Thursday, February 4, 2010, 9:30 AM Agenda Transportation Business Advisory Council Meeting One Gateway Plaza Gateway Plaza Conference Room 3 rd Floor American Indian Chamber of Commerce of California Asian American Architects & Engineers Association Asian Business Association Black Business Association Chinese American Construction Professionals Greater Los Angeles African American Chamber of Commerce Latin Business Association Latino Business Chamber of Greater Los Angeles National Association of Minority Contractors National Association of Women Business Owners – Los Angeles Regional Hispanic Chamber of Commerce Society of Hispanic Professional Engineers – Los Angeles Chapter Women Construction Owners & Executives USA Women’s Transportation Coalition Women’s Transportation Seminar I. Call to Order Lucia Tam II. Roll Call Lucia Tam III. Review/Approval of Minutes Lucia Tam IV. Chair’s Report Lucia Tam V. TBAC Speakers Borja Leon Transportation Policy Director, Office of Mayor Antonio R. Villaraigosa Rebecca Manning Kiewit Pacific VI. Metro Contracting Opportunities Tashai Smith A. Contract Look-Aheads B. Current Solicitations VII. TBAC Committee Reports A. Legislative Affairs Ezekiel Patten, Jr. B. Commodities Ezekiel Patten, Jr. C. Professional Services Carlos Morgner D. Construction Ken Wong E. Membership Lynn Chen F. Bylaws Sandi Sinicrope III. Old Business A. Action Items IX. New Business X. Public Comment XI. Adjournment

Transcript of February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is...

Page 1: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

Thursday, February 4, 2010, 9:30 AM

Agenda

Transportation Business Advisory Council Meeting

One Gateway Plaza Gateway Plaza Conference Room 3rd Floor

American Indian Chamber of Commerce of California

Asian American Architects & Engineers Association

Asian Business Association

Black Business Association

Chinese American Construction Professionals

Greater Los Angeles African American Chamber of Commerce Latin Business Association

Latino Business Chamber of Greater Los Angeles

National Association of Minority Contractors

National Association of Women Business Owners – Los Angeles

Regional Hispanic Chamber of Commerce

Society of Hispanic Professional Engineers – Los Angeles Chapter

Women Construction Owners & Executives USA

Women’s Transportation Coalition

Women’s Transportation Seminar

I. Call to Order Lucia Tam

II. Roll Call Lucia Tam

III. Review/Approval of Minutes Lucia Tam

IV. Chair’s Report Lucia Tam

V. TBAC Speakers Borja Leon Transportation Policy Director, Office of Mayor Antonio R. Villaraigosa Rebecca Manning Kiewit Pacific

VI. Metro Contracting Opportunities Tashai Smith

A. Contract Look-Aheads B. Current Solicitations

VII. TBAC Committee Reports A. Legislative Affairs Ezekiel Patten, Jr. B. Commodities Ezekiel Patten, Jr. C. Professional Services Carlos Morgner D. Construction Ken Wong E. Membership Lynn Chen F. Bylaws Sandi Sinicrope

III. Old Business A. Action Items

IX. New Business

X. Public Comment

XI. Adjournment

Page 2: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations
Page 3: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations
Page 4: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations
Page 5: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations
Page 6: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations
Page 7: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations
Page 8: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations
Page 9: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations
Page 10: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations
Page 11: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations
Page 12: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

I-405 Sepulveda Pass Widening Project,Contract No. C0882

Owner: Los Angeles County Metropolitan Transportation Authority (LACMTA)

PROJECT DBE PROGRAM

1ST QUARTER 20101TBAC Meeting Thursday, February 4, 2010

Page 13: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

DESIGNAPPROXIMATELY 50% COMPLETE

DESIGN-ONLY

DBE Contracts Awarded

CurrentApproximate

Contract Value(2-Year Value)

Scope of Work / Supply

Bullock & Associates $400,000Design Support within

Roadways

Earth Mechanics, Inc. $1,371,000Geotechnical / Foundations

Design

FPL & Associates, Inc. $1,904,000 ITS, Street Lighting Design

Valle & Associates $650,000Design Support Utilities,

Drainage, Grading

C2PM, Inc. $150,000 Document Control

AP Engineering & Testing (3rd-Tier)

TBPCivil Design Support Retaining

Walls, Cut Slopes, Embankments

Jet Drilling, Inc. (3rd -Tier)

TBPPotholing in support of

Geotechnical Design

W H Pacific (3rd -Tier)

TBP Survey & Mapping

Page 14: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

CONSTRUCTIONAPPROXIMATELY 11% COMPLETE

CONSTRUCTION-ONLY

DBE Contracts Awarded Contract Value Scope of Work / Supply

Global Business Solutions $77,000 Document Control

G & F Concrete Cutting $235,000 Saw Cutting

TEMPS, Inc.Hourly

$7,000/monthAdmin Staff Support

Allied Environmental Services, Inc.

$146,400 ADL Deposit Survey

Axiom Corporation $25,000Inspection

Temp Striping / Sign Installation

Morgner Construction Management

$438,000 Pre-Construction Survey

Pacrim Engineering $51,000 Temporary Shoring Design

National Group Security $230,000 Site Security

G & C Equipment Corp. $4,000Yard Development

Facility

Ultrasystems Environmental $50,000 Noise Abatement Plan

Clean-Up America $3,735 Yard Bins

Multiple Opportunities $5,000 Misc. Trucking

Page 15: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

CONSTRUCTIONCURRENT ANTICIPATED CONTRACT AWARD

CONSTRUCTION-ONLY Contract Value Scope of Work / Supply

Carol Trump, Inc.Dba Lindy’s Cold Planing

$457,000 Asphalt Grinding

*DBE Firm Apparent Low-Bidder $2.0-Mil Fabricate/Deliver H-Beams

*DBE Firm Apparent Low-Bidder $3.0-Mil Fuel - Diesel

*High-Bid Firms have not been notified of bidding results

Page 16: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

PROJECT DBE PROGRAM

1ST QUARTER 2010 5TBAC Meeting Thursday, February 4, 2010

OUTREACH

Page 17: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

DBE OUTREACH STEPS49 CFR, PART 26

AdvertisingWritten NoticesDBE Firms SolicitedFollow-UpSelect Portions of WorkAdequate InformationNegotiation / Assistance Contractor Assistance Organization Participation(as applicable)Public Relations / Networking Events (as applicable)

Typical Outreach

Page 18: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

DBE OUTREACH STEPS

ADVERTISING

Anticipated opportunities may be advertised in one or more of the following publications:

•McGraw-Hill—Dodge Green Sheet

•Our Weekly

•L A Watts Times, Inc.

•SBE Exchange

•SBE Today Newsletter and

•www.SBEINC.com

•La Opinion

•SBA.Gov Sub-net database

•Compliance News.com

•Los Angeles Times

•Ongoing information is also available at: www.kiewit.com (updated quarterly)

Page 19: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

DBE OUTREACH STEPS

Written NoticesSelect Portion(s) of WorkAdequate Information

Page 20: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

DBE OUTREACH STEPS

DBE Firms Solicited

California Unified Certification

Program (“CUCP”) database at

www.dot.ca.gov

In-House Vendor Database Referral Firms

Page 21: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

DBE OUTREACH STEPS

Contractor Assistance Organization Participation

Page 22: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

Modified Outreach

Data Base Search

TelephoneOutreach

Written Notices•Bid Quote Sheets / Bid Instructions

•Established Bid Date / Time

Negotiations

1-Week

Page 23: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

Currently Available to BidNotice of Interest to Submit Quotes Due No Later Than 2-5-10

Furnish-Only H-Pile, Install-Only H-Pile and Precast Pile, CIDH Piling

Notice of Interest to Submit Quotes Due No Later Than 2-09-10Copper Cable, Fiber Optic Cable

Notice of Interest to Submit Quotes Due No Later Than 2-12-10Jack & Bore, Fencing & Handrail, Aggregates

Concrete Wall Drains, *Maintenance During Construction

Notice of Interest to Submit Quotes Due No Later Than 2-19-10Furnish Precast Inlets & Structures

Open Bid Period—Call for Quote Due DatesSound Reduction Blankets, Haz Mat Removal / Disposal, SWPPP Supply / Install

Aerial Photography,

Upcoming OpportunitiesTraffic Signals, Plywood & Lumber, CIP Column Forms

Minor Demolition, HDPE Corrugated Pipe, 3rd Party Survey

OngoingSafety Supplies, Banners, Safety Incentives / Promotional Items

Small Tools & Supplies, Equipment Rental, Document Reprographics

Currently in Outreach

Page 24: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

*Maintenance During Construction

Graffiti RemovalLandscape / Tree / Irrigation Repairs

Sweepers, Pest / Rodent ControlMOT Supplies, Pavement RepairSignage Repair / Replacement

Minor Concrete, Trash RemovalGuard Rail Repair, Fence Repair

Drainage Cleaning, Haz Mat Clean-UpLight Repair, Metering System Repair

Concrete Barrier RepairSound Wall Repair, CMS Board Repair

“Notice of Interest” to Provide a Sub-QuoteDue No Later Than 2-12-10

All Areas of Opportunity will be bid separately.

Currently in Outreach

On-Call AgreementsFor Duration of

Construction Activity

Page 25: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

Outreach Started 4th Quarter 2009 / January 2010

QA / Testing / Inspection (March 2010)Trucking – Construction Route (March 2010)

Underground Utilities (2nd Quarter 2010)Mechanical Permanent Materials (2nd Quarter 2010)

Pile Driving (March 2010)CIDH (March 2010)

Furnish Precast / Steel Girders (February 2010)

Final Stages of Outreach

Page 26: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

I-405 Sepulveda Pass Widening Project,Contract No. C0882

Owner: Los Angeles County Metropolitan Transportation Authority (LACMTA)

PROJECT DBE PROGRAM

1ST QUARTER 201015TBAC Meeting Thursday, February 4, 2010

THANK YOU

ANY QUESTIONS?

Page 27: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

Current Solicitations Sorted by Due Date 2/3/10

To get more information on a specific solicitation, click on the solicitation number.

Number Title Type Due Date

C0958 El Monte Busway and Transit Center including amendments 1 & 2 IFB 03/01/2010

OP35902470

Contracted Transportation Services for the South Region of Los Angeles County including amendments 1, 2, 3 & 4 RFP 02/23/2010

10-0027 P865/P2020 LIGHT RAIL VEHICLE FRICTION BRAKE OVERHAUL IFB 02/18/2010

C0960 Division 9 Facility Maintenance Shop IFB 02/17/2010

10-0029 RAIL MRL FRICTION BRAKE SYSTEM OVERHAUL IFB 02/11/2010

10-0016 Steam Soap / Degreaser including Amendment 1 & 2 IFB 02/10/2010

OP33442483

Tree Trimming Services for Metro Transit Facilities including amendments 1 & 2 IFB 02/08/2010

OP63502378

Adjustable Stak System with Bridge including amendment 1, 2, 3, 4, 5 & 6 IFB 02/3/2010

10-0026

P865/P2020 LIGHT RAIL VEHICLE MOTOR ALTERNATOR REPAIR AND OVERHAUL INCLUDING AMENDMENT 1, 2 & 3 IFB 02/02/2010

10FSP04

Metro FSP Strategic Technology Plan Services including amendments 1 & 2 RFP 02/02/2010

C0959 El Monte Station Temporary Terminal IFB 02/01/2010

C0961 D/B Station Lighting and UPS Upgrade including amendment 1 IFB TBD

OP34342365 Pick Up Trucks IFB N/A

OP33432475 Division 10 and 18 CNG Upgrade, Operation, and Maintenance IFB TBD

OP33402480

Metro Red Line Civic Center Station Escalator Replacement including Amendment 1, 2, 3 & 4 IFB TBD

Industry Review

Elevator/Escalator Maintenance and Repair Services RFP N/A

OP34342407

Lube Trucks (Division Trucks, Spec No.QA-09-09) including amendment 1 IFB N/A

10-0009 Tap (Smart) Cards including amendments 1, 2, 3, 4 & 5 IFB TBD

Page 28: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

Current Solicitations Sorted by Due Date 2/3/10

OP63502388 Vertical Storage Carousels and Vertical Lift including amendment 1 & 2 IFB N/A

OP63502314R Vertical Storage Carousel including amendment 1 & 2 IFB N/A

C0949R Design-Build ATMS Computer Room Modifications IFB TBD

This information is provided as a service to those who want access to Metro through this

Internet site. The information contained in this system is subject to change at any time.

Please call 213-922-1037 or email Vendor Relations to request the most current

information available.

Additional Information

• Construction Solicitations above are also available on eBidboard website. • Contract Terms and Conditions • Future Contracting Opportunities

Copyright © 2010 Metro - Los Angeles County Metropolitan Transportation Authority

Page 29: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

# Project Description Scope of Work Project Estimate

Contract Administrator

Project Manager DEOD Manager DEOD Contract Compliance

Representative

Goal Status Anticipated Advertise Date

Professional Services1 ISO 14001 Registration and

AuditMetro is seeking to procure for ISO 14001 Lead Auditor and Certification organization to complete ISO certification process at Red Line Yard

$50,000 DonCosta Seawell, [email protected]

Cris B. Lian, [email protected]

Tashai Smith, [email protected]

Violeta Aguilos, [email protected]

No SBE % Established

To Be Determined

2 Bus Operators Ergonomics Hands-on Training

Metro is seeking a registered Occupational Therapist to conduct Bus Operators Ergonomics Hands-On Training

$42,990 Lily Lopez, [email protected]

Henry Ho, [email protected]

Tashai Smith, [email protected]

Violeta Aguilos, [email protected]

No SBE % Established

N/A

1 Artwork Tile Installation at Vermont/Beverly & Universal City subway stations

Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

$57,500 Mayumi Lyon, [email protected]

Jorge Pardo, [email protected]

Tashai Smith, [email protected]

Violeta Aguilos, [email protected]

No SBE % Established

To Be Determined

Metro is seeking a contractor to demolish, remove and dispose of specific wall tiles at 4 Metro Rail subway stations in order for future artwork murals

Potential Subcontract Opportunities by NAICS:

238910 - Demolition & Site Preparation Contractors236210 - Industrial Building Construction

Design & Construction (No Projects)

Equipment (No Projects)

Construction

5% SBE Established

2 Tile Demo/Disposal 4 Metro Rail Subway Stations

$41,000 Mayumi Lyon, [email protected]

Jorge Pardo, [email protected]

Tashai Smith, [email protected]

Barbara Thomasson, [email protected]

To Be Determined

Contract Look-Aheads Revised February 2010

DISCLAIMER All information provided above is subject to change. If you are interested in any of the projects, please contact the listed Contract Administrator and/or go to www.Metro.netClick on Doing Business with Metro and go to Contracting Opportunities and Future Contracting Opportunities for updated bid/proposal opportunities

LEGENDDALP – Disadvantaged Business Enterprise (DBE) Anticipated Levels of ParticipationSBE – Small Business EnterpriseWBE VALP – Women Business Enterprise Voluntary Anticipated Levels of Participation MBE VALP – Minority Business Enterprise Voluntary Anticipated Levels of ParticipationUDBE – Caltrans DBE Program Underutilized Disadvantaged Business EnterpriseTo Be Determined – Contact Contract Administrator for Updated InformationN/A – Formal Advertisement Not Required - Contact Contract Administrator for information

Diversity and Economic Opportunity Department 1 of 2 February 5, 2010

Page 30: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

# Project Description Scope of Work Project Estimate

Contract Administrator

Project Manager DEOD Manager DEOD Contract Compliance

Representative

Goal Status Anticipated Advertise Date

Contract Look-Aheads Revised February 2010

Material/ Supplies1 Bus - Copier Paper Metro is seeking to replenish the stock for copier paper $733,304 Tanya Allen,

[email protected]

Cathy Kaminski, [email protected]

Tashai Smith, [email protected]

Violeta Aguilos, [email protected]

No DALP % Established

4-Feb-10

2 Bus - Computer Monitor Metro is seeking to replenish 864 bus computer monitors $214,782 Tanya Allen, [email protected]

Cathy Kaminski, [email protected]

Tashai Smith, [email protected]

Violeta Aguilos, [email protected]

No DALP % Established

11-Feb-10

3 Rail - Pantograph Metro is seeking to replenish 90 rail pantographs $1,236,600 Sherri Jackson, [email protected]

Cathy Kaminski, [email protected]

Tashai Smith, [email protected]

Violeta Aguilos, [email protected]

No DALP % Established

To Be Determined

4 Aruba Wireless Controllers Metro is seeking to acquire Aruba Controllers, Access Points and parts for installation of 802.11 wireless network

$130,000 Mark Lu, [email protected]

Cathy Kaminski, [email protected]

Tashai Smith, [email protected]

Violeta Aguilos, [email protected]

No SBE % Established

To Be Determined

5 Bus - NABI Doosan Engine Repower Kits

Metro is seeking to replenish the stock for NABI-Doosan bus engine re-power kits

$6,800,000 Otto Ojong, [email protected]

Cathy Kaminski, [email protected]

Tashai Smith, [email protected]

Violeta Aguilos, [email protected]

No DALP % Established

8-Feb-10

OtherMetro is seeking a qualified contractor to provide roll-up, fire and glass/aluminum door installation, repair, and preventive maintenance services throughout Metro bus and rail transit facilities

Potential Subcontract Opportunities by NAICS:

423390 - Construction Material-Merchant2 Convenience Copier

ServicesMetro is seeking a contractor for furnishing / maintaining multi-function copiers and all supplies throughout the Metro facilities

$3,000,000 Ken Takahashi, [email protected]

Thomas Rodriguez, [email protected]

Tashai Smith, [email protected]

Violeta Aguilos, [email protected]

No DALP % Established

To Be Determined

To Be Determined

1 Roll-Up Door Repairs and Installation

$2,400,000 Robert Webb, [email protected]

Lena Babayan, [email protected]

Tashai Smith, [email protected]

Tom Singleton, [email protected]

10% DALP Established

Diversity and Economic Opportunity Department 2 of 2 February 5, 2010

Page 31: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

DEOD AWARD TRACKER REPORT

Total Awards: 98

DBE Awards:

SBE Awards:

MWBE Awards:

Total Federal Awards: Total State/Local Awards:$823,172,421 69 $802,213,058 29 $20,959,363

$10,391,827

$420,574

$90,000

01/01/2009 - 12/31/2009

Total DSMWBE Awards: $10,902,401

14 6

1

21

Disclaimer:

This report contains prime contract awards approved by the Metro Board during the report period.

Information on subcontracts reflects prime listing of subcontract activity known at time of bid. Metro does

not award direct contracts to subcontractors. This report does not capture all contracts awarded by Metro.

Contract #Award

Date

2/2/2010

Project Name Prime Award $Funding

Source

DALP/SBE/

VALP Est% Subcontractors Sub Amt.Cert

Type Ethnic Group

Run Date:

09-0004A 1/22/09 Bus - Starters H & H Auto Parts

Wholesale

Fed - FTA$726,774 DALP 5%

DBE: 0% $0

09-0005A 1/22/09 Bus - Turbocharger

Assembly

LC Turbo, Inc. Fed - FTA$3,470,376 DALP 0%

DBE: 0% $0

OP-2610-2253 1/22/09 JM Fiber Optics, Inc. $285,740 DBE Hispanic AmericanTunnel & Bridges

Protection Project Phase I

JM Fiber Optics, Inc. Fed - DOJ$1,076,628 DALP 10%

DBE: 27% $285,740

09-0004B 1/22/09 Bus - Starters Tec of California Fed - FTA$157,583 DALP 5%

DBE: 0% $0

09-0004C 1/22/09 Bus - Starters Muncie Transit

Supply

Fed - FTA$118,840 DALP 5%

DBE: 0% $0

09-0005B 1/22/09 Bus - Turbocharger

Assembly

Valley Power

Systems, Inc.

Fed - FTA$1,472,057 DALP 0%

DBE: 0% $0

Page 1 of 14

Page 32: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

Contract #Award

Date

2/2/2010

Project Name Prime Award $Funding

Source

DALP/SBE/

VALP Est% Subcontractors Sub Amt.Cert

Type Ethnic Group

Run Date:

09-0005C 1/22/09 Bus - Turbocharger

Assembly

Custom Turbo

Rebuilding, Inc.

Fed - FTA$706,986 DALP 0%

DBE: 0% $0

EN076 2/19/09 Lee Andrews Group, Inc. $272,315 DBE African American

ADvTECH Environmental, Inc. $128,209 DBE Asian Pacific American

Global Probe, Inc. $12,308 DBE Hispanic American

Martini Drilling $52,741 DBE Hispanic American

Environmental

Compliance Services

TRC Temporary

Services

Fed - FTA$2,563,934 DALP 20%

DBE: 18% $465,573

09-0011 2/26/09 Bus - Master Overhaul Kit Valley Power

Systems, Inc.

Fed - FTA$6,056,977 DALP 0%

DBE: 0% $0

OP-3344-2273 2/26/09 Macropest Exterminators $140,000 DBE Hispanic AmericanHerbicide Application Pestmaster Services,

Inc.

Fed - FTA$1,364,864 DALP 10%

DBE: 10% $140,000

08-0022A 3/26/09 Southend Janitorial Supply, Inc. $182,836 DBE African AmericanMisc. Bus Wash

Detergent

Acuity Specialty

Products, Inc., dba

Zep Sales and

Service, Inc.

Fed - FTA$3,675,011 DALP 5%

DBE: 5% $182,836

09-0013 3/26/09 Toner/Cartridges Laserlink

International, Inc.

Fed - FTA$852,508 DALP 0%

DBE: 0% $0

PS-4230-2295 3/26/09 Maroon Society, Inc. $255,625 DBE Subcontinent Asian American

T.E.M.P.S., Inc. $250,625 DBE African American

Michael R. Kodama Planning Consultants $10,000 DBE Asian Pacific American

GeoStats, LP $85,030

Emerson & Associates $5,000

System-Wide On-Board

Origin-Destination Survey

Project

NuStats Fed - FTA$1,234,727 DALP 20%

DBE: 42% $516,250

OP-3434-2224 3/26/09 Cranes Inspections,

Testing & Certification

Modern Track

Machinery, Inc.

Fed - FTA$1,230,581 DALP 0%

Page 2 of 14

Page 33: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

Contract #Award

Date

2/2/2010

Project Name Prime Award $Funding

Source

DALP/SBE/

VALP Est% Subcontractors Sub Amt.Cert

Type Ethnic Group

Run Date:

DBE: 0% $0

PS-4350-2327 3/25/09 Purchase of Bicycle

Lockers and Racks

Hannan Specialties,

Inc.

Fed - FTA$420,479 DALP 0%

DBE: 0% $0

09-0025 4/23/09 Bus - Tubing Kits R.T. Welding &

Fabrication

Fed - FTA$248,905 DALP 0%

DBE: 0% $0

C0882 4/23/09 Bullock & Associates $650,000 DBE African American

Earth Mechanics, Inc. $1,371,000 DBE Asian Pacific American

F P L and Associates, Inc. $1,904,000 DBE Asian Pacific American

Valle & Associates Civil Engineering Consultants, Inc.$650,000 DBE Hispanic American

Drill Tech Drilling & Shoring, Inc. $16,000,000

Western Paving Contractors, Inc. $6,000,000

Lynn Capouya, Inc. $1,261,000

Brutoco Engineering & Construction $5,000,000

Kleinfelder West, Inc. $3,841,000

Rock Bottom Inc./Landco Environmental $4,000,000

HNTB Corporation $37,048,000

Flashco, Inc. $5,000,000

CMC Regional Steel $11,000,000

Psomas $689,000

Applied Research Associates, Inc. $185,000

Traffic Solutions, Inc. $7,000,000

L. Johnson Construction, Inc. $4,000,000

Mass Electrical Construction Company $4,000,000

I-405 Sepulveda Pass

Widening Project

(Design- Build) Design

(14%) Construction (25%)

Kiewit Pacific

Company

Fed - FHWA$720,922,000 DALP 0%

DBE: 1% $4,575,000

09-0009 4/23/09 Bus - Batteries Interstate Battery

System of Eastern

Los Angeles

Fed - FTA$3,398,685 DALP 0%

DBE: 0% $0

Page 3 of 14

Page 34: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

Contract #Award

Date

2/2/2010

Project Name Prime Award $Funding

Source

DALP/SBE/

VALP Est% Subcontractors Sub Amt.Cert

Type Ethnic Group

Run Date:

PS-4370-2316 4/23/09 Sharon Greene and Associates $48,725 DBE Caucasian Fem

KPMG LLP $101,545

Nossaman LLP $40,660

Englander and Associates $15,950

Halcrow, Inc. $71,680

Public Private Partnership

Consulting Services

InfraConsult LLP Fed - FTA$397,535 DALP 10%

DBE: 12% $48,725

09-0018 4/23/09 Red Line Wheels Penn Machine

Company

Fed - FTA$501,600 DALP 0%

DBE: 0% $0

PS-7140-2313-1 4/23/09 Interviewing Services of America $0Market Research Bench Action Research, Inc. Fed - FTA$0 DALP 15%

DBE: 0% $0

09-0026 4/23/09 Bus - Re-Power Hydraulic

Hose New Flyer Low

Floor ISLG

California Industrial

Rubber Co. Inc.

Fed - FTA$527,128 DALP 0%

DBE: 0% $0

PS-7140-2313-2 4/23/09 T.E.M.P.S., Inc. $0 DBE

Fred Britton $0

Interviewing Services of America $0

Market Research Bench Applied Management

& Planning Group

Fed - FTA$0 DALP 15%

DBE: 0% $0

PS-7140-2313-3 4/23/09 I/H/R Research Group $0Market Research Bench BW Research

Partnership

Fed - FTA$0 DALP 15%

DBE: 0% $0

PS-7140-2313-4 4/23/09 Scientific Telephone Samples $0

Adept Consulting $0

Universal Survey Center $0

Market Research Bench EMC Research, Inc. Fed - FTA$0 DALP 15%

DBE: 0% $0

Page 4 of 14

Page 35: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

Contract #Award

Date

2/2/2010

Project Name Prime Award $Funding

Source

DALP/SBE/

VALP Est% Subcontractors Sub Amt.Cert

Type Ethnic Group

Run Date:

PS-7140-2313-5 4/23/09 Kandi Reyes and Associates $0 DBE

Garcia Research Associates, Inc. $0 DBE

Research America, Inc. $0

Meczka Marketing/Research/Consulting Inc. $0

McGuire Research Services $0

Scientific Telephone Samples $0

Communications Center, Inc. $0

Verbatim Response $0

Atkins Research Group, Inc. $0

Market Research Bench Fairbank, Maslin,

Maullin & Associates

Fed - FTA$0 DALP 15%

DBE: 0% $0

PS-7140-2313-6 4/23/09 T.E.M.P.S., Inc. $0 DBE

Malvada Group $0 DBE

Market Research Bench Moore & Associates,

Inc.

Fed - FTA$0 DALP 15%

DBE: 0% $0

PS-7140-2313-7 4/23/09 Facts 'n Figures $0Market Research Bench Q&A Research Fed - FTA$0 DALP 15%

DBE: 0% $0

PS-7140-2313-8 4/23/09 Market Research Bench Redhill Group Fed - FTA$0 DALP 15%

DBE: 0% $0

09-0017-B 5/25/09 AC / Air Compressors Tec of California Fed - FTA$51,734 DALP 0%

DBE: 0% $0

OP-3960-2134R 6/1/09 JM Fiber Optics, Inc. $2,461,005 DBE Hispanic American

Fujitsu NetworkCommunications Inc. $20,000

Fiber Optic Rail

Communications System

JM Fiber Optics, Inc. Fed - FTA$2,481,005 DALP 0%

DBE: 99% $2,461,005

OP-3960-2116 6/25/09 Technology Resource Center $108,804 DBEATMS Backup Voice

Radio Site (Disaster

Recovery)

Motorola, Inc. Fed - DOJ$1,222,829 DALP 0%

DBE: 9% $108,804

Page 5 of 14

Page 36: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

Contract #Award

Date

2/2/2010

Project Name Prime Award $Funding

Source

DALP/SBE/

VALP Est% Subcontractors Sub Amt.Cert

Type Ethnic Group

Run Date:

09-0017-A 6/25/09 AC / Air Compressors TK Services, Inc. Fed - FTA$895,336 DALP 0%

DBE: 0% $0

PS-6250-2297 6/25/09 Saundra J. Edwards LMFT $47,544 DBE African American

World's Printing & Specialties Co., Ltd. $26,140 DBE African American

Robert Lank, LMFT, NAADAC $4,500

Hope Morrow, LMFT $3,600

Employee Assistance

Program

Compsych

Corporation

Fed - FTA$986,400 DALP 6%

DBE: 7% $73,684

09-0023-A 6/25/09 Bus - Janitorial Paper Empire Cleaning

Supply

Fed - FTA$13,682 DALP 0%

DBE: 0% $0

PS-09-6430-2436 6/25/09 Gateway Headquarters

Building Data Center

Cleaning

Value Facility

Services, Inc.

Fed - FTA$273,600 DALP 0%

DBE: 0% $0

09-0029-A 6/25/09 Bus - Manifolds North American Bus

Industries (NABI)

Fed - FTA$439,643 DALP 0%

DBE: 0% $0

PS-9240-2354 6/25/09 Point-To-Point Dedicated

Fiber Optic Cable

Services

Time Warner Cable,

Inc.

Fed - FTA$2,222,220 DALP 0%

DBE: 0% $0

09-0016-B 6/25/09 M. L. Filters $140,773 DBE Hispanic AmericanBus PMP Filters Phase II M. L. Filters Fed - FTA$140,773 DALP 0%

DBE: 100% $140,773

PS-5211-2310 6/25/09 Unisource Group $97,115 DBE African AmericanEmployee Benefits

Consulting Services

Mercer Human

Resources

Consulting

Fed - FTA$1,516,171 DALP 15%

Page 6 of 14

Page 37: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

Contract #Award

Date

2/2/2010

Project Name Prime Award $Funding

Source

DALP/SBE/

VALP Est% Subcontractors Sub Amt.Cert

Type Ethnic Group

Run Date:

DBE: 6% $97,115

09-0016-A 6/25/09 Bus PMP Filters Phase II H & H Wholesale

Parts

Fed - FTA$139,436 DALP 0%

DBE: 0% $0

09-0023-B 6/25/09 Bus - Janitorial Paper Central Sanitary

Supply

Fed - FTA$1,951 DALP 0%

DBE: 0% $0

09-0023-C 6/25/09 Bus - Janitorial Paper Gale Supply

Company

Fed - FTA$1,608,973 DALP 0%

DBE: 0% $0

09-0017-C 6/25/09 AC / Air Compressors Carrier Transicold Fed - FTA$461,563 DALP 0%

DBE: 0% $0

09-0017-D 6/25/09 AC / Air Compressors Cummins Cal

Pacific, LLC.

Fed - FTA$985,629 DALP 0%

DBE: 0% $0

09-0029-B 6/25/09 Bus - Manifolds Valley Power

Systems, Inc.

Fed - FTA$3,749,316 DALP 0%

DBE: 0% $0

09-0019 7/23/09 Rail Carbon Strips Schunk Graphite

Technology

Fed - FTA$378,162 DALP 0%

DBE: 0% $0

09-0028 7/23/09 Bus Engines - Cummins

8.9 ISLG

Cummins Cal

Pacific, LLC.

Fed - FTA$7,495,708 DALP 0%

DBE: 0% $0

Page 7 of 14

Page 38: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations
Page 39: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

Contract #Award

Date

2/2/2010

Project Name Prime Award $Funding

Source

DALP/SBE/

VALP Est% Subcontractors Sub Amt.Cert

Type Ethnic Group

Run Date:

10-0005 10/22/09 Bus - NABI 7000 Series

Repower Installation Kit

Cummins Cal

Pacific, LLC.

Fed - FTA$5,420,796 DALP 0%

DBE: 0% $0

09-0015 12/10/09 Bus - Bellows Neopart LLC Fed - FTA$1,287,516 DALP 0%

DBE: 0% $0

09-0014R 12/10/09 Bus - Differentials North American Bus

Industries (NABI)

Fed - FTA$1,493,124 DALP 0%

DBE: 0% $0

10-0003 12/10/09 Bus - Paint Rollers/Sand

Paper

W.I.S.E Inc. Fed - FTA$382,408 DALP 0%

DBE: 0% $0

OP-3344-2073 12/10/09 Graffiti Paint-Out Services

for Metro Rail Facilities

Graffiti Control

System

Fed - FTA$430,000 DALP 0%

DBE: 0% $0

09-0014R 12/10/09 Bus - Differentials Truck Trailer and

Transit

Fed - FTA$419,754 DALP 0%

DBE: 0% $0

09-0014R 12/10/09 Bus - Differentials Gillig, LLC Fed - FTA$570,324 DALP 0%

DBE: 0% $0

09-0014R 12/10/09 Bus - Differentials America Moving

Parts

Fed - FTA$95,417 DALP 0%

DBE: 0% $0

09-0014R 12/10/09 Bus - differentials Neopart LLC Fed - FTA$44,361 DALP 0%

Page 9 of 14

Page 40: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

Contract #Award

Date

2/2/2010

Project Name Prime Award $Funding

Source

DALP/SBE/

VALP Est% Subcontractors Sub Amt.Cert

Type Ethnic Group

Run Date:

DBE: 0% $0

09-0014R 12/10/09 Bus - Differentials New Flyer Industries

Canada ULC

Fed - FTA$9,579 DALP 0%

DBE: 0% $0

09-0015 12/10/09 Bus - Bellows North American Bus

Industries (NABI)

Fed - FTA$402,410 DALP 0%

DBE: 0% $0

09-0015 12/10/09 Bus - Bellows New Flyer Industries

Canada ULC

Fed - FTA$95,896 DALP 0%

DBE: 0% $0

09-0015 12/10/09 Bus - Bellows Daimler Buses North

America Inc.

Fed - FTA$50,238 DALP 0%

DBE: 0% $0

PS09713041 1/1/09 Nielsen, Merksamer,

Parrinello, Mueller &

Naylor

Nielsen, Merksamer,

parrinello, Mueller &

naylor

State - Local$102,000 SBE 0%

SBE: 0% $0

PS09713040 1/1/09 Shaw Yoder, Inc Shaw Yoder, Inc. State - Local$120,000 SBE 0%

SBE: 0% $0

PS09713043 1/1/09 MTA State Legislative

Advocacy

Fernandez

Government Solution

State - Local$110,400 SBE 0%

SBE: 0% $0

PS-09-6010-ADA01 2/1/09 Ellen Blackman Consulting $5,862 SBE Caucasian FemSeniors on the Move and

Development of

Countywide Volunteer

Travel Training Program

A M M A State - State$30,000 SBE 10%

Page 10 of 14

Page 41: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

Contract #Award

Date

2/2/2010

Project Name Prime Award $Funding

Source

DALP/SBE/

VALP Est% Subcontractors Sub Amt.Cert

Type Ethnic Group

Run Date:

SBE: 20% $5,862

PS-4310-1268-11-1-13 2/3/09 Sarakki Associates Inc. $49,034 SBE Subcontinent Asian AmericanRIITS Network / Foothill

Transit Interface

Delcan Corporation

(dba National

Engineering

Technology Com)

State - Local$488,956 SBE 10%

SBE: 10% $49,034

PS-4320-2195 2/26/09 Metro Reserved Parking

Management Concession

Clancy Systems

International, Inc.

State - Local$1,022,000 SBE 0%

SBE: 0% $0

PS-4220-2148 3/20/09 Clean Fuel Connection, Inc $15,000

Ray Gorski $57,500

Air Quality Specialist The Better World

Group, Inc

State - Local$139,135 SBE 5%

SBE: 0% $0

PS-4220-2287 3/20/09 Arellano Associates $180,108 SBE Hispanic American

Willdan Financial Services $150,145

ABL, Inc. $60,000

Congestion Mitigation Fee

- Step 2: Project

Selection, Estimating

Project Costs, and

Confirming Growth

Forecasts

Cambridge

Systematics, Inc.

State - Local$932,718 SBE 15%

SBE: 19% $180,108

PS-09-0521-03 3/26/09 RFP for Multi-Year

Contract for Arbitrage

Rebate Calculation

Service

Bond Logistix LLC State - Local$300,000 SBE 0%

SBE: 0% $0

OP-3960-2303 3/26/09 MBL & MRL Switch

Machine Rehabilitation

Rail Development

Group

State - Local$268,800 SBE 0%

SBE: 0% $0

TBD 3/26/09 GE Transportation Parts General Electric

Transportation Parts,

LLC

State - State$885,426 SBE 0%

Page 11 of 14

Page 42: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

Contract #Award

Date

2/2/2010

Project Name Prime Award $Funding

Source

DALP/SBE/

VALP Est% Subcontractors Sub Amt.Cert

Type Ethnic Group

Run Date:

SBE: 0% $0

PS-4220-2347 6/5/09 AFSHA Consulting, Inc. $19,820 SBE OtherReview of SCAG

Demographic Forecasts

and Land Use Study for

LA County

IBI Group State - Local$54,791 SBE 15%

SBE: 36% $19,820

PS-4310-1268-11-1-14 7/1/09 Metro's Regional

Integration of ITS (RIITS)

Network Maintenance and

Operation

Delcan Corporation

(dba National

Engineering

Technology Com)

State - Local$332,451 SBE 10%

SBE: 0% $0

PS-5210-2337 7/23/09 Banking Custody,

Performance Reporting

and Compliance

Monitoring Services

U.S. Bank

Institutional Trust &

Custody

State - State$1,423,750 SBE 0%

SBE: 0% $0

PS-6350-2322 7/23/09 Procurement Contract

Management System

Solec Enterprise

Solutions

State - Local$113,900 SBE 0%

SBE: 0% $0

PS-4310-1268-05-03-3 9/15/09 Package 11 Soundwalls

with Bridge Widening

Project

CH2M HILL, Inc. State - State$3,883,784 SBE 15%

SBE: 0% $0

PS-4430-2372 9/24/09 MA and Associates, CPA $80,319 SBE Asian Pacific American

Extended Resources $85,431 SBE Asian Pacific American

FY 2007-2209 TDA

Triennial Performance

Review

Moore & Associates,

Inc.

State - State$610,582 SBE 10%

SBE: 27% $165,750

OP-3960-2422 10/22/09 Audio Frequency Track

Circuit Replacement

Alstom Signaling Inc. State - Local$1,176,450 SBE 0%

SBE: 0% $0

Page 12 of 14

Page 43: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

Contract #Award

Date

2/2/2010

Project Name Prime Award $Funding

Source

DALP/SBE/

VALP Est% Subcontractors Sub Amt.Cert

Type Ethnic Group

Run Date:

PS-5210-2418 12/10/09 Sales Tax Audit and

Forecasting

MuniServices, LLC State - Local$110,000 SBE 0%

SBE: 0% $0

OP-3960-2151 1/22/09 ATMS 508 MHz

2-Channel Integration

Project

Motorola, Inc. State - Local$1,195,826 VALP 0%

MBE: 0% $0

WBE: 0% $0

OP-3434-2264 1/22/09 Longo Toyota $0Mid Size Utility Hybrid

Vehicles

Reynolds

Buick/Pontiac/GMC

Trucks, Inc.

State - Local$703,150 VALP 0%

MBE: 0% $0

WBE: 0% $0

OP-3434-2261 2/26/09 Bucket Trucks Reynolds

Buick/Pontiac/GMC

Trucks, Inc.

State - Local$283,097 VALP 0%

MBE: 0% $0

WBE: 0% $0

C0891 3/9/09 Storms & Lowe $90,000 MBE Asian Pacific American

Taft Electric $758,658

Sierra Monitor Corp. $137,338

AMS America $625,185

DMG Corp. $90,000

RMS Life Safety $758,658

Metro Support Service

Center Building 5 CNG

Modification

EFS West State - Local$1,000,000 VALP 30%

MBE: 9% $90,000

WBE: 0% $0

OP-3434-2212 6/25/09 Ballast Regulator Knox Kershaw, Inc. State - Local$373,565 VALP 0%

MBE: 0% $0

WBE: 0% $0

OP-3434-2282A 6/25/09 Speed Swing SWNG, Inc. State - Local$874,795 VALP 0%

MBE: 0% $0

WBE: 0% $0

OP-3434-2339 6/25/09 Hi-Rail Tow Vehicle for

Train Cars-Rail

Brandt Road Rail

Corporation

State - Local$866,957 VALP 0%

Page 13 of 14

Page 44: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

Contract #Award

Date

2/2/2010

Project Name Prime Award $Funding

Source

DALP/SBE/

VALP Est% Subcontractors Sub Amt.Cert

Type Ethnic Group

Run Date:

MBE: 0% $0

WBE: 0% $0

OP-3434-2254 9/24/09 Standard Pick Up Trucks

with Regular Bed

Thorson GMC

Truck-Buick Motor

Co., Inc.

State - Local$856,847 VALP 0%

MBE: 0% $0

WBE: 0% $0

OP-3960-2371 9/24/09 Front Loader Tractor Volvo Construction

Equipment and

Services

State - Local$244,743 VALP 0%

MBE: 0% $0

WBE: 0% $0

OP-3960-2419 10/22/09 Wayside Workers

Protection Project

ProTran1 LLC State - Local$2,455,240 VALP 0%

MBE: 0% $0

WBE: 0% $0

Legend:

DALP - Disadvantaged Business Enterprise Anticipated Levels of Participation

SBE - Small Business Enterprise

MBE VALP - Minority Business Enterprise Voluntary Anticipated Levels of Participation

WBE VALP - Women Business Enterprise Voluntary Anticipated Levels of Participation

Note: Contracts not listing DALP, SBE or M/WBE percentage/dollars indicate Prime Contractor did

not list certified firms in its Bid or Proposal. On Indefinite Delivery Contracts and Task Order

Contracts exact dollar amounts are not known at time of Bid/Proposal. In this case, Prime

Contractors list certified firms without known percentage/dollar amounts.

Page 14 of 14

Page 45: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations
Page 46: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations
Page 47: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations
Page 48: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations
Page 49: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations
Page 50: February 4, 2010 - Agenda - Transportation Business ... · Universal City subway stations Metro is seeking a contractor to install of Artwork Tile Murals at 2 Metro Rail subway stations

TRANSPORTATION BUSINESS ADVISORY COUNCIL (TBAC)

Calendar of Events

January 2010 to December 2010 Thursday, January 7, 2010 Gateway Plaza Conference Room, 3rd Floor 8:30 AM - 9:30 AM Committee Meeting 9:30 AM – 11:00 AM Regular Meeting

Thursday, January 28, 2010 Meet the Primes 5:30 PM – 8:30 PM Metro Plaza Lobby, Board Room, 3rd Floor Lobby

Thursday, February 4, 2010 Gateway Plaza Conference Room, 3rd Floor 8:30 AM - 9:30 AM Committees Meeting 9:30 AM – 11:00 AM Regular Meeting

Thursday, March 4, 2010 Gateway Plaza Conference Room, 3rd Floor 8:30 AM - 9:30 AM Committees Meeting 9:30 AM – 11:00 AM Regular Meeting

Thursday, April 1, 2010 Gateway Plaza Conference Room, 3rd Floor 8:30 AM - 9:30 AM Committees Meeting 9:30 AM – 11:00 AM Regular Meeting

Thursday, May 6, 2010 Gateway Plaza Conference Room, 3rd Floor 8:30 AM - 9:30 AM Committees Meeting 9:30 AM – 11:00 AM Regular Meeting

Thursday, June 3, 2010 Gateway Plaza Conference Room, 3rd Floor 8:30 AM - 9:30 AM Committees Meeting 9:30 AM – 11:00 AM Regular Meeting

Thursday, July 1, 2010 Gateway Plaza Conference Room, 3rd Floor 8:30 AM - 9:30 AM Committees Meeting 9:30 AM – 11:00 AM Regular Meeting

Thursday, August 5, 2010 No Session

Thursday, September 2, 2010 Gateway Plaza Conference Room, 3rd Floor 8:30 AM - 9:30 AM Committees Meeting 9:30 AM – 11:00 AM Regular Meeting

Thursday, October 7, 2010 Gateway Plaza Conference Room, 3rd Floor 8:30 AM - 9:30 AM Committees Meeting 9:30 AM – 11:00 AM Regular Meeting

Thursday, November 4, 2010 Gateway Plaza Conference Room, 3rd Floor 8:30 AM - 9:30 AM Committees Meeting 9:30 AM – 11:00 AM Regular Meeting

Thursday, December 2, 2010 Gateway Plaza Conference Room, 3rd Floor 8:30 AM - 9:30 AM Committees Meeting 9:30 AM – 11:00 AM Regular Meeting

Note: Calendar of Events subject to change