Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA)...

21
Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures Team March 14, 2014

Transcript of Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA)...

Page 1: Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.

Federal AviationAdministration

Airport 20 to 1 Approach Surface

Georgia Airports Association (GAA) Annual Workshop

Cindy M Hintz Eastern Flight Procedures Team

March 14, 2014

Page 2: Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.

Federal AviationAdministration

2

20:1 Approach Penetrations

• Criteria developed by Flight Standards in the late 1990s• Requires clear 20:1 approach surface for night

minimums• Visual aids (VGSI) such as VASI or PAPI were

designated as a possible mitigation• All terminal procedures are currently reviewed every

two years, as required by AFS policy.• During that periodic review, or other amendments, the

TERPS Specialist in AeroNav Products may identify obstacles that penetrate the 20:1 visual surface.

Page 3: Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.

Federal AviationAdministration

3

20:1 Penetrations (continued)

• Background: During Oct 2012, Flight Standards Division AFS-400 required immediate NOTAM action resulting in “Not Authorized (NA) at night when 20:1 identified.

• Current Policy: Effective Jan 6, 2014, refined policy considered “Risk” factor of the identified penetrations and allowing a validation period (30 days).

• Validation: To verify if the obstacle exists or has been removed, and/or if the obstacle is lighted.

Page 4: Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.

Federal AviationAdministration

4

20 to 1 Approach Surface (TERPS)

Page 5: Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.

Federal AviationAdministration

5

Page 6: Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.

Federal AviationAdministration

6

20 to 1 Penetrations

• Identified/reported by various offices: EFPT, ANP, GDOT, FC and soon, Geographic Information System (GIS) tool

- Mandatory biennial reviews / OKC ANP

- During instrument procedure amdts

• Result in loss of night time capability

• Daytime visibility restricted to 1 SM

Page 7: Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.

Federal AviationAdministration

7

Identification of 20 to 1 Penetrations

Typical scenario:

•During biennial review of airport’s procedure(s) OKC development branch identifies non-validated penetrations.

- - Specialist’s findings are forwarded to EFPT, assigning each penetration with risk assessment of high, medium or low.

- - EFPT adds GoogleEarth overlay to the file (.kml)

Page 8: Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.

Federal AviationAdministration

8

20 to 1 penetrations (cont)

- - Within 3-business days, file is forwarded to airport requiring sponsor to validate each penetration ASAP, but no more than 30-days / ADO copied

•Airport owner/sponsor must provide a written report and copy ADO

•No response received within prescribed timeframe will result in IAP visibility minima and night capability as required.

Page 9: Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.

Federal AviationAdministration

9

Airport Owner / Sponsor Response

• If 20 to 1 penetrations determined invalid - - EFPT will notify applicable offices to update airport’s data file(s); no action required to restrict or modify subject IAP.

• If 20 to 1 penetrations determined valid:

- - Submit written compliance plan

- - Remove, light or lower

- - Actions taken per risk Assessment criteria

Page 10: Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.

Federal AviationAdministration

10

Page 11: Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.

Federal AviationAdministration

11

Page 12: Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.

Federal AviationAdministration

12

Possible Mitigation Actions

• Visual Glideslope Indicator (VGSI)

- Apt Mgr submits Form seeking AFS approval

• Apply ILS / LOC / LPV / LP Full-Scale Deflection

- Calculation, conducted by ANP when trying to

mitigate 20:1 penetration vs restricting night mins

• Restrict only CAT C/D approach category minimums vs restricting CAT A/B/C/D

- If penetrations are outside CAT A/B area

Page 13: Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.

Federal AviationAdministration

13

Mitigate by Aircraft Category

• Most common GA 20 to 1 issue

- - Runway type often, e.g., BII

- - Charted minima CAT C/D

- - CAT A/B begins at +/- 200 FT

- - CAT C/D begins at +/- 400 FT

• Airport cannot clear larger surface area

- - Other mitigation N/A (VGSI/Deflection)

- - Restrict CAT C/D minima only

Page 14: Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.

Federal AviationAdministration

14

Jim Hamilton L.B. Owens (KCUB), SC

• RWY 31 20 to 1 penetrations

- Clearing project lasting several years

- Received official notification

- Provided compliance plan, VGSI checklist and

initiated flight check within 30 day window

- EFPT forwarded to OKC requesting temporary

VGSI mitigation and requested OKC ANP perform

check of full-scale deflection and evaluate CAT

A/B vs CAT C/D penetration(s)

Page 15: Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.

Federal AviationAdministration

15

VDP or DA

Page 16: Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.

Federal AviationAdministration

16

Page 17: Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.

Federal AviationAdministration

17

Page 18: Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.

Federal AviationAdministration

18

Page 19: Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.

Federal AviationAdministration

19

Page 20: Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.

Federal AviationAdministration

20

Thank you

Questions?

Page 21: Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.

Federal AviationAdministration

21

Contact Info

• Cindy M Hintz• Eastern Flight Procedures Team• 404-305-5956, [email protected]