February 20, 2006
Nodal Architecture Overview
Jeyant Tamby20 Feb 2006
February 20, 2006
Agenda
• Background
• Document Goals and Intended Audience• System Overview• Component Systems• Data Interface Requirements• Hardware Conceptual Design• User Interface Design
• Hardware Costs– Objective– Methodology– Assumptions– Summary
February 20, 2006
Document Goals and Intended Audience
• Information Technology (IT) Centric view on Nodal Market Systems Architecture
• Provide an understanding of ERCOT IT systems and their interrelationships to support the Nodal Market.
• Base point for– Risk and Feasibility Analysis– HW and Data Center Plans– Project Delivery Patterns
• Status:– Draft version– Living document that will evolve as we move forward
February 20, 2006
System Overview
• Functions that are changing– Infrastructure, Training, Testing
– Energy Management– Market Management
• Day Ahead Market Management
• Real Time Market Management
– Commercial Systems
– Reporting/Archiving
– Network Model Management
– External Interfaces• Portal
• XML
• ICCP/RTU
– Changes in one system may have impacts on other systems
• Effects sequencing of projects
• Impacts amount of regression testing
• Functions that do not have major changes
– Retail Transactions
– Registration
– External Interfaces - EDI
XMLERCOT.
com
Energy Management
Network Model Management
Day AheadMarket Management
Real TimeMarket Management
External Interfaces
Retail Transactions
Commercial Systems
Registration
Reporting/ Archiving - Information Systems
ICCP/RTUPortalEDI
Infrastructure, Training, Testing
Credit Monitoring
& other MMS
Legend:
Interfaces
Core Systems
Support Systems
Information Services
Systems with major changes
February 20, 2006
Network Model Management System
• Maintains the accuracy of the Transmission Model that underlies all grid calculations
• Changes may come from new facilities or changes to limits
• Critical in modeling congestion and outages and determining solutions
EnergyManagement
Network Model Management
Day AheadMarket Management
Real TimeMarket Management
& other MMS
Registration ICCP/RTU
February 20, 2006
Energy Management Systems
• Provides information and tools for the real time monitoring and secure operation of the grid
• Mission critical: fault tolerant and highly available
• Increased operator workload
– Redesign information presentation
– Increase decision support
Day AheadMarket Management
Real TimeMarket Management
& other MMS
Reporting/Archiving - Information Services
Network Model Management
ICCP/RTU
SC
AD
A
State Estimator
Load Forecast/Renweable Power
Production Forecast
RT Network Security Application
Outage studies
Load Frequency control
Stability (VSA/DSA)
Real Time Performance Monitoring
Dynamic Rating
RUC Network Security Application
Limit Calculator
CRR SFT
DAM SFT
System studies
Weather Forecast
February 20, 2006
Market Management Systems
• Provides tools and information for CRR auction, Day Ahead Markets, and Real Time Markets and congestion
• Mission critical: fault tolerant and highly available
• Complexity of correlating the various data sources with the tools will increase
• Increased operator workload– Redesign information presentation– Increase decision support
Day Ahead Energy/AS/CRR
Verbal Dispatch Instructions
Supplemental AS
Reliability Unit Commitment
Real Time/SCED/LMP
Outage Scheduler
Current Operating Plan
CRR Auction
CommercialSystems
Registration
Reporting/Archiving -Information Services
Portal
EnergyManagement
Web Services
February 20, 2006
Commercial Systems
• Generates Settlement Statements and Invoices, including revisions as required; manages load profiling, metering, and renewable energy credits
• Must be able to recover within 24 hours
• Change in interval and granularity of bids will greatly increase amount of data
Retail
Transactions
Settlement and Billing
Load Profiling & Aggregation
Metering
Renewable Credit
Financial Transfer
Day Ahead
Market ManagementReal Time
Market Management
Reporting/Archiving - Information Services
CreditMonitoring
& other MMS
February 20, 2006
Information Services – Enterprise Data Warehouse
Shareplex
EnergyManagement
Day AheadMarket Management
MMSReal Time
Market Management
CommercialSystems
ReplicatedSourceSystem
OperationalData Store
ReportNetReports and
Extracts
Portal ERCOT.comWeb
Services
Retail Transactions
DataWarehouse
February 20, 2006
Data Interface Requirements
Market Interface (/XML/Portal)Market
Interface (ICCP/RTU)
Day Ahead Energy/CRR/AS
SCADA
Nodal Architecture Diagram Level 2
Verbal Dispatch Instructions
State Estimator
Supplemental Ancillary Services
Reliability Unit Commitment
Real Time/SCED/LMP
Load Forecast / Renewable
Power Production Forecast
RT Network Security Application
Outage studies
Load Frequency
control
Stability (VSA/DSA)
Outage Scheduler
Current Operating Plan
Real Time Performance Monitoring
CRR Auction CRR SFT
System studies
Dynamic Rating
Weather Forecast
DAM SFT
Network Model Management
System
RUC Network Security
Application
Limit Calculator
Registration System
Settlement and Billing
Retail Transactions
Compliance Monitoring
Credit Monitoring
Market Monitoring/
Market Analysis
Enterprise Data Warehouse/ Enterprise Information Service
Load Profiling &
Aggregation
Metering
Renewable Credit
Market Participant
Reports/Extracts
Financial Transfer
RT Data Historian
Market Interface (EDI)External Data
Interface (XML)
February 20, 2006
Hardware Conceptual Design
Three types of servers
• Server A is powerful (typically 64 cpu) machine that can be configured to represent multiple servers in multiples of 4 cpu blocks and can address 1 TB RAM
• Server B is a standalone server with up to 4 cpu and can address 32 GB RAM
• Server C is a standalone with up to 2 cpu and can address 4 GB RAM
February 20, 2006
User Interface Design
• The design of the user interface will be based on a task oriented structure. This will involve the following:– task definition/analysis– workload analysis– job definition– tool requirements definition– tool design and testing– tool development and testing– console operations validation and testing
February 20, 2006
Hardware Costs – Objective
• Use a bottom up approach to come up with a total $ amount for hardware and standard software licenses.
• To develop a budget
• Document assumptions and reasons for later review
February 20, 2006
Hardware Costs – Methodology
• Analyze individual functionality and determine what level of computation power is required using the current production hardware as a reference. Use the “CELL” concept.
• Document assumptions/reasoning for computation requirements• Evaluate the computation requirements for the following environments:
Primary, Failover, ITEST, Development, MOTE, OTS, MOMS, Vendor• Server A type cells currently available in the market are 3 times more
powerful than the ERCOT production environment equivalent Server A cells. Scale the cell requirements down by 3.
• Server A cell type is a 4 cpu, 1 TB RAM unit of computation power ($150,653.35 per cell)
• Server B cell type is a 4 cpu, 32 GB RAM unit of computation power ($27,500 per cell)
• Server C cell type is a 2 cpu, 4 GB RAM unit of computation power ($6,500)
February 20, 2006
Hardware Costs - Assumptions
• This estimate does not include Supporting Infrastructure:– Facilities– Cabling– Networking– Storage frames– Switches– Tape backup– Disk storage
• Certain functions may be partly funded by the PPL.• The Server A proposed for Nodal is the equivalent of an HP SuperDome• Nodal Application architecture is similar to Current Zonal Architecture• The number of cells and their type for individual functions is a measure
of the required computation power. It does not necessarily mean the server type to be procured.
• DB Software license is based on Enterprise Edition with RAC and partitioning. Per CPU and Per Named User license models are used.
• Operating System Cost is imbedded in the “CELL” cost.
February 20, 2006
Hardware Costs – Summary ($ million)
Total = $26.12 million
Environments
Component Total Primary Failover/ Load Balancing
ITEST Dev MOMS MOTE OTS Vendor
NMMS 1.07 0.25 0.25 0.25 0.16 0.16
EMS 6.7 1.3 1.3 1.3 0.65 0.20 0.65 0.65 0.65
MDB 1.7 0.30 0.30 0.30 0.2 0.15 0.15 0.15 0.2
DAM/Sup AS 1.65 0.30 0.30 0.30 0.15 0.15 0.15 0.15 0.15
DRUC 1.65 0.30 0.30 0.30 0.15 0.15 0.15 0.15 0.15
HRUC 2.75 0.50 0.50 0.50 0.25 0.25 0.25 0.25 0.25
SCED 2.75 0.50 0.50 0.50 0.25 0.25 0.25 0.25 0.25
CRR Auction 1.50 0.25 0.25 0.25 0.15 0.15 0.15 0.15 0.15
CRR Trading 0.5 0.10 0.10 0.10 0.05 0.05 0.05 0.05
Billing & Settlements
2.1 0.60 0.60 0.60 0.30
EMMS RSS 0.35 0.20 0.10 0.05
L* RSS 0.6 0.30 0.15 0.15
ODS 2.8 0.80 0.80 0.80 0.4
February 20, 2006
Hardware Costs – Summary
DB Software Licenses:
• Work in progress. Numbers are preliminary.
• Licensing is one time, support cost is per year and depends on type of license purchased.
• Per Processor license is $70,000, Support is $15,400.
• Per Named User license is $1,400, Support is $308.
• Existing licenses have not been discounted.
Total DB Software License= $9.8 million