FSRUG
Feedwater Systems Reliability Users Group (Jan 2016)
San Antonio, TX
Diablo Canyon: Replacement Base & Installation
Presenter: Art Washburn, P.E.
![Page 2: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/2.jpg)
FSRUG
![Page 3: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/3.jpg)
FSRUG
DISCUSSION POINTS• Two Rules to Get You Home and Plant Priorities
• Problem Statement: Condensate Booster Pump (CBP) & Motor Concrete Pad to Foundation Delamination
• Mechanical Performance
• Replacement Base
• Installation of Base, Pump and Motor
• Source References
![Page 4: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/4.jpg)
FSRUG
Two Rules:
![Page 5: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/5.jpg)
FSRUG
Two Rules:
Rule #1 – Make Conservative Decisions
![Page 6: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/6.jpg)
FSRUG
Two Rules:
Rule #1 – Make Conservative Decisions
Rule #2 – Maintain Design Control
![Page 7: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/7.jpg)
FSRUG
Two Rules:
Rule #1 – Make Conservative Decisions
Rule #2 – Maintain Design Control
Plant Priorities:
![Page 8: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/8.jpg)
FSRUG
Two Rules:
Rule #1 – Make Conservative Decisions
Rule #2 – Maintain Design Control
Plant Priorities:
1. Nuclear Safety
![Page 9: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/9.jpg)
FSRUG
Two Rules:
Rule #1 – Make Conservative Decisions
Rule #2 – Maintain Design Control
Plant Priorities:
1. Nuclear Safety
2. Legal Requirements
![Page 10: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/10.jpg)
FSRUG
Two Rules:
Rule #1 – Make Conservative Decisions
Rule #2 – Maintain Design Control
Plant Priorities:
1. Nuclear Safety
2. Legal Requirements
3. Efficiency
![Page 11: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/11.jpg)
FSRUG
Problem Statement: CBP & Motor Base
Concrete Pad to Foundation Delamination
• Original Construction - early 1970s (Age > 40 years)
• CBP (Unit 1, Pump 3) developed significant increase in
vibration from 0.1 ips to 0.48 ips
• Primary frequency of vibration increase, 120 Hz or 2X
• Base vibration (0.15 ips), Foundation (<0.03 ips)
• Base had broken bond with the Concrete Pad and Floor
• Personnel could feel the difference in the area: Nibbling
![Page 12: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/12.jpg)
Pump/Motor Base Delamination from Foundation
FSRUG
![Page 13: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/13.jpg)
Trend of Motor Vibration – Overall Amplitudes
FSRUG
![Page 14: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/14.jpg)
Trend of Pump Vibration – Overall Amplitude
FSRUG
![Page 15: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/15.jpg)
Spectral Waterfall – Motor Outboard Vertical
FSRUG
![Page 16: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/16.jpg)
Pre-Mainte Spectral Data – Motor Outboard Vertical
FSRUG
![Page 17: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/17.jpg)
Post-Mainte Spectral Data – Motor Outboard Vertical
FSRUG
![Page 18: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/18.jpg)
CBP 1-3 Pump,
Motor and Base
FSRUG
![Page 19: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/19.jpg)
CBP 1-3 Pump, Motor and Base
FSRUG
![Page 20: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/20.jpg)
CBP 1-3 Pump,
Motor and Base
FSRUG
![Page 21: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/21.jpg)
CBP 1-3 Pump,
Motor and Base
FSRUG
![Page 22: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/22.jpg)
CBP 1-3 Motor
Alignment
Bracket
FSRUG
![Page 23: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/23.jpg)
CBP 1-3 Motor Alignment Bracket
FSRUG
![Page 24: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/24.jpg)
CBP 1-3 Lube Oil
System Drain Line
FSRUG
![Page 25: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/25.jpg)
Overhead
Clearance and
Rigging
Limitations
FSRUG
![Page 26: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/26.jpg)
Original Base Required Removal
FSRUG
- Work Commenced 2 Weeks Prior to Plant Shutdown
- Risk Management Reviews Performed in Support of
Activities
- Tent Installed Around Pump Skid to Contain Dust
- Personnel Donned Mechanical Respirators
![Page 27: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/27.jpg)
Original Construction Details
FSRUG
![Page 28: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/28.jpg)
Original Base Required Removal
FSRUG
- Remove components from Base
- Weight: Base (2,400 lbs), Pump (6,000 lbs), Motor (23,000 lbs)
- Motor required Disassembly due to Rigging Limitations
- Wire Saw Cut Base from Foundation
- Base plus Concrete Weight: 9,000 lbs
- Removal of Base Presented Floor Loading Issue
- Base was Saw Cut into 2 Foot Wide Strips and Removed
![Page 29: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/29.jpg)
Original Base Required Removal
FSRUG
- Anchor Bolt (Studs) were Cut Off During Saw Cutting
- Original Studs Welded to Foundation Steel Inserts; Removed
- Foundation chipped below level and rough to achieve
required anchor profile
![Page 30: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/30.jpg)
Original Base Drawing – Typical Details for Vintage
FSRUG
![Page 31: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/31.jpg)
API-686 Recommended Practice for Machinery
Installation and Installation Design
FSRUG
- Replacement Base: Maintain Design Control
- Unless FEA Modeled and Analyzed, Minimize Changes
- If Changes are Desired, Then Evaluate Potential Impact
![Page 32: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/32.jpg)
Design Changes Implemented
FSRUG
- Original Base is Non-API 610 Design
- Original Base Exhibited Continuous Welds on Exposed
Welds, and Stitch Welds underneath.
- Updated Base Included Continuous Welds. Increased
Stiffness Increased Margin of Separation from Critical
Operating Frequencies.
![Page 33: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/33.jpg)
Design Changes Implemented - Continued
FSRUG
- Original Base Drawing Fabrication, Machining and
Geometrical Tolerancing Details were lacking.
- Generated new Base Drawing to include Common Sense
Updates, Weld Details and Geometric Tolerances per Latest
Standards
- Grout Holes and Vents: Number and Location was Not
Optimum; Increased Number and Locations to Assure a Well
Grouted Base with Minimum Air Pockets
- Added Leveling Nuts Attached Adjacent to Each Bolt Hole
![Page 34: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/34.jpg)
Design Changes Implemented - Continued
FSRUG
- Added Lifting Lugs (Quantity, 4).
- Added Driver Alignment Brackets; Site Added in the Field in
the Past; Improved on Design based on Site Requests from
Lessons Learned
- Geometric Tolerancing: Base Flatness in Free State, Pump
Pedestal Feet Profile, Motor Pedestal Feet Profile, Parallelism
Between Pump and Motor Pedestal Feet
![Page 35: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/35.jpg)
Design Changes Implemented - Continued
FSRUG
- NDT, 100% Welds Visually Inspected per ASW D1.1, Table 6.1
- NDT, Lifting Lug Welds, NDE (MT) Examined. Methodology
per ASME Section V, Article 7; Acceptance Criteria per ASME
Section VIII, Division 1, Appendix 6. Qualification of NDE
Personnel per ASNT Recommended Practice SNT-TC-1A.
- Coating Requirements including Blast Preparation and
Coating Differ Between Topside and Underside of Base. A
unique Underside Coating System Assures Long Term
Reliability of Bond Between Base and Epoxy Grout.
![Page 36: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/36.jpg)
Updated Base Drawing – Critical Dimensions only
FSRUG
![Page 37: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/37.jpg)
Replacement Base
FSRUG
![Page 38: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/38.jpg)
Replacement Base
FSRUG
![Page 39: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/39.jpg)
Replacement Base
FSRUG
![Page 40: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/40.jpg)
Installation Details – Civil Engineer’s Perspective
FSRUG
![Page 41: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/41.jpg)
Replacement Base Installation
FSRUG
- Studs Mounted in New Base Anchor Bolt Holes, Base
Leveled with Pump Bolted to Piping, Studs Welded to Inserts
- Replacement Studs Re-Attached by Welding
![Page 42: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/42.jpg)
Anchor Stud – Locating and Welding to Steel Floor Inserts
FSRUG
![Page 43: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/43.jpg)
Retrofit Installation – Not New Construction (Shims Under Pump Feet)
FSRUG
![Page 44: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/44.jpg)
Installation Details – Civil Engineer’s Perspective
FSRUG
![Page 45: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/45.jpg)
Base Installation
FSRUG
![Page 46: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/46.jpg)
Base Set, Grout Forms Installed and Anchored Into Floor
FSRUG
![Page 47: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/47.jpg)
Pouring Grout
FSRUG
![Page 48: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/48.jpg)
Grout – Initial Pour Filled to Bottom of Base Rails Plus 1/2 Inch
FSRUG
![Page 49: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/49.jpg)
Grout Pours Completed, Cured, and Forms Removed
FSRUG
![Page 50: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/50.jpg)
Vent Holes used for Gout Pour
FSRUG
![Page 51: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/51.jpg)
Grout Repairs as a Result of Voids Identified
FSRUG
![Page 52: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/52.jpg)
Grout Repair (Hardener & Resin Less Aggregate) – Injection to Fill Void
FSRUG
![Page 53: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/53.jpg)
Examples of Grout Pours Requirements
FSRUG
- Ambient Temperature (70 +/- 10 degrees F)
- Critical Pour Time
- Critical Cure Time
- Plus many more requirements (see API-686)
- Grout Pours can be viewed on Youtube
![Page 54: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/54.jpg)
Pump/Motor Base: Grouting & Grout Repairs
per API-RP686
FSRUG
![Page 55: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/55.jpg)
Pump/Motor Base: Grout Repair Map
FSRUG
![Page 56: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/56.jpg)
Mockup Grout Pour – Vertical Pump Soleplate
FSRUG
![Page 57: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/57.jpg)
Mockup Grout Pour – Plexiglas Soleplate
FSRUG
![Page 58: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/58.jpg)
Mockup Grout Pour – Plexiglas Soleplate, Grout Flows
FSRUG
![Page 59: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/59.jpg)
Lessons Learned:• Important Guidance: API 686 - Recommended Practices for
Machinery Installation & Design (Chapters 4 & 5 - Mounting
Plate Installation)
• Plan Required Rigging Needs
• Work Out Union Labor Requirements
• Terms & Conditions
FSRUG
![Page 60: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/60.jpg)
SOURCE REFERENCES:• Centrifugal Pumps: Design & Application, Lobanoff and Ross
(practical application)
• Centrifugal and Axial Flow Pumps, Stepanoff (theory)
• Centrifugal Pumps, Gülich
• Vertical Turbine, Mixed Flow & Propeller Pumps, Dicmus
• Centrifugal Pump Handbook, Sulzer
• Pump Handbook, Karassik
• Centrifugal Pump Clinic, Karassik
• Centrifugal Pumps Selection & Operation, Karassik
• Centrifugal Pumps, Karassik
• API 686 - Recommended Practices for Machinery Installation
& Design (Chapters 4 & 5 - Mounting Plate Installation)
FSRUG
![Page 61: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/61.jpg)
FSRUG
What is this?
![Page 62: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/62.jpg)
FSRUG
Hint
![Page 63: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/63.jpg)
FSRUG
Hint
![Page 64: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/64.jpg)
FSRUG
EBR-1
![Page 65: Feedwater Systems Reliability Users Group (Jan …fsrug.org/Presentations2016/6.pdf · Feedwater Systems Reliability Users Group ... Diablo Canyon: Replacement Base & Installation](https://reader030.fdocuments.in/reader030/viewer/2022020303/5b858da17f8b9a317e8e5876/html5/thumbnails/65.jpg)
THE (HAPPY) END
QUESTIONS ?