Federal Projects - USFW Region 3
-
Upload
jschelkoph -
Category
Documents
-
view
770 -
download
1
Transcript of Federal Projects - USFW Region 3
![Page 1: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/1.jpg)
Federal ProjectsProgressive Consulting Engineers, Inc.
![Page 2: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/2.jpg)
Firm Background
• Progressive Consulting Engineers, Inc. (PCE)• Civil Engineering Consulting Firm
• Founded in 1980• 1st USFW Project in 1988 – Region 3• Registered in CCR– Small Business / Minority Owned
• Currently Under IDIQ Contract with Region 3
![Page 3: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/3.jpg)
Firm Background Cont…
• Transportation Engineering• Minnesota Department of Transportation• Road and bridge work for Counties and Townships
• Water Supply• Water System Modeling• Pump Stations• 1,200-48,000 GPM
![Page 4: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/4.jpg)
Firm Background Cont…
• Hydraulic Engineering• Waterway and Channel Design• Control Structure Design and Rehabilitation• Erosion Repair and Prevention Design• Dam and Spillway Rehabilitation• Watershed Analysis• HEC-RAS Modeling• Bridge Design
![Page 5: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/5.jpg)
Region 3 Project Experience
• All 8 States
![Page 6: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/6.jpg)
• Minnesota, Agassiz NWR• 61,000 Acres in Northern Minnesota
![Page 7: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/7.jpg)
![Page 8: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/8.jpg)
![Page 9: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/9.jpg)
![Page 10: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/10.jpg)
• Minnesota, Agassiz NWR• Road and Water Management Canal
Rehabilitation• Road Deterioration• Canal Deterioration• Erosion• Overland Flooding (1997)• Animal Burrowing
![Page 11: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/11.jpg)
Agassiz NWRWater Management Canal/Road Project
• PCE responded• Site Visit / Report• Topographic Survey• Geotechnical Analysis / Report• Two Phase Design
![Page 12: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/12.jpg)
Agassiz NWRWater Management Canal/Road Project
• 8 reaches totaling more than 12 miles• Phase 1 • 4 Reaches• 7.6 miles
• Phase 2• 4 Reaches • 5.2 miles
![Page 13: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/13.jpg)
Agassiz NWRWater Management Canal/Road Project
• 60 Days / Phase• Average design rate of 800 ft / day• How did we do it?• Planning and Scheduling• Internal Deadlines• Review Timelines• Quality Control
![Page 14: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/14.jpg)
Agassiz NWRWater Management Canal/Road Project
• Civil 3D Design Software• Reduced Plan Revision Time• Higher Detailed End Product• Improved Visualization• Dynamic Cost Estimation• GPS Machine Control
![Page 15: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/15.jpg)
![Page 16: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/16.jpg)
Agassiz NWRWater Management Canal/Road Project
• Met every deadline• 50% (30 days)• 95% (50 days)• 100% (60 days)
• Satisfied Regional Engineer and USFW Staff!• Craig Swedenborg• 612.713.5265
![Page 17: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/17.jpg)
• Minnesota, Agassiz NWR• Radial Gate Structure Rehabilitation
![Page 18: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/18.jpg)
Agassiz Radial Gate Structure
![Page 19: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/19.jpg)
Built in 1967
![Page 20: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/20.jpg)
Cross-Section of Structure
![Page 21: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/21.jpg)
Agassiz NWRRadial Gate Structure Rehabilitation
• Tasks• Replace 2 Radial Gates• New Electric Hoist System• Replace Hand Railing• Rehabilitate Concrete Structure• Concrete Curbrail Extension• W-Beam Guardrail
![Page 22: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/22.jpg)
![Page 23: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/23.jpg)
Agassiz NWRRadial Gate Structure Rehabilitation
• Design Challenges• Maintain Flow through One Gate• 150 cfs to 1800 cfs• Required 10 foot of hydraulic protection
above work area.• Limited foot print for cofferdam.
![Page 24: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/24.jpg)
Agassiz NWR Radial Gate Structure Rehabilitation
• Met every deadline• 50% (30 days)• 95% (60 days)• 100% (70 days)
• Satisfied Regional Engineer and USFW Staff!• Craig Swedenborg• 612.713.5265
![Page 25: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/25.jpg)
![Page 26: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/26.jpg)
• Squaw Creek NWR, MO• Radial Gate Structure Rehabilitation
![Page 27: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/27.jpg)
![Page 28: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/28.jpg)
![Page 29: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/29.jpg)
![Page 30: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/30.jpg)
Squaw Creek NWR Radial Gate Structure Rehabilitation
• Tasks• Replace 3 Radial Gates• New Electric Hoist System• Replace Hand Railing• Rehabilitate Concrete Structure
![Page 31: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/31.jpg)
Squaw Creek NWR Radial Gate Structure Rehabilitation
• ARRA• 60 days• Detailed Concrete Rehabilitation
Design• Challenging Upstream / Downstream
Conditions
![Page 32: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/32.jpg)
Squaw Creek NWR Radial Gate Structure Rehabilitation
• Met every deadline• 50% (30 days)• 95% (50 days)• 100% (60 days)
• Satisfied Regional Engineer and USFW Staff!• Craig Swedenborg• 612.713.5265
![Page 33: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/33.jpg)
Title
![Page 34: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/34.jpg)
Crab Orchard, ILWater Line Replacementand System Modeling
![Page 35: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/35.jpg)
• Crab Orchard NWR– Purchases Water from Herrin, IL– Sells it to Southern Illinois University– Two Water Towers– Booster Pump Station– Watermains from 4” to 16” (deteriorated)
![Page 36: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/36.jpg)
![Page 37: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/37.jpg)
Crab Orchard NWR Water System Analysis
• Tasks– Construct Water System Model– Assess Fire Flow Protection– Replacement System Optimization
![Page 38: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/38.jpg)
Other Projects with Region 3• Wisconsin– Trempealeau NWR (Bridge Design)
![Page 39: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/39.jpg)
Other Projects with Region 3• Wisconsin– Genoa Fish Hatchery (Pump
Station/River Intake)
![Page 40: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/40.jpg)
Other Projects with Region 3• Indiana– Big Oaks NWR Bridge Replacement
Study
![Page 41: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/41.jpg)
Other Projects with Region 3• Michigan– Shiawassee NWR, Spalding Drain Levee
![Page 42: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/42.jpg)
Erosion Protection Projects• Army Corps. of Engineers• HW 169 Emergency Bank Protection• Minnesota River• Feasibility Report• Environmental Assessment• Design of Riprap Protection
![Page 43: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/43.jpg)
![Page 44: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/44.jpg)
![Page 45: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/45.jpg)
![Page 46: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/46.jpg)
Erosion Protection Projects• Army Corps. of Engineers• HW 28 Emergency Bank Protection• Le Sueur River, Blue Earth, MN• Feasibility Report• Environmental Assessment• Design of Riprap Protection
![Page 47: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/47.jpg)
Other Projects with ACOE• Onalaska Dam, Wisconsin• Phased over two seasons• Maintained a 500 cfs minimum
flow rate to prevent fish kill
![Page 48: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/48.jpg)
Other Projects with ACOE• Renville Park Project – Minot ND• Souris River Flood Control• 7,103 feet of levees• Control Structures• Reconstruction of Roadway
“I wish to thank you and your team for the excellent design support your provided.”-Colonel Kenneth S. Kasprisin
Current Assistant Secretary of Homeland Security
![Page 49: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/49.jpg)
Summary• Since 1988, PCE has provided high-
quality design services on dozens of projects for Region 3 and other federal agencies.
• At this time, we have an IDIQ with Region 3 that allows us to contract directly with Region 6.
• We formally offer our design services and look forward to new horizons with the Mountain - Prairie Region.
![Page 50: Federal Projects - USFW Region 3](https://reader036.fdocuments.in/reader036/viewer/2022070519/58ed47951a28abe35e8b4579/html5/thumbnails/50.jpg)
Thank you for your time.Any Questions?