader033.fdocuments.in/reader033/viewer/2022061106/54449befafaf9fa4098b4a0d/html5/thumbnails/16.jpg)
Page 16
Prototype Stage 3 - Planning
![Page 17: Ff system sdlc presentation_v0.6](https://reader033.fdocuments.in/reader033/viewer/2022061106/54449befafaf9fa4098b4a0d/html5/thumbnails/17.jpg)
Page 17
Prototype Stage 3 - Execution
![Page 18: Ff system sdlc presentation_v0.6](https://reader033.fdocuments.in/reader033/viewer/2022061106/54449befafaf9fa4098b4a0d/html5/thumbnails/18.jpg)
Page 18
Sample representation of multiple tracks/streams
![Page 19: Ff system sdlc presentation_v0.6](https://reader033.fdocuments.in/reader033/viewer/2022061106/54449befafaf9fa4098b4a0d/html5/thumbnails/19.jpg)
Page 19
Prototype Team Methodology
• Prototype Teams will run with Agile like concepts• Team determines how much time is needed – Sprint 2 to 4
weeks long• Sprint planning at the start of each sprint – Stage 3
planning• Daily stand ups – 15 minutes to see where we are at• Daily task updates – primary way to track progress• Sprint Reviews – Progress report and demo to
stakeholders• Sprint Retrospectives – Team reviews opportunities to
improve• All Stories and Tasks are tracked in RTC, daily report
![Page 20: Ff system sdlc presentation_v0.6](https://reader033.fdocuments.in/reader033/viewer/2022061106/54449befafaf9fa4098b4a0d/html5/thumbnails/20.jpg)
Page 20
Prototype Deliverables
• SOW• Prototype Specification
– Data Models – Logical, Physical and sample data– Functional Model– ARIS Model– iRISE Model– Business Studio Diagram/Link– Function Work Steps
• Functional Data Elements• Service Requirements• Routing/Entitlements• Notifications/Escalations
– Non-Functional Requirements
![Page 21: Ff system sdlc presentation_v0.6](https://reader033.fdocuments.in/reader033/viewer/2022061106/54449befafaf9fa4098b4a0d/html5/thumbnails/21.jpg)
Page 21
Additional Deliverables to Development
• Reference Architecture / Theory of Operations• Solution Architecture• Glossary• Rules Catalogue• Requirement Traceability Matrix• Definition of Terms – EA Principles doc• Global Style Sheet• Global Error Message• Global Navigation• Common Services Reference• User Interface Requirements & Guidelines
![Page 22: Ff system sdlc presentation_v0.6](https://reader033.fdocuments.in/reader033/viewer/2022061106/54449befafaf9fa4098b4a0d/html5/thumbnails/22.jpg)
Page 22
SDLC documentation
Find SharePoint link SDLC in Home Page – http://myuti.teams.go2uti.com/FreightForwarding/default.aspx
• SDLC Process• Prototype Specification, SOW template• Deliverables from SDLC Stages and templates• RACI• Roles and responsibilities(Product Owner, PM, Track
Lead, BA, EA, Dev, QA, EIM, etc..)• Product backlog Management process• Sprint Planning, Retrospective, review documentation• FAQ