FEDERAL EXECUTIVE COUNCIL (FEC) APPROVED CONTRACTS FOR FY 2011 MINISTRIES, DEPARTMENTS AND AGENCIES (MDAs)
FEDERAL CAPITAL TERRITORY (FCT)
S/N
ITEM/SERVICE NAME OF COMPANY IMPLEMENTING
AGENCY COST DATE DURATION
1 Variation of the Contract Sum for the provision of Engineering Infrastructure to Kubwa Satellite Town (Districts 4&5), Abuja
Messrs. S.C.C Nigeria Limited
Ministry of Federal Capital Territory
N42,683,490,832.49
2/11/11
2 Years
2 Variation of the Contract Sum for the provision of Engineering Infrastructure to Karshi Satellite Town (Districts 1&2), Abuja
Messrs. S.C.C Nigeria Limited
Ministry of Federal Capital Territory
N28,220,048,498.00 2/11/11
80 Weeks
3 Award of Contract for the Rehabilitation of Lower Usuma Dam (LUD) Water Treatment Plant (Phase II)
Messrs. Cupero (Nigeria) Ltd.
Federal Capital Territory
N1,018,980,566.82 16/11/11
18 Months
4 Award of contracts for the Operation, Maintenance and Training of Staff for Wupa Basin Sewage Treatment Plant
Messrs. SCC (Nigeria) Limited
Federal Capital Territory
N1,586,451,516.76
07/12/11
2 Years (from 16th April 2011 to 15th April 2013)
2
5 Award of Contract for the Supply of 28 Units of Waste Compacting Trucks (1 x Garbage Body 20 + 1.5m3 Capacity, Mounted on Mercedes Benz 3340, 6x4 Chasis with Euro Engine)
Messrs. Geodetics Offshore Services Limited
Federal Capital Territory Administration
N1,071,577,507.41
14/12/11
6 Months
6 Award of Contract for the Establishment of Plant Nursery, Tree Planting, Landscaping and Beautification of Umaru Musa Yar ‘Adua Expressway, Airport Road, FCT, Abuja
Messrs. Kashton Concepts (Nig) Ltd
Federal Capital Territory Administration
N1,451,605,114.64
14/12/11
18 Months
7 Award of contract for the supply of 2 Heavy Duty Recovery Equipment MB Chasis, 50 Ton Hydraulic Wrecker, with a dual 50,000lbs
Messrs. Balyn Auto (Nigeria) Ltd.,
Federal capital Territory
N180,999,000.00
21/12/11
8 weeks
8 Award of contract for the supply of 8 units of 3000MX and 4 units LN50 Motorized Street Sweepers
Messrs. Linens ‘’N’’ Moore (Nigeria) Limited
Federal Capital Territory
N405,677,546.40
21/12/11
6 Months
9 Award of Contract for the Supply of 8No. Light Duty Recovery Equipment for the FCT Directorate of Road Traffic Services (DRTS) under the Transportation Secretariat
Messrs Balyn Auto
(Nigeria) Limited Federal Capital Territory
N151,515,000.00
18/01/12
6 Weeks
3
10 Award of Contract for the Supply of 2 units Mercedes Benz with Muller Canal Master Flusher Type 160E 1 unit with High Pressure Jetting Installation and 1 unit without High Pressure Jetting Installation
Messrs Maxtraco
Integrated Concepts
Limited
Federal capital Territory
N130,963,218.75
18/01/12
6 Months
11 Award of Contract for the Development of Phase II of District I Abuja North Phase IV West of the Federal Capital City (FCC)
Messrs. Salini
(Nigeria) Limited Federal Capital Territory
N25,954,847,809.80
25/01/12
48 Months
12 Award of Contract for the Supply of 35 Operational Vehicles for the FCT Directorate of Road Traffic Services (DRTS)
Messrs. Elizade
Nigeria Limited Federal Capital Territory
N239,400,000.00
01/02/12
4 Weeks
13 Award of Contract for the Supply of 6 units of 30 Tonnes Mercedes Benz Diesel Engine RORO Trucks
Messrs. Yae
International Limited Federal Capital Territory
N203,590,497.36 29/02/2012
6 Months
TOTAL N103,299,147,108.43
4
MINISTRY OF AVIATION
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of contract for Procurement, Installation and Commissioning of ILS/DME in 5 Airports and DVOR/DME in 5 Airports
Messrs. Salbodi Group Ltd/Indra Sistemas S.A
Ministry of Aviation
N1,590,361,027.20 07/12/11 10 Months
2
Direct/repeat Procurement of additional 696No. of SCA 120IN Heat Proximity Clothing form the Original Equipment Manufacturers
Messrs. Sancheong Products of South Korea Through Messrs. Plastisol BV of the Netherlands (Accredited Representatives in Nigeria)
Ministry of Aviation
USD1,577,136 payable at the prevailing Exchange Rate at the time of opening the Letter of Credit
07/12/11 4 Months
TOTAL USD1,577,136.00 N1,590,361,027.20
5
MINISTRY OF COMMUNICATIONS TECHNOLOGY
1
AWARD OF CONTRACT FOR THE PROVISION OF ICT-ENABLED LEARNING THROUGH THE SCHOOLS ACCESS PROGRAM BY UNIVERSAL SERVICE PROVISION FUND WITH THE COMPLETION PERIOD OF 36 WEEKS
S/N NAME OF FIRM/CONTRACTOR IMPLEMENTING AGENCY
No. of
Schools
Project Cost
N
Date
i Messrs. Zinox Technologies
Ltd
Ministry of
Communication
Technology
70 N1,166,621,253.00 14/09/11
ii Messrs. Edtek Learning
ServicesLtd.
Ministry of
Communication
Technology
60 N999,961,074.00 14/09/11
iii Messrs. MDS Technologies Ministry of
Communication
Technology
60 N999,961,074.00 14/09/11
iv Messrs. Chips,Bites and
Bytes Ltd.
Ministry of
Communication
Technology
60 N999,961,074.00 14/09/11
v Messrs ICS Ltd. Ministry of
Communication
Technology
55 N916,630,948.50 14/09/11
6
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
2 Award of contract for the Construction of the National Information Technology Center by Galaxy Backbone Plc
Messrs. Sageto (Nig) Ltd.
Ministry of Communications Technology
N7,274,638,250.51 07/12/11 104 weeks
3 Award of Contract for the for the Provision of IT and Connectivity services to the scale-up of the CGS to Local Government Areas
Messrs. Galaxy Backbone Plc
Presidency /Galaxy Backbone
N391,272,598.98 17/08/11
TOTAL N14,115,659,740.79
vi Messrs Dialogue Global Links
Ltd.
Ministry of
Communication
Technology
42 N699,972,751.80 14/09/11
vii Messrs Sidmach
Technologies
Ministry of
Communication
Technology
40 N666,640,716.00 14/09/11
TOTAL 387 N6,449,748,891.30
7
FEDERAL MINISTRY OF EDUCATION
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of Contract for the Execution of the Pilot Phase of the Nigerian Universities Electronic Teaching and Learning Platform in 12 Universities, 2 (1 Federal and 1 State) from each of the 6 Geo-Political Zones
Messrs. Richfield Technology Ltd
Ministry of Education
N325,274,000.00 16/11/11 8 Weeks
2i Award of Contract for the Procurement of Furniture for Lecture Theatres for 13 faculties( Arts, Engineering, Physical Sciences, Veterinary Medicine, Pharmacy, Agriculture, Social Sciences, Education, Business Administration, Dentistry, Medicine, Health Sciences & Technology and Law) in the University of Nigeria, Nsukka
Messrs. Zito Phranzlo International Ltd.
Ministry of Education
N453,871,600.00 16/11/11 40 Weeks
2ii Award of Contract for the Procurement of Ubiquitous Wireless Network for the ICT Backbone Infrastructure for the
Messrs. BCX Networks Ltd., working with Wavion Wireless
Ministry of Education
N275,243,678.00 16/11/11 12 Weeks
8
Campuses of the University of Nigeria, Nsukka
Network of Israel, Business Connection of South Africa and Xiruus Inc. of USA
3 AWARD OF CONTRACT FOR THE PRINTING AND DISTRIBUTION OF ENGLISH LANGUAGE, MATHEMATICS, ACTIVITY-BASED SCIENCE, BASIC SCIENCE AND TECHNOLOGY AND SOCIAL STUDIES TEXTBOOKS PRIMARIES 1 AND 2 PUPILS; AND LIBRARY RESOURCE MATERIALS FOR JUNIOR SECONDARY SCHOOL (JSS) STUDENTS IN PUBLIC SCHOOLS NATIONWIDE BY UBEC
S/N DESCRIPTION OF PROJECT (BOOKTITLE)
PUBLISHER/CONTRACTOR QUANTITY (No. OF COPIES)
TOTAL COST (N) DATE DURATION
i Printing and Distribution of of Macmillan New Pry. Maths. Books 1 for 16 States
Macmillan 640,000 256,320,000.00 30/11/11
6 weeks
ii Printing and Distribution of Macmillan New Pry. English Lang. Book 1 for 16 States
Macmillan 640,000 229,248,000.00
iii Printing and Distribution of Think and Do: Activity-Based Science Book for Pry. 1 for 34 States and the FCT
Macmillan 1,225,000 429,975,000.00
iv Printing and Distribution of Macmillan Brilliant Primary Social Studies Book 1 for 20 States
Macmillan 1,826,000 547,800,000.00
v Printing and Distribution of Macmillan New Pry. Maths. Book 2 for 16 States
Macmillan 640,000 256,320,000.00
9
vi Printing and Distribution of Macmillan New Pry. Eng. Lang. Book 2 for 16 States
Macmillan 640,000 229,248,000.00 30/11/11
6 weeks
vii Printing and Distribution of Think and Do: Activity-based Science Book for Pry. 2 for 34 States and the FCT
Macmillan 1,225,000 429,975,000.00
viii Printing and Distribution of Macmillan Brilliant Primary Social Studies Book 2 for 20 States
Macmillan 1,826,000 547,800,000.00
ix Printing and Distribution of 160 Assorted Titles Library Resource Materials of various Quantities for the 36 States and the FCT
Macmillan 4,144,000 1,528,763,049.00
x Printing and Distribution of Evans Brothers Publishers Basic Science Books 1 for 5 States
Evans Brothers 415,000 132,800,000.00
xi Printing and Distribution of Evans Brothers Publishers Basic Science Books 2 for 5 States
Evans Brothers 415,000 132,800,000.00
xii Printing and Distribution of Evans Brothers Publishers Social Studies Books 1 for 11 States
Evans Brothers 747,000 242,775,000.00
xiii Printing and Distribution of Evans Brothers Publishers Social Studies Books 2 for 11 States
Evans Brothers 747,000 242,775,000.00
10
xiv Printing and Distribution of Heinemann Basic Science & Technology Book 1 for 15 States
Heinemann 1,245,000 373,500,000.00 30/11/11
6 weeks
xv Printing and Distribution of Heinemann Basic Science Technology Book 2 for 15 States
Heinemann 1,245,000 373,500,000.00
xvi Printing and Distribution of University Press Plc Basic Science & Technology Book 1 for 12 States
University Press Plc 830,000 336,150,000.00
xvii Printing and Distribution of University Press Plc Basic Science &Technology Book 2 I for 12 States
University Press Plc 830,000 348,600,000.00
TOTAL 6,638,349,049.00
TOTAL N7,692,738,327.00
11
FEDERAL MINISTRY OF ENVIRONMENT
S/N PROJECT DESCRIPTION NAME OF FIRM/CONTRACTOR
IMPLEMENTING AGENCY
COST
DATE DURATION
1 Award of Contract for the Remediation of Sludge Pits at Kaduna Refinery and Petrochemical Company (KRPC) dumpsites and Improvement of the lives of the Impacted Communities
Messrs. Osprey Investment Group Ltd.
Ministry of Environment /Kaduna Refining and Petrochemical Company(KRPC)
N 1,811,005,875.00 14/09/11 43 Weeks
2 AWARD OF FOUR (4) CONTRACTS FOR THE EXECUTION OF EROSION CONTROL WORKS IN THE SOUTH EAST GEO-
POLITICAL ZONE OF THE COUNTRY
S/N Lot No
PROJECT DESCRIPTION NAME OF
FIRM/CONTRACTOR IMPLEMENTING
AGENCY COST DATE DURATION
i 6 Sakamori/Nwangene Flood
Control and Dredging in
Anambra State
Messrs. Benefaf
International Ltd.
Ministry of
Environment
N1,230,015,404.31
18
Months
ii 4 Nanka Recednt Landslide in Anambra State
Messrs. Rhino Maritime Services & Construction Ltd.
Ministry of Environment
N1,111,456,582.53 12 Months
12
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
3 Award of Contract for the Channelization of Asa River and its Tributaries in Ilorin, Kwara State
Messrs Ambico Sendirian (Nigeria) Limited
Ministry of Environment
N1,233,761,817.20 04/04/12 12 Months
11 Obinagu/Akpulu/Enugueze-
Umunneobagu Erosion Control
in Enugu State.
Messrs. Nostro
Ventures Ltd.
Ministry of
Environment
N1,482,687,008.88 14/09/11
15
Months
15 Channelization of Iyi Okwu and
Iyi Udele Stream in Ebonyi
State.
Messrs City Central
Group
Ministry of
Environment
N1,544,233,440.75 14
Months
TOTAL N5,368,392,436.47
13
TOTAL N8,413,160,128.67
FEDERAL MINISTRY OF FINANCE
S/N PROJECT DESCRIPTION
NAME OF FIRM/CONTRACTOR
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of Contract for the Design, Procurement and Implementation of an Enterprise Resource Planning (Enterprise Finance and Accounts) Software for the Federal Inland Revenue Service
Messrs. Computer Warehouse Group Limited
Federal Inland Revenue Service (FIRS)
N150,000,000.00 10/08/11 12 Months
2 Award of contract of the 2No. A30 Sea Princess Boats with Back Up Spare Parts and Training of Crew Members
Messrs. John Holt Plc
Ministry of Finance N270,000,000.00 19/10/11 6 Weeks
3 Award of contract for consultancy services for stages 1 and 2 in respect of the construction of new Federal Inland Revenue Service (FIRS) Headquarters building in Abuja
Messrs. ATO Architects as consultant architects and their team of other consultants:
Ministry of Finance/ FIRS
N733,427,476.78 07/12/11 6 Months
14
Structural Engineers, Messrs. IAA Associates Ltd; Mechanical Engineers, Messrs. Molecular Consultants and Associates; Electrical Engineers, Messrs. Molecular Consultants and Associates; and Quantity Surveyors, Messrs. Sea Surveyors Ltd
4 Award of Contract for the Construction of Senior Management Quarters at Jabi Lakeside, Abuja for the Nigeria Customs Service
Messrs Afdin Construction Limited
Ministry of Finance N6,677,406,192.03 inclusive of 5% VAT
11/04/12 104 weeks
5
Award of contract for the procurement of 1No. Cessna Citation CJ4 Acquisition Aircraft
Messrs Africair Incorporated
Ministry of
Finance/Nigeria
Customs Service
N1,737,503,898.90
(Equiv. to
USD11,123,584.50)
inclusive of 5% VAT
16/05/12 4 Months
TOTAL N9,568,337,567.71
15
FEDERAL MINISTRY OF HEALTH
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Procurement of contraceptive by the United Nations Fund for Population Activities (UNFPA) for the Federal Ministry of Health
United Nations Fund for Population Activities (UNFPA)
Ministry of Health USD3,000,000.00 Federal Government counterpart funding
07/12/11
2 AWARD OF CONTRACTS FOR DIRECT PROCUREMENT OF ANTI-RETROVIRAL (ARV) DRUGS AND OTHER COMMODITIES
S/N Project Description Contractors
Implementing Agency
Contract Sum Date Completion Period
i Supply of 50,576 packs of Lamivudine/Zidovudine/Nevirapine ARV MDG Branded Drug
Messrs. Emcure Nigeria Limited
Federal Ministry of Health
N124,500,000.00
07/12/11 2 weeks
ii Supply of 50,576 packs of Lamivudine/Zidovudine/Nevirapine ARV MDG Branded Drug
Messrs. Strides Vital Nigeria Limited
N126,990,000.00
iii Supply of 50,576 packs of Lamivudine/Zidovudine/Nevirapine ARV MDG Branded Drug
Messrs. Ranbaxy Nigeria Limited
N112,050,000.00
iv Supply of 50,576 packs of Lamivudine/Zidovudine/Nevirapine ARV MDG Branded Drug
Messrs. Evans Medical Plc
N136,651,200.00
16
v Supply of 50,576 packs of Lamivudine/Zidovudine/Nevirapine ARV MDG Branded Drug
Messrs. May & Baker Nigeria Plc
N129,480,000.00
vi Supply of 55,000 tablets of Cotrimoxazole tablets and 108,108 100ml suspension of co-trimoxazole
Messrs. Clarion Medical limited
N145,860,000.00
vii Supply of 428,000 tests Double Check Gold
Messrs. Biotec Laboratory Products
N194,033,880.00
viii Supply of 428,000 tests of Determine Test kits
Messrs. Acouns Nigeria Limited
N194,033,880.00
ix Supply of 428,000 Stat Pak Test Kits
Messrs. Chembio Diagnostics Limited
N194,033,880.00
TOTAL N1,357,632,840.00
TOTAL USD3,000,000.00 N1,357,632,840.00
17
MINISTRY OF INTERIOR
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of Contract for the Automation of the Citizenship and Business Department of the Ministry of Interior on a Public Private Partnership(PPP) using Buil Operate and Transfer (BOT) Model
Messrs. Anchor Dataware Solutions
Ministry of Interior
N455,055,743.87 25/01/12 Concession
Period of 5
years
TOTAL N455,055,743.87
FEDERAL MINISTRY OF LAND, HOUSING AND URBAN DEVELOPMENT
1 AWARD OF CONTRACT FOR THE CONSTRUCTION OF 6No. NEW FEDERAL GOVERNMENT SECRETARIATS IN EACH GEO-
POLITICAL ZONE OF THE FEDERATION
S/N Project Title/Location Contractors
Implementing Agency
Project Cost Date Completion Period
i Federal Government Secretariat, Awka, Anambra State
Messrs. Cosco Investment (Nig) Ltd Ministry of Lands,
Housing and Urban Development
N2,561,268,866.56
07/12/11 100 weeks ii Federal Government
Secretariat, Yenagoa, Bayelsa State
Messrs. Trenure (Nig) Ltd
N2,563,476,419.85
18
iii Federal Government Secretariat, Gombe, Gombe State
Messrs. Vic Phranc (Nigeria) limited
N2,293,261,561.05
iv Federal Government Secretariat, Lafia, Nassarawa State
Messrs. Faplins (Nig) Ltd
N2,229,968,101.20
v Federal Government Secretariat, Osogbo, Osun State
Messrs. Golden Construction Company Limited
N2,548,444,283.80
vi Federal Government Secretariat, Gusau, Zamfara State
Messrs. Sageto Ltd N2,528,673,102.10
TOTAL N14,725,092,334.56
MINISTRY OF NIGER DELTA
1 AUGMENTATION OF THE CONTRACTS FOR THE EAST-WEST ROAD PROJECT, SECTIONS I, II-I AND II-II (MINISTRY OF NIGER
DELTA AFFAIRS)
S/N
PROJECT DESCRIPTION CONTRACT SUM
CONTRACTOR
DATE COMPLETION PERIOD
i
East-West Road, Section I (Warri-Kaiama) in Delta State
Revised Contract Sum From N64,125,000,000.00 To N112,166,400,493.60
Setraco
10/08/11 28 Months
19
Ii
East-West Road, Section II-I (Port-Harcourt-Ahoada-Kaiama ) in Rivers State
Revised Contract Sum From N29,922,478,839.19 To N48,973,303,132.78
Setraco
10/08/11 28 Months
iii
East-West Road, Section II-II (Ahoada-Kaiama) in Rivers/Bayelsa State
Revised Contract Sum From N44,883,718,258.18 To N84,759,913,053.64
Setraco
10/08/11 28 Months
N245,899,616,680.02
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
2 Award of the Phase II Contract for the Construction of Ogriagbene – Torugbene 3.675Km Road with spurs to Edegbene and Torugbene townships in Delta State
Messrs. Setraco (Nig.) Limited
Ministry of Niger Delta Affairs
N3,453,476,572.13 09/11/11 12 Months
3 AUGMENTATION OF CONTRACTS FOR THE ENGINEERING CONSULTANCY SERVICES TO INCORPORATE FULL RESIDENT SUPERVISION OF
THE CONSTRUCTION OF FOUR (4) ROAD PROJECTS IN THE NIGER DELTA REGION
S/N Project Title Consultant
Implementing Agency
Revised Contract Sum
Date Completion
Period
20
i Construction of Oriagbene-Torugbene Road
Messrs. Jon Khan Ltd.
Ministry of Niger Delta Affairs
N112,937,829.59
09/11/11
24 Months
ii Re-construction of Benin-Abraka Road
Messrs. Agbomire Engineering Consultants
N126,543,689.80
12 Months
Iii Construction of Odorobo-Kpakiama Bomadi Road
Messrs. Auspoint Ltd.
Ministry of Niger Delta Affairs
N115,663,821.44
09/11/11
18 Months
Iv Construction of Mbato Junction, Okputuite, Orie Market, Omara Road
Messrs. Techs Engineering Associates
N187,788,747.43
30 Months
TOTAL N583,184,097.26
S/N
ITEM/SERVICE NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
4 Ratification of the President’s Approval for the take over of the 18.7km Gbaregolor-Ogriagbene Road in Bomadi LGA of Delta State from the Delta State Government
Messrs. Setraco (Nigeria)Limited
Ministry of Niger Delta Affairs
N7,348,335,298.50 30/11/11 24 Months
TOTAL N257,284,612,647.91
21
MINISTRY OF PETROLEUM RESOURCES
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of Contract for the Dismantling and Reconstruction of Tank 13 and Rehabilitation of Tank 11, 12, & 22 at NNPC Depot, Mosimi
Messrs. Adano Engineering Co. (Nig.) Ltd.,
Ministry of Petroleum Resources
N3,904,635,594.84 30/11/11 20 Months
2
Award of Contract for the Execution of the Outstanding Works for Gas Supply to PHCN Power Plant, Papalanto
Messrs. MORPOL Engineering Services Limited/JAIHIND Projects Ltd.,
Ministry of Petroleum Resources
N1,015,094,003.11 Plus USD20,234,439.59 payable at the prevailing exchange rate at the time of payment Plus 5% VAT of N202,512,997.10
30/11/11 7 Months
3
Award of contract for the execution of the outstanding works for gas supply to PHCN Power Plant, Alaoji
Messrs. Oil serve Limited
Ministry of Petroleum Resources
N2,582,787,557.23 Plus USD8,216,198.44 Equivalent to N3,815,217,323.00 Plus 5% VAT of N190,760,866.10
21/12/11 7 Months
4 Award of contract for the construction of the NPDC Head Office Building at Oko Village, Benin City
Messrs. Bouygues (Nigeria) Limited
Ministry of Petroleum Resources
N14,196,623,377.35 21/12/11 24 Months
TOTAL USD28,450,638.03 N21,699,140,532.53
22
MINISTRY OF POWER
1 AWARD OF CONTRACT FOR THE DESIGN, MANUFACTURE, SUPPLY, INSTALLATION AND COMMISSIONING OF 2NO. TRANSMISSION 330/132KV & 32/33KV SUB-STATIONS FOR THE TRANSMISSION COMPANY OF NIGERIA (TCN) PLC
S/N LOT NO. PROJECT
DESCRIPTION NAME OF FIRM/CONTRACTOR
IMPLEMENTING AGENCY
COST
BUDGETARY PROVISION
DATE DURATION
i Lot 2010-21
Design, Manufacture, Supply, Installation and Commissioning of 2x150MVA,330/132KV Plus 2x60MVA,132/33KV Sub-Station at Akure with TurnIn/Turn out of One Circuit and 2x330KV Line Bay Extensions at Osogbo and Benin North Sub-stations
Messrs. Matelec ECL/S.A.L.
Ministry of Power
USD19,025,537.45 Plus N1,573,779,429.43 payable at the prevailing exchange rate at the time of payment inclusive of a provisional sum of N505,050,433.43 for 5% VAT on onshore payments,compensations and Contingency
Provided in 2011 Appropriation
10/08/11 24 Months
ii Lot 2010-22
Design, Manufacture, Supply, Installation and Commissioning of 2x150MVA,330/132K
Messrs. Matelec ECL/S.A.L.
Ministry of Power
USD15,129,749.22 Plus N1,267,800,811.75 payable at the
Provided in 2011 Appropriation
10/08/11 24 Months
23
V Plus 2x60MVA,132/33KV Sub-Station at Olorunsogo
prevailing exchange rate at the time of payment inclusive of a provisional sum of N377,182,637.80 for 5% VAT on onshore payments,compensations and Contingency
USD34,155,286.67
Plus
N1,772,851,245.18
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
2 Award of Contract for the Supply of Aluminium Conductor Composite Core Reinforced (ACCCR)
Messrs. Composite Technology Corporation
Ministry of Power USD1,627,464.00 Plus N24,853,002.74 inclusive of 5% VAT
30/11/11 32 weeks
3 Revision of the Contract Sum for the Provision of Project Management Consultancy Service on the 3rd Benin-Onitsha 330kv Double Circuit
Messrs. Colenco Power Engineering Ltd.,
Ministry of Power USD2,610,413.16 Plus N204,452,067.90
30/11/11 30th June, 2012
24
Transmission Line Project
4 AWARD OF CONTRACTS FOR THE PROVISION OF PROJECT MANAGEMENT CONSULTANCY SERVICE FOR 2010 HIGH VOLTAGE TRANSMISSION LINE AND SUB-STATION PROJECTS FOR THE TRANSMISSION COMPANY OF NIGERIA (MINISTRY OF POWER)
S/N COMPANY PROJECT MANAGEMENT CONSULTANCY SERVICE LOCATIONS
CONTRACT SUM DATE COMPLETION PERIOD
1 Messrs. Jiyoda Engineering Ltd
Erukan-Omotosho 330kv DC Transmission Line (132km) and Omotosho-Epe-Aja 330kv Double Circuit (DC) Transmission Line (135km)
N281,869,932.31 30/11/11
24 Months
2 Messrs. London Power Associates Ltd
2x150MVA, 330/132KV + 2x60MVA, 132/33KV Substation at Omotosho, 2x150MVA, 330/132KV + 2X60MVA, 132/33KV Substation at olorunsogo, 4x330kv Line Bay Extension at Erunkan 330/132kv Substation, 6x330kv Line Bay Extension at Omotosho Substation and 2x330kv Line Bay Extension at Aja 330/132kv Substation
USD1,463,293.68 Plus N76,477,693.77
3 Messrs. Fichtner
Engineering/Metr
osource Nigeria
Ltd
Benin North- Oshogbo 330kv DC Transmission Line with one Single Circuit turning in and out to New Akure (260km), 2x150MVA, 330/132KV + 2x60MVA, 132/33KV Substation at Akure, 2x330kv Line Bay Extension at Benin North and Oshogbo 330/132kv Substations
USD1,455,789.00 Plus N114,691,710.00
4 Messrs. AF-Colenco/Colenco Nigeria Ltd
Kano-Katsina 330KV DC Transmission Line (180km), 2x150MVA, 330/132KV + 2x60MVA, 132/33KV Substation at Katsina and 2x330kv line Bay Extension
USD1,896,503.00 Plus N110,376,420.00
25
+ 1x75 MVAr Reactor at Kano 330/132kv Substation 30/11/11
24 Months
5 Messrs. Gopa- Intec International/UE SL
Kaduna Power Plant-Mando Road 330kv DC Transmission Line and 2x330kv Line Bay Extension at Mando and Akwanga – Lafia 132kv Transmission Line, 2x30/40MVA, 132/33kv Substation
€1,147,500.00 Plus N49,279,545.00
6 Messrs. Arcon Engineers/Afcon Offshore
Reinforcement with 1x150MVA, 330/132/33KV Transformer each at Kano AND Birni-Kebbi and Rehabilitation of Sokoto-Tlata Mafara 132kv Double Circuit Transmission Line
USD1,190,722.00 Plus N86,580,821.25
7 Messrs. Gopa- Intec International/UE SL
Extension of Kainki 330kv Substation with 330kv Single Circuit River Crossing and 1x150MVA, 330/132 Substation at Kainji, and Kainji –New Bussa 132kv DC Transmission Line, 2x30/40MVA, 132/33KV Substation at New Bussa , and Reinforcement with 1x60MVA, 132/33KV Transformer each at Hadejia, Katsina and Kontagora
€1,053,425.00 Plus N47,515,545.00
8 Messrs. Trans Africa/Elens Consult
Ikeja West – Ayobo 132kv DC Transmission Line with associated 2x60MVA, 132/33KV Substation at Ayobo and 2x60MVA, 132/33KV Substation at Odogunyan and Ikorodu-Odogunyan –Shagamu 132kv DC Transmission Line
USD888,811.00 Plus N131,628,210.00
30/11/11
24 Months
9 Messrs. Markcillio Engineering and Cobra 91 Limited
Onitsha-Oba-Nnewi-Ideato-Okigwe 132KV DC Transmission Line, 2x60MVA, 132/33KV Substation at Oba and 2x60MVA, 132/33KV at ideato
€691,470.00 Plus N72,412,425.31
10 Messrs. Energy Giants Drn Ltd
New Abeokuta-Igbo Ora- Lanlate and Tee off from Igbo Ora-Igangan, 132kv DC Transmission Lines (110km), 2x60MVA, 132/33KV Substation at Lanlate, 2x60MVA, 132/33JV Substation at Igangan and 132kv Switching Station at Igbo Ora
USD1,226,188.16
26
11 Messrs. Great Northern Industries and Metanoya Group/Enzani
1x30/40MVA, 132/33KV Substation at Kwanar Dogara ant turn in and out of Zaria-Kano 132 132KV Transmission line at Kwanar Dangora, 2x30/40MVA, 132/33kv Substation at Tamburawa Water Supply and turn in and out of Zaria-Kano 132KV Transmission Line at Tamburawa water Supply
USD939,449.00 Plus N63,531,880.31
12 Messrs. Amal Engineering Services Ltd
Katsina-Dutsinma-Kankara-Malunfashi 132kv Transmission Line (173km), 2x30/40MVA, 132/33kv Substation at Kurfi, 2x30/40MVA,132/33KV Substation at Dutsinma, 2x30/40MVA, 132/33KV Substation at Kankara, 2x30/40MVA, 132/33KV Substation at Malunfashi, 2x132kv Line Bay Extension at Katsina 132/33kv Substation
N209,481,557.88 30/11/11
24 Months
13 Messrs. FM Chidez Ltd/GIT
Ganmo-Shongal 132kv DC Transmission Line (120km), 2x60MVA, 132/33KV Substation at Shongai, and 2x132kv Line bay Extension at Ganmo
USD888,856.92 Plus N63,525,000.00
14 Messrs. Pat-Sam & Partners
Owerri-Aboh Mbaise 132kv DC Transmission Line (26km), 2x60MVA, 132/33KV Substation at Aboh Mbaise, 2x132kv Line Bay Extension at Owerri 132kv Substation at Amasiri, 2x60MVA, 132/33KV Substation at Afikpo, 2x132kv Line Bay Extension at Nenwe 132/33kv Substation and 2x60MVA, 132/33KV Substation at Mpu
N249,359,029.50
15 Messrs. Yaroson & Partners
5.5km 1323kv Underground Cable from Golf Course Asokoro to Central Area 132kv Substation and 4.4 km 132kv Overhead Line from Katampe 330kv Substation to Golf Course Asokoro, 2x60MVA, 132/33KV Substation at Kukwaba with 6x33kv Outgoing Feeders, Daura-Dambatta 132kv DC Transmission Line (60km), 2x30/40MVA, 132/33KV Substation at Dambatta and 2x132kv Line Bay Extension at Daura 132/33kv Substation
N244,419,245.60
27
16 Messrs. Derekson/Teshmont Ltd
Oshogbo-Ede 132kv DC Transmission Line (15km), 2x60MVA, 132/33KV Substation at Ede, 2X132KV Line Bay Extension at Oshogbo, 2x30/40MVA, 132 Substation at Efon Alaye and 2x132kv Line Bay Extension at Oke Agbe
N253,053,399.48 30/11/11
24 Months
5 AWARD OF CONTRACTS FOR THE CONSTRUCTION OF TRANSMISSION LINES AND SUBSTATIONS FOR THE TRANSMISSION
COMPANY OF NIGERIA(TCN)
S/N Project Description Contractors
Implementing Agency
Contract Sum Date Completion Period
i Lot 2011 – 1 Engineering, design, manufacture, Supply, Construction and Commissioning of the 235km 2nd Kaduna-Kano 330kv Double Circuit Transmission Line
Messrs. National Power Construction Corporation
Ministry of Power/Transmission Company of Nigeria (TCN)
USD42,968,950.21 Payable at prevailing rate at the time of exchange Plus N4,154,133,631.19
07/12/11 24 Months ii Lot 2011 – 2 Engineering, design, manufacture, Procurement, Supply, Construction and Commissioning of the 150 km Delta-Portharcourt 330kv Double Circuit Transmission Line
Messrs. Icomm Tele Ltd/PPP International Ltd
USD27,079,493.25 Plus N3,627,601,391.33
iii Lot 2011-3 Abakaliki-Amasiri 132kv Double Circuit Transmission Line
Messrs. Flour Engineering/Eurafric Energy Ltd
Ministry of Power/Transmission Company of Nigeria (TCN)
USD6,044,617.26 Plus N898,080,164.52
07/12/11 24 Months
28
iv Lot 2011-4 Keffi-Kwoi-Kachia 132kv Double Circuit Transmission Line
Messrs. Aster Infrastructures
USD9,495,089.71 Plus N1,587,493,882.99
v Lot 2011-5 Ugwuaji-Nnenwe 132kv Double Circuit Transmission Line
Messrs. Ashtavinayaka Energy Infra Pvt Ltd/Bran Engineering Ltd
USD3,732,770.65 Plus N511,793,146.63
vi Lot 2011-6 132kv Double Circuit Transmission Line Nnewi MBO
Messrs. Dorman Long Engineering/Genesis/Power Projects Ltd Nnenwe-Mpu
USD2,858,534.87 Plus N643,790,391.31
vii Lot 2011 – 7 Engineering, design, manufacture, Supply, Construction and Commissioning of the 50km Omuaran -Egbe 330kv Double Circuit Transmission Line
Messrs. Aravali Infra Power Limited/Alicon Ventures Nig. Ltd
USD3,088,924.41 Plus N621,321,904.69
viii Lot 2011 – 8 Engineering, design, manufacture, Procurement, Supply, Construction and Commissioning of the 90km Obajana-Okeagbe 330kv Double Circuit Transmission Line
Messrs. Everest Infra Energy Ltd/Dyehnum ventures Ltd
Ministry of Power/Transmission Company of Nigeria (TCN)
USD7,743,804.84 Plus N803,692,934.38
07/12/11 24 Months
ix Lot 2011 – 9 Engineering, design, manufacture, Supply, Construction and
Messrs. Skipper Electricals/Summit Energy
USD25,545,146.96 Plus N3,471,734,877.83
29
Commissioning of the 180km Yola-Song-Little Gombi-Mubi-Gulak 330kv Double Circuit Transmission Line
x Lot 2011 – 10 Design, manufacture, Supply,and Commissioning of 2x330kv Lines Bay Extension in each of Kaduna (Mando) and Kano( Kumbotso) 330/132kv substation
Messrs. Exernegia Power Africa Bigen
USD4,212,379.53 Plus N500,823,961.92
xi Lot 2011-11 2x330kv Line bays extension in each of Delta (Ughelli) and portharcourt 330/132kv substation
Messrs. MBH Power Ltd
USD4,401,074.24 Plus N551,133,551.17
xii Lot 2011 – 13 Design, manufacture, Supply, Construction and Commissioning of 2x60MVA, 330/132kv substation at Kachia
Messrs. Esterbag Engineering Limited
Ministry of Power/Transmission Company of Nigeria (TCN)
USD6,031,516.62 Plus N437,340,330.79
07/12/11 24 Months
xiii Lot 2011 – 16 Design, manufacture, Supply, Commissioning of 2x60 MVA, 132/33kv substation at Okeagbe and 2x132kv line bays extension at Obajana
Messrs. Power Contral & Appliances
USD5,612,652.66 Plus N687,987,881.45
xiv Lot 2011 – 17 Design, manufacture, Supply, and Commissioning of 2x60MVA, 132/33kv substation at Song and
Messrs. Qingdao Wuxio Grwa Company ltd/Ahmin Technology and Power System
USD6,506,881.47 Plus N676,045,227.30
30
2x132kv Lines Bay Extension at Yola
xv Lot 2011 – 18 Design, manufacture, Supply, and Commissioning of 2x60MVA, 132/33kv substation at Little Gombi
Messrs. Shandong Taikai
USD4,852,409.00 Plus N711,474,893.72
xvi Lot 2011 – 19 Design, manufacture, Supply, and Commissioning of 2x60MVA, 132/33kv substation at Mubi
Messrs. Hyundi/Richfield
USD5,534,586.81 Plus N574,978,088.57
xvii Lot 2011-20 2X60MVA, 132/33kv substation at Gulak
Concepts Engineering Pvt India/Chanref (Nig) Ltd
USD5,333,749.93 Plus N1,044,144,867.47
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
6 Revision of the Contract Sum for the Rehabilitation of Makeri-Pankshin 132kv single circuit transmission line project
Messrs. Mogabs
(Nigeria) Ltd
Ministry of Power Revised Contract Sum
USD2,390,900.00
payable at the prevailing exchange rate at the time of payment
Plus
14/03/2012 10 Months
31
N235,785,213.25
7 Award of Contract for the design, manufacture and supply of 10No. Mobile Transformer Oil filtration Machines
Messrs. Globe
Core Ltd.
Ministry of Power €673,781.49
payable at the prevailing exchange rate at the time of payment
Plus
N17,905,155.68 inclusive of port clearance and delivery to Transmission Company of Nigeria Plc stores at Ojo, Lagos
14/03/2012 6 Months
8
AWARD OF CONTRACTS FOR THE CONSTRUCTION OF 5NOs. SUB-STATIONS FOR THE TRANSMISSION COMPANY OF NIGERIA (TCN) PLC
S/N
PROJECT SCOPE COMPANY CONTRACT SUM
IMPLEMENTING
AGENCY
DATE
COMPLETION PERIOD
32
1 Lot 2011-12 Engineering, Manufacture, Supply, Construction and Commissioning of 2x60MVA, 132/33KV Substation at Kwoi and 2x132KV line Bays extension at Keffi
Messrs. Liaoning
Efacec Electrical
Equipment Co. USD5,739,384.54 Plus N694,464,562.83
Ministry of
Power/
Transmission
Company of
Nigeria (TCN)
14/03/2012
24 Months
2 Lot 2011-14 Engineering, Manufacture, Supply, Construction and Commissioning of 2x60MVA, 132/33KV Substation at Nnenwe and 2x132KV line Bays extension at Ugwuaji
Messrs. Metro
Elektrik USD5,955,066.60 Plus N825,826,590.01
3 Lot 2011-125 Engineering, Manufacture, Procurement, Supply, Construction and Commissioning of 2x60MVA, 132/33KV Substation at Egbe and 2x132KV line Bays extension at Omuaran
Messrs. TBEA-
Henyang USD5,634,240.14 Plus N740,273,654.32
4 Lot 2011-33 Engineering, Manufacture, Procurement, Supply, Construction and Commissioning of 2x60MVA, 132/33KV Substation at Ose LGA Headquarters and 2x132KV line Bays extension at Okeagbe
Messrs. Junot
Engineering
Services Ltd
€5,148,815.00 Plus N779,567,357.90
Ministry of
Power/
Transmission
Company of
Nigeria (TCN)
14/03/2012
24 Months 5 Lot 2011-34
Engineering, Manufacture, Procurement, Supply, Construction and Commissioning of 2x60MVA, 132/33KV Substation at Gagarawa, Jigawa State
Messrs. Power
Control &
Appliances Ltd
USD4,071,959.14 Plus N635,653,940.81
33
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
9 Award of Contract for the completion and commissioning of the Umuahia-Ohafia, Umuahia-Mbalano and Ohafia-Arochukwu 132kv Single Circuit Transmission Lines for the Transmission Company of Nigeria Plc (TCN)
Messrs. KEC International Limited
Ministry of Power/TCN
USD7,564,756.88 Payable at prevailing exchange rate Plus N1,007,539,148.49 inclusive of a provisional sum of N379,143,721.26 for 5% VAT, 10% Contingency sum and 2.5% for Right of Way Compensation
28/03/12 18 Months
TOTAL USD250,741,666.31 €8,714,991.49 N31,565,674,477.78
MINISTRY OF TRADE AND INVESTMENT
APPROVAL OF THE SUM OF N15,000,000,000.00 (FIFTEEN BILLION NAIRA) TO THE FGN-ASSISTED PUBLIC MASS TRANSIT REVOLVING FUND (PMTF) SHEME FOR ONWARD LENDING TO ELIGIBLE AND CREDIBLE TRANSPORT OPERATORS ACROSS THE COUNTRY UNDER PHASE II OF
THE FEDERAL GOVERNMENT OF NIGERIA ASSISTED PUBLIC MASS TRANSIT REVOLVING FUND (PMTF)
S/N
Transport Operator
Mass Transit Capacity Qty Unit Price (Initial N)
Unit Price (BPP Recommended N)
Total Cost (N)
34
1
Elizade Motors
Toyota Coaster (Petrol) 30 80 12,500,000.00 11,875,000.00 950,000,000.00
Toyota Coaster (Diesel) 30 20 13,600,000.00 12,920,000.00 258,400,000.00
Sub-total
1,208,400,000.00
2
Innoson Vehicle Manufacturing Co. Ltd
Innoson IVM660A 26 100 6,900,000.00 6,555,000.00 655,500,000.00
Innoson IVM6800 35 50 8,800,000.00 8,360,000.00 418,000,000.00
Innoson IVM660A 98 (48 standing)
- 19,000,000.00 18,050,000.00
Sub-total
1,073,500,000.00
3 Viramsum Motors
Tata 59 200 13,000,000.00 12,350,000.00 2,470,000,000.00
Sub-total
2,470,000,000.00
4 VON Auto Nig. Ltd.
Asok Leyland 42 240 13,000,000.00 12,350,000.00 2,964,000,000.00
Sub-total
2,964,000,000.00
35
5 Barbedos Motors Ltd
Mercedes 50 50 40,000,000.00 38,000,000.00 1,900,000,000.00
Sub-total
1,900,000,000.00
6 Yutong Hong
Kong Ltd
Yutong (City Bus) 40 100 13,017,600.00 12,366,720.00 1,236,672,000.00
Yutong (Coach) 59 50 19,161,600.00 18,203,520.00 910,176,000.00
Sub-total
2,146,848,000.00
7
Globe Motors Ltd
Hyundai Super C 38 (8 standing)
300 8,957,550.00 8,509,672.50 2,552,901,750.00
Hyundai Super Aero 64 (14 standing)
5 17,824,375.00 16,933,156.25 84,665,781.25
Hyundai Luxury 71 (21 standing)
5 26,398,125.00 25,078,218.75 125,391,093.75
Sub-total
2,762,958,625.00
8
Anambra Motor Manufacturing Co. Ltd
Anamco (Marcopolo) 52 5 31,275,000.00 29,711,250.00 148,556,250.00
Anamco (Mascarello) 27 5 11,902,500.00 11,307,375.00 56,536,875.00
36
Sub-total
205,093,125.00
9 Leyland Nig. Ltd
Leyland Busan (City Bus)
38 (21 standing)
10 9,916,830.00 9,420,988.50 94,209,885.00
Leyland Busan Coastliner
30 20 7,770,000.00 7,381,500.00 147,630,000.00
Sub-total
241,839,885.00
GRAND TOTAL 1,240
14,972,639,635.00
FEDERAL MINISTRY OF TRANSPORT
S/N ITEM/SERVICE NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of Contract for the Fast Tracking of the Development of the Phase 4 Port Facilities, at Onne Port Complex, for NPA / Ministry of Transport (MT)
Messrs. Intels (Nig.) Ltd.
Ministry of Transport
USD370,481,720.42
26/10/11
40 Months
2 Award of Contracts for the construction of Yenagoa Jetty and Terminal Facilities at
Messrs. Combined Building Services Limited
National Inland Waterways Authority/Ministry of Transport.
N1,311,636,134.50
26/10/11
37
Yenagoa, Bayelsa State for National Inland Waterways Authority/Ministry of Transport.
14 Months
3.0 REQUEST FOR THE REVISION OF THE ESTIMATED TOTAL COST (RETC) FOR THE DREDGING OF LOWER RIVER NIGER FROM WARRI IN DELTA STATE TO BARO IN NIGER STATE (LOTS 1-5)
3.1 Warri to Bifurcation of Forcados and River Nun = 154km
Messrs Fung Tai (Nig.) Ltd.
Ministry of Transport/NIWA
N6,069,422,355.00
2/11/11
2 Years
3.2 Warri to Bifurcation of Forcados and River Nun to Onitsha =116km
Messrs Dredging Int. Ltd.
N5,363,766,897.55
3.3 Onitsha to Idah = 118km
Messrs Van Oord (Nig.) Ltd.
N10,399,867,317.00
3.4 Idah to Jamata = 108km
Messrs Van Oord (Nig.) Ltd.
N13,806,242,793.00
3.5 Jamata to Baro = 76km
Messrs William Llyods Tech. Co. Ltd.
N7,695,412,970.00
TOTAL 572KM
N43,334,712,332.55
4 Re-Development of the Port Facilities at Bullnose, Lagos Port Complex, Apapa
Messrs Eko Support Services Limited
Ministry of Transport/NPA
USD124,400,000.00
Lease Period of 20 years
38
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
5 Award of Contract for the Re-Construction of Apapa Dual Carriageway within Apapa Quays, Lagos
Messrs. Sanju Sunny (Nigeria) Limited
Nigerian Ports Authority /Ministry of Transport
N2,113,656,976.26
09/11/11 12 Months
6 Augmentation of the Contract for the Rehabilitation of TinCan Island Port (Quay Wall and Quay Apron)
Messrs. Johnak
Engineering
Limited
Nigerian Ports Authority(NPA)/ Ministry of Transport
N3,642,611,404.44
inclusive of all taxes
16/11/11 12 Months
7 Award of Contract for the Design, Supply, Installation and Commissioning of New Signalling and Communication Solutions for the Eastern Line including 2 Branch Lines for the Ministry of Transport and Nigeria Railway Corporation (NRC)
Messrs. A3 &
O/ANSALDO
Limited
Ministry of Transport/NRC
N5,616,459,436.22
30/11/11 14 Months
8 Award of Contract for the Supply of Fire and Salvage Equipment for the Ministry of Transport/NPA
Messrs. Jagsul
(Nigeria) Limited Ministry of Transport/ NPA
N136,500,000.00
30/11/11 4 weeks
9
Augmentation of the contract sum for the Rehabilitation of Lagos Harbour Moles
Messrs. China Civil
Engineering and
Construction
Corporation
(CCECC) Ltd
Ministry of Transport/Nigeria Ports Authority
Revised Estimated
Total Cost
N20,035,710,566.72 07/12/11 21 Months
39
10 Award of contract for the Re-Construction of 1.6km Dual Carraigeway within Apapa Quays, Lagos
Messrs. P.W.
(Nigeria) Limited Ministry of Transport
N3,000,819,175.42
21/12/11 18 Months
11 Award of Contract for the Procurement of 2No. Fast Moving Passenger Ferries (Catamaran) by the National Inland Waterways (NIWA)
Messrs. Karflex
Fisheries Limited Ministry of Transport/ NIWA
N168,455,700.00
inclusive of all
taxes 25/01/12 6 Months
12
Award of Contract for the Strategic Concessioning Partnership with NIMASA to provide Platforms for tracking Ships and Cargoes, enforcement of Regulatory Compliance and Surveillance of the entire Nigerian Maritime Domain
Messrs. Global
West Vessel
Specialist Nigeria
Limited (GWVSL) Federal Ministry of Transport/Nigerian Maritime Administration and Safety Agency (NIMASA)
Initial Investment of
the sum of
USD103,400,000.
00 inclusive of all
taxes on a
Contractor-
financed Supply,
Operate and
Transfer
Concession
01/02/12
10 years and renewable for further two terms of 5 years and no more
13 Augmentation of the Contract for the Rehabilitation of Onitsha Port Complex and Installation of Cargo Handling Equipment for Ministry of Transport/National Inland Waterways Authority (NIWA)
Messrs. InterBau Construction Limited
Ministry of
Transport/National
Inland Waterways
Authority (NIWA)
N483,512,696.26
15/02/12 Extended Completion period of 3 Months
14 Award of Contract for the Rehabilitation of Julius Berger Terminal ‘C’ at Old Port, Warri, Delta State for the Ministry of Transport and Nigerian Ports Authority
Messrs. Julius Berger Nigeria Plc
Ministry of
Transport/Nigeria
Ports Authority
N9,406,510,158.05 29/02/2012 25 Months
40
15 Award of Contract for the provision of Consultancy Services for the Study and Design of Yola-Makurdi Navigational Route Lot 2
Messrs. Enviplan International Limited
Ministry of
Transport/ National
Inland Waterways
Authority
N221,036,330.00 inclusive of all taxes
14/03/2012 20 Months
16 Award of Contract for the Rehabilitation of AMS Terminal ‘B’ at Old Port, Warri, Delta State
Messrs. China Harbour Engineering Company Limited
Ministry of
Transport/ Nigerian
Ports Authority
N7,022,310,942.78 inclusive of all taxes
14/03/2012 9 Months
TOTAL USD598,281,720.42 N96,493,931,853.20
FEDERAL MINISTRY OF WATER RESOURCES
S/N PROJECT DESCRIPTION
NAME OF FIRM/CONTRACTOR
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of Contract for the rehabilitation and expansion of Ogbia Central Water Supply Scheme
Messrs. NAIRDA Limited
Ministry of Water Resources
N4,522,864,505.00 17/08/11 18 Months
2 Augmentation of Contract Sum for the Construction of Agaie/Lapai Earth Dam in Niger State.
Messrs. Infiouest International Ltd.
Ministry of Water Resources /UNRBDA
Revised Contract Sum From N1,536,802,608.00 To N2,055,444,192.75
14/09/11
3 Months
3 Award of contract for the completion of Nkari Dam Project in Akwa Ibom State
Messrs. A.G Vision Ministry of Water Resources
N2,911,284,239.73 07/12/11 24 Months
41
4 Augmentation of contract for the construction of Ogbese Multi-purpose Dam Project in Ekiti State
Messrs. Foundation Solid (Nigeria) Limited
Ministry of Water Resources
N7,802,436,568.66 07/12/11 36 Months
5 Award of contract for the repairs to the Goronyo Dam emergency spillway
Messrs. Gilmor Engineering (Nig) Limited
Ministry of Water Resources
N3,882,146,985.99 07/12/11 8 Months
6 Award of contract for the Construction of Ogwashi-Uku Multipurpose Earth Dam Phase II
Messrs. Nelson Benjamin Limited
Ministry of Water Resources
N3,615,323,794.01 07/12/11 24 Months
TOTAL N24,789,500,286.14
FEDERAL MINISTRY OF WORKS
S/N PROJECT DESCRIPTION
NAME OF FIRM/CONTRACTOR
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of Contract for the Reinstatement of washout and completion of the rehabilitation of Sokoto Illela road including repairs of Usman Danfodiyo University Road in Sokoto State
Messrs. Mothercat Limited
Ministry of Works N2,256,354,874.62 17/08/11 24 Months
42
2 AWARD OF SEVEN (7) CONTRACTS FOR THE CONSTRUCTION AND REHABILITATION OF ROADS SPREAD IN FOUR (4) GEO-
POLITICAL ZONES OF THE COUNTRY( SOUTH WEST, SOUTH EAST, SOUTH SOUTH & NORTH EAST)
S/N
PROJECT DESCRIPTION NAME OF
FIRM/CONTRACTOR IMPLEMENTING
AGENCY COST DATE DURATION
i Rehabilitation of Ijebu Igbo-Olomi (Oyo State Border) Road in Ogun State
Messrs. A.A Duhu & Sons Limited
Ministry of Works
N1,381,556,046.26 17/08/11
13 Months
ii Rehabilitation of Ondo-Ore Road in Ondo State
Messrs. Chrisbrown International Limited
Ministry of Works
N1,799,786,661.75 9 Months
Iii Rehabilitation of Odo-Oba-Takie-Gambari-Otte Oyo State Border Along Ibadan-Oyo-Ogbomosho-Ilorin Road 45.3km (Route 20) in Oyo State
Messrs. Coduc (Nigeria) Limited
Ministry of Works
N2,136,669,265.50 17/08/11
9 Months
Iv Reconstruction/Rehabilitation of Gbongan-Owo-Oyo road in Oyo State
Messrs. Kopek Construction Limited
Ministry of Works
N6,917,558,164.42 18 Months
V Rehabilitation of Spur from Onitsha-Owerri Road To Okija-Ihembosi-Afor Ukpor-Ebenator-Ezinifite in Nnewi South LGA in Anambra State
Messrs. Fodiac Engineering Co. Ltd
Ministry of Works
N1,786,546,349.60 9 Months
43
Vi Construction of 15 km Inter-State Road from Aivegunle, Okoko Edo LGA in Edo State
Messrs. Fame Highway Company Limited
Ministry of Works
N1,428,007,350.00 12 Months
Vii Construction of Jalingo-Kuna-Lau Road in Taraba State Section II
Messrs. Amitech Interglobal Engineering Limited
Ministry of Works
N1,430,875,575.94 16 Months
3 AUGMENTATION OF CONTRACTS FOR THE DUALISATION OF ABUJA-ABAJI-LOKOJA ROAD SECTIONS I&II IN THE
FEDERAL CAPITAL TERRITORY
S/N
PROJECT DESCRIPTION NAME OF
FIRM/CONTRACTOR IMPLEMENTING
AGENCY COST DATE DURATION
i Augmentation of Contract No. 5862 for the Dualisation Abuja-Abaji Section I (International Airport Link Road Junction to Sheda Village Junction)
Messrs. Dantata and Sawoe Construction Company (Nigeria) Limited
Ministry of Works
Reviewed Contract Sum N28, 666, 721,831.64
28/09/11
24 to 30 Months
ii Augmentation of Contract No. 5863 for the Dualisation Abuja-Abaji Section II (Sheda Village Junction to Abaji)
Messrs. RCC (Nigeria) Limited
Reviewed Contract Sum N31, 236, 905,170.83
44
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
4 Award of contract for the for the Construction of the Oju/Loko-Oweto Bridge (Phase 1) to link Oju/Loko to Oweto in Nassarawa/Benue States along Traffic Route F238
Messrs. Reynolds Construction Company Ltd.
Ministry of Works N36,118,910,405.94 19/10/11 48 Months
5 Award of Contracts for Repairs of Third Mainland Bridge, Phase II Additional Works involving the Repairs of 8No. Expansion Joints to Eliminate noticed Super-Structure Sources of Stresses on the already Compromised Foundation Structures of the Bridge in Lagos
Messrs. Borini Prono Construction Co. Ltd.,
Ministry of Works N1,055,447,608.16 23/11/11 9 Months
6 COMPLETION OF CONTRACT NOS. 5884 AND 5885 FOR THE DUALISATION OF ABUJA-ABAJI-LOKOJA ROAD SECTION III (ABAJI – KOTON KARFE) AND SECTION IV (KOTON KARFE – LOKOJA) – REVISION AND AUGMENTATION FOR REVISED SCOPE OF WORKS, ADDITIONAL WORKS
AND VARIATION
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
6a Completion of Contract No. 5884 for the Dualization of Abuja-Abaji-Lokoja Road Section III (Abaji – Koton Karfe)
Messrs. Bulletine Construction Company Limited
Ministry of Works N25,827,333,686.52
23/11/11 24 Months
6b Completion of Contract No. 5885 for the Dualisation of Abuja – Abaji – Lokoja Road Section IV (Koton Karfe –
Messrs. Gitto Construzioni Generalli Nigeria Limited
N31,087,756,036.84 23/11/11
45
Lokoja)
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
7 Award of contract for additional works to address the gully erosion at Chainages 9+700 and 11+400 be executed on the contract for the Rehabilitation of Onitsha – Enugu Dual Carriageway Section II; Anambra State Border – Enugu Road
Messrs. CCC (Nigeria) Limited
Ministry of Works N710,135,133.75 07/12/11 24 Months
8 Augmentation of contract for the Rehabilitation of Obiozora-Uburu-Mpu-Ishiagu-Portharcourt Expressway Road
Messrs. Setraco (Nigeria)Limited
Ministry of Works N8,367,343,094.25 07/12/11 12 Months
TOTAL N122,304,280,253.55
46
PRESIDENCY
S/N PROJECT DESCRIPTION
NAME OF FIRM/CONTRACTOR
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of contract for the extension of the services of the National Management Consultants (NMC) for the management of the warehouses in the 6 Geo-political zones
Messrs. ETAT Consulting Limited
Presidency N115,857,000.00 30/11/11 9 Months (from 1st April, 2011
TOTAL N115,857,000.00
OFFICE OF THE SECRETARY TO THE GOVERNMENT OF THE FEDERATION (OSGF)
S/N PROJECT DESCRIPTION
NAME OF FIRM/CONTRACTOR
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of Contract for the reclamation works at the site of the Federal University of Technology, Otuoke, Bayelsa State
Messrs. Azikel Dredging and Construction
Presidency/OSGF N4,997,862843.75 07/09/11 7 Months
TOTAL N4,997,862843.75
47
POLICE SERVICE COMMISSION
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of contract for the construction OF Police Service Commission Corporate Head Office Building, Abuja
Messrs. Vita Construction Nigeria Ltd
Presidency/Police Service Commission
N3,486,867,519.53 07/12/11 15 Months
TOTAL N3,486,867,519.53
NIGERIA EXTRACTIVE INDUSTRY TRANSPARENCY INITIATIVE (NEITI)
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1a Award of Contract for the conduct of Oil and Gas Industry Audit (2009 to 2011)
Messrs Sada Idris & Co.
Presidency/NEITI
N226,613,000.00 18/01/12
9 Months
1b Award of contract for the conduct of Solid Minerals Industry Audit (2009 t0 2010)
Messrs Haruna Yahaya & Co.
N137,000,000.00
TOTAL N363,613,000.00
48
INDEPENDENT NATIONAL ELECTORAL COMMISSION(INEC)
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of Contract for the printing of forty (40) Million Permanent Voters Cards
Messrs ACT Technologies Limited
Independent National Electoral Commission (INEC)
N2,600,000,000.00 at the rate of N65.00 per Card
11/04/12 7 Months
TOTAL N2,600,000,000.00
NATIONAL EMERGENCY MANAGEMENT COMMISSION (NEMA)
S/N PROJECT DESCRIPTION
NAME OF FIRM/CONTRACTOR
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of Contract for the procurement of 23No. Mobile Intensive Care Ambulances for the National Emergency Management Agency (NEMA)
Messrs. Longevity Services Limited
Presidency/NEMA N667,000,000.00 at N29,000,000.00 each unit
17/08/11 5 Months
2 Award of Contract for the Procurement of 1No. Bell 429 DPIFR EMS Configuration with Special Equipment and Bell Standard Installed Kits, Avionics, Specialized
Messrs. Sea jewel Energy Limited
Presidency/NEMA USD9,594,603.17 Plus N508,394,035.50
30/11/11 8 Months
49
Equipment, Accessories and Spare Parts and Emergency Medical Service Configuration
TOTAL USD9,594,603.17 N1,175,394,035.50
MILLENNIUM DEVELOPMENT GOALS (MDGs)
S/N PROJECT DESCRIPTION
NAME OF FIRM/CONTRACTOR
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of Contract for the completion of Otuoke Hospital in Bayelsa State
Messrs. Avandale Services Limited
Presidency/MDGs N2,835,746,571.75 17/08/11 12 Months
2 AWARD OF CONTRACTS FOR THE SUPPLY OF PROJECT VEHICLES FOR TECHNICAL ASSISTANTS FOR THE 113 LOCAL GOVERNMENTS MDGs CONDITIONAL GRANTS SCHEME SCALE-UP
S/N PROJECT
DESCRIPTION NAME OF
FIRM/CONTRACTOR IMPLEMENTING
AGENCY COST
ZONE/REGION
QTY DATE DURATION
50
S/N PROJECT DESCRIPTION NAME OF FIRM/CONTRACTOR
IMPLEMENTING AGENCY
COST DATE DURATION
3 Award of Contract for the Extension of the Services of the National Management Consultants
Messrs. ETAT Consulting Limited
Presidency/ OSSAP-MDGs
N248,004,847.24 30/11/11 9 Months (from 1st April, 2011)
1 Toyota Hilum (Tropicalised), 2.7 Eng. Capacity, Shell Spec
Messrs Elizade (Nig) Ltd
Presidency/MDGs
N128,417,625.00 North Central 23 17/08/11
2 Weeks
2 Toyota Hilum (Tropicalised), 2.7 Eng. Capacity, Shell Spec
Messrs. Elizade (Nig) Ltd
N128,340,000.00 North West 23
3 Toyota Hilum (Tropicalised), 2.7 Eng. Capacity, Shell Spec
Messrs. Ivory-Link International (Nig) ltd
N118,800,000.00 South West 20
4 Toyota Hilum (Tropicalised), 2.7 Eng. Capacity, Shell Spec
Messrs. R.T Briscoe (Nig) Ltd
N106,115,000.00 South South 19
5 Toyota Hilum (Tropicalised), 2.7 Eng. Capacity, Shell Spec
Messrs. Development Management System System Ltd
Presidency/MDGs
N106,305,000.00
North East
19
17/08/11
2 Weeks
Grand Total N580,977,625.00
104
51
(NMC) for the Completion of Quickwins 2008/2009 Projects
TOTAL N3,664,729,043.99
NIGER DELTA DEVELOPMENT COMMISSION (NDDC)
1 Award of Contracts for Forty-Five (45) Infrastructural Development Projects in Nine (9) States of the Niger Delta Region (NDDC)
S/N PROJECT DESCRIPTION SCOPE
STATE/ LOCATION
NAME OF CONTRACTOR
BPP REVIEWED PROJECT COST
COMPLETION PERIOD
1 Construction of Ihie Ukwu Road Network
15.37km Road, asphaltic concrete surface, culverts and lined drains
Abia State Oneplus Holding Nig. Ltd
N1,967,699,553.75 72 Dry weeks
2 Construction of Ikot Ekwere Ndukpoise Road
28.5km asphaltic concrete carriageway, 40m long bridge of 2x20m spans, 11.0m wide, ring culverts RC offshoot drains
Nsit Ubuim LGA, Akwa Ibom State
Ewobros & Company Nig. Ltd
N3,128,468,773.50 120 Dry weeks
3
Construction of Mkpot Okoroba Ekang Road
28km + 85 Bridge, ring and box culverts, RC offshoot drains, asphaltic concrete way, span deck on pile and 85m bridge works
Cross Rivers State
John Davis Construction Ltd.
N7,679,353,819.73 104 Dry weeks
4 Construction of Bulo Ndoro Shore Protection works
9.47km shore protection works, dredging of sharp sand to fill the entire area, fixing of geotextile
Delta State Cawa Marine & Oil Services Ltd
N6,178,174,054.53 72 Dry weeks
52
materials
5 Construction of Oloa Ossissa AtuOkpai-Osume-Alala Uno Road and Bridge
15km of asphaltic concrete carriageway concrete carriageway, 120m bridge, ring and box culvert, 3,500m of rectangular concrete line drain
Delta State Inter-Bau Construction Nig. Ltd
N3,997,940,111.46 130 Dry weeks
6 Construction of Oboro Shore Protection Works
RENO matters revetment, concrete landing apron, installation of concrete sheet piles
Delta State Osmoserve Global Ltd
N2,816,589,905.05 116 Dry weeks
7 Construction of St Saviour and other adjoining streets
13.3km earth work, 13.3km asphaltic concrete carriageway, ring and box culverts RC drains, stone base filling
Edo State Deastern Elec. & Mech Eng Services
N3,174,362,343.60 86 Dry weeks
8 Construction of Assa Ubrielem Okwu Abasiri River Umuoka Umuokabia Road
9.5km + 200m bridge Ring and boxculverts, RC offshoot drains, Asphaltic concrete carriageway, span deck on pile and bridge works
Imo State FEW Western Energy Ltd
N4,149,264,426.44 72 Dry weeks
9
Construction of Shore Protection and sandfilling of Ataba to Aba-Ijong
Supply and placement of rock-filled PVC coated Renomattress, placement of geotextile filter fabric, concrete beam with reinforcement and shuttering, corrosion treatment of U channel and other metal accessories
Rivers State Atafranc Nig. Ltd.
N9,996,134,955.95 104 Dry weeks
10 Construction of Asukoyet Ikuku Asukama Road and Bridge
Site clearing and earth works, ring and box culverts, RC offshoot drains, asphaltic concrete concrete carriageway,
Andoni LGA, Rivers State
Zcubes Nig Ltd N3,606,805,509.55 72 weeks
53
span deck on pile, bridge work
11
Construction of Borokiri Okirika Road and Bridge
Site clearing and earth works, ring and box culverts, RC offshoot drains, asphaltic concrete concrete carriageway, span deck on pile, bridge work
Rivers Zerock Construction Ltd
N16,787,393,981.88 130 Dry weeks
12
Sandfilling and shore Protection of Iko town
3 HA Sandfilling + 1.651km shore line, tree planting construction of Perimeter containment bund wall, Dewatering, pumping sumps and temporary drain, pre dredge and post dredge
Eastern Obolo LGA, Akwa Ibom State
Hydrodram Nig. Ltd
N2,220,469,674.08 78 Dry weeks
13
Construction of Burutu Reclamation Works
Dredging including construction of 9, 013m bund wall/berm, reclamation works including sand filling to a height of 10.416m
Delta State Hingla Integrated Concept Ltd
N6,554,429,788.98 104 Dry weeks
14 Construction of Obianuku Ogume Road with bridge
25km of asphaltic concrete carriageway, 3No bridges of various spans, drain and culverts
Delta State Mphasis Fulcrum Ltd
N5,248,122,738.08 134 Dry weeks
15 Construction of Ojobo Shore protection works
Includes Sheet pilling works, 4,400m
Delta State Interfaze Global Services Ltd
N5,499,079,996.58
16 Construction of inter town connection connecting itc line linking thirteen villages
Clearing of 61.3km HT line, HT overhead materials, transformer substation materials, connection of 132kv Transformers
Edo Fiphs Invest Ltd N2,981,407,434.32 160 Dry weeks
17 Construction of Obukofia ring road Egbema
27.49km of asphaltic concrete carriageway, single cell culverts: 90mm 2Nos, 1200mm 3Nos,
Ohaji/Egbema LGA, Imo State
O.K Isokariri 7 Sons Nig Ltd
N2,667,805,051.38 72 Dry weeks
54
reinforced concrete side drain-5200 meters, reinforced concrete side drain -5200 meters, reinforced concrete external 3x2x1.5m trapezoidal drains- 1000meters, 2000m precast concrete kerbs along the edges of the road
18 Construction of Ikot Isong-Ekpene Obom-Ndon Eyo-Nya Odiong Road
14.7km of asphaltic concrete carriageway, 175m bridges of various spans, ring and box culverts, 18,000 of RC side drains
Akwa Ibom State
ET-Dicks Nig Ltd
N3,377,567,117.76 156 Dry weeks
19
Otuan Erosin Control Project
Sand filling of embankment- 8733m3, Geotextile covering, PVC coated galvanized Renomattress, 1No Landing aporon
Bayelsa State Neoman International Ventures Ltd
N2,622,046,533.75 72 Dry weeks
20
Construction of Nigerian Army Jetty
Sheet pilling works, concrete jetty, slip way, asphaltic concrete way, buildings to serve as workshop/warehouse, cafeteria, base clinic, 2 nr Guest house, fire station, 2 admin blocks, 4 nr security watch towers, fule dump, helipad, parade ground, fencing water supply and fire fighting installation
Delta Simoka Marine Ltd
N4,731,900,048.33 104 Dry weeks
21 Construction of Erema Ring Road
18.919km of asphaltic Concrete carriageway, 5No. single cell culverts, 5 double cell boxes culverts, crush stone base
Rivers Ahiahu Cost & Co Ltd
N3,409,156,163.06 76 Dry weeks
55
course 150mm thick and 37,838m lined drains
22 Emergency shore protection
Okrika LGA, Rivers State
Roudo Nig. Ltd N11,151,432,936.00
23 Construction of Udo Ofunama Road
46.5km Edo State Japul Mines & Product Ltd
N6,062,172,454.15 86 Dry weeks
24 Emergency shore protection & Land reclamation
Reclamation 1,124,600m2 Sandfilling 4,413m, Landing Aprons 8no
Itak Abasi, Okutitak & Akputuwa, Akwa Ibom State
Zement & Zement Nig. Ltd
N7,322,249,908.34 24 Months
25 Construction of 330/132/33kv Transmission Substation at Ikot Ekpene and Associated Transmission Lines
Installation of 330/132/33kv Transmission Substation at Ikot Ekpene and Associated 132kv & 33kv transmission lines and substations to different parts of Akwa Ibom State
Ikot Ekpene LGA, Akwa Ibom State
Income Electrix Ltd
N7,289,223,123.30 120 Dry weeks
26 Construction of Ogoloma Shore Protection
2.851km Okrika LGA, Rivers State
Edvic Ltd N4,808,822,700.00 88 Dry weeks
27
Construction of Adiabo- Eseku Road
13.41km asphaltic concrete single carriageway, 1.5m shoulders, 240m long bridge, 160m x 900m pipe culvert, 150mm thick grouted triangular drains
Cross River State
John Davids Construction Ltd
N4,366,411,760.00 72 Dry weeks
28 Construction of Adiabo-Okurikang-Uken Road Odukpani LGA in Cross Rivers State
3.79km Cross Rivers State
Zenith Construction Ltd
N535,112,567.00 26 weeks
56
29 Construction of Ubafan Adakagbene Setreboubou Road and Bridges in Delta State
15.18km Delta State Wintima Company (Nig) Ltd
N8,976,265,831.01 185 weeks
30 Erosion control and sandfilling of Onuegbum in Bayelsa State
Erosion Control Bayelsa State Trenuer (Nig) Ltd
N2,679,452,580.00 98 weeks
31 Construction of Foreshore protection of Opobo Community in Opobo LGA of Rivers State
Supply and placement of rockfilled PVC coated Reno Mattress
Rivers State Valdon Logistics Ltd
N2,818,902,569.57 28 weeks
32 Phase 1 of the Emergency Shore protection and Reclamation works Ayama in Bayelsa State
Reclamation Bayelsa State Dredging International
N2,131,580,000.00 30 weeks
33 Phase 1 of the Emergency Shore protection and Reclamation works in Famgbe in Bayelsa State
Reclamation Bayelsa State Dredging International
N2,641,580,000.00 30 weeks
34 Construction of Agge Shore protection Ekeremor LGA in Bayelsa State
2.1km of Shoreline Bayelsa State Beks Kimse (Nig) Ltd
N3,565,500,049.13 80 weeks
35 Construction of Nsasak Junction Akon Road in Akwa Ibom State
30km Akwa Ibom State
Seyang Ltd N5,819,165,840.52 156 weeks
36
Construction of Ajagba -Kiribo Road in Ondo State
13.43km Ondo State Don Frat Jercess Limited
N1,304,259,671.93 52 weeks
57
37 Rehabilitation of inter town connection (ITC) Line linking 13 villages and construction of 2x30MVA substation at Ugo in Orhiomwon LGA, Ondo State
2x30MVA 132/33kv Edo State Tehinnah Investment Ltd
N1,645,053,094.01 160 weeks
38 Construction of Umuojima Omuma Link road/drain
14.3km Ugwunagbo LGA, Abia State
M/s Decka Eng & Tech. Serv. Ltd.
N1,166,254,364.00 52 Dry weeks
39 Construction of Ugwali-Obokwe-Umuekechi-Uratta Road
9.93km
Ukwa West/Aba South LGA, Abia State
M/s Alliance Logistics Ltd
N1,239,249,986.00 72 Dry weeks
40 Construction of Ozoro Township Road
12.4 km Ikoko North LGA, Delta State
M/s S.O Olutu & Sons Nig. Ltd
N2,431,686,005.50 102 Dry weeks
41 Reclamation Awoye-Moleletin
2.93km – Reclamation 1,043, 288.48m2 Sandfilling
Ilaje LGA, Ondo State
M/s Dreging Atlantic Ltd
N8,193,235,703.73 104 Dry weeks
42 Construction of Okwuzi-Ugada Road/Bridge
9.5km ONELGA, Rivers State
M/s Jocari Invest Ltd
N3,914,142,601.90 78 Dry weeks
43 Construction of Rumuekpe-Ogbele-Abua Road
15.7km with Bridge Emohua and Abua LGA
M/s Jam Services Ltd
N3,805,221,590.19 120 Dry weeks
44 Emergency shore protection & Land reclamation
Reclamation 1,124,600m2 Sandfilling 4,413m, Landing Aprons 8no
Itak Abasi, Okotitak & Akputuwa, Akwa Ibom State
Zement & Zement Nig Ltd
N7,322,249,908.34 24 Months
58
45 Construction of 330/132/33kv Transmission Substation at Ikot Ekpene and Associated Transmission Lin
Installation of 330/132/33kv Transmission Substation at Ikot Ekpene and Associated 132kv & 33kv transmission lines and substations to different parts of Akwa Ibom State
Ikot Ekpene LGA, Akwa Ibom State
Income Electrix Ltd
N7,289,223,123.30 120 Dry weeks
TOTAL 15%
N211,273,620,349.68 N31,691,043,052.45