Transcript of Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary...
![Page 1: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/1.jpg)
Feasibility of Offshore Wind Power in the South Atlantic Bight
Bill Bulpitt, Susan Stewart, Mary Hallisey HuntGeorgia Tech Strategic Energy Institute
Southeastern Energy SocietyNovember 20, 2006
![Page 2: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/2.jpg)
Background• NSF Funded InfinitEnergy: A Coastal Georgia
Partnership for Innovation – Search for alternative energy options to stimulate
economic opportunities for Coastal Georgia region.• Strategic energy technology assessments • Determine potential for implementation
• Initial assessments of offshore wind potential in coastal Georgia merited further study
• Approached local utility to perform a detailed conceptual design study for an offshore wind farm
![Page 3: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/3.jpg)
South Atlantic Bight Wind Resource
• Bight definition:– Long gradual bend or recess in
coastline forming large open bay.– Describes coastal ocean between
South Carolina and Florida.
• 140 km wide continental shelf• Off of Georgia’s coast alone:
– < 20m deep: ~8,000 sq.km– < 30m deep: ~12,800 sq.km
![Page 4: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/4.jpg)
South Atlantic Bight Wind Resource
(continued)
• Rare offshore wind data available:– 50 m high anemometer– Online since June 1999 (nearly 7 years)– 27 m deep water, 60 km offshore– 6-minute data averages
![Page 5: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/5.jpg)
Grays Reef Buoy
R2 Tower
Savannah Light Tower
![Page 6: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/6.jpg)
R2 Tower Annual Average Wind Speeds
7.13
6.95
7.10
7.37
7.72 7.69
6.5
7.0
7.5
8.0
8.5
1999 2000 2001 2002 2003 2004 2005 2006Year
Av
era
ge
An
nu
al
Win
d S
pe
ed
(m
/s)
R2 Tower @ 50m
Overall Annual Average, 7.36 m/s
![Page 7: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/7.jpg)
Average Annual Wind Speed Comparisons at 50 m
0
1
2
3
4
5
6
7
8
9
10
1985 1990 1995 2000 2005
Year
Ave
rag
e A
nn
ua
l Win
d S
pe
ed
(m
/s)
Savannah Light Tower @ 50m
Gray's Reef Buoy @ 50m
R2 Tower @ 50m
![Page 8: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/8.jpg)
R2 Tower Monthly Average Wind Power Density (W/m2)
0
200
400
600
800
1000
1 2 3 4 5 6 7 8 9 10 11 12
Month
6 Y
ear
Mo
nth
ly A
ver
ag
e W
ind
Po
we
r (W
/m^
2) a
t 5
0 m
Class: 7
5
6
4 3
1
2
![Page 9: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/9.jpg)
![Page 10: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/10.jpg)
Wind Farm Conceptual Design Study
• Working with Southern Company on a detailed feasibility study of an offshore wind farm in Coastal Georgia.
• Teams incorporating both entities working on project tasks.
• Interaction with State, DOE,MMS, turbine vendors, and environmental organizations throughout study
![Page 11: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/11.jpg)
Update on Project Tasks
• Wind Turbine Technology Review
• Turbine Foundation and Platform Options
• Selection of Offshore Sites/Interconnection Points
• Submarine Cabling Requirements
• South Atlantic Bight Benefits & Concerns– Environmental and other issues
![Page 12: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/12.jpg)
Wind Turbine Technology
• 3 major offshore wind turbine vendors– Others have not “weatherized” products for
this environment.– Visited vendors’ projects in Europe
• Discussions with vendor sales reps
![Page 13: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/13.jpg)
Arklow
![Page 14: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/14.jpg)
Arklow
![Page 15: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/15.jpg)
Project Statistics• Turbines 3.6MW x 7• Dept of piles 35-45m• Weight of piles 280tonne (5m diameter)• Weight of turbines 290tonne• Blades 50.5m, 15tonne each• Nacelle/Hub height 73.5M• Rotational speed 8.5 – 15 rpm• Distance offshore 10km• Onshore cable 5km• Voltage 38kV distribution connected• Rotor diameter 104m > soccer pitch area• 25MW serves 16,000 households (Irish)
• Sandbank 24 miles long & 2.5 wide, depths 3 -20 m• Largest commercially operating turbines installed to date• Largest consented offshore site todate
Source: McAdam
![Page 16: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/16.jpg)
Scroby Sands
![Page 17: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/17.jpg)
Scroby Sands
Country: United KingdomLocation: East Anglian Coast, 3km east of Great YarmouthTotal Capacity: 60 MWNumber of Turbines: 30Distance to Shore: 2.5 kmDepth: 4-8 mCapital Costs: about 110 million EuroStatus: BuiltConstruction Date: 2003Manufacturer: VestasTotal Capacity: 2 MWTurbine-type: V80 - 80m diameter/ 60m hubheightMean Windspeed: 7.5 m/s Windfarm Developer: E.ON UK
![Page 18: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/18.jpg)
Horns Rev
![Page 19: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/19.jpg)
Horns RevCountry: DenmarkLocation: West CoastTotal Capacity: 160 MWNumber of Turbines: 80Distance to Shore: 14-20 kmDepth: 6-12 mCapital Costs: 270 million EuroStatus: Operational Construction Date: 2002 Manufacturer: VestasTotal Capacity: 2 MWTurbine-type: V80 - 80m diameter / 70m hubheightMean Windspeed: 9.7 m/sAnnual Energy output: 600 GWhWindfarm Developer: Elsam http://www.hornsrev.dk/Engelsk/default_ie.htm
![Page 20: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/20.jpg)
Wind Turbine Technology(continued)
• Sellers Market– Demand for turbines high in Europe & Asia due to
Kyoto Protocol and other promotional programs.– May be hard to obtain equipment for use in U.S.
before 2008-2009.– Cost information difficult to acquire from vendors
• They require a review in great detail of wind farm potential
• PTC “on again – off again” history not helpful.
![Page 21: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/21.jpg)
Wind Turbine Technology(continued)
• Selection of a unit depends on best economics (power output for the cost) for the given wind resource.– Power output calculated from vendor power
curves using R2 data extrapolated to 80 m.
![Page 22: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/22.jpg)
Annual Capacity Factor Using Three Different Wind Turbines
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
1998 2000 2002 2004 2006
Year
Cap
acity
Fac
tor
Turbine A, 3.6 MWTurbine B, 2.3 MWTurbine C, 2.0 MW
![Page 23: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/23.jpg)
Turbine Foundation and Platform Options
• From site visits, monopile support preferable– Steel tube 4-5 m diameter driven 15-30 m into ocean floor– Water depth < 20 m
• Most expertise resides in Europe, as does the necessary equipment
• R2 Tower wave characteristics:– Significant wave height = 1.16 m– Maximum wave height = 6.3 m
![Page 24: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/24.jpg)
Selection of Offshore Sites Interconnection Points
• Geographical consistency of wind resource• Substation/landfall considerations:
– Grid interconnection access points• Proximity to coast• Operating voltage• Expansion availability• Accessibility to beach for access
– Shipping lanes– Cabling distance to shore– Cable landfall environmental impact
![Page 25: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/25.jpg)
Economics
0
2
4
6
8
10
12
14
16
2.0% 4.0% 6.0% 8.0% 10.0% 12.0% 14.0% 16.0% 18.0%
Interest Rate (%)
Cen
ts/k
Wh
50 MW Farm
100 MW Farm
160 MW Farm
20 Year Amoritization, Cost includes 1.9 cents/kWh O&M and PTC
Coal
Natural Gas Simple Cycle
Natural Gas Combined Cycle
![Page 26: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/26.jpg)
Submarine Cabling Requirements • Trench for cable:
– Prepared with water jet• Sand settles over top after cable is laid
– Depth of trench important to prevent damage from anchors and trawlers
• Georgia specific:– Submerged barrier islands– Sand filled channels (former rivers)– Shifting sands
![Page 27: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/27.jpg)
South Atlantic BightBenefits & Concerns
• Many benefits and concerns are more specific to South Atlantic Bight Region:– Environmental Issues
• Migratory pathways and habitats for– Avian species– Right whales ( critical habitat – only known calving
ground)– Sea turtles
![Page 28: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/28.jpg)
South Atlantic Bight Benefits & Concerns
(continued)– (cont.) Environmental Issues
• Warm weather– Lightning strikes– Hurricanes
» Technology developments » Statistical studies
![Page 29: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/29.jpg)
South Atlantic Bight Benefits & Concerns
(continued)
– (cont.) Environmental Issues• Fisheries
– May create an area closed to fishing– Could help increase fish populations
• Hard bottom substrates– Could be extended via wind farm foundations and scour
protection» Creating larger habitat for existing species.
![Page 30: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/30.jpg)
South Atlantic Bight Benefits & Concerns
(continued)
– Other Issues• Coexistence with military installations• Hydrography and coastal effects
– Submerged barrier islands
• Community acceptance• SocioEconomics • Viewshed
– Unpopulated stretches of coastline
![Page 31: Feasibility of Offshore Wind Power in the South Atlantic Bight Bill Bulpitt, Susan Stewart, Mary Hallisey Hunt Georgia Tech Strategic Energy Institute.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0c5503460f94af4eda/html5/thumbnails/31.jpg)
Bringing ‘Offshore’ Wind Energy into the Mainstream
• Need a pathway for development– Will vary by region due to different:
• Wind Resources• Geography• Environmental Issues• Permitting Issues• Coastal population density