Federal Funding Authorizations
Brian Jones
Budget Section - 38
(Federal Aid)
(225) 379-1495
![Page 2: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N](https://reader033.fdocuments.in/reader033/viewer/2022042020/5e778cb505ae2a4c0852d27d/html5/thumbnails/2.jpg)
Federal Aid
• Federal Aid Highway Program (FAHP)
• Federal Highway Administration (FHWA)
Financial Management Information System (FMIS 5.0)
• Stewardship & Oversight
• Over $773 million awarded and obligated in 2017
• $228,472,066.61 thru March 23, 2018
![Page 3: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N](https://reader033.fdocuments.in/reader033/viewer/2022042020/5e778cb505ae2a4c0852d27d/html5/thumbnails/3.jpg)
Federal Aid Authorizations
Types of Authorization
Initial Authorization
Modification
Project Closeout
Period of Performance
6 Phases of a Project
Feasibility
Environmental
Right of Way
Utility Relocation
Design (Engineering)
Construction
![Page 4: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N](https://reader033.fdocuments.in/reader033/viewer/2022042020/5e778cb505ae2a4c0852d27d/html5/thumbnails/4.jpg)
Initial Authorization
• The authorization of Federal funds to a project.
• Initiate Federal authorization by working with the FHWA for all
phases of a project.
Feasibility, Environmental, Right of Way, Utility, Design, and Construction.
• Verification of the submitted documentation and data entered in
LaGov begins the process.
![Page 5: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N](https://reader033.fdocuments.in/reader033/viewer/2022042020/5e778cb505ae2a4c0852d27d/html5/thumbnails/5.jpg)
Modification, Closeout, and Period of Performance
• Modification – the revision of an authorized project.
• Closeout – a closeout is the de-obligation of remaining funds
and closure of the project. A refund or release of Federal funds and project closure can occur due to non-
compliance of Federal guidelines until corrective actions take place.
• Period of Performance – the period of performance is a period
of when costs can be incurred, which includes a project
agreement start and end date.
![Page 6: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N](https://reader033.fdocuments.in/reader033/viewer/2022042020/5e778cb505ae2a4c0852d27d/html5/thumbnails/6.jpg)
Required Documents
• Project Budget Request ( All phases) Initial Authorization, Modification, Closeout, or Period of Performance
• Federal Authorization Checklist (All phases) Initial Authorization
• Cost Estimate (Phase 6 only) Initial Authorization
• Change Order Summary Report (Phase 6 only) Modification
• Task Order/Contract ( All phases) Modification
• Email (All phases) Closeout or Period of Performance
![Page 7: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N](https://reader033.fdocuments.in/reader033/viewer/2022042020/5e778cb505ae2a4c0852d27d/html5/thumbnails/7.jpg)
![Page 8: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N](https://reader033.fdocuments.in/reader033/viewer/2022042020/5e778cb505ae2a4c0852d27d/html5/thumbnails/8.jpg)
![Page 9: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N](https://reader033.fdocuments.in/reader033/viewer/2022042020/5e778cb505ae2a4c0852d27d/html5/thumbnails/9.jpg)
![Page 10: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N](https://reader033.fdocuments.in/reader033/viewer/2022042020/5e778cb505ae2a4c0852d27d/html5/thumbnails/10.jpg)
![Page 11: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N](https://reader033.fdocuments.in/reader033/viewer/2022042020/5e778cb505ae2a4c0852d27d/html5/thumbnails/11.jpg)
![Page 12: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N](https://reader033.fdocuments.in/reader033/viewer/2022042020/5e778cb505ae2a4c0852d27d/html5/thumbnails/12.jpg)
![Page 13: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N](https://reader033.fdocuments.in/reader033/viewer/2022042020/5e778cb505ae2a4c0852d27d/html5/thumbnails/13.jpg)
![Page 14: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N](https://reader033.fdocuments.in/reader033/viewer/2022042020/5e778cb505ae2a4c0852d27d/html5/thumbnails/14.jpg)
Prior to Working the Request
• Federal Authorization Request form (Checklist)
• Cost Estimate (Phase 6 only)
• HPP and STIP data in place
• Verify amount needed/requested
• Verify funding availability (STP>200K, FBR-OFF,
NHPP, etc) and Federal share (80/20, 90/10, 100%)
• EC date is within 3 years
• Permits have been satisfied
• Proposals are at 95%/Plans signed
• Period of Performance
![Page 15: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N](https://reader033.fdocuments.in/reader033/viewer/2022042020/5e778cb505ae2a4c0852d27d/html5/thumbnails/15.jpg)
Project Builder/CJ20N
• Funding amounts are loaded into CJ20N’s Project
Federal Funding tab.
• Several fields must be populated as well.
• CJ20N is reviewed, approved, and then saved for
the project to interface with FMIS.
• Once the Budget Request is authorized by the
FHWA, the Capital Outlay unit is notified of the
approval.